Contract Summary

This is a Work Authorization document issued by the State of Nebraska, State Building Division, dated June 23, 2026, establishing an agreement between the State of Nebraska (Owner) and SSH Architecture, represented by Scott Smith, Architect (Consultant). The contracting agency is the Nebraska Military Department - CFMO, with project management by Dylan Espinoza and contracting oversight by Keith Brocksmith. The project is located at the North Omaha Readiness Center, 11650 Rainwood Road, Omaha, Nebraska.

The scope of work encompasses Architect-Engineer (A-E) services consisting of Type A (Investigative), Type B (Design), Bid Phase, and Type C (Construction Administration) services for the North Omaha Readiness Center Kalwall Repairs Project (Project No. 31030415). The project involves replacing failing Kalwall panel systems with new energy-efficient, 1-inch insulated tempered windows, including demolition, flashing installation, drywall repairs, and painting work, with construction costs not to exceed $85,000. The total lump-sum compensation is $10,200.00, comprised of Type A Services ($2,550.00), Type B Services ($4,462.50), Type B-Bid Phase Services ($637.50), and Type C Services ($2,550.00, conditional upon construction funding availability). The design must achieve a base bid of 85% of the construction budget with the remaining 15% as Alternate Bid Items, with the design scheduled to be bid-ready by November 19, 2026. Reimbursable expenses are included in the lump-sum cost unless additional design changes or specifications are authorized in writing. The contract includes federal provisions addressing nondiscrimination, Equal Opportunity, Clean Air and Water compliance, Buy American Act requirements, Copeland Act wage standards, and Drug-Free Workplace compliance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF NEBRASKA

STATE BUILDING DIVISION

WORK AUTHORIZATION

Document Distribution: Consultant Owner Agency

1 original 1 original 1 copy

WORK AUTHORIZATION NO. CO 116651 O4

Attachment A

Standard Form of Agreement Between Owner and Architect

Engineer

DATE: June 23, 2026

PROJECT NAME: A-E Services- (Type 'A', 'B', Bid Phase, & 'C') for the North Omaha Readiness Center Kalwall

Project No. 31030415 Repairs Project

Project Location: North Omaha RC, 11650 Rainwood Rd, Omaha, NE 68142

PROJECT MGR. Dylan Espinoza (402) 309-8462

CONTRACTING Keith Brocksmith (402) 309-8473

AGENCY NAME: Nebraska Military Department - CFMO

CONSULTANT Scott Smith, Architect

SSH Architecture

2433 NW 24th Street Lincoln, NE 68524

PHONE NO.

ADDRESS:

DESCRIPTION OF WORK

402.483.2893

6240 Ballard Avenue, Suite A

Lincoln, NE 68507

This Work Authorization, with the AGREEMENT between Owner and Consultant for Special Services between the State of Nebraska here called "Owner" and ArchitecUEngineer herein called "Consultant" constitutes the express authority given the Consultant by the Owner to do work as follows:

The contract items for this project are outlined below and described in detail in the attached Statement of Work (SOW) provided by the State of Nebraska Military Department. The Project includes Type A, Type B, Bid Phase, and C Services.

The work covered by this Statement of Work (SOW) consists of all design services, labor, equipment, tools, materials, travel, licenses, and permits required to repair the failing Kalwall panel systems within the North Omaha National Guard

Readiness Center in Omaha, Nebraska. The project aims to resolve a pervasive issue with the existing Kalwall system, which consists of insulated translucent panels installed throughout the building, but primarily in the corridors and drill hall.

These panels have deteriorated, allowing rainwater and outside air to seep into the facility, and they cannot be economically repaired. To address this, the project intends to replace the damaged components with new energy-efficient, 1" insulated tempered windows designed to prevent the recurring issues associated with the Kalwall system. Additionally, the scope of work includes all demolition, and any flashing installation, drywall repairs, and painting of lintels and interior surfaces to accomplish the repairs. Construction costs not to exceed $85,000.

Specific Requirements

SERVICE REQUIREMENTS

1) Replace all Kalwall systems in the building with insulated tempered windows

2) Match finishes to existing interior and exterior finishes

3) Replace flashing as necessary

4) Conduct minor modifications to framing if necessary to accommodate new windows

5) Patch wall finishes as required

6) Repair exterior and interior water damage to walls beneath existing Kalwalls

7) Design base bid to 85% of construction budget with remaining 15% being AB ls.

8) Design will be bid ready by November 19, 2026