Appendix A - Cost Breakdown.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- B267_Expand Hazardous Waste Facility
- Solicitation number
- A038555
About this file
This document is Appendix A - Cost Breakdown.xlsx, which is a pricing template for a federal contract opportunity. The template requests the vendor to provide a detailed cost breakdown for the construction project, including information on bonds and insurance, mobilization, architecture and engineering design, materials, equipment, labor hours and rates, and miscellaneous charges. The purpose is to assist government personnel in reviewing and evaluating the proposals submitted by offerors. The related federal contract opportunity is for the expansion of a hazardous waste storage facility, which includes site work, foundation, block walls, roof, rolling door, electrical, and fire protection. The solicitation number is A038555, the estimated value is between $1,000,000 and $5,000,000, and there is a mandatory site visit scheduled for July 8, 2024. All RFIs must be submitted by July 11, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Appendix A |
| CONSTRUCTION PRICE PROPOSAL BREAKDOWN |
| VENDOR'S INFORMATION |
| Name: |
| Address: |
| Phone Number: |
| Email: |
| Cage Code: |
| SOLICITATION INFORMATION | ||||
| Title of Project: | ||||
| Solicitation Number: | ||||
| Days proposal good for: | ||||
| BONDS AND INSURANCE | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| Certificate of Insurance | 1 | |||
| Performance Bonds | 1 | |||
| Payment Bonds | 1 | |||
| Bid Bonds | 1 | |||
| MOBILIZATION | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| ARCHITECTURE AND ENGINEERING DESIGN | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| 35% Design's | ||||
| 65% Design's | ||||
| 95% Design's | ||||
| 100% Design's (Construction Set) | ||||
| MATERIAL | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| EQUIPMENT | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| LABOR | HOURS | UNIT OF ISSUE | RATE | AMOUNT |
| MISCELLANEOUS CHARGES | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| CONSTRUCTION PROJECT | GRAND TOTAL | |||
| GENERAL INFORMATION | ||||
| The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of proposals submitted by offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed pricing; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. Further, FAR 15.403-4 sets forth those circumstances in which offerors are required to submit certified cost or pricing data. (Updated Nov. 19, 2013) |
supportable and well-prepared propsal. The basis and rationale for all proposed pricing should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate.
File details come from the government source that posted it. Updated .