A02_3-Bid_Schedule_(HQ_-QTRS)-blank.pdf

PDF 68 KB Posted

Attached to
LA-LACASSINE NWR-EMERGENCY REPAIRS
Solicitation number
140F0421R0033
Issued by

About this file

This bid schedule outlines pricing requirements for emergency repair projects at Lacassine National Wildlife Refuge in Louisiana. The U.S. Fish and Wildlife Service is soliciting lump sum bids for repairs to the headquarters, Quarters #1, and maintenance shop, with bidders required to provide pricing breakdowns at the sub-item level for labor, materials, equipment, and other direct costs. The total evaluated price will be determined by adding the lump sum amounts for the three bid items. Bids are due by March 2021 under solicitation number 140F0421R0033. Bidders must enter prices for all line items or risk rejection of their bid.

View the file

Other files

File Type Posted
General_Decision_Number_LA20210003.pdf PDF
Statement_of_Works_(SOWs).zip ZIP file
General_Decision_Number_LA20210025.pdf PDF
Sol_140F0421R0033.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B -- SUPPLIES OR SERVICES AND PRICES

B.1 SECTION B - BID SCHEDULE MARCH 2021

SCHEDULE OF ITEMS

Construction Services for Storm Damage Repair Projects at Lacassine National Wildlife Refuge, Lake Arthur, LA.

Item Number Description Unit Amount

001 (Bid Item 1) Lump Sum $ .

Headquarters Repairs

Lacassine NWR

002 (Bid Item 2) Lump Sum $ .

Quarters #1

003 (Bid Item 3) Lump Sum $ .

Maintenance Shop

TOTAL AMOUNT (CLINS 0001-003) $ .

Note: Instructions for submission of cost or pricing data or information other than cost or pricing data (Reference Solicitation Section L., 52.215-20)

Note: Provide pricing and cost element break downs for each of the items listed, down to the sub item level in the Scope of Work, in enough detail to allow adequate price analysis. This could include, but is not limited to, labor, materials, equipment, competitive subcontractor quotes, overhead, bonding and profit.

FAILURE TO ENTER PRICES ON ALL LINE ITEMS SHALL BE CAUSE FOR REJECTION OF THE

BID.