Summary: City of Bartow Demolition Project Invitation to Bid

This Invitation to Bid (ITB 26-33) is issued by the City of Bartow Community Redevelopment Agency (CRA) in Florida for comprehensive demolition services at 970 E. Main Street, Bartow, Florida 33830. The project requires a qualified, licensed, and experienced demolition contractor to perform complete building demolition and removal of the approximately 15,360 square-foot commercial structure, including all roof systems, structural framing, exterior and interior walls, concrete slabs, foundations, and mechanical, electrical, and plumbing systems. The scope also includes removal and disposal of all demolition debris, existing sign removal, site grading and stabilization, chain-link fence installation with two lockable vehicle access gates, privacy screen installation with six vinyl mesh banners (60" x 36"), and final site cleanup. The project is to be completed within 30 calendar days from the Notice to Proceed. The solicitation was released on September 23, 2026, with a non-mandatory pre-bid site walk-through scheduled for October 2, 2026, at 9:00 AM. Questions must be submitted by October 6, 2026, at 4:00 PM, and bids are due on October 14, 2026, by 2:00 PM through the City's e-procurement system (OpenGov). Bid openings shall be public and conducted after 2:00 PM on the due date.

The City of Bartow has established a maximum project budget of $100,000.00 for all services. All bid prices must be firm and inclusive of all costs to the jobsite, including labor, supervision, equipment, materials, transportation, permits, and disposal. The City is exempt from state and federal sales and use taxes; however, if applicable taxes result from third-party purchasing, the City reserves the right to delete line items and purchase directly from suppliers. Contractors must have been in business under the same name and TIN/FEIN number for the past five years, hold all required active licenses including a General Contractor (GC) license, and provide three project references with at least two from governmental entities. Prime contractors must self-perform a minimum of 60 percent of the total contract value. A Bid Bond is not required as the contract amount is under $150,000. An asbestos inspection report (Attachment A) has been completed and must be reviewed by bidders; all environmental compliance costs must be included in proposals. Successful bidders must execute all contract documents, including public construction bonds and required insurance (Workers' Compensation, Commercial General Liability of $1,000,000 per occurrence, and Commercial Automobile Liability of $1,000,000 per accident), within 10 working days of receiving documents for execution.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/bartowfl

City of Bartow, FL

Invitation to Bid

970 E Main Street-Demolition Project Project ID: ITB 26-33

RELEASE DATE: September 23, 2026

RESPONSE DEADLINE: October 14, 2026, 2:00 pm

Please refer to the project timeline in this document for all important deadlines.

#ITB 26-33

Title: 970 E Main Street-Demolition Project

Table Of Contents

1. INTRODUCTION AND BACKGROUND INFORMATION

2. INSTRUCTIONS TO BIDDERS - CONSTRUCTION

3. FOR SEALED HARD COPY SUBMISSION ONLY: ADDRESS LABELS

4. SCOPE OF WORK

5. STANDARD TERMS AND GENERAL CONDITIONS

6. PRICING TABLE

7. SPECIAL CONDITIONS

8. VENDOR SUBMITTAL FORMS

Attachments:

A - Attachment A - Asbestos Report 970 Main Street

B - Attachment B - Privacy Screen 970 Main Street

C - Attachment C - Location and Images 970 Main Street

D - Attachment D - Preliminary Artwork 970 Main Street

SECTION 1: INTRODUCTION AND BACKGROUND INFORMATION

1.1. Purpose of Solicitation

The City of Bartow Community Redevelopment Agency (CRA) is soliciting proposals from qualified, licensed, and experienced demolition contractors to provide comprehensive demolition services for the commercial building at 970 E. Main Street, Bartow, Florida 33830.

The demolition contractor will provide all labor, supervision, equipment, materials, transportation, permits, disposal, and related services needed to complete these tasks and must subcontract the project-branding component of the privacy screen installation per the scope of work.

The CRA has established a maximum project budget of One Hundred Thousand Dollars ($100,000.00) for the services described in this Invitation to Bid (ITB).

1.2. City Background Information

PROPERTY INFORMATION

Property Address: 970 E. Main Street, Bartow, Florida 33830 Parcel ID: 25-30-05-366500-004020 Legal Description: BURROWS ADD PB 4, PG 80, Block 4, Lots 2–8, 13–19, and Alley Between Same Existing Building: Approximately 15,360 square feet Redevelopment Site: Approximately 3.04 acres, consisting of multiple parcels associated with the 970 E. Main Street redevelopment site Property Owner: Bartow Community Redevelopment Agency and City of Bartow Existing Use: Commercial/Municipal Property Zoning: C-2 – Community Commercial

SECTION 2: INSTRUCTIONS TO BIDDERS - CONSTRUCTION

2.1. Bid Schedule

ITB-CON Solicitation Issued: September 23, 2026

Pre-Bid Site Walk-Through (Non-Mandatory): October 2, 2026, 9:00am

970 E. Main Street, Bartow, Florida 33830

Question Submission Deadline: October 6, 2026, 4:00pm

Bids Due: October 14, 2026, 2:00pm

Microsoft Teams meeting Join:

https://teams.microsoft.com/meet/26713122082345?

p=Hgx58HwA3TTFjP2jsV Meeting ID: 267 131 220 823 45 Passcode: 6BF6by3D Dial in by phone +1 872-256-4257,,312519811# United States, Chicago Find a local number

Phone conference ID: 312 519 811#

2.2. Bid Opening

It is the responsibility of the bidder to assure that their bid is delivered or submitted at the proper time and place prior to the bid opening. All bid openings shall be public, following 2:00 pm, on the date specified in the solicitation. Bids which for any reason are not so delivered or submitted electronically through the City’s e-procurement system, will not be considered. Bid Submittals Using

Facsimile or Email Will Not Be Accepted.

Note: In accordance with Florida Statute 119.071, a listing of vendors that provided a bid submittal shall be posted to the City’s e-procurement platform OpenGov.

All bids shall remain exempt from disclosure, including bid amounts, until recommendation of award or 30 days after bid opening, whichever event occurs first. Should the City reject all bids, before the recommendation of award or 30 days after bid opening, and concurrently provide notice of the City’s intent to reissue the bid, the rejected bids will remain exempt from

Florida Statute 119.07 until such time as the City provides notice of recommendation of award of the reissued bid or until the

City withdraws the reissued bid. The bid is not exempt for longer than 12 months after the notice of rejection of all bids.

2.3. Execution of Bid

Bid must contain an original signature of an authorized representative in the space provided on the signature page. Bid must be typed or printed in black ink. Erasable ink is not permitted. Corrections made by the bidder to any bid entry must be initialed by the person who signs the bid.

2.4. Bid Submittals

Submittal may be withdrawn by notifying the City, in writing, at any time prior to the deadline for bid submittal. After the deadline, the bids become a record of the City and will not be returned to the Contractor unless the bid is cancelled. It is the responsibility of the https://teams.microsoft.com/meet/26713122082345?p=Hgx58HwA3TTFjP2jsV https://teams.microsoft.com/meet/26713122082345?p=Hgx58HwA3TTFjP2jsV

Contractor to make a written request for return of the Bid Submittal after notification of cancellation. Absent this written request, the

City shall destroy the submittal. Negligence on the part of the Contractor in preparing their Bid Submittal confers no right of withdrawal or modification of their Bid Submittal after such Bid Submittal has been opened by City Staff at the appointed time and place. Bid

Submittals and any bid security shall be in force for a period of not less than ninety (90) calendar days after the bid opening time.

At the time and place specified for the opening of Bid Submittals (see above), every Bid Submittal properly delivered within the time specified for receiving Bid Submittals will be opened and publicly read aloud, irrespective of any irregularities found therein. Bidders and other people interested may be present or represented.

2.5. Bid Submittal -Exhibits & Forms

Supplementary Conditions, Special Conditions, Plans, Drawings, Instructions to Bidders, the Conditions of the Contract, Exhibits, the

Bid Submittal, Technical Specifications, any resulting addenda issued, and the Contract together therein identified constitute the entire

“bid package” and upon award shall constitute the Contract Documents concerning this present bid matter.

The following documents, collectively, comprise the “Bid Submittal” which, when tendered, on or before the Bid due date and time, must include:

• Bid Sheet(s) o Bid pricing must be submitted through the City’s e-procurement system, OpenGov. A printed copy may also be included with the physical bid submission, if applicable. Contractors shall not deviate from the Pricing Table unless expressly authorized by the City of Bartow Procurement Contact. Any unauthorized deviation from the provided Pricing Table may result in the bid being deemed non-responsive.

• With the signature of an authorized representative of the company or their designee, all information requested below shall be uploaded and submitted with your bid in accordance with the requirements of this bid/project (Contractors are to

Refer to Section 8: Vendor Submittal Forms):

o Bidder Incorporation Information o Reference Form o Acknowledgement Form o Exhibit I – Bid Bond, when applicable o Exhibit IV – Non-Collusion Affidavit of Prime Bidder o Exhibit VI – Affidavit of Percentage of Work o Exhibit VI-A – Subcontractor List o Exhibit VI-B – Good Faith Effort Documentation o Exhibit VII – Trench Safety Act Compliance o Exhibit VIII – Equal Employment Opportunity o Exhibit IX – Drug-Free Workplace Form o Exhibit X – Safety Requirements/Regulations o Exhibit XVIII – Certificate of Compliance o Exhibit XIX – Affidavit Certification Immigration Laws o Exhibit XX – Contractor Certification regarding Scrutinized Companies List o Exhibit XXI – Certification Regarding Debarment, Suspension, Proposed Debarment, and other Responsibility Matters o Exhibit XXII – Appendix A, 44 C.F.R. Part 18 – Certification Regarding Lobbying o Exhibit XXIII – Employment Eligibility Verification (E-Verify) Certification o Exhibit XXIV – Sworn Statement of Public Entity Crimes o Exhibit XXV – Affidavit Regarding the Use of Coercion for Labor or Services o All additional information requested as a “must” item in any Addendum.

o All corrections made by the Bidder to the Bid Sheets and Acknowledgement Form should be acknowledged by written initials of the authorized representative signing the Bid Submittal or their designee. Should a price correction not be acknowledged, the lowest price will prevail.

2.6. Requested Information by the City (Post Submittal/ Pre-Award)

All additional requested information and Exhibits must be submitted within a reasonable period of time if chosen as the apparent low, responsive, and responsible bidder during the Bid Analysis phase. These items include:

• Exhibit II, Public Performance Bond

• Exhibit III, Payment of Bond

• Exhibit V, Non-Collusion Affidavit of Subcontractor

Upon Execution of a Contract (Post Notice to Proceed Forms, when or if applicable):

• Exhibit XI, Application for Payment

• Exhibit XII, Contractor Certification of Disbursement

• Exhibit XIII, Certification of Substantial Completion

• Exhibit XIV, Certification of Final Completion

• Exhibit XV, Materials & Equipment Stored On-Site

• Exhibit XVI, Allowance Authorization Release (AAR)

• Exhibit XVII, Change Order

• Sales Tax Savings Form

2.7. F.O.B Destination

All prices covered by this bid/contract will be inclusive of all costs to the jobsite within the City of Bartow, Florida.

2.8. Packaging

All containers shall be suitable for storage or shipment, and all prices should include standard commercial packaging.

2.9. Taxes

No taxes shall be included in any bid price. The City of Bartow is exempt from state and federal sales use and excise tax. If sales taxes are applicable due to third party purchasing, nothing herein shall prohibit the City from deleting line items and purchasing said items directly from a supplier if it is determined that there are sufficient sales tax savings to make purchasing by the City practical.

2.10. Prices

Unless otherwise specified, all prices and/or discounts shall be firm for the duration of the original contract/purchase order. In the event of price decreases, the City of Bartow shall be given full proportionate benefits immediately at any time during the contract period.

2.11. Invoices

Any invoices at higher prices than the contract price shall be held until proper credit memorandums have been received. Any applicable cash discounts that apply as the result of this contract shall be taken even though the allowable time has elapsed due to the time awaiting credit memorandums. All original invoices shall be mailed to the City of Bartow, Finance Department at 450 N. Wilson Ave., Bartow, FL 33830 or they may be emailed to: cbrown.finance@cityofbartow.net. The bidder shall include the bid number and/or the purchase order number on all invoices. By submitting an invoice, Bidder’s Project Manager or any authorized officer is attesting to the correctness and accuracy of all charges. Invoices will be processed for payment when approved by the appropriate User Division/

Department. The City’s payment of an invoice shall not constitute evidence of the City’s acceptance of the Bidders performance of the

Service or the City’s acceptance of any work.

2.12. Discounts

Bidders may offer a cash discount for prompt payment (within 30 days); however, such discounts shall not be considered in determining the lowest net cost for bid evaluation purposes. Bidders are encouraged to reflect cash discounts in the prices quoted.

2.13. Manufacturer's Name

Any manufacturer’s name, trade name, brand name, information and catalog numbers used herein are for proposes of description and establishing general quality levels. References are not intended to be restrictive of any products that manufacturer may offer. The determination as to whether any alternate product or service is equal shall be made by the city of Bartow and such determination shall be final and binding among all bidders.

2.14. Safety Requirements / Regulations

All Bidders are required to submit with their Bid Submittal, Exhibit X - Safety Requirements/Regulations which states that if the firm falls under the Occupational Health and Safety Administration (OSHA) Regulations, as interpreted by OSHA, the successful contractor will be able to provide, at the request of the City, a copy of their OSHA 300 Log for the past three (3) years, a copy of the Workers

Compensation Modification Rate; a copy of the Contractor’s Safety and Health Program, and a copy of the Contractor’s Drug Free

Workplace Program. Any questions regarding compliance with this provision shall be directed to The City of Bartow.

The Bidder is hereby notified that if awarded the bid and it involves work such as maintenance, repair, turnaround, renovation, construction or engineering on chlorine disinfection facilities or other covered process(es) must be able to provide, at the request of the

City, the following items for review: OSHA 300 Log for past five (5) years, current safety program, training program and experience with other related processes. Documented evidence showing compliance with confined space entry, lockout/tagout, emergency response and safe work is required. All contract workers must comply with the facility’s safe work practices and controls outlined in the facility safety manual and operating procedures.

The Bidder is hereby notified that if awarded the bid they shall be responsible for maintenance of traffic within the limits of the project for the duration of the construction period, including any temporary suspensions of the Work. The Contractor shall construct and maintain detours and provide facilities for access to residences, businesses, etc., along the project. The contractor shall furnish, install and maintain traffic control and safety devices during construction, furnish and install work zone pavement markings for maintenance of traffic in construction areas, and provide any other special requirements for safe and expeditious movement of traffic specified on the plans. Maintenance of Traffic includes all facilities, devices and operations as required for safety and convenience of the public within the work zone. Refer to Florida Department of Transportation’s (FDOT) latest edition of the Standard Specifications for Road and

Bridge Construction and the latest version of the Manual on Uniform Traffic Control Devices (MUTCD) for the minimum national standard for traffic control for highway construction, maintenance, and utility operation.

2.15. Toxic Substances

Chapter 442 of the Florida Statue states that manufacturers, importers or distributors of any toxic substance shall prepare and provide each direct purchaser of such toxic substance with Material Safety Data Sheet(s), herein referred to as MSDS, which to the best of the manufacturer’s, importer’s or distributor’s knowledge, is current, accurate and complete based on information then reasonably available to the manufacturer, importer or distributor. Upon notification of a new or revised MSDS the manufacturer, importer or distributor, on a timely basis not to exceed three (3) months after notification, shall provide the City with the revised information as it becomes available to the manufacturer, importer or distributor.

mailto:cbrown.finance@cityofbartow.net

Failure to provide the MSDS, when applicable, shall be cause for rejection of bid.

2.16. Liquidated Damages

Bidders are hereby advised that if the Contract documents so indicate, a reasonable amount for liquidated damages may be assessed for

Contractor’s failure to meet stated specifications, schedule, or other relevant issues as determined by the City. Information regarding the composition of liquidated damages can be found in the Supplementary Conditions. Liquidated damages are not intended as a penalty.

2.17. Specifications

Any deviations from bid specifications indicated herein shall be clearly stated, otherwise it shall be considered that items offered are in strict compliance with specifications, and the successful bidder shall be held responsible. Deviations shall be explained in detail.

2.18. Standard Basis for Bidding

Where a particular system, product or material is specified by name, it shall be considered as a standard basis for bidding and as the most satisfactory for its particular purpose. Where two or more products, materials or manufacturers are specified by name, each shall be considered as a predetermined equal and acceptable for its particular purpose; and the bidder may use any of the listed items within their bid.

2.19. Recommendations of Award

A bid may be recommended for award by the Financial Services Manger to the lowest responsive and responsible Bidder, provided that

Bidder’s bid submittal is considered (within the sole discretion of said Manager) reasonable, in the best interest of City to recommend, and no bid protest has been filed. Unless otherwise noted, the basis of recommendation will either be the Base Bid, the Base Bid plus all alternates or any combination thereof, whichever is in the best interest of the City or may be determined by the availability of funds.

Should the basis of award be the Base Bid plus selected alternates, the priority of the selection of those alternates will be set forth in the

Supplementary Conditions, if applicable.

The successful Bidder to whom a bid is recommended for award will be so notified by City staff. The Financial Services Manager, however, at their sole discretion, reserves the right to reject any and all bid submittals or to waive any informality concerning the bid submittal whenever such rejection or waiver is in the best interest of the City. The Financial Services Manager, likewise, reserves the right to reject the bid submittal of any Bidder who has previously failed to perform properly or to complete on time, contracts of a similar nature; or who is not in a position to perform the contract; or who has habitually and without just cause neglected the payment of bills or otherwise disregarded its obligations to subcontractors, materialmen or employees.

2.20. Approval of Contract

The recommended Bidder will be required to execute the contract documents as outlined in the bid package including, the Public

Construction Bond, all signed exhibits and other required information stated in the supplemental conditions or any addendums. The executed documents should be returned to Procurement within 10 working days of the documents being sent by Procurement to the

Bidder for execution. After the executed documents are received back by Procurement, they will be given to the City Legal Department for approval to be added to a Board agenda for Board approval and execution by the City Commission for contracts over 100,000.00, if the project was not specifically listed in the approved fiscal year’s budget. If the project was listed it shall be executed by the City

Manager.

All contracts are subject to final approval of the City of Bartow Board of City Commissioners or City Manager. Persons or firms which incur expenses or change positions in anticipation of a contract prior to the City’s approval do so at their own risk.

2.21. Security Forfeiture

If after Bidder’s receipt of a notice of recommendation for award the successful Bidder refuses or otherwise neglects to execute and deliver the required Contract documents, including the Public Construction Bond, all signed exhibits, required insurance documents and other required information stated in the supplemental conditions or addendums within a reasonable time, the amount of the Bidder’s bid security (Bid Bond) may be forfeited and the award rescinded if such action is deemed to be in the best interests of the City. The

Financial Services Manager will make the determination of “a reasonable time”. It is recommended that the executed contract documents be returned to Procurement within 10 working days of the documents being sent by Procurement to the recommended Bidder for execution. No plea of mistake in the bid or misunderstanding of the conditions of forfeiture shall be available to the Bidder for the recovery of their bid security or as a defense to any action based upon the neglect or refusal to execute the required agreement or furnish the required bonds and insurance certification.

2.22. Performance

Efficient service is essential to this contract. Therefore, if determined that the holder of the bid is unable to meet delivery within a reasonable amount of time it may become necessary to make procurement from other bidders or suppliers. This shall be determined by the City of Bartow.

2.23. Conflict of Interest

All bidders must disclose, with their bid, the name of any officer, department head or agent who is also an employee of the City or any of their agencies. Furthermore, all bidders must disclose the name of any City employee who owns, directly or indirectly, any interest of any amount in the bidder’s firms or any of their branches. Award of this bid shall be subject to the provisions of Chapter 112, Florida

Statutes.

2.24. Samples

Samples of items, when called for, must be furnished free of expense and may, upon request, be returned at the bidder’s expense. Each individual sample must be labeled with bidder’s name, manufacturer’s brand name and number, bid number and item reference. Samples of successful bidder’s items may remain on file with the Procurement Department for the term of the contract. Request for return of samples shall be accompanied by instructions, which include shipping authorization and name of carrier, and must be received within ninety (90) days after bid opening date. If instructions are not received within this time, the Procurement Department shall dispose of the samples.

2.25. Inspection, Acceptance and Title

Inspection and acceptance will be at the designated facility unless otherwise indicated. Title and risk of loss or damage to all items shall be the responsibility of the contract supplier until accepted by the City, unless loss or damage results from negligence by the City.

2.26. Drug-free Workplace

This form shall be included with your bid under Section 8. Vendor Submittal Forms.

2.27. Bid Protest

Any bidder desiring to file a bid protest, with respect to a recommended award of any bid shall do so by filing a written protest. The written protest must be in possession of the Procurement Department within three (3) working days of the Notice of Recommended

Award posting date. All bidders who bid will be sent a Notice of Recommended Award, unless only one bid is received. A copy of the bid protest procedures may be obtained from the City of Bartow’s website: https://www.cityofbartow.net/431/Protest-Procedures.

“Failure to Follow Bid Protest Procedure Requirements Within the Time Frames Prescribed Herein as Established by the City of Bartow, Florida Shall Constitute a Waiver of Your Protest and Any Resulting Claim.”

2.28. Code of Ethics

If any bidder violates or is a party to a violation of the code of ethics of the City of Bartow or the State of Florida, with respect to this bid, such bidder may be disqualified from performing the work described in this bid or from furnishing the goods or services for which the bid is submitted and shall be further disqualified from bidding on any future bids for work, goods, or services for the City.

2.29. Attorney's-in-fact

Attorneys-in-fact who sign bonds or other surety instruments must attach with each bond or surety instrument an effective and certified power of attorney.

2.30. Bonds

The Bid Bond and Public Construction or Performance Bond & Payment Bond shall be executed by a surety authorized to do business in the State of Florida and as named in the current list of “Companies Holding Certificates of Authority as Acceptable Sureties on

Federal Bonds and as Acceptable Reinsuring Companies” as published in Circular 570 (amended) by the Audit Staff, Bureau of https://www.cityofbartow.net/431/Protest-Procedures

Government Financial Operations, U.S. Treasury Department and A.M. Best rated A VIII or better. All bonds signed by an agent must be accompanied by a certified copy of authority to act and indicate that they are licensed to do business in the State of Florida.

• Bid Bond: A Bid Bond is required to be submitted with all construction bids in excess of $150,000.00 in an amount not exceed five percent (5%) of the preliminary estimate of the cost of the work (amount bid). Unsuccessful bidders will be entitled to return of surety. A successful bidder may forfeit any surety required upon failure on their part to enter into a contract within the specified time after the award.

• Performance Bond & Payment Bond: A Public Construction or Performance and Payment Bond will be required on all construction contracts when the price exceeds $250,000. A surety bond shall be required of the successful bidder in an amount equal to the awarded contract price and, if called out in the contract, the allowance amount; and shall be submitted to Procurement along with the executed contract documents as outlined under Instructions to Bidders, Approval of Contract.

The City may choose, in its discretion and applicable only to multiyear maintenance contracts, to allow for incremental annual contract bonds that cumulatively total the full, awarded, multiyear contract price.

2.31. Coordination

The Contractor shall notify all utilities, transportation department, etc., in writing, with a copy to the Public Works Department before construction is started and shall coordinate his Work with them. The Contractor shall cooperate with the owners of any underground or overhead utility lines in their removal, construction and rearrangement operations in order that services rendered by these parties will not be unnecessarily interrupted.

The Contractor shall arrange his Work and dispose of his materials so as to not interfere with the operation of other Contractors engaged upon adjacent work and to join his Work to that of others in a proper manner and to perform his Work in the proper sequence in relation to that of other Contractors all as may be directed by the Public Works Department Head. Each Contractor shall be responsible for any damage done by him or his agents to the work performed by another Contractor.

The Contractor shall contact the City of Bartow Public Works and the Florida Department of Transportation, as applicable, to verify and obtain the location of any and all traffic conduits, loops, and street light underground services.

2.32. Compliance with Federal Laws, Regulations and Executive Orders

Bidders are required to comply with all provisions of federal, state, county and city local laws, ordinances, rules and regulations that are applicable to the services being offered in the bid. Lack of knowledge of the Bidder shall in no way be a cause for relief from responsibility.

The Bidder shall familiarize itself and comply with all Federal, State, County and City laws, codes, ordinances or regulations controlling the action or operation of those engaged in the Work, or affecting materials or methods used, and govern itself in accordance with them.

If the Bidder observes that there are conflicts between the Drawings and Specifications or between any other documents, they shall promptly notify the City in writing. Failure of the Bidder to notify the City of these variances shall not provide relief for compliance to the document as may be interpreted by the City. The Bidder shall hold harmless, to the fullest extent permitted by Florida Law, the City and all of its officers, agents or servants against any claims or liability arising from, or based upon the violations of any such laws, by-laws, ordinances, regulations, orders or decrees, whether by itself or their employees.

2.33. Debarred or Suspended

The bidder or proposer certifies, by submission of a response to this solicitation, that neither it nor its principals and subcontractors are presently debarred or suspended by any Federal department or agency.

2.34. Employees of Contractor

Employees of the Contractor shall at all times be under its sole direction and not be an employee or agent of the City. The Contractor shall supply competent employees. The City may require the Contractor to remove an employee or subcontractor it deems careless, incompetent, insubordinate or otherwise objectionable without any cost to the City or without any increase in Contract Price. Contractor shall be responsible to the City for the acts and omissions of all employees working under its directions whether or not the actions taken go beyond the normal scope of employment.

2.35. Examination of Bid Documents and Site

The Contractor assumes responsibility to examine the site of the Work and become familiar with the form of Submittal, Drawings, Specifications, any Addenda issued thereto and all other forms of Contractual Documents pertaining to the proposed Work. The submission of the bid shall be sufficient to establish the presumption that the Contractor has investigated the site of the Work and is satisfied as to all conditions to be encountered, the character, quantity and quality of the work to be performed and materials furnished in the completion thereof. No pleas of ignorance of conditions or difficulties that may be encountered in the execution of the Work pursuant to this bid package as a result of failure to make necessary and reasonable examinations and investigations will be accepted as an excuse for any failure or omission on the part of the successful Bidder to fulfill, in every detail, all of the requirements of the Contract

Documents; nor will they be accepted as a basis for any claims whatsoever for extra compensation or for any extension of time. Prior to the time specified for receiving bid submittals any interpretation or modifications of the proposed Contract documents will be made only by Addendum. The City will send a courtesy notification when addenda are issued to each person to whom attended a mandatory or non-mandatory pre-bid meeting, if applicable; and/or submitted Bidder Registration. It is the sole responsibility of the Bidders to check the City’s website at https://www.cityofbartow.net/bids.aspx and/or OpenGov to ensure that all available information, addenda, has been received prior to submitting a bid. The City shall not be responsible for oral instructions.

2.36. Expenses

Neither the City nor its representatives shall be liable for any expenses incurred in connection with the preparation of a response to this bid. All expenses in the preparation of this bid are the sole responsibility of the Proposer. All Submittals should be prepared to provide a straightforward and concise description of the respondents’ qualifications and ability to meet the requirements of the bid.

2.37. Materials and Construction

All material, equipment and construction furnished shall be new and shall be of good quality, workmanship and material. If silent in specifications, then the most acceptable industry-standard product shall be furnished and installed.

2.38. Florida Trench Safety Act Compliance

In the event this contract requires trench excavation, the requirement of Fla. Stat. 553.60, et seq., shall be adhered to by all Contractors.

Every Contractor shall provide a certification on the form provided and other required documentation.

2.39. Women/Minority Business Enterprises Outreach (W/MBEs)

The City hereby notifies all Bidders that W/MBE’s are to be afforded a full opportunity to participate in any bid by the City and will not be subject to discrimination on the basis of race, color, sex or national origin. The City asks that Bidders make good faith efforts to use qualified W/MBE subcontractors in preparing their bid. The W/MBE’s must be identified as such on the subcontractors list. If a Bidder makes a good faith effort to find and utilize qualified W/MBE subcontractors, but is not successful, they have fulfilled the Good Faith

Effort required. Good Faith Effort shall be described as the effort put forth by bidders on construction bids to solicit prices from women/ minority contractors.

2.40. Non-Exclusivity Contract

Contractor agrees and understands that the contract shall not be construed as an exclusive arrangement and further agrees that the City may, at any time, secure similar or identical services from another vendor at the City’s sole option.

2.41. Agreement withs other Governmental Agencies

Proposers agree that this response serves as a valid submittal to all Florida governmental agencies. Subject to the Proposer's consent, these agencies may utilize this proposal under identical pricing, terms, and timelines. Participating entities shall execute independent awards and assume sole liability for their respective purchases. This solicitation establishes no mutual liability among agencies, nor does it restrict any agency’s right to independently re-solicit these goods or services.

2.42. Unit Prices

Unless otherwise stated in this document unit prices will be utilized to adjust the total compensation due the successful Bidder based on actual quantities provided as part of the Work and verified by the City. Significant changes in quantities, including deletion of any https://www.cityofbartow.net/bids.aspx particular item are possible. Negotiation of unit prices shall not be allowed except under conditions of Force Majeure, where those conditions are sufficiently documented to the full satisfaction of the City. No other claim to negotiate unit prices will be considered.

2.43. Substitution of Personnel

It is the intention of the City that the Contractor’s personnel proposed for the contract will be available for the contract term. In the event the Contractor wishes to substitute personnel, he shall propose personnel of equal or higher qualifications and all replacement personnel are subject to City approval. In the event substitute personnel are not satisfactory to the City and the matter cannot be resolved to the satisfaction of the City, the City reserves the right to cancel the Contract for cause.

2.44. Use of Florida Lumber, Timber and Other Forest Products

In accordance with Florida Statute 255.20 (3), the City specifies that lumber, timber, and other forest products used for this project shall be produced and manufactured in the state of Florida if such products are available and their price, fitness, and quality are equal. This requirement does not apply to plywood specified for monolithic concrete forms, if the structural or service requirements for timber for a particular job cannot be supplied by native species, or if the construction is financed in whole or in part from federal funds with the requirement that there be no restrictions as to species or place of manufacture. The Bidder affirms by submitting a bid response to this solicitation that they will comply with section 255.20 (3) Florida Statutes.

2.45. Preconstruction Conference

After the Commission Board and/or City Manager has approved the Bidder’s executed contract and prior to the start of construction, a joint meeting may be held with representatives of the successful Bidder, the City and other invited parties or government agencies which may be affected by or have jurisdiction over the Work.

2.46. Placing of Orders

The award of this bid does not constitute an order. Before shipments or service is provided, the contractor shall receive a signed Purchase

Order or Purchase Order number. In some cases, contractors shall be issued blanket orders. In this case shipments shall be specified on the order.

SECTION 3: FOR SEALED HARD COPY SUBMISSION ONLY: ADDRESS LABELS

All bids shall be securely sealed in an envelope and clearly marked on the outside with:

• Company/ Bidder’s Name,

• Company Address,

• The Bid Number & Title,

• Due Date & Time, and

• Attention: Procurement Department

“An address label has been provided for your use below. The City of Bartow will not be responsible for bids opened prior to the specified time due to envelopes that are improperly addressed or not marked as instructed in this notice.”

NAME OF COMPANY: ___________________________________________________

COMPANY ADDRESS: _______________________________________________

CITY: _____________________________ STATE: ____________ ZIP CODE: _____________

BID NUMBER & TITLE: ITB 26-33, 970 E Main Street-Demolition Project

BIDS ARE DUE PRIOR BY 2:00 pm (EDT) ON, Wednesday, October 14, 2026

DELIVER TO: CITY OF BARTOW, PROCUREMENT DEPARTMENT

450 N. WILSON AVE.

BARTOW, FL 33830

It is recommended that the above label is taped onto the outside of the envelope that contains the bid documents.

Note: Be sure to label the envelope containing the bid documents or if the envelope is placed inside another envelope or shipping container (e.g., UPS envelope/box or FedEx envelope/box), then the label shall be affixed to the outside of that outer envelope or box.

SECTION 4: SCOPE OF WORK

4.1. Overview

The City of Bartow Community Redevelopment Agency (CRA) is soliciting proposals from qualified, licensed, and experienced demolition contractors to provide comprehensive demolition services for the commercial building at 970 E. Main Street, Bartow, Florida 33830.

The demolition contractor will provide all labor, supervision, equipment, materials, transportation, permits, disposal, and related services needed to complete these tasks and must subcontract the project-branding component of the privacy screen installation per the scope of work.

The CRA has established a maximum project budget of One Hundred Thousand Dollars ($100,000.00) for the services described in this Invitation to Bid (ITB).

4.2. Project Background & Site Conditions

PROPERTY INFORMATION

Property Address: 970 E. Main Street, Bartow, Florida 33830 Parcel ID: 25-30-05-366500-004020 Legal Description: BURROWS ADD PB 4, PG 80, Block 4, Lots 2–8, 13–19, and Alley Between Same Existing Building: Approximately 15,360 square feet Redevelopment Site: Approximately 3.04 acres, consisting of multiple parcels associated with the 970 E. Main Street redevelopment site Property Owner: Bartow Community Redevelopment Agency and City of Bartow Existing Use: Commercial/Municipal Property Zoning: C-2 – Community Commercial

4.3. Project Timeline

The Contract Time is as follows: 30 CALENDAR DAYS from the Notice to Proceed.

The contract will be complete once Final Completion is reached and all final documentation, including the final application for payment, has been received and processed.

The Contractor shall provide a project schedule identifying milestones and anticipated completion dates.

4.4. Qualifications

1. The Contractor submitting a bid must have been in business under the same name & TIN/FEIN number for the past five (5) years.

2. The Bidder must hold all active licenses, registrations, and certifications required to perform the project, including a General

Contractor (GC) license.

3. The Bidder must hold a City of Bartow (if located within Bartow) or Polk County Local Business Tax Receipt for those located outside of the City of Bartow.

4. The Contractor shall provide three (3) references from clients for whom the bidder has served as the prime contractor on projects of similar size and scope within the past five (5) years. At least two (2) of the three (3) references must be from a governmental entity, such as a municipality, county, state agency, or other public-sector organization. Please refer to the Reference Form provided under the Vendor Submittal Forms.

5. Subcontractors are permitted; however, the prime Contractor must self-perform a minimum of sixty percent (60%) of the total contract value.

6. Alternative materials or supplies will not be accepted unless expressly authorized by the City in the solicitation documents or by written addendum.

7. The Bidder must meet all applicable federal, state, and local requirements necessary to perform the project, including licensing, registration, permitting, insurance, and any other requirements applicable to the project.

4.5. Minimum Required Services

The demolition contractor will be responsible for providing all labor, supervision, equipment, materials, transportation, permits, disposal, and related services necessary to complete the project for:

• Building Demolition, Removal, and Disposal.

• Existing Sign Removal and Site Cleanup.

• Site Grading and Stabilization.

• Fence Installation, Privacy Screen, and Project Branding.

4.6. Detailed Scope of Services

The Contractor shall perform all work necessary to complete the demolition project, including, but not limited to, the following:

(a) Project Mobilization and Permitting

Prior to commencing any work, the Contractor shall:

• Conduct a site visit and field verification of existing conditions.

• Obtain all required demolition permits, licenses, and regulatory approvals.

• Coordinate all required inspections.

• Verify all utilities have been disconnected prior to commencement of demolition activities.

• Prepare and implement all required safety measures in accordance with OSHA standards.

• Install temporary barriers, fencing, signage, and other public safety measures necessary to secure the project site.

• MOT and traffic control will be handled by a road closure permit.

• Coordinate the permit with the Bartow Police Department for closing adjacent roads.

Coordinate project activities with the CRA throughout the duration of the project.

(b) Environmental Compliance

An asbestos inspection report has been completed and is included as Attachment A.

The Contractor shall:

• Review the asbestos report prior to submitting a proposal.

• Comply with all applicable federal, state, and local environmental regulations.

• Coordinate any regulated notifications associated with demolition activities.

• Ensure that all regulated materials identified within the report are managed and disposed of in accordance with applicable laws and regulations.

Include all costs associated with environmental compliance within the proposal.

(c) Demolition

The Contractor shall provide complete demolition and removal of the existing commercial improvements, including approximately:

• 15,360 square-foot commercial building.

• Roof systems.

• Structural framing.

• Exterior and interior walls.

• Concrete slabs and foundations, unless otherwise directed by the CRA.

• Mechanical systems.

• Electrical systems.

• Plumbing systems.

• Miscellaneous site improvements associated with the structure.

The Contractor shall perform demolition using methods that minimize dust, noise, or impacts to adjacent properties. Dust suppression measures shall be maintained throughout demolition operations.

(d) Removal and Disposal

The Contractor shall remove all demolition debris from the project site, including:

• Concrete.

• Masonry.

• Structural steel.

• Wood.

• Roofing materials.

• Miscellaneous construction debris.

• Foundations removed as part of demolition.

• Any additional materials generated during the demolition project.

• No debris shall remain on-site upon project completion.

All debris shall be transported and disposed of at an approved landfill or recycling facility. The Contractor shall provide disposal documentation upon request.

(e) Existing Sign Removal

The Contractor shall remove and properly dispose of the existing steel roadside sign, including:

• Sign structure.

• Support posts.

• Concrete footing.

• Associated hardware.

The area shall be restored following removal.

(f) Site Grading and Stabilization

Following demolition activities, the Contractor shall:

• Remove remaining building pad materials as necessary.

• Backfill excavated areas with suitable fill material.

• Compact fill to industry standards.

• Grade the site to promote positive drainage.

• Leave a smooth, level, and stabilized dirt surface suitable for future development.

• Ensure grading complies with applicable City of Bartow and Polk County requirements.

• The fill should be compacted to 95% Modified Proctor, placed in lifts not exceeding 12".

The finished site shall be free of depressions, construction debris, and unsafe conditions.

(g) Chain Link Fence Installation

Upon completion of grading activities, the Contractor shall furnish and install:

• Six-foot (6') galvanized chain-link fencing around the perimeter of the property.

• Two (2) lockable vehicle access gate points.

• Provide two sets of locks with two sets of keys. The contractor may select the locks.

• All necessary posts, braces, hardware, and concrete footings.

Fence installation shall comply with applicable City standards and manufacturer recommendations.

(h) Privacy Screen Installation and Project Branding

The Contractor shall install a green privacy screen along the entire perimeter of the newly installed chain-link fence. See Attachment

B.

The Contractor shall provide and install:

• Six (6) vinyl mesh banners.

• Banner dimensions: 60 inches by 36 inches.

• The Contractor is responsible for contracting the services of a qualified printing company to produce the banner artwork.

• An artwork is provided for reference purposes only and does not represent the final design. The Community

Redevelopment Agency will provide and approve the final design. See Attachment D.

Securely mount all banners using manufacturer-recommended hardware.

(i) Site Cleanup

Upon completion of all work, the Contractor shall:

• Remove all equipment, temporary facilities, and excess materials.

• Remove construction debris from adjacent streets and sidewalks.

• Restore any disturbed public improvements resulting from construction activities.

• Leave the property in a clean, safe, and orderly condition.

Final acceptance of the project shall be contingent upon approval by the Community Redevelopment Agency.

4.7. Contractor Responsibilities

The Contractor shall be solely responsible for:

• Furnishing all labor, supervision, equipment, tools, materials, transportation, and supplies.

• Obtaining all permits, licenses, and inspections.

• Maintaining site security throughout construction.

• Providing traffic control when required.

• Protecting adjacent public and private property.

• Repairing any damage caused by demolition operations.

• Maintaining compliance with all OSHA safety requirements.

• Coordinating utility disconnections and notifications (if applicable).

• Maintaining appropriate insurance throughout the duration of the project.

4.8. Deliverables

At project completion, the Contractor shall provide:

• Final permit approvals.

• Inspection approvals.

• Documentation of debris disposal.

• Warranty information for fencing materials, if applicable.

• Final site acceptance by the CRA.

4.9. Applicable Standards

All work shall comply with, but is not limited to:

• Florida Building Code.

• Florida Fire Prevention Code.

• OSHA Standards.

• Florida Department of Environmental Protection (FDEP) requirements.

• Polk County regulations.

• City of Bartow Land Development Regulations.

All applicable Federal, State, and Local Laws governing demolition and construction activities.

SECTION 5: STANDARD TERMS AND GENERAL CONDITIONS

5.1. Contract Documents & Definitions

1.1 Contract Documents

1.1.1 The Contract Documents comprise the entire contract between the City and the Contractor.

1.2 Definitions

Whenever used in any of the Contract Documents, the following meaning shall be given to the terms herein:

1.2.1 The term “Addendum” or “Addenda” means any changes, revisions or clarifications of the Contract Documents which have been duly issued by the City to prospective Bidders prior to the time of receiving Bids.

1.2.2 The term “Allowance Authorization Release” means the written pre-approval forms signed by the City Manager or their designee for all allowance work.

1.2.3 The term “Allowance Work” means work that may not have been in the specifications and is deemed by the City to be necessary.

1.2.4 The term “Application for Payment” means the pay request accepted by the Professional and the City which is to be used by the Contractor in requesting progress or final payments that is accompanied by such supporting documentation as is required by the

Contract Documents.

1.2.5 The term “Bid Submittal” means the offer or submittal of the Bidder submitted on the prescribed form setting forth the price(s) for the Work to be performed.

1.2.6 The term “Bonds” means the Bid and Public Construction Bond and other instruments of security furnished by the Contractor and its Surety in accordance with the Contract Documents.

1.2.7 The term “Change Order” means any change that requires the City’s approval and either includes a change in the work or a change in the Contract Time.

1.2.8 The term “Construction Change Directive” means any change initiated by the City where a change order has not been agreed to between the City and the Contractor.

1.2.9 The term “Contract” means the Contract executed by the City and the Contractor.

1.2.10 The term “Contractor” means the person, firm or corporation entering into the Contract with the City to construct and install the improvements embraced in this Contract.

1.2.11 The term “Contractor Certification of Disbursement of Previous Progress Payments to Subcontractors and Suppliers” means the form that the Contractor must execute and submit with each Application for Payment certifying that the Contractor has paid all Subcontractors and Suppliers their respective pro rata share of all previous payments (to include payments of retainage) that the City has made to Contractor for Work that has been satisfactorily completed.

1.2.12 The term “Contract Documents” means and shall include the following: Special Conditions, Plans, Drawings, Relocation

Schedule Permits, Instruction to Bidders, General Conditions, Exhibits, Supplementary Conditions, Technical Reports, Technical

Specifications, Bid Submittal, Bid and Public Construction Bonds, all Addenda issued by the City, Certificates of Insurance, Permits, Notice of Award, Allowance Authorization Release Form, Change Order Form, Substantial Completion Form and Final Completion

Form duly delivered after execution of Contract.

1.2.13 The term “Contract Time”, unless otherwise provided, means the period of time including adjustments by Change Order, allotted in the Contract Documents for substantial completion of the work.

1.2.14 The term “City” means the City of Bartow, FL, and…