United States Department of the Interior Bureau of Land Management
Uncompahgre Field Office
Gunnison Gorge Fencing 2022
SPECIFICATIONS
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 12 00 GOVERNMENT SUPPLIED MATERIAL
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
DI VI SI ON 05 - METALS
05 50 13 STEEL POST AND CABLE FENCE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
Install fencing and gates at specified locations.
1.2 LOCATION
The project is located near Delta, CO. The work is distributed at three different locations within the Gunnison Gorge National Recreation Area.
Elephant Skin Road Fencing - Start Latitude: 38.536180° Longitude: -107.868244°
Elephant Skin Road Fencing - End Latitude: 38.544164° Longitude: -107.862880°
Delta Reservoir Approximate Location Latitude: 38.810020° Longitude: -108.070445°
Orchard River Access Approximate Location Latitude: 38.779057° Longitude: -107.853006°
1.3 WORK SCHEDULE
Work shall be completed within 150 days of issuance of the Notice to Proceed. Work shall occur Monday - Friday, excluding federal holidays.
1.4 ORDER OF WORK
The fencing along Elephant Skin road shall be completed first, using the primary, Government supplied, materials.
The primary materials shall be used first. The secondary materials may be used after the primary materials are installed.
1.5 GOVERNMENT SUPPLIED MATERIALS
See section 01 12 00 GOVERNMENT SUPPLIED MATERIAL for Government supplied materials.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 11 00 Page 3
SECTION 01 12 00
GOVERNMENT SUPPLIED MATERIAL
PART 1 GENERAL
1.1 LOCATION
The material is located at the Montrose Public Lands Center.
2465 South Townsend Ave Montrose, CO 81401
Contractor is responsible for loading and transporting material.
PART 2 PRODUCTS
The following material is available for Contractor to use to construct fencing.
2.1 PRIMARY MATERIALS
These materials shall be used first.
Quantity Item
306 3.5 inch (3 inch nominal) Schedule 80 Steel pipe, 10 foot length
68 3.5 inch (3 inch nominal) Schedule 80 Steel pipe, 5 foot length, with post cap
607 Steel post cap
5 1,680 foot roll of 9/16 inch Steel Wire Rope
420 9/16 inch Wire Rope Clamp
2.2 SECONDARY MATERIALS
Secondary materials may be used after the primary materials have been used.
Quantity Item
5,000 feet 1/4 inch steel wire rope
300 2.875 inch (2.5 inch nominal) diameter steel pipe, with cap and hole drilled
PART 3 EXECUTION
Not Used.
SECTION 01 12 00 Page 4
SECTION 01 12 00 Page 5
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1 STEEL POST AND CABLE FENCE - ELEPHANT SKIN ROAD
1.1.1 Payment
Payment will be made for all costs associated with providing and installing fencing.
1.1.2 Unit of Measure
Unit of measure: linear foot, measured straight between posts.
1.2 STEEL POST AND CABLE FENCE - ORCHARD SITE
1.2.1 Payment
Payment will be made for all costs associated with providing and installing fencing.
1.2.2 Unit of Measure
Unit of measure: linear foot, measured straight between posts.
1.3 STEEL POST AND CABLE FENCE - NORTH DELTA
1.3.1 Payment
Payment will be made for all costs associated with providing and installing fencing.
1.3.2 Unit of Measure
Unit of measure: linear foot, measured straight between posts.
SECTION 01 20 00 Page 6
1.4 GATE - ELEPHANT SKIN ROAD
1.4.1 Payment
Payment will be made for all costs associated with providing and installing gate.
1.4.2 Unit of Measure
Unit of measure: each.
1.5 GATE - ORCHARD SITE
1.5.1 Payment
Payment will be made for all costs associated with providing and installing gate.
1.5.2 Unit of Measure
Unit of measure: each.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 7
SECTION 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Initial Project Schedule ; G
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution.
3.2.2 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of submittals.
b. Long procurement activities
c. Contractor's pre-final inspection.
d. Government's pre-final inspection.
e. Final inspection.
SECTION 01 32 01 Page 8
3.2.3 Government Activities
Include Government activities that could impact progress. These activities include, but are not limited to: Government inspections of work, Government approval of submittals.
3.3 WEEKLY PROGRESS MEETINGS
Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.
3.4 FAILURE TO ACHIEVE PROGRESS
Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.
3.4.1 Failure to Perform
Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.
3.4.2 Recovery Schedule
Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15 Schedules for Construction Contracts.
SECTION 01 32 01 Page 9
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
1.2 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.3 GOVERNMENT APPROVING AUTHORITY
The Contracting Officer's Representative will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within 10 days of receipt.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.
1.3.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with
SECTION 01 33 00 Page 10 appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.
1.4 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.5 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 11
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
01 32 01 GInitial Project Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION 05 50 20
STEEL POST AND CABLE FENCE
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
PART 2 PRODUCTS
2.1 CONTRACTOR SUPPLIED MATERIALS
Contractor supplied materials needed to complete the work include, but are not limited to:
Material Estimated Quantity
Thimbles Dependent on length (number) of wire rope runs
Steel Rings Dependent on length (number) of wire rope runs
Gate chain 3 gates
Gate locks 6
1/4 inch wire rope clamps Dependent on length (number) of wire rope runs
Concrete or grout Dependent on Contractor's ability to drive steel posts
Material to secure wire to posts (every third post)
Dependent on length (number) of wire rope runs
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
Verify all field dimensions prior to fabrication. Set steel pipe vertical and plumb. Layout the fence line continuous and straight, make curves consistent and smooth. Drive posts without disturbing in-situ soil.
3.1.1 DRILLED HOLES
Solid rock may be present at fence post locations. If holes are drilled
SECTION 05 50 13 Page 12 to facilitate post installation, then high strength, non-shrink grout shall be placed between any gaps in the fence post and the drilled hole.
3.2 WELDING
Perform welding in accordance with AWS D1.1/D1.1M
3.3 WIRE ROPE
Wire rope shall be permanently and securely fastened to every third fence post to prevent movement of wire through the post. There are several different ways to achieve this requirement. The contractor may choose any method that permanently prevents movement of wire through the post.
Wire rope shall be installed with as few splices as practical.
SECTION 05 50 13 Page 13
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 PROJECT DESCRIPTION |
| 1.2 LOCATION |
| 1.3 WORK SCHEDULE |
| 1.4 ORDER OF WORK |
| 1.5 GOVERNMENT SUPPLIED MATERIALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 12 00 - GOVERNMENT SUPPLIED MATERIAL |
| PART 1 GENERAL |
| 1.1 LOCATION |
| PART 2 PRODUCTS |
| 2.1 PRIMARY MATERIALS |
| 2.2 SECONDARY MATERIALS |
PART 3 EXECUTION
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 STEEL POST AND CABLE FENCE - ELEPHANT SKIN ROAD |
| 1.1.1 Payment |
| 1.1.2 Unit of Measure |
| 1.2 STEEL POST AND CABLE FENCE - ORCHARD SITE |
| 1.2.1 Payment |
| 1.2.2 Unit of Measure |
| 1.3 STEEL POST AND CABLE FENCE - NORTH DELTA |
| 1.3.1 Payment |
| 1.3.2 Unit of Measure |
| 1.4 GATE - ELEPHANT SKIN ROAD |
| 1.4.1 Payment |
| 1.4.2 Unit of Measure |
| 1.5 GATE - ORCHARD SITE |
| 1.5.1 Payment |
| 1.5.2 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 32 01 - PROJECT SCHEDULE |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS |
| 3.2.1 Level of Detail Required |
| 3.2.2 Mandatory Tasks |
| 3.2.3 Government Activities |
| 3.3 WEEKLY PROGRESS MEETINGS |
| 3.4 FAILURE TO ACHIEVE PROGRESS |
| 3.4.1 Failure to Perform |
| 3.4.2 Recovery Schedule |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 INFORMATION ONLY SUBMITTALS |
| 1.3 GOVERNMENT APPROVING AUTHORITY |
| 1.3.1 Review Notations |
| 1.4 DISAPPROVED SUBMITTALS |
| 1.5 APPROVED SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| DIVISION 05 - METALS |
| 05 50 13 - STEEL POST AND CABLE FENCE |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| PART 2 PRODUCTS |
| 2.1 CONTRACTOR SUPPLIED MATERIALS |
| PART 3 EXECUTION |
| 3.1 GENERAL INSTALLATION REQUIREMENTS |
| 3.1.1 DRILLED HOLES |
| 3.2 WELDING |
| 3.3 WIRE ROPE |