A_02 - SOW Load Weights Test Set.docx

DOCX document 618 KB Posted

Attached to
Load Test Lifting Weight
Solicitation number
W912LM-24-Q-0012
Issued by

About this file

This document is a Statement of Work (SOW) for the fabrication and delivery of four (4) sets of load test lifting weights for the Minnesota Army National Guard.

The SOW specifies the quantity, weight requirements, dimensions, and design standards for the load test weights. Each set contains weight blocks ranging from 500 lbs to 5,000 lbs, with a total weight of 18,000 lbs per set. The weights must be capable of being handled by both forklift and crane hook, and will be delivered to the USPFO Warehouse in Camp Ripley, Minnesota by May 31, 2024. The SOW includes detailed requirements for the weight fabrication, including proof testing, non-destructive evaluation, and mandatory data documentation.

View the file

Other files

File Type Posted
W912LM-24-Q-0012 Question_29APR24.docx DOCX document
B 01 - Combined Synopsis_Solicitation - Load Test Lifting Weight.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for Load Test Lifting Weights

1. QTY: Four (4) SETS.

2. Fabrication of 9 Ton deadweight

3. Individual weight blocks to be handled by both forklift from bottom and crane hook using two point lifting capability. Tree to be handled by both forklift from bottom and crane hook with single point lift capability.

4. Approximate dimensions: minimum -37”Lx37”W maximum -45”Lx45”W

5. Stackable certified steel weight list:

Each Set Contains:

1 ea. 1,000 lbs (center tree frame/base) 1 ea. 4,000 lb 1 ea. 5,000 lbs 1 ea. 2,000 lbs 4 ea. 1,000 lbs 4 ea. 500 lbs Total: 18,000 lbs Per Tree.

Tree Comes with the following:

· Designed to ASME B30.20, w/ a 3 to 1 s.f. against yield

· Fabricated to AWS D 1.1.

· Proof tested to 125% of its Working Load Limit (WLL).

· Price includes VT and MT of all welds prior to and following the proof test.

· Tagged with information as required by ASME B30.20 (i.e. WLL, Fixture Weight, Manufacturer's Name, etc).

· Also included would be a data book for each item containing all mill cert's., NDE reports, proof test cert's., welders' certifications, etc. as applicable.

6. Delivery address:

USPFO Warehouse, Bldg 11-62, 15000 Highway 115 Camp Ripley, Little Falls, MN 56345

7. Delivery date: 31 May 2024 Picture below is only an example and not the mandatory requirement:

image1.jpeg

File details come from the government source that posted it. Updated .