A1 0675 MES REMOVAL AND STOWAGE (spd_ctc).docx
DOCX document 73 KB Posted
- Attached to
- USNS SPEARHEAD and CHOCTAW COUNTY MES
- Solicitation number
- N3220524Q0154
About this file
This statement of work outlines the removal, crating, and stowage of Marine Evacuation Systems and life rafts from the USNS SPEARHEAD and USNS CHOCTAW COUNTY. The contractor shall provide industrial support and an authorized OEM field service representative to remove the two MES units and four life rafts from their current locations. The equipment must be crated according to ISPM 15 standards and stowed in a designated location aboard the vessels. The period of performance is March 11-29, 2024 at Rhoads Industries in Philadelphia, Pennsylvania. The Navy seeks these services under solicitation number N3220524Q0154 to support the USNS SPEARHEAD and USNS CHOCTAW COUNTY.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B10 Q and A for 24Q0154.docx | DOCX document | |
| B9 RFQ N3220524Q0154.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phillip Mitchell / Larry Lowton
USNS SPEARHEAD / USNS CHOCTAW COUNTY
EPF 1 & EPF 2
CONTRACT NO. N3220523##### N322052NN3220524#####
HABITABILITY OUTFITTING AND FURNISHINGS
ITEM NO. 0675
CATEGORY "A"
2024-01-25
TEPF_MARINE EVACUATION SYSTEM (MES)REMOVAL,CRATING AND STORAGE
0675 - 1
1.0 ABSTRACT
The purpose of this item is to remove, crate and stow the Marine Evacuation System (MES) Port and Starboard on the USNS SPEARHEAD and USNS CHOCTAW COUNTY.
2.0 REFERENCES
2.1 NAVSEA Tech Manual SG516-AA-MMC-010, Marine Evacuation System Model JHVS Class
3.0 ITEM LOCATION/DESCRIPTION
3.1 Location/Quantity
3.1.1 Location
a. Stbd #1 MES (01-13-1)
b. Port #2 MES (01-13-2)
Level,
| c. Frame |
| Stbd 32 |
| 100 |
| Man |
| Life |
| Rafts, |
| SOLAS |
| Pack |
| A, |
| 03 |
| d. Frame |
| Stbd 41 |
| 100 |
| Man |
| Life |
| Rafts, |
| SOLAS |
| Pack |
| A, |
| 03 |
| e. Frame |
| Port 32, |
| 100 |
| Man |
| Life |
| Rafts, |
| SOLAS |
| Pack |
| A, |
| 03 |
| f. Frame |
| Port 41 |
| 100 |
| Man |
| Life |
| Rafts, |
| SOLAS |
| Pack |
| A, |
| 03 |
3.1.2 Quantity
a. Four (4), 2 per vessel, 17M (T/T-100P SRL B Pack Raft L/A0167/13) MES Evacuation Slide Units
b. Eight (8), 4 per vessel, 100 Person Life (link) Rafts (J/A/0479/00)
3.2 Item Description/Manufacturer’s Data
3.2.1 Description
a. 17M (T/T-100P SRL B Pack Raft – L/A0167/13) MES Evacuation Slide Units
b. 100 Person Life (link) Rafts (J/A/0479/00)
3.2.2 Manufacturer’s Data
Liferaft Systems Australia (LSA) 5 Sunmount Street Derwent Park, Tasmania 7009
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: None.
5.0 NOTES
5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 23, 24, 28, and 29.
5.2 Period of Performance: 3/11/2024 – 3/29/2024
5.3 Place of Performance: Rhoads Industries, Philadelphia Navy Yard PA
5.4 POC: Phillip Mitchell, PPE
Phone: 757-597-6215(c) Email: Phillip.d.mitchell12.civ@us.navy.mil
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK REQUIRED
7.1 Provide industrial support, an authorized OEM field
service representative.
0675 - 3
7.2 Coordinate with the Chief Engineer for the isolation and lock-out/tag-out of any equipment or systems.
7.3 Provide the services of a Marine Evacuation System (MES) OEM field service representative.
7.4 Furnish all rigging, crane services, crane lifts, access requirements, and transportation required for completion of Statement of Work.
Ensure crane can access both port and stbd sides of vessel from pier or barge.
7.5 Remove all listed equipment from current installed positions on ship. Crate for storage and stow crated units in The Ships Mission Bay in a location designated by Ships Force. Ref 3.1.1 and 3.1.2
7.5.1 Temporarily remove port and starboard MES hatch covers from hull side shell. Stow in safe location and reinstall once MES units have been removed.
7.5.2 Remove the two (2) MES units and four (4) life
rafts from their respective fabricated crates.
operational locations and secure in
Crates are to be fabricated in accordance with ISPM 15 (International Standards for Phytosanitary Measures).
7.5.3 Provide an “as found” condition report to OMT REP detailing any abnormal conditions from visual inspection.
7.6 Manufacturer’s Representative
7.6.1 Provide the services of a Marine Evacuation System (MES) OEM field service representative and authorized repair facility.
7.6.2 Possible Sources
Rhoads Industries POC: Nicole Baehr Project Coordinator Philadelphia navy yard, Building 57 1900 Kitty Hawk Ave Philadelphia, PA 19112 Office: 267-728-6374 Mobie: 445-229-3201 nbaehr@rhoadsinc.com
7.6.3 Possible OEM reps.
Liferaft Systems Australia (LSA) POC: Vlad Prato, P. ENG North American Manager 2736 Rosemont Drive Vancouver, BC V5S 2C5 Canada ss Tel: +1 604 780 0016 v.prato@LSAMES.com Web: www.LSAMES.com
MOBILE SHIP CHANDLERY INC.
POC: Mr. Mac McGovern 606 Western Drive, Mobile, Alabama 36607, United States. Contact:
Phone: +1 251 432 3501 Email: Mobileshipchandleryinc@gmail.com
7.6.4 Provide the OMT REP with a signed letter of qualification from the Original Equipment Manufacturer and certificate of training for the field service representative for the equipment listed in paragraph 3.0 prior to the start of any work.
7.7 Preparation of Drawings: None.
0675 - 4
File details come from the government source that posted it. Updated .