A.02_Specifications_7N21Q0013.pdf

PDF 363 KB Posted

Attached to
Aluminum Survey Vessel
Solicitation number
W9127N21Q0013
Issued by

About this file

This document outlines specifications for the procurement of an aluminum survey vessel for the United States Army Corps of Engineers, Portland District. The solicitation calls for the purchase of a new 34-foot aluminum survey vessel and trailer that meets specific dimensional and capacity requirements. Key equipment and systems required for the vessel include twin 250HP outboard motors, navigation and auxiliary equipment, interior accommodations for up to ten persons, and the ability to carry 200 pounds of survey equipment. The vessel must comply with applicable ISO standards and pass stability testing. The contractor must deliver the completed vessel within one year of award and provide associated documentation, warranties, crew training, and technical support. The solicitation is set aside for total small businesses and is available through the System for Award Management database. Quotes are due by the date and time specified in the solicitation, which is identified by number W9127N21Q0013.

View the file

Other files

File Type Posted
B.01_CombinedSynopsisSolicitation_7N21Q0013.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE PORTLAND DISTRICT

SPECIFICATIONS FOR PROCUREMENT OF SURVEY VESSEL

1. General

Provide all labor, materials and services to procurement a new 34’ aluminum USACE Survey Vessel boat and trailer.

1.1. Description of Vessel

The vessel shall meet the following characteristics:

Hull

1.1.1. Length Overall Between 34’ 0” and 34’ 8”

1.1.2. Beam 110”-120”

1.1.3. Freeboard Between 42” and 46”

1.1.4. Dry Weight 7,200 lbs maximum

1.1.5. Propulsion Twin outboard motors, minimum 250 HP each

1.1.6. Aluminum 5086 H116

1.1.7. Transom thickness 0.250” minimum

1.1.8. Bottom thickness 0.250” minimum

1.1.9. Side thickness 0.160” minimum

1.1.10. Fuel Capacity 225 gallons

1.1.11. Transom walk through door

1.1.12. MILSPEC Magnesium anodes

1.1.13. Stainless steel hull through fittings below water line with seacock valves

1.1.14. Forward double scuppers in rear deck

1.1.15. Two points of egress with oversized 24” evacuation hatch in forward v-berth

1.1.16. Full reverse chine bottom hull shape and design

1.1.17. Self-bailing rear deck primed and coated with dark gray colored non-skid coating system suitable for application over aluminum substrate.

1.1.18. The exterior finish shall include all Government decals stating USACE SURVEY.

Locations to be approved by COR prior to application.

1.1.19. Pressure tested sub-floor fuel cell-diurnal system compliant sound deadening foam package.

Electrical and Auxiliary Equipment

1.1.20. Ground Fault Detection and isolated grounds using a single point grounding methodology for the entire vessel electrical system.

1.1.21. Aft Control Station with wheel and forward and reverse controls

1.1.22. Driver, passenger and center windshield pantograph windshield wipers

1.1.23. Stainless steel marine horn

1.1.24. Dashboard with LED switches, fuel gauge, trim tab controls

1.1.25. LED Navigation and anchor lights

1.1.26. Electric trim tabs on brackets (piano hinge style mounting or comparable)

1.1.27. 3-auto bilge pumps and high-water bilge alarm

1.1.28. Wash-down kit

1.1.29. Remote battery switches for each battery bank

1.1.30. Emergency start crossover fuel water separator

1.1.31. Hydraulic steering with tilt helm

1.1.32. Carbon monoxide detector

1.1.33. Trailer for transportation of vessel that meets ODOT and WSDOT standards.

1.1.34. Convenience Lighting

Enclosed Deckhouse & Interior

1.1.35. V-berth

1.1.36. Marine Head with 21 gallon holding tank.

1.1.37. Convertible dinette

1.1.38. Gray interior color package

1.1.39. Helm suspension seat with swivel

1.1.40. Aft door and forward door/hatch

1.1.41. HVAC for heat and A/C with ability to maintain 75 deg F

1.1.42. Convenience lighting

1.2. References

Technical Standards:

Refer to sections 3.5.2 & 3.5.3 and applicable subparts.

ISO 11812: Small Craft – Watertight cockpits and quick-draining cockpits

ISO 11215 (all parts): Small Craft – Hull construction and scantlings

ISO 12216: Small Craft – Windows, port lights, hatches, deadlights and doors – Strength and water- tightness requirements

ISO 12217-1: Small Craft – Stability and Buoyancy Assessment Part 1: Non-sailing boats of hull length greater than or equal to 6 m (20’)

ISO 14945: Small Craft – Builder’s Plate

ISO 14946: Small Craft – Maximum Load

ISO 15085: Small Craft – Man-overboard prevention and recovery

IACS No. 47 Guide for Shipbuilding and Repair

ABYC Electrical Standards

ABS Habitability for Workboats

1.3. Specifications

Provide all labor, materials and services to procurement a new 34’ aluminum USACE Survey Vessel boat and trailer. Vessel shall meet all characteristics as identified in section 1.1 Description of vessel.

Prior to construction of vessel, contractor must submit vessel builder’s design and calculations, general arrangement plan, and profile drawing of the cabin, decks, engine mounting and auxiliary equipment layouts to the Contracting Officer as part of the proposal which will be verified to ensure it meets the stated criteria. Inability to meet ISO and USACE defined damage stability criteria could result from termination of the contract.

Vessel shall be capable of handling offshore, rough or heavy seas. Furthermore vessel must be capable of housing 200 pounds of survey equipment.

For intact stability and buoyancy assessment, the vessel shall satisfy the requirements identified in ISO 12217-1, Part 1, Design Category B.

For damage stability, in addition to the ISO buoyancy assessment, the vessel shall be designed with watertight bulkheads and decks so that in the event of any one single compartment becoming damaged, the vessel will remain floating in a general upright attitude, no down-flooding locations submerged (to prevent cascading/progressive flooding), and allowing the crew to safely evacuate from the cabin.

All stability calculations shall be submitted to the COR for review and approval.

Contractor shall install Capacity Plate in accordance with ISO 14945 showing maximum capacities of vessel (people, weight, cargo, etc.) on appropriate location of vessel. The boat must accommodate a maximum capacity of 10 persons in accordance with all applicable standards.

1.4. Period of Performance

Delivery is required to the address under item 3.5.2 Delivery, within one (1) year of the date of award.

2. Definitions

Throughout this contract, terms are defined as follows:

Contracting Officer (CO): Government employee who is authorized to enter into, administer and/or terminate contracts and make related determinations and findings.

Contracting Officer’s Representative (COR): Government employee who has been authorized in writing as the COR by the CO, acting within the limits of their authority.

Critical Path Method (CPM): Project modeling technique used to identify important deadlines and deliver project on time. Reference section 3.2.1 Production Schedule.

3. Contractor Requirements

3.1. General Statement

The Contractor shall furnish all management, supervision, labor, engineering, subcontracting services of manufacturer’s representatives and all facilities, utilities, equipment, tools, lubricants, fuels, materials and articles necessary to fully execute the procurement of the vessel. The Contractor shall perform to the standards in the contract and comply with all federal, state, and local regulations during the services performed.

3.1.1. Regulatory Body Approved Material, Supplies and Equipment

Contractor shall ensure all furnished materials, supplies and equipment used for repairs to, replacement of, or installation of new items, shall comply with all applicable ISO and USACE defined requirements.

3.1.2. General Workmanship & Construction Standards

All design, engineering, modifications, and repairs to the vessel shall be performed in accordance with the criteria set forth in the latest issues of the following standards or regulations:

U.S. Army Corps of Engineers, Engineer Manual (EM) 385-1-1, “Safety and Health Requirements Manual.” Online at: http://www.usace.army.mil/publications/eng-manuals/em385-1-1/toc.htm

USCG, Navigation Rules - Inland/International.

Title 29 Code of Federal Regulations (C.F.R.) part 1915, Occupational Safety and Health Standards for Shipyard Employment. (Also found in Occupational Safety and Health Administration publication no.

2268, Shipyard Industry Standards.)

ISO standards set forth in section 1.2

33 C.F.R. chapters I-II.

46 C.F.R. parts 41-69, 90-105, 110-13, 159-65, 170-74.

American Bureau of Shipping, Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE-45 – “Recommended Practice for Electrical Installation on Shipboard”

ABS Habitability for Workboats

National Electrical Manufacturer Association (NEMA). National Fire Protection Association (NFPA).

Standards incorporated by reference within the aforementioned standards, where applicable.

3.2 Production Schedule.

The Contractor shall submit a Production Schedule and is required to use the CPM of network calculation to generate the schedule. The Preliminary Production Schedule shall illustrate the sequence the Contractor proposes to perform the work and the dates the Contractor contemplates commencement and completion of each schedule activity. The schedule shall include a sufficient level of detail to denote work overlaps, commence and completion dates of all activities, predecessor/successor relationships, milestones, critical path, and the logical and efficient order the contractor proposes to accomplish all work. Activities shall be scheduled for earliest possible completion, commensurate with the best commercial marine practices and availability of materials.

3.3 Submittals

3.3.1 Pre-Work Submittals

After award the Contractor is required to submit the following documents to the COR for review and approval before they can begin fabrication of the vessel. After approval, fabrication shall commence in accordance with the specifications and approved production schedule.

1. Compliance with applicable standards

2. Contractor shall provide builder’s design and calculations general arrangement plan, and profile drawing of the cabin, decks, engine mounting and auxiliary equipment layouts

3. Production Schedule (Paragraph 3.2).

3.3.2 Material Submittals

Two (2) paper copies and one (1) PDF and USB Drive of all equipment manufacturers’ installation, operation, service, and parts manuals for all equipment installed aboard the vessel shall be provided to the

COR.

Contractor shall furnish as-built drawings to the COR for review and approval. Drawings shall be submitted as two (2) full-size sets in hard copy, as well as two (2) electronic sets in PDF, USB Drive and AutoCad. Drawings shall include Final inspection for individual tasks requiring as-built drawings shall not take place until drawings are approved.

Drawings to include final general arrangement plan and profile drawings of the cabin, decks, engine mounting, all major equipment layouts, and electrical and plumbing schematics. Two (2) copies of all equipment manufacturers’ installation, operation, service, and parts manuals for all equipment installed aboard the vessel shall be provided to the COR.

3.4 Quality Control (QC) Program / Plan

Contractor shall provide and maintain a QC Program/Plan

3.4.1 Post-award conference

After award, the contractor shall attend a pre-work meeting with the COR to assure parties are in full agreement and understanding of the specifications herein.

3.4.2 Inspections

The Contracting Officer’s Representative shall be accommodated for any inspections they determine necessary during boat fabrication. The COR will give preliminary approval of completed boat after a successful operational trial. A successful operational trial will have demonstrated the boat to perform static list and trim, list and trim at 10 knots and full speed trim as designed and in accordance with the contract specifications. Preliminary approval shall mean the vessel is complete and ready for shipping.

A USCG simplified stability test or incline test shall be performed prior to vessel delivery. The contractor shall apply the results of the test to the original intact, buoyancy assessment and damage stability calculations to confirm the vessel’s design is in accordance with the specification requirements.

Final acceptance shall come after delivery to Portland, Oregon and following successful operational testing of all vessel characteristics listed in paragraph 1.1 through the methods described in paragraph 3.5.

3.5 Testing

Conduct sea trials as directed by the COR.

Sea trials shall only be completed after completion of all other specification items.

Sea trials shall consist of a minimum two (2) hour underway operational test of motors, steering, auxiliary equipment and navigation electronics. Testing shall at a location agreed to by the COR, consistent with safe testing procedures to prove all repairs. Trials shall include full speed transit (30 minutes minimum) and vessel rotation. Contractor shall have sufficient staffing available aboard vessel to correct all contractual work deficiencies found during this minimum two (2) hour time period.

Sea trials shall be considered complete and successful upon correction of all deficiencies found during this trial.

3.5.1 Warranty of Vessel

The Contractor shall assign, in writing, all commercial warranties for equipment provided under this job order to the Government. The warranty period shall be 1 (one) year from vessel acceptance.

3.5.2 Delivery

The vessel shall be shipped to The Plant Maintenance Section, US Moorings, 8010 NW St. Helens Rd.

Delivery date shall be arranged with the COR prior to shipping to ensure receiving can be accomplished within a timely manner. The vessel shall be delivered to the address indicated thoroughly cleaned, inside and out, in as-new condition. All articles of outfit stored and secured during shipping, shall be properly installed after delivery. All systems, including engines and generators shall be checked out and operated to the satisfaction of the COR. Delivery: F.O.B. Destination. All delivery costs are the responsibility of the contractor and are included in the contract price.

3.5.3 Training

Crew familiarization training at delivery location for up to eight (8) personnel. Training shall cover the operation of all systems and vessel operation. Contractor training personnel must be available for on-site questions for up to 8 hours. All fuel and safety equipment will be provided by USACE.

3.5.4 Workmanship

All work shall be completed in accordance with these specifications to the satisfaction of the COR or QAE and representatives of USCG and/or ABS and meet all requirements and regulations of the ABS, USCG, and the Institute of Electrical and Electronic Engineers