TX - INKS DAM NATIONAL FISH HATCHERY Radon Mitigat
Solicitation number
140FS224Q0249
Issued by

About this file

This document is a Statement of Work (SOW) for radon mitigation work to be performed at the Inks Dam National Fish Hatchery's Butler Building and Holding House In-Vitro Lab. Radon testing has identified elevated levels above EPA standards in these two facilities, requiring mitigation. The SOW specifies that the work must be performed in accordance with industry standards to reduce radon levels below 4 Pico curies. The contractor must conduct post-mitigation radon testing within 30 days to verify the system is working properly. The SOW includes contact information for the Inks Dam National Fish Hatchery and the Region Facilities Coordinator. This SOW is related to a federal contract opportunity solicitation (Solicitation Number: 140FS224Q0249) issued by the Department of the Interior Fish and Wildlife Service for the Inks Dam National Fish Hatchery radon mitigation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INKS DAM NATIONAL FISH HATCHERY

Statement of Work

INKS DAM NATIONAL FISH HATCHERY RADON MITIGATION FOR BUTLER

BUILDING AND HOLDING HOUSE IN-VITRO LAB.

General Information

Radon testing of Butler Building and Holding House In-Vitro Lab resulted in elevated levels above EPA standards. Tests concluded Butler Building at an elevated level of 21.32 pCi/L and Holding House In-Vitro Lab at an elevated level of 9.4 pCi.L.

Radon mitigation work to be performed (in accordance with industry standards)

1. Perform work for the purpose of reducing radon in air in accordance with industry standards. All Mitigation Systems guaranteed to bring Radon levels to below 4 Pico curies.

2.Conduct radon test to verify the validity of the radon mitigation system and warranty.

You must wait for at least 24 hours to run a retest for radon levels after radon mitigation.

After 24 hours testing, retest within 30 days of the new mitigation system’s installation.

Radon Testing Report shall be conducted by State certified technician. Contractor shall include the certification with the radon testing report.

Attached is a reference site plan showing proposed butler building and in-vitro lab.

Contacts:

Inks Dam NFH Contact: Jeff Conway

Project Leader Inks Dam National Fish Hatchery 345 Clay Young Road Burnet, TX 78611 512-793-2474 05-570-1689 (Cell)

Region Facilities Coordinator: Monish Bhan

(505) 549-9958

Butler Bldg

Housing House