CASS PARK IMPROVEMENT PROJECT - BID FORM SUMMARY

This is a bid form for the Cass Park Improvement Project issued by the City of Detroit Office of Contracting and Procurement on behalf of the General Services Department in Michigan. The project encompasses comprehensive park improvements including demolition of existing site elements (trees, concrete, asphalt, and pavers), restoration and relocation of two sculptures (Robert Burns Statue and James Lawton Sculpture), installation of new concrete paths and pads totaling approximately 55,910 square feet, playground equipment including swings, robinia logs and stumps, boulders, and synthetic turf surfacing, fitness equipment (pull-up bars, air walkers, benches), plaza and park site amenities (tables, benches, drinking fountain, trash receptacles, park signs), electrical lighting and outdoor power infrastructure, landscaping with 57 deciduous trees and landscape materials, irrigation systems, and green stormwater infrastructure on a design-build basis. The bid form structure requires contractors to provide unit pricing for all line items organized into eleven main categories plus soft costs and allowances.

The total base bid shown on the form is $345,000, which includes fixed-fee items for park landscaping ($45,000), miscellaneous work including green stormwater infrastructure design and build ($150,000), and additional services ($150,000). Bidders must complete all pricing fields, unit rates for future work (engineered wood fiber surfacing, poured-in-place surfacing, topsoil, and topsoil seed/mulch), and fully burdened labor rates for construction manager personnel including project managers, superintendents, engineers, estimators, and laborers. The form notes that right-of-way concrete pricing and water tap pricing should include applicable permit fees, and playground surfacing pricing should include post-installation testing (G-Max and H.I.C testing). The bid form allows for alternate proposals to be submitted on a separate schedule with all costs included.

View the file

Other files for this state and local contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

CASS PARK IMPROVEMENTS - Bid Form
DO NOT EDIT ANY OF THE COLUMNS - THESE ARE CALCULATED FIELDS - PRICE SHEET TO BE ISSUED IN EXCEL
BIDDING CONTRACTOR:
ITENCOSTQTYUNITTOTAL BID COSTAll Fees/Bonds/Insurance/GC's listed under Soft Costs
1SOIL EROSION AND SEDIMENTATION CONTROL MEASURES$ - 0
aSESC Measures$ - 01LSUM$ - 0
bTemporary Construction Sign$ - 02EA$ - 0
2DEMOLITION$ - 0
aTree Pruning56EA$ - 0
bTree/Shrub/Vegetation Removal, 6" less$ - 036EA$ - 0
cTree Removal, 6"-18"$ - 041EA$ - 0
dTree Removal, 19"-36"$ - 022EA$ - 0
eConcrete Removal$ - 016,400SF$ - 0
fAsphalt Removal$ - 028,500SF$ - 0
gPaver Removal$ - 04,000SF$ - 0
hMisc. Light Poles, Footings, Site Furniture$ - 01LSUM$ - 0
iRelocate Light Control Cabinet (Electrical) and Restore Connection$ - 01LSUM$ - 0
jDisconnect and Vacate Water Supply$ - 01LSUM$ - 0
3STATUE AND SCULPTURE RESTORATIONS$ - 0
aRobert Burns Statue Restoration incl. Preliminary Assessment and Documentation1LSUM$ - 0
bJames Lawton Sculpture Relocation and Restoration1LSUM$ - 0
4CONCRETE PATHS AND PADS$ - 0R.O.W price should include DPW permit fee
aConcrete R.O.W. Remove and Replace$ - 012,000SF$ - 0
b4" Concrete$ - 039,050SF$ - 0
c4" Concrete w/ Exposed Aggregate Finish$ - 04,420SF$ - 0
d6" w Concrete Curb$ - 0440LF$ - 0
5PLAY ELEMENTS$ - 0
aSwings$ - 02EA$ - 0
bRobinia Logs (approx. 10' L by 1'-0" Dia.)$ - 02EA$ - 0
cRobinia Stumps (approx. 1'-10 - 3'HT by 1'-4" - 1-6" Dia.)$ - 04EA$ - 0
d4' Boulders, on all sides$ - 015EA$ - 0
eStanding Seasaw$ - 01EA$ - 0
f8" w Concrete Playground Border$ - 0150LF$ - 0
gEngineered Wood Fiber (EWF) Playground Surfacing$ - 02500SF$ - 0price to include surfacing post installation test (G-Max and H.I.C testing)
hPlayground Grass, Synthetic Turf Playground Surfacing$ - 01050SF$ - 0price to include surfacing post installation test (G-Max and H.I.C testing)
6FITNESS EQUIPMENT$ - 0
aDual Pull Up$ - 01EA$ - 0
bAir Walker$ - 02EA$ - 0
cFitness Sign$ - 01EA$ - 0
dFitness Bench$ - 01EA$ - 0
7PLAZA SITE AMENITIES$ - 0
a5-Seat Table, Backed$ - 04EA$ - 0
b3-Seat Table, Backed$ - 02EA$ - 0
c4-Seat Table, Backless$ - 03EA$ - 0
dOutdoor Concrete Foosball Table$ - 02EA$ - 0
8PARK SITE AMENITIES$ - 0
a6' Bench$ - 09EA$ - 0
b12' Bench$ - 03EA$ - 0
cPicnic Tables$ - 07EA$ - 0
d6' Swing Bench$ - 06EA$ - 0
eDrinking Fountain + Water Tap Connection$ - 01EA$ - 0Water tap price should include DWSD permit fee
fTrash Receptacles$ - 014EA$ - 0
gPark Sign$ - 02EA$ - 0
9Electrical Lighting and Outdoor Power$ - 0Include permit fee
aLighting Materials and Design-Build$ - 01EA$ - 0
aaFoundation Install$ - 0EA$ - 0
bbTrenching Conduits$ - 0LSUM$ - 0
ccWire Pull & Terminate$ - 0LSUM$ - 0
ddLight Pole$ - 0EA$ - 0
eeLight Fixture$ - 0EA$ - 0
bOutdoor Power Pedestal$ - 02EA$ - 0
10PARK LANDSCAPING$ 45,000.00
a72" Round Tree Grates$ - 08EA$ - 0
bTrees, Deciduous 2.5" Caliper$ - 057EA$ - 0
cLandscape Materials$ 20,000.001LSUM$ 20,000.00Fixed Fee GMP Pricing
dIrrigation$ 25,000.001LSUM$ 25,000.00Fixed Fee GMP Pricing
11Miscellanous - Fixed Fee GMP Pricing$ 150,000.00
aGreen Stormwater Infrastructure (GSI) Design and Build$ 150,000.001LSUM$ 150,000.00
SOFT COSTS
12Site Restoration$ - 0$ - 0
13Mobilization$ - 0$ - 0
14Layout & Field Survey$ - 0$ - 0
15Bonds & Insurance$ - 0$ - 0
16General Conditions$ - 0$ - 0Fixed duration cost. To include staffing
17Miscellaneous & Close-Out Work$ - 0$ - 0
ALLOWANCESAll fees/Bonds/Insurance to be calcualted for Allowances below under soft costs
18Additional Services$ 150,000.00$ 150,000.00Fixed Fee
TOTAL BASE BID$ 345,000.00
BID ALTERNATES - ALTERNATES TO BE LISTED ON SCHEDULE FOR DURATION & ALL PRICING MUST INCLUDE ALL COSTS (FEE/GCS/BONDS/INSURANCE)
L11. Alternate 1 -
L22. Alternate 2 -
L3
L4

BELOW USED FOR EVALUATION PURPOSES AND MUST BE COMPELTED

UNIT RATES FOR FUTURE WORK WITHIN CONTRACT - FAILURE TO NOT INCLUDE UNIT PRICE CAN DISQUALIFY BID
DescriptionValueUnit
ENGINEERED WOOD FIBER (EWF), SURFACING$ - 0100 SF @ 12" DEPTH PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS
POURED-IN-PLACE (PIP), SURFACING$ - 0PER DETAIL - 100 SF PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS -
TOPSOIL$ - 050 CYD PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS
TOPSOIL SEED/MULCH$ - 0PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS
Construction Manager's Project Personnel*Hourly Rate**Hourly Rate**Provide Fully Burdened Labor Rates*
Project Manager$0.00$0.00
Project Superintendent$0.00$0.00
Project Engineer$0.00$0.00
Project Estimator$0.00$0.00
Accounting$0.00$0.00
Clerical$0.00$0.00
Journeyman for General Contractor$0.00$0.00
Laborer$0.00$0.00
Others:$0.00$0.00