United States Department of the Interior Bureau of Land Management

Tres Rios Field Office

Summit Trailhead

SPECIFICATIONS

Summit Trailhead SUMMIT

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 20 00 PRICE AND PAYMENT PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 79 00 AERIAL (DRONE) PHOTOGRAPHS

DI VI SI ON 05 - METALS

05 50 12 STEEL GATE - ROAD

DI VI SI ON 12 - FURNI SHI NGS

12 93 00 SITE FURNISHINGS

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 31 26 WIRE FENCES AND GATES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

The project is the construction of a new trailhead. The work includes, but is not limited to; clearing and grubbing, earthwork, road and parking area construction, fence construction, sign and kiosk construction, gate construction, and parking delineator construction.

1.2 LOCATION

The project is located on public land, off state highway 184, between Dolores and Manco, CO. From Dolores, CO head southeast on State highway 184, travel approximately 8 miles to Country Road 35.6. Head south on

County Road 35.6 until the road turns 90 degrees to the east. From there, the project is located to the southwest, across the pipeline right of way.

Latitude: 37.399496° N

LLongitude: -108.396773° W

1.3 WORK SCHEDULE

Project shall be completed within 120 days of the Notice to Proceed. Work will not be allowed December 1st through April 30th in order to protect big game critical winter range habitat. Work shall occur Monday - Friday, excluding federal holidays.

1.4 ORDER OF WORK

The contractor shall stakeout the roads and parking areas as detailed on the drawings. The design intent is to minimize damage to existing vegetation. The Contracting Officer's Representative will review the layout as staked and may make minor modifications to the layout in order to minimize the damage to existing vegetation. The contractor shall receive approval of the stakeout prior to construction.

1.5 GOVERNMENT SUPPLIED MATERIAL

Aggregate for this project is available without cost to the contractor. The aggregate is located at the

Montezuma County Mancos Quarry, off state highway 42, northeast of Mancos, Colorado. Approximately 12 miles from the project site. Coordinate with the Contracting Officer's Representative prior to picking up the aggregate.

The contractor is responsible for loading the aggregate at the quarry, hauling, placing, and compacting.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 11 00 Page 3

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

Payment items for the work of this contract for which contract payments will be made are listed in the

SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved.

The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1 MOBILIZATION AND DEMOBILIZATION

1.1.1 Payment

Payment will be made for costs associated with mobilization and demobilization.

When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.

When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.

Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.

1.1.2 Unit of Measure

Unit of measure: job.

1.2 DEMOLITION

1.2.1 Payment

Payment will be made for all costs associated with demolition of the existing fence. Including transportation and disposal.

1.2.2 Unit of Measure

Unit of measure: job.

SECTION 01 20 00 Page 4

1.3 CLEARING AND GRUBBING

1.3.1 Payment

Payment will be made for all costs associated with clearing and grubbing. Including transportation and disposal of materials.

1.3.2 Unit of Measure

Unit of measure: Job.

1.4 SITE GRADING

1.4.1 Payment

Payment will be made for all costs associated with grading and compacting the roads, parking areas and ancillary features.

1.4.2 Unit of Measure

Unit of measure: Job.

1.5 AGGREGATE

1.5.1 Payment

Payment will be made for all costs associated with providing aggregate surfacing. Including preparation, transportation, placement, and compaction.

1.5.2 Unit of Measure

Unit of measure: square yard in place

1.6 STEEL TRAILER PARKING DELINEATOR - 30 FOOT LENGTH

1.6.1 Payment

Payment will be made for all costs associated with providing 30 foot steel trailer parking delineators.

1.6.2 Unit of Measure

Unit of measure: Each.

SECTION 01 20 00 Page 5

1.7 STEEL TRAILER PARKING DELINEATOR - 20 FOOT LENGTH

1.7.1 Payment

Payment will be made for all costs associated with providing 20 foot steel trailer parking delineators.

1.7.2 Unit of Measure

Unit of measure: Each.

1.8 WIRE FENCING

1.8.1 Payment

Payment will be made for all costs associated with providing wire fencing. Including the access gate and connecting the new fence where it intersects the existing fence.

1.8.2 Unit of Measure

Unit of measure: Job.

1.9 KIOSK

1.9.1 Payment

Payment will be made for all costs associated with providing a kiosk.

1.9.2 Unit of Measure

Unit of measure: Each.

1.10 ENTRANCE SIGN

1.10.1 Payment

Payment will be made for all costs associated with constructing an entrance sign.

1.10.2 Unit of Measure

Unit of measure: Each.

1.11 NO CAMPING SIGN

1.11.1 Payment

Payment will be made for all costs associated with providing no camping signs.

SECTION 01 20 00 Page 6

1.11.2 Unit of Measure

Unit of measure: Each.

1.12 EQUESTRIAN PARKING SIGN

1.12.1 Payment

Payment will be made for all costs associated with providing equestrian parking signs.

1.12.2 Unit of Measure

Unit of measure: Each.

1.13 GATE - ROAD

1.13.1 Payment

Payment will be made for all costs associated with providing a road gate.

1.13.2 Unit of Measure

Unit of measure: Each.

1.14 AERIAL (DRONE) PHOTOGRAPHS

1.14.1 Payment

Payment will be made for all costs associated with providing aerial (drone) photographs.

1.14.2 Unit of Measure

Unit of measure: Job.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 20 00 Page 7

SECTION 01 32 01

PROJECT SCHEDULE

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Initial Project Schedule; G

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.

3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS

3.2.1 Level of Detail Required

Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution.

3.2.2 Mandatory Tasks

Include the following activities/tasks in the initial project schedule and all updates.

a. Submission, review and acceptance of submittals.

b. Long procurement activities

c. Contractor's pre-final inspection.

d. Government's pre-final inspection.

e. Final inspection.

SECTION 01 32 01 Page 8

3.2.3 Government Activities

Include Government activities that could impact progress. These activities include, but are not limited to:

Government inspections of work, Government approval of submittals.

3.3 WEEKLY PROGRESS MEETINGS

Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.

3.4 FAILURE TO ACHIEVE PROGRESS

Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.

3.4.1 Failure to Perform

Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the

Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default

(Fixed-Price Construction), and other contract provisions.

3.4.2 Recovery Schedule

Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15

Schedules for Construction Contracts.

SECTION 01 32 01 Page 9

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only.

1.2 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer's

Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the

Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the

Government.

1.3 GOVERNMENT APPROVING AUTHORITY

The Contracting Officer's Representative will:

a. Note the date on which the submittal was received.

b. Review submittals for approval within 10 days of receipt.

c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the

Contractor.

1.3.1 Review Notations

Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete.

SECTION 01 33 00 Page 10

A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed.

Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the

Government. This applies only to "information-only submittals" as previously defined.

1.4 DISAPPROVED SUBMITTALS

Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting

Officer.

If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.5 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals is not to be construed as a complete check.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 33 00 Page 11

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES

Summit Trailhead

01 32 01 SD-01 Preconstruction Submittals

GInitial Project Schedule

12 93 00 SD-03 Product Data

2.2 GKiosk

2.3 GEquestrian Parking Sign

2.4 GNo Camping Sign

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SECTION 01 79 00

AERIAL (DRONE) PHOTOGRAPHS

PART 1 GENERAL

Provide all materials and labor necessary to obtain aerial photographs taken less than 400 feet from the ground.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

Provide aerial (drone) photographs of the project after all other work is complete. Take photos from different perspectives, and include all work in the photographs. Provide aerial (drone) photographs on a portable hard

(flash) drive. Portable hard (flash) drive shall become property of the BLM.

SECTION 01 79 00 Page 12

SECTION 05 50 12

STEEL GATE - ROAD

PART 1 GENERAL

Provide a steel gate as shown on the plans and as specified below.

1.1 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and

Hot-Dipped, Zinc-Coated, Welded and Seamless

MASTER PAINTERS INSTITUTE (MPI)

MPI 23 (2012) Primer, Metal, Surface Tolerant

MPI 94 (2012) Alkyd, Exterior, Semi-Gloss (MPI Gloss Level 5)

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2020) Structural Welding Code - Steel

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC SP 1 (2015) Solvent Cleaning

PART 2 PRODUCTS

2.1 STEEL

Steel shall pipe shall be in accordance with ASTM A53/A53M, and manufactured in the United States.

2.2 PAINT

Metal Primer MPI 23

Intermediate Coat MPI 94

Top Coat MPI 94

Dry Film Thickness 5.25 mils

SECTION 05 50 12 Page 13

Color Brown

2.3 SIGNS

Signs shall comply with the Manual of Uniform Traffic Control Devices (MUTCD). OM4-1 signs shall be 18" x

18". OM2-2V signs shall be 12" x 6".

2.4 CONCRETE

Concrete shall have a minimum compressive strength of 3,000 psi.

PART 3 EXECUTION

3.1 FABRICATION, WELDING, AND INSTALLATION

Verify all dimensions prior to fabrication. Perform welding in accordance with AWS D1.1/D1.1M. Field verify post locations prior to setting. Set posts vertically in concrete piers. Fill posts with concrete.

3.2 PAINT

Prepare surfaces for paint in accordance with SSPC SP 1. Apply a primer coat, intermediate coat, and finish coat of paint.

3.3 SIGNS

Firmly secure signs to the gate and gate posts. Provide galvanized or stainless steel hardware.

SECTION 05 50 12 Page 14

SECTION 12 93 00

SITE FURNISHINGS

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Kiosk; G

Equestrian Parking Sign; G

No Camping Sign; G

PART 2 PRODUCTS

2.1 STEEL PARKING DELINEATORS

Steel parking delineators shall be schedule 40 steel pipe. Used pipe may be supplied; however pipe must be clean of excessive oil, grease, rust, etc. Pipe must be straight and have no dents, bends, or obvious defects.

2.2 KIOSK

Kiosk shall be as manufactured by "Wood Product Signs". Kiosk features include:

Custom 9' Utah Roof Kit with brown metal roof

(3) 6" x 6" x 10'4" Metal Posts, painted brown

36" x 48" - Bulletin Boards with routed pocket for digital graphic

33" x 32" - Digital Graphic inlay

36" x 48" - Bulletin Boards with routed pocket for corkboard

32" x 8.5" - Corkboard inlay

The bulletin board routed text and digital graphics will be provided after BLM acceptance of the submittal and should not impact the product cost or installation.

2.3 EQUESTRIAN PARKING SIGN

Equestrian parking signs shall be as manufactured by "Rock Art Signs", sign number 93-1043. 18"x24"x ¾", HDPE routed plastic sign.

2.4 NO CAMPING SIGN

The "no camping" sign shall be as manufactured by "Rock Art Signs", sign number 10-146-8. 8" x 8" x 0.08"

Aluminum sign, with brown background and red "prohibited line".

SECTION 12 93 00 Page 15

PART 3 EXECUTION

3.1 STEEL PARKING DELINEATORS

Steel parking delineators shall be installed as shown on the drawings. Tops of the steel parking delineators shall be set three inches above the finished grade of the aggregate surfacing.

3.2 ENTRANCE SIGN

The entrance sign and mounting hardware will be Government provided. Install the sign with the mounting hardware provided. A picture of the mounting hardware is on the plans for reference.

3.3 EQUESTRIAN PARKING AND NO CAMPING SIGNS

Install the sign posts plumb as shown on the drawings. Firmly secure signs to the posts using galvanized or stainless steel hardware.

3.4 KIOSK

Install the kiosk posts plumb as shown on the drawings. Construct the kiosk according to the manufacturer's directions.

SECTION 12 93 00 Page 16

SECTION 31 00 00

EARTHWORK

PART 1 GENERAL

Not Used.

PART 2 PRODUCTS

2.1 AGGREGATE

See Section 01 11 00 for aggregate.

PART 3 EXECUTION

3.1 UNDERGROUND UTILITIES

There are underground utilities in the work area. The Contractor is responsible for locating underground utilities prior to construction. Notify the Contracting Officer's Representative if any utilities will be impacted by the construction.

3.2 GENERAL EXCAVATION

Perform excavation of every type of material encountered to the lines, grades, and elevations indicated and as specified. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times.

3.3 GROUND SURFACE PREPARATION

Clear and grub in accordance with section 31 11 00 . Do not perform construction when surfaces are frozen or muddy. Prepare the subgrade to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Shape subgrade to drain.

3.4 ROADS AND PARKING AREAS

3.4.1 Subgrade

Contractor shall prepare the subgrade to the lines and grades shown on the plans.

3.4.2 Subgrade Compaction

Moisten material as necessary to achieve compaction. Compact the subgrade by operating compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.

3.4.3 Aggregate

The Contractor shall receive approval of the subgrade prior to placing aggregate. Place aggregate to the lines and grades shown on the plans.

SECTION 31 00 00 Page 17

3.4.4 Aggregate - Compaction

Moisten material as necessary to achieve compaction. Compact the aggregate by operating compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.

3.5 FINISHING

Finish the surfaces to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Provide the degree of finish for graded areas within 0.2 foot of the grades and elevations indicated. Finish surfaces in a manner that will result in effective drainage, regardless of tolerance.

SECTION 31 00 00 Page 18

SECTION 31 11 00

CLEARING AND GRUBBING

PART 1 GENERAL

Not Used.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 CLEARING AND GRUBBING LIMITS

Clearing and grubbing limits shall be within the road and parking areas, including ditches.

3.2 PROTECTION

Prior to clearing and grubbing, the contractor shall stake out the roads and parking areas as detailed on the drawings. The design intent is to minimize damage to existing vegetation. The Contracting Officer's

Representative will review the layout as staked and may make minor modifications to the layout in order to minimize the damage to existing vegetation. The contractor shall receive approval of the stakeout prior to construction.

Protect trees and vegetation from damage incident to clearing, grubbing, and construction operations.

3.3 CLEARING

Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface.

3.4 GRUBBING

Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas. Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 12 inches below the original surface level of the ground in the area of new road construction. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground.

3.5 DISPOSAL OF MATERIALS

Logs, stumps, roots, brush, rotten wood, and other organic material resulting from the clearing and grubbing operations, shall be uniformly scattered on site in piles less than 12 inches off the ground.

SECTION 31 11 00 Page 19

SECTION 32 31 26

WIRE FENCES AND GATES

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)

AWPA U1 (2017) Use Category System: User Specification for Treated

Wood

ASTM INTERNATIONAL (ASTM)

ASTM A121 (2013) Standard Specification for Metallic-Coated Carbon Steel

Barbed Wire

ASTM A702 (2013) Standard Specification for Steel Fence Posts and

Assemblies, Hot Wrought

PART 2 PRODUCTS

2.1 BARBED WIRE

Barbed wire shall be a strand of two (2) 12-1/2-gauge galvanized wires twisted together with 2-point barbs of

14-gauge wire spaced 4 inches apart. Wire and barbs shall be zinc-coated steel, with a Class 1 zinc coating as per ASTM A121. The minimum breaking strength of each wire shall be 950-lb force. The barbed wire shall conform to ASTM A121

2.2 BARBLESS WIRE

Barbless wire shall be a strand of two (2) 12-1/2-gauge, galvanized wires twisted together. Wire shall be a Class

1 zinc coating as per ASTM A121. The minimum breaking strength of each wire shall be 950-lb force. The barbless wire shall conform to ASTM A121.

2.3 WOOD POSTS AND BRACES - PANELS AND GATES

Wood posts and braces used for the panels and gates shall be sound single-stem members of round cross section and have 5 inches minimum diameter at the small end. Provide posts free of ring shake, season cracks more than 1/4 inch wide, splits in the end, and unsound knots. Treat posts in accordance with AWPA U1.

Honey Locust, western red cedar (full stem with bark removed), Juniper, Osage Orange, and White Oak are acceptable without treatment.

2.4 WOOD FENCE POSTS

Wood fence posts shall be sound single-stem members of round cross section and have 4 inches minimum diameter at the small end. Provide posts free of ring shake, season cracks more than 1/4 inch wide, splits in the

SECTION 32 31 26 Page 20 end, and unsound knots. Treat posts in accordance with AWPA U1. Honey Locust, western red cedar (full stem with bark removed), Juniper, Osage Orange, and White Oak are acceptable without treatment. .

2.5 STEEL FENCE POSTS

Steel fence posts shall conform to ASTM A702; green with white or silver top "T" bar type, with a welded or riveted anchor plate. Furnish with clip-type wire fasteners (punched tabs for fastening wires are not acceptable). Steel posts shall be manufactured from wrought, rail or new billet steel, shall have a minimum weight of 1.33 pounds per linear foot. The anchor plates shall weigh a minimum of 0.67 pounds and shall have a minimum area of 18 square inches.

2.6 STEEL TUBE GATE

Steel tube gate shall welded pipe with minimum pipe diameter of 1-1/2 inches and be factory painted. Provide hinges, latches, and other hardware as required for the operation of the gate.

PART 3 EXECUTION

3.1 ALIGNMENT

The Contractor shall layout and stake the fence alignment for approval by the Contracting Officer's

Representative. The fence and gate locations shall generally match the layout shown on the plans, with deviations for constructability.

3.2 CLEARING

Clearing shall be limited to cutting of brush in the fence line alignment. Maximum clearing width is 6 feet on each side of the fence line. Minimize disturbance to existing vegetation.

3.3 END PANELS, CORNER PANELS, AND GATE PANELS

Construct as shown on the drawings. End panels shall be constructed at the ends of the fence, corner panels at changes in fence alignment. Gate panels shall be constructed at the gate.

Set posts plumb in dug or drilled holes. Post holes shall provide adequate open space around the post so backfill can be tamped the full depth around the post. Place backfill in layers of 9 inches or less, moistened to optimum condition, and compacted with hand tampers.

3.4 WOOD LINE POSTS

Set posts plumb in dug or drilled holes. Post holes shall provide adequate open space around the post so backfill can be tamped the full depth around the post. Place backfill in layers of 9 inches or less, moistened to optimum condition, and compacted with hand tampers.

3.4.1 Wood Line Post Frequency

Every third line post shall be a wood post.

3.5 STEEL LINE POSTS

Posts shall be driven plumb.

SECTION 32 31 26 Page 21

3.6 WIRE

Wire is properly stretched when it is springy to the touch. Stretch tightly and staple to wood posts or securely attach to steel posts with standard manufactured wire clips. Drive staples into wood until the staple comes in contact with the wire against the post, but not so tight as to crimp the wire or prevent free movement of the wire between the post and the staple. Do not drive staples parallel to the grain of the wood.

3.7 WIRE CLIPS

Wire clips shall be used on every wire at steel post locations. Secure wire to steel posts by bending clip ends over or around wire, crimping ends to secure wire on both sides of the post, but not so tight as to prevent free movement of the wire through the clip. Each side of the clip shall be twisted around the wire and back parallel to the clip itself.

3.8 BRACE WIRE

Shall be double looped in a crisscross fashion, twisted tight with either four plies of 9-gauge smooth wire or 8 plies of 12-1/2-gauge wires. Leave one end of the stick long enough to fasten behind the horizontal brace to prevent wire from unwinding.

3.9 SPIKING

Predrilled lead holes shall be used. The hole diameter shall be three-fourths the diameter of the spike and drilled to a depth that is one-half the length of the spike.

3.10 GATE ASSEMBLY

Provide standard metal gate assemblies, with fittings and hardware necessary for complete installation.

SECTION 32 31 26 Page 22