This document provides detailed specifications for a pine valley herbicide weed treatment contract opportunity. The contract seeks treatment of up to 1005 acres for scotch thistle, Canada thistle, and hoary cress located approximately 3-10 miles from Carlin, Nevada between June 3rd and July 31st. The contractor must supply sufficient equipment for the job, a qualified work crew, and herbicide chemicals from an approved list including picloram, metsulfuron methyl, and 2,4-D with required adjuvants and dye. Rates of application are specified. The contractor will take responsibility for controlling drift and may encounter access issues. Terrain and vegetation types are described. The solicitation number is 140L3924Q0038 and is issued by the Bureau of Land Management Nevada Region.

View the file

Other files

File Type Posted
B03_Wage_Determination.pdf PDF
Sol_140L3924Q0038.pdf PDF
A06_Map_1.pdf PDF
A06_PAR_Example.pdf PDF
A06_BLM_Herbicides.pdf PDF
A06_Map_4.pdf PDF
A06_BLM_Adjuvants.pdf PDF
A06_PAR_Template.docx DOCX document
A06_Map_2.pdf PDF
A06_Map_3.pdf PDF
A04_SOW_General_Herbicides.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DETAILED SPECIFICATIONS

HERBICIDE APPLICATION

2024 Pine Valley Herbicide Weed Treatment

1. Target Species: Scotch thistle, Canada Thistle, Hoary Cress

Additional noxious weed species found within the designated contract boundary, and susceptible to chemical intended for use, will also be treated.

2. Treatment Area: 1005 acres including up to approximately 98 acres of streams/have the potential for water present and will require the use of both aquatic herbicide and adjuvant. Treatment areas vary in the amount of noxious weeds that are within the polygon. Actual weed treatments will be less than that of the treatment area itself.

3. Location of Work Site: Project areas are located approximately 3 miles West, and 10 miles South of Carlin, Nevada in Pine Valley. The Legal description for the treatment areas is: T33N R51E, T32N R51E, T31N R52E, and T30N R52E. See Attached Location Maps.

Access to Work Site: Public or private access roads damaged by the Contractor shall be restored, at the Contractor’s expense, to the same condition they were in at the commencement of work.

4. Approximate Performance Period: Period of performance is estimated, and timing of treatments will need to be flexible to maximize the effects on target weed species. The anticipated treatment window for this project is June 3rd to July 31st and the Contractor must be available during that time period.

5. Requirements of Equipment to be supplied by the Contractor: Sufficient to meet specifications of the contract.

6. Loading Facilities: Use of any loading area on federal or private land, shall be arranged by and at the discretion and risk of the contractor.

7. Work Crew Requirements: Work crew for handling and mixing of chemical and loading equipment shall be furnished by the Contractor.

8. Requirements of Chemical to be supplied by the Contractor: Herbicide, surfactant, and dye shall be used and selected from the attached lists of Approved Herbicide Formulations and Approved Adjuvants for use on BLM land. Colorant/dye must be visible for 3 days after application.

9. Kind of Chemical: Picloram + Metsulfuron methyl + Dye AND Aquatic 2,4-D + Aquatic Surfactant + Dye

Contractor must provide a list of chemicals intended for use with their bid package.

10. Rate of Application:

· Terrestrial Tank Mix: Picloram (Tordon 22k or equivalent) at 16 ounces/acre (0.25 lb. ae/acre) + Metsulfuron methyl (Escort, MSM60, or equivalent) at 1 ounces/acre (0.0375lb AI/acre) + Surfactant (Rate as specified on label and compatible with herbicide) + Dye

· Aquatic Mix: Aquatically approved 2,4-D (Alligare 2,4-D or equivalent) at 64 ounces/acre (1.9 lb. ae/acre) + Aquatically approved surfactant (Rate as specified on label and compatible with herbicide) + Dye.

11. Remarks and Other Requirements: Apply the spray solution in properly maintained and calibrated equipment capable of delivering the desired volume. Controlling drift is the responsibility of the Applicator.

The Pine Valley herbicide weed treatment areas consist predominately of upland and riparian application. To the best of the Government’s knowledge known access issues related to private landowner permissions or washed-out roads were avoided. However, the Government cannot guarantee additional issues may not arise due to previously undocumented or changing conditions (i.e. fire activity, previously unreported washouts, or overgrown roads) and access restrictions (i.e. locked gates), especially in the “checkerboard ownership” areas. Even if access is limited, contractor is expected to travel these areas for treatment. Terrain varies from relatively flat 2-5% slope to rolling hills ranging from 10-30% slope. Soils are loamy. Elevation ranges from 5200 to 5800 feet. Vegetation consists of dense patches of Wyoming sage. Mixed perennial bunchgrasses, native forbs, annual invasive grasses, and forbs are widespread throughout.

For areas where water is present during the time of application, the buffers for non-aquatically formulated herbicides will be maintained at 10 feet for application by handgun and 25 feet for application with boom equipment. Spraying up to the water’s edge (within the buffer) will require use of aquatic formulated herbicide and surfactant.