Specifications to supply, deliver, a 20’ x 12’ prefabricated Interior Modular Office to Paint Creek Lake.
The general description of the work is to furnish a four wall, interior modular office that is 12’20’, EB-300’PR’,9 H Panels, 8’ Drop ceiling, modular electric, LED lighting and HVAC, and supervision needed to accomplish the following as described below: Furnish and deliver a prefabricated interior modular office according to the specifications here within.
DELIVERY INFORMATION:
Delivery Date: Within 10 days of issuance of the Notice to Proceed
Delivery Address: 504 Reservoir Rd. Bainbridge Ohio 45612
SCOPE OF WORK
GENERAL: The contractor shall supply and deliver a prefabricated interior modular office in accordance with the following specifications:
Width: 12’ Length: 20’ Height: 9’ Walls: 9’ Structurals: 9’ EB-300 Door: 3x7 with ADA Lockset Ceiling: 240 2’x4’ acoustical grid ceiling Electrical: CAT 6 computer jacks with junction box Modular Electric: 1 EA Dedicated 220V Receptacle 20A (Modular); 6 EA Receptacle Duplex 110v (Modular); 1 EA Switch Single Pole (Modular); 1 EA 125 Amp 12 Space CB Box w/ 4 Circuits (Modular); 3 EA Light LED Troffer 2'x4' w/Lamps (Modular) HVAC: 1 EA 12,000 BTU AC & 11,000 BTU Heat 230V
The building shall include two (2) walkdoors with keyed locksets included for both, and two (2) framed openings with trim included.
Hours of delivery will be 0700-1500, Monday thru Friday, with no delivery on Government holidays. The building will be placed on an existing blacktop pad at the project. The Contractor will be instructed by a Government Designated Authority (GDA) as to the building’s exact location and orientation.
Contractor shall start deliver 10 days of contract award. The Contractor shall notify the project 48 hours prior to delivering.
SPECIAL CONTRACT REQUIRMENTS:
1. Hours of Operation
a. The contractor shall deliver during the following hours:
Monday through Friday, 0700-1500 except Federal holidays
b. Federal Holidays: When one of the designated holidays falls on a Sunday the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours to be approved by Project Manager. Work shall be scheduled around the above listed Federal holidays unless approved in advance.
Ten Federal holidays observed are as follows:
New Years Day (January 1st)
| Martin Luther King Day (3rd Monday in January) |
| President’s Day (3rd Monday in February) |
| Memorial Day (Last Monday in May) |
| Independence Day (July 4th) |
| Labor Day (1st Monday in September) |
| Columbus Day (2nd Monday in October) |
Veterans Day (November 11th)
| Thanksgiving Day (4th Thursday in November) |
| Christmas Day (December 25th) |
File details come from the government source that posted it. Updated .