NOTES: 1. CAPACITY LISTED IS THE CAPACITY REQUIRED AT THE SCHEDULED EWT, LWT, EAT, & FLUID TYPE.

2. CONE JET DISCHARGE

3. TRUNCATED CONE DISCHARGE

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\R ev it

Lo ca l F ile s\

B

LD

G

M ec ha ni ca l M

EP

E

LT

.rv t

7/ 8/

:0

8:

A M

ELT

SDC

090293

MECHANICAL

SCHEDULES

Q:\09Proj\090293\DWGS\Revit\M

STEWART D. CRAN

2120207/09/10

No Date Revision

WH-1

P-3

1 1/2"1"

1/2"

1"

BOILER SUPPLY

AND RETURN

CH

W

HW CW

TO ST-1

FROM HX-1

BID OPTION #4

BALANCING VALVE

SHUT-OFF VALVE

FLOW SWITCH

TEMPERATURE / PRESSURE GUAGE

SAFETY RELIEF VALVE

LOW WATER CUT-OFF

PROBE OR FLOAT TYPE (OPTIONAL)

SHUT-OFF VALVE

STRAINER

EXISTING BOILER CIRCULATOR PUMP

TEMPERATURE GUAGE

UNION UNION

TO EXPANSION

TANK

PRESSURE REDUCING VALVE

WATER METER

ET-1

AS-1

BYPASS

FEEDER

A

P-1 P-2

TO SYSTEM

RETURN FROM SYSTEM

P-4

WH-1

EX. B-2

T

T/P

TO DRAIN

EX. B-1

T/P

TO DRAIN

T

M

(RPZ)

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\R ev it

Lo ca l F ile s\

B

LD

G

M ec ha ni ca l M

EP

E

LT

.rv t

7/ 8/

:0

8:

A M

ELT

SDC

090293

MECHANICAL

DETAILS

Q:\09Proj\090293\DWGS\Revit\M

STEWART D. CRAN

2120207/09/10

NO SCALE2 INDIRECT WATER HOOK-UP

NO SCALE1 BOILER HOOK-UP DETAIL

No Date Revision

1267183372C Text Box

ORIGINAL DESIGN

WH-1

P-3

1 1/2"1"

1/2"

1"

BOILER SUPPLY

AND RETURN

CH

W

HW CW

TO ST-1

FROM HX-1

BID OPTION #4

BALANCING VALVE

SHUT-OFF VALVE

FLOW SWITCH

TEMPERATURE / PRESSURE GUAGE

SAFETY RELIEF VALVE

LOW WATER CUT-OFF

PROBE OR FLOAT TYPE (OPTIONAL)

SHUT-OFF VALVE

STRAINER

EXISTING BOILER CIRCULATOR PUMP

TEMPERATURE GUAGE

UNION UNION

TO EXPANSION

TANK

PRESSURE REDUCING VALVE

WATER METER

ET-1

AS-1

BYPASS

FEEDER

A

P-1 P-2

TO SYSTEM

RETURN FROM SYSTEM

P-4

WH-1

EX. B-2

T

T/P

TO DRAIN

EX. B-1

T/P

TO DRAIN

T

M

(RPZ)

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\R ev it

Lo ca l F ile s\

B

LD

G

M ec ha ni ca l M

EP

E

LT

.rv t

7/ 8/

:0

8:

A M

ELT

SDC

090293

MECHANICAL

DETAILS

Q:\09Proj\090293\DWGS\Revit\M

STEWART D. CRAN

2120207/09/10

NO SCALE2 INDIRECT WATER HOOK-UP

NO SCALE1 BOILER HOOK-UP DETAIL

No Date Revision

1267183372C

REMOVED BY PAST PROJECTS

BALANCING VALVE

SHUT-OFF VALVE

FLOW SWITCH

TEMPERATURE / PRESSURE GUAGE

SAFETY RELIEF VALVE

LOW WATER CUT-OFF

PROBE OR FLOAT TYPE (OPTIONAL)

SHUT-OFF VALVE

STRAINER

EXISTING BOILER CIRCULATOR PUMP

TEMPERATURE GUAGE

UNION UNION

TO EXPANSION

TANK

PRESSURE REDUCING VALVE

WATER METER

ET-1

AS-1

BYPASS

FEEDER

A

P-1 P-2

TO SYSTEM

RETURN FROM SYSTEM

P-4

WH-1

EX. B-2

T

T/P

TO DRAIN

EX. B-1

T/P

TO DRAIN

T

M

(RPZ)

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\R ev it

Lo ca l F ile s\

B

LD

G

M ec ha ni ca l M

EP

E

LT

.rv t

7/ 8/

:0

8:

A M

ELT

SDC

090293

MECHANICAL

DETAILS

Q:\09Proj\090293\DWGS\Revit\M

STEWART D. CRAN

2120207/09/10

NO SCALE1 BOILER HOOK-UP DETAIL

No Date Revision

1267183372C

EXISTING SYSTEM

FLOW SWITCH

TEMPERATURE / PRESSURE GUAGE

SAFETY RELIEF VALVE

LOW WATER CUT-OFF

PROBE OR FLOAT TYPE (OPTIONAL)

SHUT-OFF VALVE

STRAINER

EXISTING BOILER

CIRCULATOR PUMP

TEMPERATURE GUAGE

UNION UNION

TO EXPANSION

TANK

PRESSURE REDUCING VALVE

WATER METER

ET-1

AS-1

BYPASS

FEEDER

A

P-1 P-2

TO SYSTEM

RETURN FROM SYSTEM

P-4

WH-1

EX. B-2

T

T/P

TO DRAIN

EX. B-1

T/P

TO DRAIN

T

M

(RPZ)

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\R ev it

Lo ca l F ile s\

B

LD

G

M ec ha ni ca l M

EP

E

LT

.rv t

7/ 8/

:0

8:

A M

ELT

SDC

090293

MECHANICAL

DETAILS

Q:\09Proj\090293\DWGS\Revit\M

STEWART D. CRAN

2120207/09/10

NO SCALE1 BOILER HOOK-UP DETAIL

No Date Revision

1267183372C

EXISTING SYSTEM

FLOW SWITCH

TEMPERATURE / PRESSURE GUAGE

SAFETY RELIEF VALVE

LOW WATER CUT-OFF

PROBE OR FLOAT TYPE (OPTIONAL)

SHUT-OFF VALVE

STRAINER

EXISTING BOILER CIRCULATOR PUMP

TEMPERATURE GUAGE

UNION UNION

TO EXPANSION

TANK

PRESSURE REDUCING VALVE

WATER METER

ET-1

AS-1

BYPASS

FEEDER

A

P-1 P-2

TO SYSTEM

RETURN FROM SYSTEM

EX. B-2

T

T/P

TO DRAIN

EX. B-1

T/P

TO DRAIN

T

M

(RPZ)

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\R ev it

Lo ca l F ile s\

B

LD

G

M ec ha ni ca l M

EP

E

LT

.rv t

7/ 8/

:0

8:

A M

ELT

SDC

090293

MECHANICAL

DETAILS

Q:\09Proj\090293\DWGS\Revit\M

STEWART D. CRAN

2120207/09/10

NO SCALE1 BOILER HOOK-UP DETAIL

No Date Revision

1267183372C Polygon

1267183372C Text Box

INSTALL NEW BOILER TO MATCH ORIGINAL DESIGN

1267183372C Line

AHU-1

AHU-2

250x800 (10x32)

700x700 (28x28)

B-2B-1

ET-1

0x

0 ( x2

4)

0x

0 ( x1

6)

EX. 1000x2700 (40x108) LOUVER

150 (6Ø) B2 FLUE150 (6Ø) B1 FLUE

200 (8Ø) B1 & B2 OSA

700x600 (28x24)

400x500 (16x20)

450x650 (18x26) UH-9

EF-10

WH-1

0 (

6Ø

0 (

8Ø

0 (

6Ø

D ED E

AHU-1

AHU-2

400x500 (16x20)

400x500 (16x20)

600x700 (24x28)

650x450 (26x18)

B-1 & B-2

550x350 (22x14)

0x

0 ( x1

8)

D E

WH-1

EF-10

CC

550x350 (22x14)

RH-1IH-5

450x450 (18x18)

450x450 (18x18)

250x250 (10x10)

1000x300 (40x12)

ERV-1

800x300 (32x12)

800x300 (32x12)

(TYPICAL)

ERV-1

300x300 (12x12)

250x250 (10x10)

400 (16Ø) TRANSITIONS

TO 350 (14Ø)

34 34

MUA-1

DOUBLE WALL INSULATED

DUCT . 950 (38") INSIDE DIAMETER

1050 (42") OUTSIDE DIAMETER.

SEE DETAIL 4 / M6.03 FOR

PLENUM CONSTRUSTION

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\R ev it

Lo ca l F ile s\

B

LD

G

M ec ha ni ca l M

EP

E

LT

.rv t

7/ 8/

:0

8:

A M

ELT

SDC

090293

MECHANICAL

SECTIONS

Q:\09Proj\090293\DWGS\Revit\M

STEWART D. CRAN

2120207/09/10

1/4" = 1'-0"2 AHU SECTION 1

1/4" = 1'-0"4 AHU SECTION 2

1/4" = 1'-0"3 ERV SECTION 1

1/4" = 1'-0"1 ERV SECTION 2

1/4" = 1'-0"5 MUA-1

T

KEYED SHEET NOTES

D E

M6.08

M6.08

AHU-1

& AHU-2

0x

0 ( x2

6)

0x

0 ( x1

4)

AFMS

M

AFMS

EX. 1000x2700 (40x108) LOUVER

B-1

B-2

0x

0 ( x2

8)

500x400 (20x16)

0x

0 ( x1

6)

150 (6"Ø)

FLUE UP

200 (8"Ø)

OSA UP

G

ET-1

M

UH-9

13 (1/2")

HWS & HWR

75 (3") GAS

13 (1/2") HWS & HWR

HW

S

HW

R

G

HW

S

HW

R

G

HW

S

G

WH-1

38 (1-1/2") CW

AND HW DN

50 (2"Ø) G

P-1 (BLW)

P-2 (ABV)

AS-1

P-3

75 (3") CW

19 (3/4") HW

EX. 100 (4")

CW DN

450x650 (18x26)

450 x 450 (18" x 18")

UP TO EF-10

M

1500 x 700 (60 x 28) DAMPER PROVIDE

INSULATED BLANK OFF PANEL ON

UNUSED PORTION OF LOUVER.

EXISTING (1800 x 800) 72 x 32 LOUVER.

D E

HW

R

150 (6"Ø)

FLUE UP

CH

W

CW

HW

HW

CW

CHW

75 (3") CW

19 (3/4") HW

AFMS

5900 MBH

VFD-1 VFD-2 VFD-3

TO ST-1 AND ST-2

SEE M3.01 FOR CONTINUATION

SEE DETAIL 1/M6.05 FOR SYSTEM

HOOK-UP

P-6

1 RUN GAS AT 2" PSIG. PROVIDE PRESSURE REDUCING REGULATOR WHERE REQUIRED FOR EQUIPMENT

HOOK-UP.

2 INSTALL VARIABLE FREQUENCY DRIVES ON FLOOR MOUNTED UNISTRUT RACK. DO NOT ATTACH TO

AIR HANDLING UNIT.

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\R ev it

Lo ca l F ile s\

B

LD

G

M ec ha ni ca l M

EP

E

LT

.rv t

7/ 8/

:0

8:

A M

ELT

SDC

090293

MECHANICAL

ENLARGED PLAN

Q:\09Proj\090293\DWGS\Revit\M

STEWART D. CRAN

2120207/09/10

1/2" = 1'-0"1 MECHANICAL ENLARGED PLAN

WP

GFI

1/12

1 3

R

EPO

1/121/20

RR

TC

T

60"

GFI

AC48"48"

GFI

AC

GF

I

S

V

S

GFI

AC

GF

I

62"62"

S

REF. REF.

BID OPTION ITEMS

J w

KEYED SHEET NOTES

D E

D E

SURVIVAL

EQUIPMENT

PARACHUTE SHOP

EXISTING MECH /

ELEC

D E

M

DP

-4

V M

AI

N

M

ET

ER

DI

ST

S

EC

. 1

DI

ST

S

EC

. 2

HP4N-101 LP4N-PVP LP4N-101

VFD's FOR

AHU-1, P-1, P-2

AHU-2

P-5

MCC4N-480V

MCC4N-480V

P-1

P-2

HP4N-101

31,33,35

HP4N-101

37,39,41

THRU VFD

THRU VFD

B-1

B-2

B1

LP4N-101

CLEAR SPACE

PER NEC 110.26

2P

UH-9

LP4N-101

LP4N-101

AHU-1

MCC4N-480V

THRU VFD

P-3

LP4N-101

8,10

NACPS-1&2

CKT 39

FACP CKT 41

TO B1 & B2

LP4NEG-101

39, 41

LP4NEG-101

CT1 CKT 42

LP4N-101

T-687 208Y/120V

(EXISTING)

T-687 480Y/277V

(EXISTING)

CT5

CT6

CT7

CT4

CT3

CT21

UE UE

UE

C

C

C

K5 K5 K3 K6

K1

K2

K4 K4

5 7

LP4NEG-101

1,3

13 15 17

LP4N-102B

13,15,17

LP4N-102B

1,3,5,7

LP4N-102B

9,11

3 1 3

REFER TO SPECIFICATION SECTION 01 2300 FOR DESCRIPTION

OF BID OPTIONS.

PUMP P - 4 SOLAR WATER PUMP IS INCLUDED IN A BID OPTION.

A.

B1

D

D

D

32 34

LP4NEG-101

32,34

UPS

LP4NEG-101

ACCU-2

21(3/4")C-4#18

LP4N-101

33,35

FCU-2

MNS - AMP

CKT 37

MNSPS-1 & 2

CKT 37

LP4NEG-101

SYMBOL USED FOR KEYED NOTES

MOUNT CONTACTOR(S) ABOVE SWITCHBOARD OR DISTRIBUTION

PANEL.

CUT AND PATCH FLOOR AS NECESSARY FOR 480V/208V AND

208V/120V UNDERGROUND SERVICE LATERALS.

REFER TO SINGLE LINE DIAGRAM AND ASSOCIATED CONDUIT &

WIRE SCHEDULE FOR SERVICE LATERAL SIZES.

1.

2.

3.

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\U se rs

\a m he rs t\D oc um en ts \0

B ui ld in g

E le ct ric al

M E

P

C en tr al

_a m he rs t.r vt

7/ 7/

0:

:1

A

M

WXW

LRH

090293

ELECTRICAL LARGE

SCALE PLANS

090293 BUILDING 687

JOHN W. TOWNSEND

4036007/09/10

1/4" = 1'-0"1 LARGE SCALE MECHANICAL ROOM PLAN

1/4" = 1'-0"2 LARGE SCALE BREAK/CLASSROOM PLAN

1/4" = 1'-0"3 LARGE SCALE TELECOMM ROOM PLAN

Ø Ø Ø

Ø Ø Ø

1. PROVIDE ALL FITTINGS, TAP BOXES, AND MOUNTING HARDWARE NECESSARY FOR A COMPLETE INSTALLATION.

2. PROVIDE SPARE FUSIBLE DISCONNECT SWITCHES: (2) 100A. 3P, (2) 60A. 3P, (5) 30A. 3P.

SCHEDULE NOTES:

1. PROVIDE ALL FITTINGS NECESSARY FOR A COMPLETE INSTALLATION.

SCHEDULE NOTES:

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

2-SPD TWO SPEED

VFD VARIABLE FREQUENCY DRIVE

RVS REDUCED VOLTAGE

STARTER TYPES:

FS FUSED SWITCH

NFS NON-FUSED SWITCH

MCP MOTOR CIRCUIT PROTECTOR

CB CIRCUIT BREAKER

COMBINATION DISCONNECT TYPES:

HOA HAND-OFF-AUTO SWITCH

RP RED (RUN) PILOT LIGHT

GP GREEN (POWER) PILOT LIGHT

0/0 ON-OFF SELECTOR SWITCH

S/S STOP-START PUSHBUTTONS

CONTROL DEVICES:

EC ELECTRICAL CONTRACTOR

MC MECHANICAL CONTRACTOR

GC GENERAL CONTRACTOR

TC TEMPERATURE CONTROL

OWN OWNER

ABBREVIATIONS:

1. INPUT AND OUTPUT CONDUCTORS TO AND FROM VFD'S SHALL BE INSTALLED IN SEPARATE RACEWAYS, INDEPENDENT FROM ANY OTHER CONDUCTORS, AND SHALL NOT PASS THRU ANY COMMON WIREWAY OR

RACEWAY.

NOTES:

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\U se rs

\a m he rs t\D oc um en ts \0

B ui ld in g

E le ct ric al

M E

P

C en tr al

_a m he rs t.r vt

7/ 7/

:3

6:

A M

WXW

LRH

090293

ELECTRICAL

SCHEDULES

090293 BUILDING 687

JOHN W. TOWNSEND

4036007/09/10

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

2-SPD TWO SPEED

VFD VARIABLE FREQUENCY DRIVE

RVS REDUCED VOLTAGE

STARTER TYPES:

FS FUSED SWITCH

NFS NON-FUSED SWITCH

MCP MOTOR CIRCUIT PROTECTOR

CB CIRCUIT BREAKER

COMBINATION DISCONNECT TYPES:

HOA HAND-OFF-AUTO SWITCH

RP RED (RUN) PILOT LIGHT

GP GREEN (POWER) PILOT LIGHT

0/0 ON-OFF SELECTOR SWITCH

S/S STOP-START PUSHBUTTONS

CONTROL DEVICES:

EC ELECTRICAL CONTRACTOR

MC MECHANICAL CONTRACTOR

GC GENERAL CONTRACTOR

TC TEMPERATURE CONTROL

OWN OWNER

ABBREVIATIONS:

1. DISCONNECT SHALL BE PLUG-IN TYPE AT BUSWAY.

2. EQUIPMENT IS INCORRECT FOR 208V/120V FACILITY ELECTRICAL DISTRIBUTION. 200, 230 AND 240 VOLT EQUIPMENT WILL BE OPERATING AT 208 VOLTS.

3. PROVIDE ADDITIONAL WP 30A. 3P NON-FUSED DISCONNECT AT BUILDING EXTERIOR. LOCATE PER POWER PLAN.

4. NAMEPLATE ON EQUIPMENT INDICATES 460 VOLT. EQUIPMENT IN EXISTING LOCATION IS OPERATING AT 208 VOLTS, WILL BE CONNECTED TO 208 VOLTS IN NEW LOCATION.

5. RECONFIGURE EQUIPMENT TO OPERATE AT 460 VOLTS.

6. DISCONNECT SWITCH IS EX.

NOTES:

SCHEDULE NOTES:

1. REFER TO EXTERIOR LIGHTING CONTROL DIAGRAM.

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\U se rs

\a m he rs t\D oc um en ts \0

B ui ld in g

E le ct ric al

M E

P

C en tr al

_a m he rs t.r vt

7/ 7/

:3

6:

A M

WXW

LRH

090293

ELECTRICAL

SCHEDULES

090293 BUILDING 687

JOHN W. TOWNSEND

DISC. FUSE FUSE

X

DISC. FUSE FUSE

DISC. FUSE FUSE

DISC. FUSE FUSE

DISC. FUSE FUSE

CT

CT

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\U se rs

\a m he rs t\D oc um en ts \0

B ui ld in g

E le ct ric al

M E

P

C en tr al

_a m he rs t.r vt

7/ 7/

:3

6:

A M

WXW

LRH

090293

ELECTRICAL

SCHEDULES

090293 BUILDING 687

JOHN W. TOWNSEND

BID OPTION ITEMS

REFER TO SPECIFICATION SECTION 01 2300 FOR DESCRIPTION

OF BID OPTIONS.

PHOTOVOLTAICS PANEL LP4N-PVP IS INCLUDED IN A BID

OPTION.

A.

B.

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT TITLE:

COPYRIGHT 2009 BY LHB, INC. ALL RIGHTS RESERVED

DULUTH MINNEAPOLIS

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS

CLIENT:

ST. PAUL, MN

MINNESOTA AIR

NATIONAL GUARD

133rd AIR WING

REPAIR CONSOLIDATED

MAINTENANCE FACILITY,

BLDG 687

QJKL 990189

C :\U se rs

\a m he rs t\D oc um en ts \0

B ui ld in g

E le ct ric al

M E

P

C en tr al

_a m he rs t.r vt

7/ 7/

0:

:2

A

M

WXW

LRH

090293

ELECTRICAL

SCHEDULES

090293 BUILDING 687

JOHN W. TOWNSEND

QJKL222003 - B687 Mechanical room boiler FINAL.pdf
QJKL222003 - B687 Mechanical room boiler (copy).pdf
QJKL222003 - Drawings B687 a.pdf
QJKL222003 - B687 Mechanical room boiler FINAL
QJKL222003 - B687 Mechanical room boiler (copy)
QJKL222003 - B687 Mechanical room boiler
090293 100% Drawings B687 Boiler design (3.a)
QJKL222003 - B687 Mechanical room boiler
QJKL222003 - B687 Mechanical room boiler (copy)

File details come from the government source that posted it. Updated .