This Statement of Work (SOW) details a construction services project for drilling two boreholes at Valley City National Fish Hatchery (VCNFH) and Baldhill Dam National Fish Hatchery (BDNFH) in North Dakota. The project requires a well driller with a minimum of 3 years of similar experience and a North Dakota well driller's license to complete two boreholes, with specific requirements including determining water flow rates (3,000 gpm for VCNFH and 2,500 gpm for BDNFH), assessing pumping quality, drawdown, and recharge rates, and conducting comprehensive water quality testing utilizing EPA or State of North Dakota laboratory methods.

The project must be completed within 80 calendar days of the Notice to Proceed (NTP), with potential additional time allowed for permits and material procurement. The contractor must coordinate the construction start date with the Contracting Officer, complete all borehole-related permits, coordinate utility locates, and be available for conference calls to discuss project progress. The boreholes will be located near the Sheyenne River at each site, with specific locations to be selected by local staff, and the successful completion may lead to a future project to install production wells for the fish hatcheries.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I n t a k e T i t l e I a n d I I P a g e 1 | 3

STATEMENT OF WORK

Construction Services

Valley City National Fish Hatchery and Baldhill National Fish Hatchery

Boreholes

Project 23-007

I. PROJECT SCOPE

A. General

The Contractor shall provide two boreholes, one located at Valley City National Fish

Hatchery (VCNFH) and one at Baldhill Dam National Fish Hatchery (BDNFH), both located near Valley City, North Dakota.

The Contractor shall abide by Chapter 33.1-18. If the boreholes are successful, a future project will be to install production wells for the fish hatchery. The Contractor shall determine if the boreholes can meet the flow rates at the hatcheries. VCNFH requires

3,000gpm. BDNFH requires 2,500gpm. The Contractor shall determine the viability of the pumping quality, drawdown, and recharge rate.

The local staff will select the location of the borehole. For VCNFH, the borehole will generally be located central south within the property near the Sheyenne River. For

BDNFH, the borehole will generally be located southwest within the property past the fish production ponds located near the Sheyenne River.

The Contractor shall complete all permits related to the borehole. USFWS shall get a copy of all documents submitted.

The Contractor shall coordinate a utility locate prior to work.

The Contractor may utilize existing water, sewer, and electricity.

The Contractor shall test the water quality at both sites utilizing an EPA or State of North

Dakota lab. If the pump test results can’t meet hatchery demands, the water tests shall not occur. Any user error in sampling methods shall be the Contractor’s reasonability to retest.

pH Alkalinity Nitrite

Electrical conductivity Carbonate Nitrite-nitrogen

Bicarbonate Hardness total Phosphate

I n t a k e T i t l e I a n d I I P a g e 2 | 2

Calcium Iron Fluoride

Manganese Magnesium Sodium adsorption ratio

Sulfate Nitrate Charge balance

Nitrate-nitrogen Ammonia Total phosphorus

Total Nitrogen Boron Cadmium

Chromium Copper Molybdenum

Nickel Sodium Zinc

Mercury Arsenic Coliform

II. CONTRACTOR QUALIFICATIONS

A. The Well Driller shall have a minimum of 3 years of completing similar work in this

Statement of Work. The Well Driller shall have a well driller’s license in the State of

North Dakota.

III. PERFORMANCE

A. The Contractor shall coordinate the construction start date with the Contracting

Officer. The project shall be completed and available for use within 80 calendar days from the date the Notice to Proceed (NTP) is issued. Additional time will be allowed, if needed, to obtain permits and lead times for materials. Construction will not continue on Saturdays, Sundays, or Federal Government holidays without prior permission of the Contracting Officer.

B. During the performance period of the contract, the Contractor shall be available for conference calls as needed with the Contracting Officer, the Contracting Officer’s

Representative (COR), and the Government On-Site Inspector to discuss project progress and/or problems.

mailto:michael_wandersee@fws.gov