A04_SOW_TempOfficeTrailerRental_final.pdf

PDF 1 MB Posted

Attached to
TEMPORARY MOBILE OFFICE SPACE RENTAL - RED ROCK NC
Solicitation number
140L3923Q0078
Issued by

About this file

This statement of work outlines requirements for a temporary mobile office trailer rental to support operations at Red Rock Canyon National Conservation Area in Nevada. The Bureau of Land Management seeks to lease a double-wide trailer measuring a minimum of 24 feet by 60 feet to serve as office space for employees while improvements are made to the administrative building. The trailer must include at least four enclosed offices, ADA-compliant restroom facilities serviced weekly, HVAC, electrical power, and carpeted flooring. The selected contractor will deliver, set up, and later remove the trailer, placing it adjacent to the existing trailer in the visitor center parking lot. The performance period is one base year with four optional one-year extensions.

View the file

Other files

File Type Posted
B03_SCA-WD_2015-5593_ClarkCo.pdf PDF
Sol_140L3923Q0078.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Red Rock Canyon NCA Visitor Center Temporary Office Trailer Project

Southern Nevada District, Las Vegas, Nevada

Bureau of Land Management

Nevada

TABLE OF CONTENTS

1.0 INTRODUCTION

2.0 SCOPE OF WORK

3.0 PROJECT DETAILS

4.0 PROJECT ADMINISTRATION

Appendix A:

Exhibit 1 .........Site Location

Exhibit 2 ........ Trailer Location Map

Exhibit 3 .........Delivery Route Map

June 6, 2023 Red Rock Canyon NCA – Temporary Office Trailer Page 1 of 5

1.0 INTRODUCTION

1.1 Facility Location

Red Rock Canyon National Conservation Area (RRNCA) Visitor Center, 1000 Scenic Loop Dr., Las Vegas, Nevada 89161 (Exhibit 1).

The Visitor Center lower parking lot and existing trailer are shown on Exhibit 2 – lat: 36.148896°

/ long: -115.411422°

1.2 Background

The employees of RRNCA require a temporary office space while improvements are made to the administrative building. There is currently a double wide office trailer on site (rented by another entity). The trailer shall be located adjacent to the existing trailer in the lower parking lot of the

RRNCA Visitors Center (VC). The parking lot is paved asphalt. Power is run to the existing trailer through overhead power lines. This trailer, currently being solicited, will hook up to the existing power source. There is no water or septic on site. The trailer shall include an ADA compliant restroom with water and septic tanks that are serviced weekly.

2.0 SCOPE OF WORK

The purpose of this solicitation is to rental a double wide trailer to serve as a short-term temporary office space for RRNCA employees. This requirement includes the following actions:

1. Deliver a mobile office trailer to the specified location in Exhibit 2.

2. Complete set up of mobile office trailer for occupancy.

3. Provide weekly service to the septic and water tank for the trailer facilities.

4. Tear-down and remove trailer once services are no longer required.

June 6, 2023 Red Rock Canyon NCA – Temporary Office Trailer Page 2 of 5

3.0 PROJECT DETAILS

3.1 Contractor shall provide an office trailer with a minimum size (nominal, exterior dimensions of box) of 24’ x 60.

3.2 Trailer shall have a minimum of 4 corner offices with working switch lights, at least one power outlet (2 preferred, but not required) and their own operable interior doors.

3.3 The mobile office trailer must have two “Front Doors” both of which must be able to be locked from the interior and exterior of the trailer. Both doors should be on the same side of the unit.

3.4 One of the unit’s front doors must have an ADA compliant ramp for access. The other shall have a set of stairs.

3.5 The stairs and the ramp shall be delivered and attached by the Contractor, no later than two (2) working days of delivery of the trailer.

3.6 The unit’s “Front Doors” should have direct access to an open space area that measures a minimum of 600 square feet.

3.7 The open space must have direct interior access to all offices. Access Via hall or direct access is acceptable.

3.8 The mobile office trailer must be capable of accepting electrical power from an existing temporary utility line strung from the current administrative building. Contractor shall verify the available power on site is compatible with the contractor’s unit, but the connection to power is not required.

3.9 The mobile office trailer interior walls should be floor-to-ceiling.

3.10 The mobile office trailer must be no more than 10 years old.

3.11 The land where the mobile office will be located is in a paved asphalt area.

3.12 Trailer skirting is required and must be secured with all openings sealed.

3.13 Paneling trim adhered and in place.

3.14 Paneling in good shape and secured properly, no holes or excessive nails.

3.15 The main access road to the lot where the trailer will be placed is asphalt. See Exhibit 3 for delivery route.

3.16 There is no water or sewer at the site.

3.17 An ADA compliant restroom shall be located within the trailer. The trailer shall include a water tank with a minimum size of 100 gallons serviced weekly. The trailer shall include

June 6, 2023 Red Rock Canyon NCA – Temporary Office Trailer Page 3 of 5 a waste tank with a minimum size of 100 gallons serviced weekly.

3.18 A used trailer is acceptable if it is in good condition with working lights and thermostatically controlled HVAC (cold/heat), HVAC unit is of high capacity and high efficiency.

3.19 Heating and air conditioning is required and must be in good working order. Note, temperatures vary throughout the year and can range from 20˚ F to 120˚ F.

3.20 All windows shall have working blinds and operable locks, window security bars are preferred, not required.

3.21 Windows: glass in good condition.

3.22 Flooring: carpet is required in all areas except the restroom.

3.23 Flooring must be solid throughout the trailer without gaps. All flooring shall be properly adhered to subfloor, with limited non-removable marks and expected gaps, particularly where the units are joined together.

3.24 Electrical outlets working and wired correctly, GFCI’s in operable condition.

3.25 Interior lighting: standard fluorescent lighting is acceptable.

3.26 Light fixtures attached properly, wired correctly, switched and in working order.

3.27 All underneath insulation covered, and fabric or other material secured.

3.28 Electrical panel in good working order and must be lockable from the outside, a key must be provided for access.

3.29 Roof structure is solid and roofing material is in good condition with no visible deficiencies.

3.30 Contractor is responsible for all services calls within 48 hours of contact.

3.31 Trailer shall be placed with breaker panel adjacent to breaker panel on the existing trailer as shown in Exhibit 2.

3.32 Contractor shall bag non-re-installable material such as floor tile, levelers, trash and/or siding and dispose of off-site in accordance with applicable Federal, State, and local regulations.

3.33 Contractor shall repair any damage caused by their operations at their cost.

4.0 PROJECT ADMINISTRATION

4.1 Project Coordination

June 6, 2023 Red Rock Canyon NCA – Temporary Office Trailer Page 4 of 5

4.1.1 Contractor shall notify Government a minimum of 5 working days before initiating on-site work area work efforts.

4.1.2 Government shall provide the resources necessary to keep the work area free of Red Rock

Canyon NCA visitors.

4.1.3 Government personal shall be available by phone or email and will be on-site as needed to respond to Contractor questions. Contact information will be provided when notice to proceed is issued.

4.1.4 Government shall be available for on-site pre-installation meeting if requested.

4.2 Period of Performance/Site Access/Work Hours/Protection

4.2.1 Period of Performance:

a. Office trailer shall be delivered no later than 30 business days from the issuance of award.

b. Period of performance is for one base year with up to four (4) 12-month option periods. Options will be dependent on availability of funds and continuation of government need. The Contractor shall notify Government five working days in advance of initiating work at the site and obtain Government approval for that date.

4.2.2 Site Access:

a. The Contractor shall have full use of areas needed to perform the work. Contractor’s use of premises is limited only by Governments right to perform work. Schedule and sequence operations necessary to complete the work.

b. Government shall install as needed signs and protective barriers to prevent the public from parking in the designated area during the project period of performance.

4.2.3 Work Hours:

a. Work shall be performed Monday through Friday, 7:00 a.m. to 5:00 p.m. except on weekends and legal holidays. Work at other times shall be prior approved by

Government.

4.2.4 Protection:

a. Protect any areas adjacent to the project site from any debris. Comply with governing regulations pertaining to environmental protection. Ensure safety of persons in the work area. Provide temporary barricades as required to protect personnel and public from injury.

APPENDIX A

1. Site Location Map

2. Trailer Location Map

3. Delivery Route Map

Summerlin Master Planned Community

West Side of Las Vegas Valley

Red Rock Canyon NCA

Visitor Center

EXHIBIT 1.

Existing Trailer Location

New Trailer Location

Breaker Panels and Shore Power Connection

EXHIBIT 2.

Delivery Route

From Summerlin

EXHIBIT 3.