A06 Schedule of Items.pdf
PDF 160 KB Posted
- Attached to
- MATTHEWS REC AREA REPAIR
- Solicitation number
- 140L3421Q0014
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06 Technical Specifications.pdf | ||
| B03 Wage Determination.pdf | ||
| A06 Project Narrative.pdf | ||
| Past Performance Questionnaire.doc | DOC document | |
| Sol_140L3421Q0014.pdf | ||
| A06 Combined Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO. PAY ITEM NO. DESCRIPTION ESTIMATED QUANTITY PAY UNIT UNIT PRICE TOTAL
1 MT‐01505 (1) Mobilization 1 LS $ $ 2 MT‐02050 (1) Concrete Picnic Table Removal 3 EA $ $ 3 MT‐02213 (1) Site Grading 1 LS $ $ 4 MT‐02213 (2) Picnic Table Install (2 Replacement & 1 New Install) 3 EA $ $ 5 MT‐02233 (1) Crushed Aggregate Base 37 TONS $ $
6 MT‐02765 (1) Pavement Marking 1 LS $ $
7 MT‐02910 (1) Reclamation 1 LS $ $
8 MT‐03306 (1) Concrete Trail 111 LF $ $ 9 MT‐03306 (1) Concrete ADA Parking Pad 1 LS $ $
BASE QUOTE TOTAL: $
ITEM NO. PAY ITEM NO. DESCRIPTION ESTIMATED QUANTITY PAY UNIT UNIT PRICE TOTAL
10 MT‐02050 (2) Additive A: Concrete Trail Removal 418 LF $ $ 11 MT‐02213 (3) Additive A: Site Grading 1 LS $ $ 12 MT‐02233 (2) Additive A: Crushed Aggregate Base 298 TONS $ $ 13 MT‐02910 (2) Additive A: Reclamation 1 LS $ $ 14 MT‐03306 (3) Additive A: Concrete Trail 418 LF $ $
ADDITIVE A TOTAL: $
ADDITIVE A QUOTE
MATTHEWS REC AREA REPAIR
SCHEDULE OF ITEMS
BASE QUOTE
NOTE: Base Quote work entails all work associated with the preparation and construction of the new concrete trail, 3 picnic tables, and 1 ADA parking.
NOTE: Depending on the availability of funds Additive A Quote may be awarded at the discretion of the GOVERNMENT. Additive A Quote shall include all equipment and labor to remove existing concrete trail and install new concrete trail.
File details come from the government source that posted it. Updated .