(x)
89503118RWA000001
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PHOENIX AZ 85005-6457
DSW
PO BOX 6457
DESERT SOUTHWEST REGIONAL OFFICE
US DOE/WESTERN AREA POWER
WAPA (DSW)
07/13/20180002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/11/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See continuation pages.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Susan M. Ethridge
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
07/13/2018 Signature on File
Solicitation 89503118RWA000001 Amendment 0002
This Amendment incorporates the following information:
A. Attachment A, the Performance Work Statement (PWS) is hereby replaced with the attached Performance Work Statement. Changes reflect those mentioned in the below answers to questions.
B. Solicitation Page 13, Clause 52.222-42 Statement of Equivalent Rates for Federal Hires. (May 2014) is replaced with the attached revised page.
C: The due date for receipt of proposal(s) is hereby extended to 02 August, 2018, 2:00 PM Local Time.
D. Below is a continuation of responses to questions received related to Solicitation 89503118RWA000001.
Q124: Per the PWS 3.15.1 Item G. Flag ROW boundaries and/or special features (e.g. biological, cultural, water resources, sediment sources along access roads, endangered plants and animals, etc.) within the project area for avoidance and/or visual reference. This task might require the use of Global Positioning System (GPS) equipment for assistance in locating special resources within the project area.
Does the Government provide the GPS equipment task G might require?
How is G currently accomplished?
Is an Application on a cell phone acceptable to the DOE for task G?
A124: No, the contractor will need sub-meter procession. Current contractor uses IPADs to accomplish this. The cell phone may not have this capability.
Q125: Per the PWS 3.13.2, the Contractor shall furnish all equipment required for Construction
Inspection Support performed in accordance with the PWS. All equipment shall comply with applicable OSHA/ANSI guidelines and shall be in good operating condition. The Contractor shall operate the equipment in accordance with the original manufacturer’s recommendations and applicable laws and regulations. The following equipment is required: D. Copier/printer with 11” x 17” paper capability. How will we be reimbursed for the toner cartridges, paper and other supplies needed for the copier/printer?
A125: The Fixed Price CLIN shall include all cost not specifically mention as cost reimbursable.
Q126: Reference A11 of amendment 0001. As stated, please provide the current staff’s years of service by each labor category.
A126:
PWS Position Title Date Hired
3.3 ENGINEERING TECH IV 30084 8/1/2010
3.3 ENGINEERING TECH IV 30084 3/5/2018
3.3 ENGINEERING TECH IV 30084 6/2/2014
3.3 ENGINEERING TECH IV 30084 5/31/2011
3.3 ENGINEERING TECH IV 30084 11/28/2017
3.3 ENGINEERING TECH IV 30084 1/26/2015
3.4 ENGINEERING TECH V 30085 7/27/2015
3.4 ENGINEERING TECH V 30085 1/6/2014
3.4 ENGINEERING TECH V 30085 2/12/2009
3.4 ENGINEERING TECH V 30085 4/17/2005
3.5 ENGINEERING TECH V 30085 GIS 6/20/2016
3.5 ENGINEERING TECH V 30085 GIS 1/18/2017
3.6
ENGINEERING TECH V 30085 PROJECT
MANAGEMENT vacant
3.6
ENGINEERING TECH V 30085 PROJECT
MANAGEMENT 11/19/2014
3.6
ENGINEERING TECH V 30085 PROJECT
MANAGEMENT 9/12/2016
3.6
ENGINEERING TECH V 30085 PROJECT
MANAGEMENT 3/6/2017
3.6
ENGINEERING TECH V 30085 PROJECT
MANAGEMENT 3/21/2016
3.7 PROTECTION AND CONTROL SPEC 4/3/2012
3.8 METERING AND RELAY TECHNICIAN 4/4/2011
3.9 DRAFTER/CAD OPERATOR IV 30064 3/12/1990
3.9 DRAFTER/CAD OPERATOR IV 30064 10/15/1990
3.9 DRAFTER/CAD OPERATOR IV 30064 10/15/1991
3.9 DRAFTER/CAD OPERATOR IV 30064 3/24/2008
3.9 DRAFTER/CAD OPERATOR IV 30064 1/1/2012
3.9 DRAFTER/CAD OPERATOR IV 30064 3/21/2013
3.9 DRAFTER/CAD OPERATOR IV 30064 8/1/2002
3.12 COMPUTER OPERATOR III 14043 8/2/1999
3.13 CONSTRUCTION INSPECTOR vacant
3.13 CONSTRUCTION INSPECTOR 1/17/2017
3.13 CONSTRUCTION INSPECTOR 1/17/2017
3.13 CONSTRUCTION INSPECTOR vacant
3.14 REALITY SPECIALIST 4/16/2018
3.14 REALITY SPECIALIST vacant
3.15 SENIOR UTILITY FORESTER 7/11/2017
3.16 UTILITY FORESTER 11/6/2016
3.16 UTILITY FORESTER 5/1/2017
3.17 TRANS. UTILITY HERBICIDE APPLICATOR 5/7/2018
3.17 TRANS. UTILITY HERBICIDE APPLICATOR 5/14/2018
3.18 HEAVY EQUIPMENT MECHANICS Not on current contract
3.18 HEAVY EQUIPMENT MECHANICS Not on current contract
Q127: We request that the government strongly consider a not-to-exceed amount for all ODCs in order to have equitable bidding criteria that does not favor the incumbent contractor, since the incumbent already has the vehicles, materials and all equipment. Or will the government consider having offerors bid ODCs separately and the government NOT evaluate the cost of ODCs when evaluating and comparing price proposals.
A127: The Fixed Price CLIN shall include all cost not specifically mentioned as cost reimbursable.
Q128: What are the exact make, year, model, and accessories for each of the 9 vehicles? (Model year, and additional accessories, i.e., bucket trucks, utility beds, etc., can make a huge difference in pricing).
A128: The government does not record or retain this information.
Q129: In Amendment 1, Answer A8 – “Sections 3.10 and 3.11 have been removed and two additional positions have been added to Section 3.9.”
a. Are offerors no longer expected to propose a Lead or Supervisor for the CAD group?
b. Those two positions require additional skills including, training CAD designers and Engineering Techs, CAD Server drawing records retrieval, and CAD system administration.
Are those services no longer required under this contract?
A129: References to PWS 3.10 and PWS 3.11 have been removed.
Q130: Reference A109 of amendment 0001 – “Program Manager is listed as a separate position”. It is not listed in 3.0 with the other labor categories.
a. Should it be?
b. Is it not listed because it is now an exempt position?
A130: No, detailed in 1.5.5 and yes will be an exempt position.
Q131: RE: Attch_A_PWS_Revisions_Tech_Services_July_12_29/ 1.5.5.Special Qualifications A: “The
Contractor shall appoint an on-site Program Manager (PM) and an Alternate PM who shall be responsible for overall management and supervision of assigned Contractor personnel. The PM will be designated as a full time position. The Alternate PM will have collateral duties assigned to a specific PWS position and will represent the PM when he/she are not available.” By “appointing” a Program Manager, are offerors to assume we should choose someone already on the contract to appoint/offer as PM? Only the incumbent would know who on the current staff would qualify for that post, and yet all bidders are required to propose a PM and include a resume and commitment letter. As was requested during the last Q&A session, we too, request that a PM resume NOT be required in proposals, but instead that the government allow bidders to notify the government after award the names and qualifications of the PM and Alternate as stated in 1.5.5. B “The names of the PM and Alternate PM shall be designated in writing to the CO and COR prior to commencement of work”.
A131: The Project Manager is considered a key position and resume will have to be submitted with proposal.
Q132: Since final questions are due on July 17th, we respectfully request an extension of the proposal due date to accommodate any changes that might need to be made to proposals after receipt of answers to any additional questions.
A132: See Above.
Q133: Reference Amendment 1 A66 “Typical applicators use 2-ton Flatbed trucks with 2 hose reelers and mix tanks on the back”, please give an example of a model of truck that is typically used for this purpose? What is the required Gross Vehicle Weight Requirement of this vehicle? (GVWR).
A133: Reference PWS 3.17.1.J.
Q134: 52.222-42 Statement of Equivalent Rates – Mechanics, Heavy Equipment and Vehicles. Which PWS section includes Mechanics, Heavy Equipment and Vehicles employment class?
A134: Position 3.18
Q135: 52.222-42 Statement of Equivalent Rates - Do the monetary wages include fringe benefits?
A135: No, the page has been revised.
Q137: Amendment 0001, A16 specifies position locations. PWS Section 3.9: How many of the seven
(7) contractor employees are located in Clark County, NV?
A137: 1
Q138: We request the government grant a week extension to allow time for questions to be answered and revisions incorporated.
A138: See above.
Q139: Item A of Amendment 0001 (page 2) says, “Changes include the removal of positions related to
Section 3.10 and 3.11, and increases the positions related to Section 3.9 to seven.” The PWS was updated to include the word “RESERVED” at the beginning of 3.10 and 3.11, but the details for these positions remain in the updated PWS. Please confirm that the Government is NOT expecting offerors to include costs associated with these two positions in the price proposal.
A139: The remaining info related to the 3.10 and 3.11 has been removed.
Q140: A107 in Amendment 0001 (page 17) says, “The evaluation of all proposals, even multiples from one company will be evaluated independently of each other using evaluation criteria provided in the solicitation.” For companies interested in providing multiple offers, would the Government prefer a separate Technical and Pricing volume for each, or can the multiple offers be described as discrete options in a single submission that includes the two volumes?
A140: Any offer would be considered a standalone offer and shall include all required of the solicitation.
Q141: Amendment 1 A119: It is up to the contractor to determine costs for this based on the specifications and include that cost in the fixed price. The average mileage is 18,000 per year. Is the 18,000 mile average per year, a combined mileage of all 9 vehicles? Would the total number of miles driven for all 9 vehicles be 162,000 miles?
A141: The 18000 is per vehicle.
Q142: RE: Attch_A_PWS_Revisions_Tech_Services_July_12_20, 1.5.5. Special Qualifications:
Administrative Considerations/Management and Oversight. C. “Managerial experience in supervising the scope of activities which encompasses at all categories identified in the PWS.
The PM and Alternate shall have demonstrated history of progressively more responsible and diverse supervisory and managerial experience commensurate with the scope of activities identified for each of the technical and/or professional labor categories identified in the PWS.”
Please confirm that the “categories” in the first sentence are labor categories?
If this refers to all of the labor categories found in the PWS, or even the many different functional areas of the PWS, there would only be one person on the planet that has the experience encompassing ALL the diverse labor categories or functional areas in the PWS: from computer operators and engineering techs to herbicide applicators and foresters. That person is the incumbent Program Manager. Again, this experience requirement would give an advantage to the contractor who currently employs that PM. To make the proposal effort a level playing field, we request that offerors not be required to submit a resume for the PM, but rather provide the name of the PM for approval, after award.
Please note that the first paragraph under C conflicts with the “Qualifications” requirements under C. at (4) “Minimum of 5 Years of progressive Supervisory Managerial. Preferred but not required in the power industry in project management in construction or technical project management support.”
A142: Refer to answer A131 above.
Q143: Q1, With the exception of the applicators, when the contractor’s vehicles are not out in the field, can they be parked at the WAPA Desert Southwest Office? (Example: weekends, nights, holidays)
A143: Yes, as long as the vehicle are in good order.
Q144: Even though we cannot bill for the drive home, is it the expectation that the employees drive the vehicles home when it is logistically closer to the planned field work?
A143: This would be at the contractor discretion.