A03_JA_Chiller_Redacted.pdf

PDF 186 KB Posted

Attached to
Chiller Repair Services
Solicitation number
Not on record
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENTS OF THE ARMY AND THE AIR FORCE

NATIONAL GUARD BUREAU

MASSACHUSETTS AIR NATIONAL GUARD

CONTRACTING DIVISION

102 IW - Otis

Engineered modifications to two (2) existing Carrier Centrifugal Chillers. Work to include internal inspection, engineering, the replacement of the internal bearings and head producing assembly and upgrading the operating software.

Carrier Corporation Carrier Corporation

6.302-2 -- Unusual and Compelling Urgency.

Chillers and Towers at are freezing up and shutting down mission critical operations causing mission essential equipment to function incorrectly which in turn is causing mission failure. The constant part replacement and associated costs are growing and repairs are needed immediately. These chillers are manufactured by Carrier, and the repair work required on the chillers includes engineering specifics to Carrier's Evergreen model. This engineering is to be performed by the direct factory engineering and repair group for Carrier. A letter from Carrier is attached as to the nature of repairs needed for the system and their proprietary engineering and parts to conduct this emergency work. This repair is mission critical and must be completed immediately.

We cannot prepare a SOW that describes engineered modifications specific to Carrier's Central Engineering.

They have the drawings and procedures that, we are told, are for internal use only.

YES

On-line research for companies authorized by Carrier for Engineered Modifications.

Other companies are authorized by Carrier for installation and repair, but not for internal engineering.

Notice will be published in accordance with FAR Subpart 6.303-2 Unusual and compelling urgency (mission failure); 6.303-1 Requirements; 6.303-2 Content; 6.304 Approval of the justification; and 6.305 Availability of the justification. Any and all future work that does not require internal proprietary matters will be competed to the fullest extent practicable.

5.202(a)(2)

Not Applicable

File details come from the government source that posted it. Updated .