A-3 Contract Surveillance Plan.docx

DOCX document 36 KB Posted

Attached to
Aircrew Electronic Warfare Tactical Training Range (AEWTTR-II) Threat Radar Systems and Simulators Federal contract opportunity
Solicitation number
N6893620R0081
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document is a Contract Surveillance Plan (CSP) for a five-year Multiple Award Contract to provide acquisition of products and services associated with Electronic Warfare Threat Systems (EWTS), and peripheral instrumentation supporting Naval Aviation Training Systems Program management Activity and Department of Defense activities. The contractor will be responsible for delivering upgraded EWTS and peripheral instrumentation as specified in individual task orders, including research, development, procurement, sustainment, upgrade, technology insertion, integration, testing, networking, cybersecurity, and configuration and data management. The Naval Air Warfare Center Weapons Division will oversee quality assurance and technical surveillance to ensure the contractor meets requirements for cost, quality, schedule, management, and data standards. The Contracting Officer's Representative and Alternate will monitor the contractor's performance semiannually using a Surveillance Activity Checklist.

View the file

Other files for this federal contract opportunity

Other files attached to Aircrew Electronic Warfare Tactical Training Range (AEWTTR-II) Threat Radar Systems and Simulators, newest first.
File Type Posted
AEWTTR QA 10.7.2021.xlsx XLSX spreadsheet
20R0081 Amendment 1.docx DOCX document
L-2 Teaming Matrix.xlsx XLSX spreadsheet
L-4 RFP Questions Form.xlsx XLSX spreadsheet
L-1 CPAQ 1.pdf PDF
Solicitation N6893620R0081.docx DOCX document
L-3 PP Info Form.xlsx XLSX spreadsheet
E-A CDRLs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT SURVEILLANCE PLAN (CSP)

AIRCREW ELECTRONIC WARFARE TACTICAL TRAINING RANGE (AEWTTR-II)

THREAT RADAR SYSTEMS AND SIMULATORS

(SERVICE CLINS ONLY)

12 FEBRUARY 2021

1. Purpose

This Contract Surveillance Plan (CSP) is a Government developed and applied document used to make sure systematic quality assurance methods are used in the administration of the services under the planned contract. The intent is to ensure that the contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the contract.

The scope of the SOW covers acquisition of products and services associated with Electronic Warfare Threat Systems (EWTS), and EWTS peripheral instrumentation supporting DoD and foreign, test and evaluation (T&E), and training ranges engaged in pre-deployment aircrew training and weapons and countermeasures development. The T&E and Training ranges, hereafter referred to as Ranges. The contractor will be responsible for delivering upgraded EWTS and Peripheral Instrumentation as specified in individual Orders. The scope of the instrumentation and EWTS upgrades shall include: research, development, procurement, sustainment, upgrade, technology insertion, integration, testing, networking, cybersecurity, and Configuration and Data management (CM/DM).

This requirement will be met by issuing task orders with SOWs. The contract will be for a five-year period of performance. A properly executed CSP will assist the Government in achieving the objectives within this procurement.

2. Authority

Authority for issuance of this CSP is provided by Section E - Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in service task orders, to be executed by the Contracting Officer or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between a Quality Management Plan and the Contract Surveillance Plan. The contractor, not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract.

The CSP on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the contract.

4. Government Resources The following definitions for Government resources are applicable to this plan:

Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer, (PCO)) or administer (Administrative Contracting Officer, (ACO)) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is D232000. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.

Alternate Contracting Officer’s Representative (ACOR) – An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.

Technical Assistant (TA) – The COR designates an individual Technical Assistant to assist in technical oversight of specific efforts under the task order.

5. Responsibilities

The following Government resources shall have responsibility for the implementation of this CSP:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Contracting Officer’s Representative (COR) – The COR is responsible for technical surveillance of the contract and assures proper Government oversight of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

Alternate Contracting Officer’s Representative (ACOR) – The ACOR is responsible for technical surveillance of the contractor’s performance in the absence of the COR. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect task order price, terms or conditions shall be referred to the Contracting Officer for action.

Technical Assistant – The Government Project Lead is responsible for assisting in technical oversight of specific efforts under the task order. A Government Project Lead cannot, in any manner, alter the scope of the task order, make commitments, or authorize any changes on the Government’s behalf.

6. Methods of QA Surveillance

a.CSP - The method of surveillance, Enclosure (1), shall be used by the COR in the execution of this CSP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance for the Semiannual reviews is the Surveillance Activity Checklist provided herein.
7.Surveillance

The Surveillance Activity Checklist (SAC), Enclosure (1), will be provided to the contractor on a semiannual basis, as feedback on their performance of the services provided under this contract.

8. Documentation

In addition to providing semiannual reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer semi-annually. The Contracting Officer will retain the records in the contract file to document contractor performance.

9. Enclosures

N68936-20-R-0081

N68936-20-R-0081

Enclosure (1) Surveillance Activity Checklist

Enclosure (1)

SURVEILLANCE ACTIVITY CHECKLIST

All services tasks will be assessed focusing on the following:

Cost - (Applies to cost reimbursable CLINs) Assess the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort. Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Assess the funding and cost status reports are accurate and complete and submitted in accordance with contract requirements. Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. If the contractor is experiencing cost growths, assess the causes and contractor-proposed solutions for the cost overruns.

Quality – Assess the contractor’s effort to transform operational requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets the program quality.

Schedule – Assess the contractor’s adherence to the required schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also, address significance of scheduled events, discuss the causes of any delays, and assess the effectiveness of contractor corrective actions.

Management – Assess the timeliness, completeness, and quality of problem identification, corrective action plans, proposal submittals (especially responses to change orders, Engineering Change Proposals or undefinitized contract actions), and the contractor's history of reasonable and cooperative behavior, effective business relations, and customer satisfaction. Consider the contractor’s responsiveness to the program as it relates to meeting contract requirements during the period covered by the report.

Data Standards – Assess the contractor’s accuracy, timeliness, and appropriate ownership or rights markings on each data and software deliverable. Assess the contractor’s adherence with respect to following the applicable DID and format cited in each CDRL.

Enclosure (1)

The evaluation ratings are as follows:

Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the tasks being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good – Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the tasks being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

Satisfactory – Performance meets contractual requirements. The contractual performance of the tasks contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal – Performance does not meet contractual requirements. The contractual performance of the tasks being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the tasks contains a serious problem(s) for which the contractor’s actions were not implemented or were ineffective.

Services

Task Description
Applicable SOW Section(s)
Surveillance Method
Date Planned
Date Completed
Cost
Quality
Schedule
Management
EW Threat Systems (EWTS) Sustainment and Service Life Extension
3.1
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
Range Instrumentation, Equipment and EWTS Connectivity
3.2
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
Open Loop and Closed Loop EWTS Life Cycle Logistics and Spare Parts
3.3
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
Man-Portable Air Defense System (MANPADS) Interface Instrumentation
3.4
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
Opposition Forces (OPFOR) Communication Systems and Electronic Attack (EA
3.5
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
OPFOR Communication Systems
3.5.1
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
OPFOR EA Systems
3.5.2
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
OPFOR Integrated Air Defense Systems (IADS) Components
3.5.3
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec

Services

Task Description
Applicable SOW Section(s)
Surveillance Method
Date Planned
Date Completed
Cost
Quality
Schedule
Management
EW Multiplexer (EWMUX)
3.6
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
Smart Target/Multispectral Threats Development
3.7
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
Studies, Analyses, and Site Surveys
3.8
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
Web-Accessible Database
3.9
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
EWTS System Support Activity (SSA)
3.10
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
Cybersecurity
3.11
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
Training
3.12
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec
Future Capabilities
3.13
90% inspected by COR/ACOR; with input from TAs, and customer feedback.
June and Dec

Data Products

CDRL Description
Applicable CDRL
Surveillance Method/Measure
Date Planned
Date Completed
Data Standards
Revisions to Existing Government Documents
A001
100% Inspection by COR/ACOR with assistance from TAs
Upon Submssion
Conference Report
A002
90% Inspection by COR/ACOR
Upon Submission
Presentation Material
A003
90% Inspection by COR/ACOR
June and Dec
Engineering Change Proposal (ECP)
A004
100% Inspection by COR/ACOR
Upon Submission
Supplier’s Configuration Management Plan
A005
90% Inspection by COR/ACOR
Upon Submission
Training Materials
A006
90% Inspection by COR/ACOR
June and Dec
Software Development Plan (SDP)
A007
90% Inspection by COR/ACOR
June and Dec
System/Subsystem Specification (SSS)
A008
90% Inspection by COR/ACOR
June and Dec
System/Subsystem Design Description (SSDD)
A009
90% Inspection by COR/ACOR
June and Dec
Software Requirements Specification (SRS)
A00A
100% Inspection by COR/ACOR
Upon Submission
Interface Requirements Specification (IRS)
A00B
100% Inspection by COR/ACOR
Upon Submission
Software Design Description (SDD)
A00C
100% Inspection by COR/ACOR
Upon Submission
Software Test Plan (STP)
A00D
100% Inspection by COR/ACOR
Upon Submission
Software Test Report (STR)
A00E
100% Inspection by COR/ACOR
Upon Submission
Software Product Specification (SPS)
A00F
100% Inspection by COR/ACOR
Upon Submission
Softwaare Version Description (SVD)
A00G
100% Inspection by COR/ACOR
Upon Submission

Data Products

CDRL Description
Applicable CDRL
Surveillance Method/Measure
Date Planned
Date Completed
Data Standards
Software User Manual (SUM)
A00H
100% Inspection by COR/ACOR
Upon Submission
Management Plan
A00J
100% Inspection by COR/ACOR
Upon Submission
Site Preparation Requirements and Installation
A00K
100% Inspection by COR/ACOR
Upon Submission
Status Report
A00L
100% Inspection by COR/ACOR
Upon Submission
Operations Security (OPSEC) Plan
A00M
100% Inspection by COR/ACOR
Upon Submission
Technical Report – Study / Services
A00N
100% Inspection by COR/ACOR
Upon Submission
System Deficiency Report (SDR) Data
A00P
100% Inspection by COR/ACOR
Upon Submission
Acceptance Test Plan
A00Q
100% Inspection by COR/ACOR
Upon Submission
Technical Data Package (TDP)
A00R
100% Inspection by COR/ACOR
Upon Submission
Systems Engineering Management Plan (SEMP)
A00S
100% Inspection by COR/ACOR
Upon Submission
Government Property (GP) Inventory Report
A00T
100% Inspection by COR/ACOR
Upon Submission
Funds and Man-Hours Expenditure Report
A00U
100% Inspection by COR/ACOR
Upon Submission
Configuration Status Accounting (CSA) Information
A00V
100% Inspection by COR/ACOR
Upon Submission
DOD Architecture Framework Documentation
A00W
100% Inspection by COR/ACOR
Upon Submission
Request for Variance (RFV)
A00X
100% Inspection by COR/ACOR
Upon Submission
Computer Software Product
A00Y
100% Inspection by COR/ACOR
Upon Submission
Quality Assurance Program Plan (QAPP)
A00Z
100% Inspection by COR/ACOR
Upon Submission

File details come from the government source that posted it. Updated .