A04-FY2021_Imperial_Trash_SOW.doc
DOC document 46 KB Posted
- Attached to
- IMPERIAL DAM REC AREA TRASH REMOVAL SVC
- Solicitation number
- 140L6421Q0026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L6421Q0026.pdf | ||
| A06-Imperial_Dam_Bin_Locations.pdf | ||
| B03_WG-2015-5479_La_Paz_County__AZ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Bureau of Land Management
Yuma Field Office
STATEMENT OF WORK
IMPERIAL DAM RECREATION AREA
TRASH REMOVAL CONTRACT
05/05/21 1.1
REQUIREMENT
It is required that trash collection services be performed at the recreation sites indicated in paragraph 1.3. The Contractor is required to furnish all labor, material, supplies, and equipment including trash bins and vehicles needed to perform in accordance with these specifications.
Bins will have hinged lids that cover the entire opening, will be painted at least once per year, and maintained in proper working condition at all times. Paragraph 1.3 shows the location, number, and schedule for bins to be serviced. Paragraph 1.5 describes the unscheduled collections. The number of bins as shown in paragraph 1.3 is based upon bins of 5 cubic yards in size. Bins of 5 cubic yards or greater may be used provided the total holding capacity for each location is equal to the amount of the bins indicated in paragraph 1.3.
1.2
LOCATION
The bins will be placed at locations in the quantities indicated in paragraph 1.3. The scheduled collection, removal, and transport of solid waste from Bureau of Land Management Public locations, as follows:
1.3
COLLECTION LOCATIONS, SCHEDULES, AND OTHER SPECIFI ATIONS
| Location |
| Pickup Schedule |
| Required Number of |
5-Yard Bins Required Collection Days
| Quail Hill |
| Sept. 1 – April 15 |
| 2 |
| MON & FRI |
(2x per week)
Kripple Kreek
| Sept. 1 – April 15 |
| 1 |
MON & FRI
| South Mesa |
| May 1 – Dec. 31 |
| 8 |
| MON & FRI |
| Jan. 1 – April 30 |
| 10 |
| MON, WED, FRI |
(3x per week)
Senator Wash Boat Ramp
| All Year |
| 1 |
| MON & FRI |
Squaw Lake
| All Year |
| 4 |
| MON & FRI |
Mittry Lake Boat Ramp
| All Year |
| 2 |
| MON & FRI |
1.4
GENERAL DESCRIPTION OF WORK
Collection of trash from the bins will be according to schedule as described in paragraph 1.3. The Contractor will be responsible for the cleanup of any spillage caused by his/her operation. Disposal of the trash will be only at approved sanitary landfills. Contractor must participate in the single stream recycle process.
It is anticipated that bagged refuse will at times be stacked alongside trash bins when bins are full. The Contractor is required to pick up bagged refuse stacked alongside trash bins.
1.5
UNSCHEDULED TRASH COLLECTION
If additional trash collection is required due to heavier use than anticipated, the Contractor shall provide the requested service at the unit price. It is estimated that four unscheduled trips for each work location may be required. Unscheduled collections for the purpose of this contract are defined as additional trips to the work locations on days or at times other than those specified in Paragraph 1.3
1.6
DELIVERABLES/PERIOD OF PERFORMANCE
The performance period for the contract is for one year from the date of the award of the contract, with a four 1-year Option Periods subject to acceptable contractor performance.
1.7
RESTRICTIONS
Only authorized BLM personnel can make on-call services.
Any weigh or dump charges must be documented. (Weight tickets, etc.).
Any performance of services outside the scope of work or in excess of funding is at the contractor’s risk. Services must be in accordance with any applicable local, state, or federal regulations.
1.8
PAYMENT TERMS
Payments are to be made via monthly itemized invoice.
Price is based upon established commercial pricing for similar services to other organizations.
Government Furnished Property: None.
1.9
QUALITY ASSURANCE PLAN
Introduction: The quality assurance plan is intended to measure the quality of goods and services purchased from the Contractor. To accomplish quality assurance the Government may utilize assessment measures to ensure that the Contractor’s Performance is acceptable. The criteria for determining task performance is timeliness, work omissions, and any re-work needed.
1.10 METHODS OF ASSESSMENT
100% inspection: Monthly or weekly observation and recorded reports indicating satisfactory or unsatisfactory performance may be used.
Planned Sampling: The Government may utilize scheduled evaluations resulting in an assessment of the Contractor’s performance.
Validated Complaints: Validated complaints may be recorded to indicate any deficient work. Complaints must be verified by authorized BLM Personnel.
1.11 GENERAL CRITERIA FOR TASKS
Work Omissions: A major omission is a work requirement that if omitted or performed unsatisfactory would have a significant impact on the overall work requirement.
Minor work omissions do not have a significant effect on the work requirement.
Timeliness: Daily, weekly, bi-weekly, and/or monthly tasks shall be completed in accordance with the delivery schedule.
Re-work needed: The Contractor is allowed a reasonable time to perform any work that is identified as unsatisfactory or has not been performed.
1.12 LEVEL OF ASSESSMENT
The level of assessment shall be determined by the Contracting Officer’s Representative. If reporting indicates performance below an acceptable level, increased assessment of performance may be required by scheduled evaluations.
File details come from the government source that posted it. Updated .