A06 Schedule of Items.pdf

PDF 160 KB Posted

Attached to
MATTHEWS REC AREA REPAIR
Solicitation number
140L3421Q0014
Issued by

View the file

Other files

File Type Posted
A06 Technical Specifications.pdf PDF
B03 Wage Determination.pdf PDF
A06 Project Narrative.pdf PDF
Past Performance Questionnaire.doc DOC document
Sol_140L3421Q0014.pdf PDF
A06 Combined Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO. PAY ITEM NO. DESCRIPTION ESTIMATED QUANTITY PAY UNIT UNIT PRICE TOTAL

1 MT‐01505 (1) Mobilization 1 LS $ $ 2 MT‐02050 (1) Concrete Picnic Table Removal 3 EA $ $ 3 MT‐02213 (1) Site Grading 1 LS $ $ 4 MT‐02213 (2) Picnic Table Install (2 Replacement & 1 New Install) 3 EA $ $ 5 MT‐02233 (1) Crushed Aggregate Base 37 TONS $ $

6 MT‐02765 (1) Pavement Marking 1 LS $ $

7 MT‐02910 (1) Reclamation 1 LS $ $

8 MT‐03306 (1) Concrete Trail 111 LF $ $ 9 MT‐03306 (1) Concrete ADA Parking Pad 1 LS $ $

BASE QUOTE TOTAL: $

ITEM NO. PAY ITEM NO. DESCRIPTION ESTIMATED QUANTITY PAY UNIT UNIT PRICE TOTAL

10 MT‐02050 (2) Additive A: Concrete Trail Removal 418 LF $ $ 11 MT‐02213 (3) Additive A: Site Grading 1 LS $ $ 12 MT‐02233 (2) Additive A: Crushed Aggregate Base 298 TONS $ $ 13 MT‐02910 (2) Additive A: Reclamation 1 LS $ $ 14 MT‐03306 (3) Additive A: Concrete Trail 418 LF $ $

ADDITIVE A TOTAL: $

ADDITIVE A QUOTE

MATTHEWS REC AREA REPAIR

SCHEDULE OF ITEMS

BASE QUOTE

NOTE: Base Quote work entails all work associated with the preparation and construction of the new concrete trail, 3 picnic tables, and 1 ADA parking.

NOTE: Depending on the availability of funds Additive A Quote may be awarded at the discretion of the GOVERNMENT. Additive A Quote shall include all equipment and labor to remove existing concrete trail and install new concrete trail.

File details come from the government source that posted it. Updated .