9-Cass Park Improvements - Bid Form.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- CASS PARK IMPROVEMENT PROJECT State and local contract opportunity
- Solicitation number
- 542897
- Issued by
- Wayne County, Detroit City, Michigan
About this file
CASS PARK IMPROVEMENT PROJECT - BID FORM SUMMARY
This is a bid form for the Cass Park Improvement Project issued by the City of Detroit Office of Contracting and Procurement on behalf of the General Services Department in Michigan. The project encompasses comprehensive park improvements including demolition of existing site elements (trees, concrete, asphalt, and pavers), restoration and relocation of two sculptures (Robert Burns Statue and James Lawton Sculpture), installation of new concrete paths and pads totaling approximately 55,910 square feet, playground equipment including swings, robinia logs and stumps, boulders, and synthetic turf surfacing, fitness equipment (pull-up bars, air walkers, benches), plaza and park site amenities (tables, benches, drinking fountain, trash receptacles, park signs), electrical lighting and outdoor power infrastructure, landscaping with 57 deciduous trees and landscape materials, irrigation systems, and green stormwater infrastructure on a design-build basis. The bid form structure requires contractors to provide unit pricing for all line items organized into eleven main categories plus soft costs and allowances.
The total base bid shown on the form is $345,000, which includes fixed-fee items for park landscaping ($45,000), miscellaneous work including green stormwater infrastructure design and build ($150,000), and additional services ($150,000). Bidders must complete all pricing fields, unit rates for future work (engineered wood fiber surfacing, poured-in-place surfacing, topsoil, and topsoil seed/mulch), and fully burdened labor rates for construction manager personnel including project managers, superintendents, engineers, estimators, and laborers. The form notes that right-of-way concrete pricing and water tap pricing should include applicable permit fees, and playground surfacing pricing should include post-installation testing (G-Max and H.I.C testing). The bid form allows for alternate proposals to be submitted on a separate schedule with all costs included.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 7-Attachment F-1 - Performance Bond (1).pdf | ||
| 6-Attachment B - Respondent Proposal Introduction and Solution Approach (2).docx | DOCX document | |
| 1-Attachment E - Professional Service Contract Sample.docx | DOCX document | |
| 4-Attachment D-2 - Conditions of Award.pdf | ||
| 8-Amendment Form.pdf | ||
| 11-Attachment F-2 - Payment Bond.pdf | ||
| 10-Attachment - Model Professional Services Contract-1.pdf | ||
| 12-RFP 542897 CASS PARK IMPROVEMENT.pdf | ||
| 2-Equalization Credit Statement.pdf | ||
| 5-Attachment A - Respondent Questionnaire RFP.docx | DOCX document | |
| 3-Attachment D-1 Required Forms Affidavits.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Sheet
| CASS PARK IMPROVEMENTS - Bid Form | ||||||
| DO NOT EDIT ANY OF THE COLUMNS - THESE ARE CALCULATED FIELDS - PRICE SHEET TO BE ISSUED IN EXCEL | ||||||
| BIDDING CONTRACTOR: | ||||||
| ITEN | COST | QTY | UNIT | TOTAL BID COST | All Fees/Bonds/Insurance/GC's listed under Soft Costs | |
| 1 | SOIL EROSION AND SEDIMENTATION CONTROL MEASURES | $ - 0 | ||||
| a | SESC Measures | $ - 0 | 1 | LSUM | $ - 0 | |
| b | Temporary Construction Sign | $ - 0 | 2 | EA | $ - 0 | |
| 2 | DEMOLITION | $ - 0 | ||||
| a | Tree Pruning | 56 | EA | $ - 0 | ||
| b | Tree/Shrub/Vegetation Removal, 6" less | $ - 0 | 36 | EA | $ - 0 | |
| c | Tree Removal, 6"-18" | $ - 0 | 41 | EA | $ - 0 | |
| d | Tree Removal, 19"-36" | $ - 0 | 22 | EA | $ - 0 | |
| e | Concrete Removal | $ - 0 | 16,400 | SF | $ - 0 | |
| f | Asphalt Removal | $ - 0 | 28,500 | SF | $ - 0 | |
| g | Paver Removal | $ - 0 | 4,000 | SF | $ - 0 | |
| h | Misc. Light Poles, Footings, Site Furniture | $ - 0 | 1 | LSUM | $ - 0 | |
| i | Relocate Light Control Cabinet (Electrical) and Restore Connection | $ - 0 | 1 | LSUM | $ - 0 | |
| j | Disconnect and Vacate Water Supply | $ - 0 | 1 | LSUM | $ - 0 | |
| 3 | STATUE AND SCULPTURE RESTORATIONS | $ - 0 | ||||
| a | Robert Burns Statue Restoration incl. Preliminary Assessment and Documentation | 1 | LSUM | $ - 0 | ||
| b | James Lawton Sculpture Relocation and Restoration | 1 | LSUM | $ - 0 | ||
| 4 | CONCRETE PATHS AND PADS | $ - 0 | R.O.W price should include DPW permit fee | |||
| a | Concrete R.O.W. Remove and Replace | $ - 0 | 12,000 | SF | $ - 0 | |
| b | 4" Concrete | $ - 0 | 39,050 | SF | $ - 0 | |
| c | 4" Concrete w/ Exposed Aggregate Finish | $ - 0 | 4,420 | SF | $ - 0 | |
| d | 6" w Concrete Curb | $ - 0 | 440 | LF | $ - 0 | |
| 5 | PLAY ELEMENTS | $ - 0 | ||||
| a | Swings | $ - 0 | 2 | EA | $ - 0 | |
| b | Robinia Logs (approx. 10' L by 1'-0" Dia.) | $ - 0 | 2 | EA | $ - 0 | |
| c | Robinia Stumps (approx. 1'-10 - 3'HT by 1'-4" - 1-6" Dia.) | $ - 0 | 4 | EA | $ - 0 | |
| d | 4' Boulders, on all sides | $ - 0 | 15 | EA | $ - 0 | |
| e | Standing Seasaw | $ - 0 | 1 | EA | $ - 0 | |
| f | 8" w Concrete Playground Border | $ - 0 | 150 | LF | $ - 0 | |
| g | Engineered Wood Fiber (EWF) Playground Surfacing | $ - 0 | 2500 | SF | $ - 0 | price to include surfacing post installation test (G-Max and H.I.C testing) |
| h | Playground Grass, Synthetic Turf Playground Surfacing | $ - 0 | 1050 | SF | $ - 0 | price to include surfacing post installation test (G-Max and H.I.C testing) |
| 6 | FITNESS EQUIPMENT | $ - 0 | ||||
| a | Dual Pull Up | $ - 0 | 1 | EA | $ - 0 | |
| b | Air Walker | $ - 0 | 2 | EA | $ - 0 | |
| c | Fitness Sign | $ - 0 | 1 | EA | $ - 0 | |
| d | Fitness Bench | $ - 0 | 1 | EA | $ - 0 | |
| 7 | PLAZA SITE AMENITIES | $ - 0 | ||||
| a | 5-Seat Table, Backed | $ - 0 | 4 | EA | $ - 0 | |
| b | 3-Seat Table, Backed | $ - 0 | 2 | EA | $ - 0 | |
| c | 4-Seat Table, Backless | $ - 0 | 3 | EA | $ - 0 | |
| d | Outdoor Concrete Foosball Table | $ - 0 | 2 | EA | $ - 0 | |
| 8 | PARK SITE AMENITIES | $ - 0 | ||||
| a | 6' Bench | $ - 0 | 9 | EA | $ - 0 | |
| b | 12' Bench | $ - 0 | 3 | EA | $ - 0 | |
| c | Picnic Tables | $ - 0 | 7 | EA | $ - 0 | |
| d | 6' Swing Bench | $ - 0 | 6 | EA | $ - 0 | |
| e | Drinking Fountain + Water Tap Connection | $ - 0 | 1 | EA | $ - 0 | Water tap price should include DWSD permit fee |
| f | Trash Receptacles | $ - 0 | 14 | EA | $ - 0 | |
| g | Park Sign | $ - 0 | 2 | EA | $ - 0 | |
| 9 | Electrical Lighting and Outdoor Power | $ - 0 | Include permit fee | |||
| a | Lighting Materials and Design-Build | $ - 0 | 1 | EA | $ - 0 | |
| aa | Foundation Install | $ - 0 | EA | $ - 0 | ||
| bb | Trenching Conduits | $ - 0 | LSUM | $ - 0 | ||
| cc | Wire Pull & Terminate | $ - 0 | LSUM | $ - 0 | ||
| dd | Light Pole | $ - 0 | EA | $ - 0 | ||
| ee | Light Fixture | $ - 0 | EA | $ - 0 | ||
| b | Outdoor Power Pedestal | $ - 0 | 2 | EA | $ - 0 | |
| 10 | PARK LANDSCAPING | $ 45,000.00 | ||||
| a | 72" Round Tree Grates | $ - 0 | 8 | EA | $ - 0 | |
| b | Trees, Deciduous 2.5" Caliper | $ - 0 | 57 | EA | $ - 0 | |
| c | Landscape Materials | $ 20,000.00 | 1 | LSUM | $ 20,000.00 | Fixed Fee GMP Pricing |
| d | Irrigation | $ 25,000.00 | 1 | LSUM | $ 25,000.00 | Fixed Fee GMP Pricing |
| 11 | Miscellanous - Fixed Fee GMP Pricing | $ 150,000.00 | ||||
| a | Green Stormwater Infrastructure (GSI) Design and Build | $ 150,000.00 | 1 | LSUM | $ 150,000.00 | |
| SOFT COSTS | ||||||
| 12 | Site Restoration | $ - 0 | $ - 0 | |||
| 13 | Mobilization | $ - 0 | $ - 0 | |||
| 14 | Layout & Field Survey | $ - 0 | $ - 0 | |||
| 15 | Bonds & Insurance | $ - 0 | $ - 0 | |||
| 16 | General Conditions | $ - 0 | $ - 0 | Fixed duration cost. To include staffing | ||
| 17 | Miscellaneous & Close-Out Work | $ - 0 | $ - 0 | |||
| ALLOWANCES | All fees/Bonds/Insurance to be calcualted for Allowances below under soft costs | |||||
| 18 | Additional Services | $ 150,000.00 | $ 150,000.00 | Fixed Fee | ||
| TOTAL BASE BID | $ 345,000.00 |
| BID ALTERNATES - ALTERNATES TO BE LISTED ON SCHEDULE FOR DURATION & ALL PRICING MUST INCLUDE ALL COSTS (FEE/GCS/BONDS/INSURANCE) | |
| L1 | 1. Alternate 1 - |
| L2 | 2. Alternate 2 - |
| L3 | |
| L4 |
BELOW USED FOR EVALUATION PURPOSES AND MUST BE COMPELTED
| UNIT RATES FOR FUTURE WORK WITHIN CONTRACT - FAILURE TO NOT INCLUDE UNIT PRICE CAN DISQUALIFY BID | |||
| Description | Value | Unit | |
| ENGINEERED WOOD FIBER (EWF), SURFACING | $ - 0 | 100 SF @ 12" DEPTH PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS | |
| POURED-IN-PLACE (PIP), SURFACING | $ - 0 | PER DETAIL - 100 SF PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS - | |
| TOPSOIL | $ - 0 | 50 CYD PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS | |
| TOPSOIL SEED/MULCH | $ - 0 | PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS |
| Construction Manager's Project Personnel | *Hourly Rate* | *Hourly Rate* | *Provide Fully Burdened Labor Rates* | |
| Project Manager | $0.00 | $0.00 | ||
| Project Superintendent | $0.00 | $0.00 | ||
| Project Engineer | $0.00 | $0.00 | ||
| Project Estimator | $0.00 | $0.00 | ||
| Accounting | $0.00 | $0.00 | ||
| Clerical | $0.00 | $0.00 | ||
| Journeyman for General Contractor | $0.00 | $0.00 | ||
| Laborer | $0.00 | $0.00 | ||
| Others: | $0.00 | $0.00 |