SECTION B –BIDDING SCHEDULE
U.S. ARMY CORPS OF ENGINEERS
JERRY F. COSTELLO LOCK AND DAM
MODOC, IL.
AIR COMPRESSOR SYSTEM REPLACEMENT
Bidding Schedule Item Estimated Unit Estimated No. Description Quantity Unit Price Amount _
| 0001. Air Compressors | | 2 | EA _____ | _________ |
| 0002. Primary Air Receiver | 1 | EA _____ _________ | | |
OPTIONAL ITEMS
| 0003. Secondary Air Receiver | | 3 | EA _____ _________ |
| 0004. Low Voltage Distribution | 1 | JB _____ _________ | |
Equipment Replacement
TOTAL $ _________
ABBREVIATIONS
(See BIDDING SCHEDULE NOTES)
BIDDING SCHEDULE NOTES
1. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit is shown as job "JOB".
2. When bids are solicited on a unit price basis, bidders shall insert in the spaces provided therefore in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the bidder quotes only a total price ("estimated amount") in its bid and fails to quote the unit price, the Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The bidder agrees that the unit price so determined shall be used for the purpose of bid evaluation, award and all payments to the Contractor including final payment.
3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid and the extension will be corrected accordingly.
4. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
5. Bidders are required to bid on all items listed on the Bidding Schedule in addition to inserting a total quoted bid in the appropriate space provided. Failure to do so will be considered cause to disqualify the bid.
6. Items Included in Bid Item 0004. Stainless Steel Piping; Stainless and Galvanized Piping:
Welded (Flanged) Inlet OD(in) Outlet OD(in)
| Desiccant Air Dryers |
| 2 |
| Flanged |
| 2.5 |
| 2.5 |
| Pressure Gages |
| 4 |
| Welded |
| 1.5 |
| 1.5 |
| Pressure Gages |
| 2 |
| Welded |
| 1 |
| 1 |
| Line Strainers |
| 2 |
| Flanged/Welded |
| 2.5 |
| 2.5 |
| Line Strainers |
| 4 |
| Flanged/Welded |
| 1.5 |
| 1.5 |
| Ball Valves |
| 9 |
| Flanged |
| 2.5 |
| 2.5 |
| Ball Valves |
| 8 |
| Flanged |
| 1.5 |
| 1.5 |
| Ball Valves |
| 12 |
| Flanged |
| 1 |
| 1 |
| Gage Cocks |
| 4 |
| Welded |
| 1.5 |
| 1.5 |
| Gate Valves |
| 7 |
| Flanged |
| 2.5 |
| 2.5 |
| Gate Valves |
| 8 |
| Flanged |
| 1.5 |
| 1.5 |
| Gate Valves |
| 1 |
| Flanged |
| 1 |
| 1 |
| Solenoid Valves |
| 4 |
| Flanged |
| 1.5 |
| 1.5 |
| 2.5” Stainless Steel Piping |
| 575 (feet) |
| Welded |
| 2.5 |
| 2.5 |
| 2” Stainless Steel Piping |
| 1429 (feet) |
| Welded |
| 2 |
| 2 |
| 1.5” Stainless Steel Piping |
| 87.5 (feet) |
| Welded |
| 1.5 |
| 1.5 |
| 1” Stainless Steel Piping |
| 89 (feet) |
| Welded |
| 1 |
| 1 |
| 0.75” Stainless Steel Piping |
| 0.75 (feet) |
| Welded |
| 0.75 |
| 0.75 |
Fittings
| 90 degree elbow |
| 45 |
| Welded |
| 2.5 |
| 2.5 |
| 90 degree elbow |
| 5 |
| Welded |
| 2 |
| 2 |
| 90 degree elbow |
| 28 |
| Welded |
| 1.5 |
| 1.5 |
| 90 degree elbow |
| 22 |
| Welded |
| 1 |
| 1 |
| 90 degree reducing elbow |
| 2 |
| Welded |
| 2 |
| 1.5 |
| 90 degree reducing elbow |
| 2 |
| Welded |
| 1.5 |
| 1 |
| 45 degree elbow |
| 8 |
| Welded |
| 2.5 |
| 2.5 |
| 45 degree elbow |
| 8 |
| Welded |
| 2 |
| 2 |
| 45 degree elbow |
| 2 |
| Welded |
| 1 |
| 1 |
| “T” Junction |
| 18 |
| Welded |
| 2.5 |
| 2.5 |
| “T” Junction |
| 12 |
| Welded |
| 1.5 |
| 1.5 |
| “T” Junction |
| 7 |
| Welded |
| 1 |
| 1 |
| “T” Junction |
| 1 |
| Welded |
| 1 |
| 2.5, 2.5 |
| “T” Junction |
| 1 |
| Welded |
| 2.5 |
| 2.5, 1 |
| “T” Junction |
| 1 |
| Welded |
| 2.5 |
| 1.5, 0.75 |
| “T” Junction |
| 1 |
| Welded |
| 2 |
| 1.5, 1.5 |
| “T” Junction |
| 1 |
| Welded |
| 2.5 |
| 2, 1.5 |
| Air Hose Connector |
| 2 |
| Flanged |
| 1 |
| 1 |
| Capped End |
| 2 |
| Flanged |
| 0.75 |
| 0.75 |
Welded (Flanged) Inlet OD(in) Outlet OD(in)
| Desiccant Air Dryers |
| 1 |
| Threaded |
| 2.5 |
| 2.5 |
| Desiccant Air Dryer |
| 1 |
| Flanged |
| 2.5 |
| 2.5 |
| Pressure Gage |
| 4 |
| Welded |
| 1.5 |
| 1.5 |
| Pressure Gages |
| 2 |
| Threaded |
| 1 |
| 1 |
| Line Strainers |
| 4 |
| Flanged/Welded |
| 1.5 |
| 1.5 |
| Line Strainers |
| 2 |
| Threaded |
| 2.5 |
| 1.5 |
| Filters |
| 1 |
| Threaded |
| 1.5 |
| 1.5 |
| Ball Valves |
| 8 |
| Threaded |
| 2.5 |
| 2.5 |
| Ball Valves |
| 8 |
| Threaded |
| 1.5 |
| 1.5 |
| Ball Valves |
| 6 |
| Threaded |
| 1 |
| 1 |
| Ball Valves |
| 1 |
| Flanged |
| 2.5 |
| 2.5 |
| Ball Valves |
| 6 |
| Flanged |
| 1 |
| 1 |
| Gage Cocks |
| 4 |
| Welded |
| 1.5 |
| 1.5 |
| Gage Cocks |
| 2 |
| Threaded |
| 1 |
| 1 |
| Gate Valves |
| 7 |
| Flanged |
| 2.5 |
| 2.5 |
| Gate Valves |
| 8 |
| Threaded |
| 1.5 |
| 1.5 |
| Gate Valves |
| 1 |
| Threaded |
| 1 |
| 1 |
| Solenoid Valves |
| 4 |
| Welded |
| 1.5 |
| 1.5 |
| 2.5” Galvanized Piping |
| 451 (feet) |
| Threaded |
| 2.5 |
| 2.5 |
| 2” Galvanized Piping |
| 1429 (feet) |
| Threaded |
| 2 |
| 2 |
| 1.5” Galvanized Piping |
| 67 (feet) |
| Threaded |
| 1.5 |
| 1.5 |
| 1” Galvanized Piping |
| 24 (feet) |
| Threaded |
| 1 |
| 1 |
| 0.75” Galvanized Piping |
| 0.75 (feet) |
| Threaded |
| 0.75 |
| 0.75 |
| 2.5” Stainless Steel Piping |
| 124 (feet) |
| Welded |
| 2.5 |
| 2.5 |
| 2” Stainless Steel Piping |
| 0 (feet) |
| Welded |
| 2 |
| 2 |
| 1.5” Stainless Steel Piping |
| 22 (feet) |
| Welded |
| 1.5 |
| 1.5 |
| 1” Stainless Steel Piping |
| 65 (feet) |
| Welded |
| 1 |
| 1 |
| 0.75” Stainless Steel Piping |
| 0 (feet) |
| Welded |
| 0.75 |
| 0.75 |
Fittings
| 90 degree elbow |
| 7 |
| Welded |
| 2.5 |
| 2.5 |
| 90 degree elbow |
| 28 |
| Welded |
| 1.5 |
| 1.5 |
| 90 degree elbow |
| 7 |
| Welded |
| 1 |
| 1 |
| 90 degree elbow |
| 38 |
| Threaded |
| 2.5 |
| 2.5 |
| 90 degree elbow |
| 5 |
| Threaded |
| 2 |
| 2 |
| 90 degree elbow |
| 15 |
| Threaded |
| 1 |
| 1 |
| 90 degree reducing elbow |
| 2 |
| Threaded |
| 2 |
| 1.5 |
| 90 degree reducing elbow |
| 2 |
| Welded |
| 1.5 |
| 1 |
| 45 degree elbow |
| 2 |
| Welded |
| 2.5 |
| 2.5 |
| 45 degree elbow |
| 6 |
| Threaded |
| 2.5 |
| 2.5 |
| 45 degree elbow |
| 8 |
| Threaded |
| 2 |
| 2 |
| 45 degree elbow |
| 2 |
| Threaded |
| 1 |
| 1 |
| “T” Junction |
| 1 |
| Welded |
| 2.5 |
| 2.5 |
| “T” Junction |
| 12 |
| Welded |
| 1.5 |
| 1.5 |
| “T” Junction |
| 17 |
| Threaded |
| 2.5 |
| 2.5 |
| “T” Junction |
| 7 |
| Threaded |
| 1 |
| 1 |
| “T” Junction |
| 1 |
| Threaded |
| 1 |
| 2.5, 2.5 |
| “T” Junction |
| 1 |
| Threaded |
| 2.5 |
| 2.5, 1 |
| “T” Junction |
| 1 |
| Threaded |
| 2 |
| 1.5, 0.75 |
| “T” Junction |
| 1 |
| Threaded |
| 2 |
| 1.5, 1.5 |
| “T” Junction |
| 1 |
| Threaded |
| 2.5 |
| 2, 1.5 |
| Air Hose Connector |
| 2 |
| Threaded |
| 1 |
| 1 |
| Capped End |
| 2 |
| Threaded |
| 0.75 |
| 0.75 |
| Dielectric Unions |
| 2 |
| Galv: Threaded |
SS: Welded