845766longBalt.pdf
PDF 25 MB Posted
- Attached to
- Long Quarter Interceptor Rehabilitation
- Solicitation number
- 23001 SX0
- Issued by
- Baltimore County, Maryland
About this file
This is a project description document for the Long Quarter Interceptor Rehabilitation project administered by the State of Maryland. The project encompasses comprehensive sewer infrastructure rehabilitation work including cured-in-place pipe lining of approximately 2,360 linear feet of eight-inch through 24-inch diameter sewer lines and approximately 6,050 linear feet of 36-inch through 42-inch diameter sewer lines, sprayed-in-place pipe lining of approximately 5,840 linear feet of 60-inch through 66-inch diameter sewer lines, and rehabilitation of approximately 530 vertical feet of manholes using cementitious coating, epoxy coating, and geopolymer spray applied coating. Additional work includes mobilization, clearing and grubbing, demolition as required, maintenance of traffic, excavation, shoring, dewatering, backfill operations, base and surface pavement replacement for point repairs, landscaping and restoration of disturbed surfaces, erosion and sediment control measures, testing activities, and demobilization.
The document does not specify pricing terms, set-aside provisions, incumbent contractor information, contract award dates, response deadlines, or contract term details in the available summary information. Funding sources, amounts, site visit schedules, bidder's conference details, and other financial requirements are not detailed in the provided project description document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .