A06_Specifications_(F).pdf
PDF 99 KB Posted
- Attached to
- AL- DEEP HORIZON NRDA-LIMESTONE
- Solicitation number
- 140F0422Q0023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140F0422Q0023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
Project: Limestone, #57 stone and Sand
PR Number: PPR1023652
Item: Limerock, Sand, and #57 Stone
Product Features
Name of Item: Limerock Salient Characteristics: Meets the requirements of FL DOT Specifications Section 911 for Limerock Quantity: 950 Tons
Product Features
Name of Item: #57 stone Salient Characteristics: Recycled concrete Quantity: 40 Tons
Delivery Location
Product shall be delivered to the following location: Fishbone Creek Road (SW 800 Ave., off Dixie County Highway 357; 29° 25.863'N, 83° 11.657'W). The material will be delivered to Fishbone Creek Road and dumped in multiple piles along the Fishbone Creek roadway." This will be a judgement call on part of the refuge's Equipment Engineers as to exactly where. They will coordinate closely with the haulers.
Installation:
Prices quoted must include delivery to specified location above. All labor and parts associated with and required for delivery are the sole responsibility of the contractor. No assistance or equipment will be provided by the government.
Please coordinate all Questions about this RFQ through the Contracting Officer Sadie Roudebush at Sadie_Roudebush@fws.gov mailto:Sadie_Roudebush@fws.gov
Delivery Instructions
No later than three days prior to delivery, please contact the Point of Contact listed on award to arrange a specific time for delivery. Unloading the product is the sole responsibility of the delivery carrier. No labor or equipment will be provided by the government to unload the supplies.
Customer Specific Delivery Requirements
The material will be delivered to Fishbone Creek Road and dumped in multiple piles along the Fishbone Creek roadway." This will be a judgement call on part of the refuge's Equipment Engineers as to exactly where. They will coordinate closely with the haulers.
| Product Features |
| Product Features |
| Delivery Location |
| Installation: |
| Delivery Instructions |
| Customer Specific Delivery Requirements |
File details come from the government source that posted it. Updated .