Old Frederick Road Slope Stabilization
Solicitation number
26030 GX0
Issued by
Baltimore County, Maryland

About this file

This proposal form and project documentation concerns a construction contract solicitation issued by the Baltimore County Department of Public Works and Transportation in Towson, Maryland for embankment stabilization and roadway reconstruction on Old Frederick Road in Catonsville. The project (Contract Number 26030 GX0, Project Number J-10000932) encompasses stabilization of an existing steep embankment experiencing sloughing and erosion along the west side of Old Frederick Road between Frederick Road and Bryans Mill Way through regrading to a flatter 2H:1V slope over approximately 500 feet, installation of a 42-inch single slope concrete traffic barrier with architectural form liner finish, landscaping of the regraded slope and impacted areas, milling and overlaying existing asphalt pavement over approximately 800 feet, installation of new traffic signage and pavement markings, and comprehensive erosion and sediment control measures. A pre-bid meeting is scheduled for Wednesday, September 23, 2026 at 10:00 a.m. EST via WebEx, with the final deadline for bidder questions set for Friday, October 2, 2026 at 4:00 p.m. EST. Bids must be submitted electronically to dpwbid@baltimorecountymd.gov by October 8, 2026. Construction is limited to 7:00 a.m. to 6:00 p.m. weekdays, with a full roadway closure in effect throughout the reconstruction period. The contract is based on the Baltimore County Department of Public Works and Transportation September 2023 Standard Specifications for Construction and Materials.

Bidders must be formally pre-qualified by the Director of Public Works and Transportation within the advertised work classification at least ten calendar days prior to bid opening and must submit a bid bond equal to five percent of the bid amount. The apparent low bidder must submit the original bid bond within ten days after bid opening. Successful bidders will be required to post a performance bond and payment bond equal to 100 percent of the contract amount for projects exceeding $25,000, along with a maintenance bond of five percent of the total contract cost or five percent retainage for two years from final acceptance. Prevailing wage rates in effect as of the contract solicitation date will apply throughout project duration. Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) participation requirements apply, with MBE/WBE forms required for bid submission. Liquidated damages are established at $1,500 per calendar day for days 1-30 after contract expiration, $2,000 per day for days 31-60, and $2,750 per day for day 61 and thereafter until final completion and acceptance. The contractor must maintain a field office for resident engineers and inspectors, provide site video documentation prior to construction, and maintain comprehensive as-built drawings throughout the project duration. All work is subject to compliance with Maryland Department of Environment erosion and sediment control standards, OSHA safety regulations, prevailing wage requirements, and non-discrimination employment practices.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL FORM

BALTIMORE COUNTY

DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION

TOWSON, MARYLAND

Division of Construction Contracts Administration

Contract Number 26030 GX0

STRUCTURES DESIGN PROJECT

Old Frederick Road Slope Stabilization Catonsville – District 1c1

Workday Number PROJ-10000932

CONTRACT BASED ON SEPTEMBER 2023

STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS

AND STANDARD DETAILS FOR CONSTRUCTION

Bidders Information

A pre-bid meeting will be held on Wednesday, September 23, 2026 at 10:00 a.m. EST via WebEx. Phone-In (Audio Only) 1-415-655-0001, Meeting Number 2306 466 4128##. Video Conference go to https://signin.webex.com/join Meeting Number 2306 466 4128, Password erMsbcJn345, for Webex link go to:

www.baltimorecountymd.gov/departments/public-works/engineering/contracts/current-solicitations

Last day for questions will be Friday, October 2, 2026 at 4:00 p.m. EST. Questions should be emailed to Karen McCormick kmccormick@baltimorecountymd.gov and Barbara Wentworth bwentworth@baltimorecountymd.gov.

Baltimore County Prevailing Wage and Local Hiring Affidavit, Wage Rates & Requirements see pages 84-91 (Contract Disclosure): “Wage rates that are in effect as of the contract solicitation date will be the wage rates through the duration of the project”

MBE/WBE Requirements & Forms see pages 92-106 https://signin.webex.com/join http://www.baltimorecountymd.gov/departments/public-works/engineering/contracts/current-solicitations mailto:kmccormick@baltimorecountymd.gov mailto:bwentworth@baltimorecountymd.gov

Revised 9/2024

THIS PROPOSAL FORM INCLUDES AND INCORPORATES ALL DOCUMENTS AND

INFORMATION REFLECTED, LISTED, AND/OR REFERENCED IN THIS

TABLE OF CONTENTS, AND ALL SUCH DOCUMENTS AND INFORMATION ARE PART

OF AND INCORPORATED INTO THE CONTRACT DOCUMENTS.

TABLE OF CONTENTS

Section Page Number SECTION NAME Number

Title Page (cover) ……………………………………………………………….. 1 Table of Contents ……………………………………………………………….. 2

I. INFORMATION FOR BIDDERS ………………………………………. 3-6

II. SPECIAL PROVISIONS ……………………………………………….. 7-65

III. PERMITS…………………………………………………...................… 66

Building Permit…………………………………………………………. 67-68 Forest Conservation Plan (FCP)…………………………………….. 69 Right of Entry Permission Letter……………………………………. 70 Stormwater Management Variance…………………………………. 71

IV. PROPOSAL (This section to be completed at time of bid) …………. 72

Description of Work …………………………………………….. 73 Description of Items & Schedule of Prices …………………… 74-76 Proposal Affidavit ……………………………………………….. 77-82 Bid Bond …………………………………………………………. 83 Baltimore County Prevailing Wage and Local Hiring Affidavit, Wage Rates and Requirements……………………. 84-91 MBE/WBE Requirements and Forms ………………………… 92-106

V. POST AWARD DOCUMENTS (This Section to be completed by successful bidder after award) ….………………………... 107

Contract Agreement …………………………………………….. 108-110 Performance Bond ……………………………………………… 111 Payment Bond …………………………………………………… 112 Insurance Documents ………………………………………….. 113

S E C T I O N I

INFORMATION FOR BIDDERS

ELECTRONIC SUBMITTAL PROCESS

To be considered, Bids (Section IV – Proposal) shall be received by the bid closing date and time to the following email address dpwbid@baltimorecountymd.gov. The contract number and company name should be referenced in the Subject Line of the email. Bids may not be submitted by any other means. Bids that are mailed or otherwise delivered to the Purchasing Division (including emails which indicate links to locations where the bid may be downloaded) and/or emails sent to any other Baltimore County email address will not be accepted.

Late Bids will not be considered. Bidders are strongly encouraged not to wait until the last minute to submit bids. The time stated on the auto-receipt (described below) will be definitive of the time of receipt. Bids received after the deadline will not be accepted. Bidders are advised that the County cannot receive email attachments greater in size than twenty-five (25) megabytes and this size limitation may be further reduced by requirements of the Bidder’s email provider which are beyond the control of the County. Bidder should consider separating any large bid attachment into multiple parts and emailing each part separately. In such case, Bidder will note that each email is 1 of 2, 2 of 2, etc.

Multiple part bids will not be considered unless all parts are received by the bid closing date and time.

After submitting a Bid to dpwbid@baltimorecountymd.gov, and upon successful receipt by the County thereof, Bidder will receive an auto-receipt email. This receipt is proof that the bid has been received by the Division of Construction Contracts Administration and should be retained for Bidder’s records. In the case of a bid submitted in multiple parts as described above, an auto-receipt email will be generated for each part. The County has no obligation to consider any Bid for which an auto-receipt was not generated.

As with any system, power outages or technology problems may arise that are outside of the County’s control and could affect your submission. The County will not be held accountable for such issues that may delay the transmission of any Bid.

NOTE: Electronic copy of the Bid Bond will be accepted at bid opening. The apparent low bidder is required to submit the original Bid Bond within ten (10) days after the bid opening to the Division of Construction Contracts Administration, 111 West Chesapeake Avenue, Room 300B, Towson, Maryland 21204.

INSTRUCTIONS AND SPECIFICATIONS

Refer to the enclosed proposal sheets for quantities to be bid upon. All proposals submitted on the attached form must give the price in clear figures for each item of the proposed work and be signed by the bidder with his name and address. Bidders must not change any item in the proposal for which a price has been stipulated by the County. Any change will cause rejection of the proposal.

NOTE: STATEMENT UNDER OATH FORM TO ACCOMPANY BID as per Baltimore County Purchasing Act 65-98, Section 15-94 and 15-95 which requires that the enclosed affidavit (see Proposal Affidavit pages in Section IV) be completed and submitted as part of the sealed bid.

Proposals made on any other than the attached form will not be considered. All papers included in, bound thereto, or attached to the Proposal Form are necessary parts thereof and shall not be detached, separated, or altered in their intent.

Changes in the phraseology of the proposal, additions, or limiting provisions will render the proposal informal or void and may cause its rejection.

All right is hereby reserved by the Purchasing Agent to reject any or all proposals and to waive formalities and technicalities as the interest of the County may require.

No successful bidder may withdraw his bid within NINETY (90) days after the opening thereof.

The successful bidder will be required to be bonded to Baltimore County, Maryland to the sum of One Hundred per Cent (100%) of the amount of his proposal or proposals according to the form of bond hereto attached for projects in excess of $25,000.00.

This Proposal must be accompanied by a Bid Bond in an amount of 5% of the bid, the exact amount to be determined by the difference between the low bid and the next lowest bid if two or more bids are received, or 5% of the bid if one bid is received. This guarantees payment of the amount thus determined in case of a default in any matter specified as required before award or in any matter resulting in failure to execute and deliver an Agreement, together with Payment and Performance Bonds, after award. The Bid Bond must be in the form accompanying the Proposal executed by a Surety licensed in the State of Maryland. The Surety must be currently rated “B” or better by the A. M.

Best Company, and the bid must be in an amount less than, or equal to, the underwriting limitation contained in Department of Treasury Circular 570 as amended at the time of the underwriting.

All work to be performed under this contract shall be done under strict compliance with Baltimore County Department of Public Works and Transportation September 2023 Standard Specifications for Construction and Materials and Standard Details for Construction and any and all proposed revisions thereto as of the date of advertisement and copies of which are available on the County’s website at www.baltimorecountymd.gov/departments/public-works/standards, and all of which are made a part hereof and incorporated herein (collectively, the “Specifications”).

If the bidder to whom an award is made shall fail to execute the contract and bond hereto attached and as herein provided, the award may be annulled and the contract awarded to the lowest responsible bidder who has consented to a time extension, and such bidder shall fulfill every stipulation embraced herein as if he were the original party to whom the award was made, or the Purchasing Agent may reject all of the bids as the interest of the County may require.

The Bid Bond of the three lowest bidders is deemed to be effective until the execution and delivery of the Contract Agreement, together with Payment and Performance Bonds for projects in excess of $25,000.00 or until rejection of all bids, whereupon Surety is deemed relieved of all further obligations under the bid bonds provided.

Bidders must examine the drawings and specifications carefully and must make a personal examination of the location and nature of the proposed work. In case doubt shall arise as to the meaning or intent of anything shown on the drawings or comprised in the specification, inquiry shall be made of the Director of Public Works and Transportation at least five (5) days prior to the date of http://www.baltimorecountymd.gov/departments/public-works/standards bid opening. The submission of the Proposal shall indicate that the bidder thoroughly understands the drawings and the terms of the Specifications.

To better ensure fair competition and to permit a determination of the lowest bidder, unresponsive bids or bids obviously unbalanced may be rejected by the Purchasing Agent.

Bidders are required to fill out the total price column and total their proposals so that the result of the bidding, barring possible arithmetical errors, will be known at once. Any errors in computations will be corrected by the Engineer when the proposals are canvassed. Where the unit price and the total price are at variance, the unit price will prevail.

Bidders must be prepared to complete the work within the time stated in the proposal.

NOTE: ONLY CONTRACTORS FORMALLY PRE-QUALIFIED WITHIN THE

ADVERTISED WORK CLASSIFICATION BY THE DIRECTOR OF PUBLIC WORKS AND

TRANSPORTATON OF BALTIMORE COUNTY 10 CALENDAR DAYS PRIOR TO BID

OPENING WILL BE ELIGIBLE TO SUBMIT BIDS.

Contracts for work under this proposal will obligate the contractors and subcontractors not to discriminate in employment practices. Bidders must, if requested, submit a compliance report concerning their employment practices and policies in order to maintain their eligibility to receive the award of the contract. Successful bidders must be prepared to comply in all respects with the Contract Provisions regarding nondiscrimination.

Baltimore County has adopted a Minority Business Enterprise (MBE) program and Women’s Business Enterprise (WBE) Program. The percentage of participation applies to the contract amount awarded to the Contractor. Qualified minority subcontractors are those certified as being a Minority Business Enterprise by the following:

1. Maryland Department of Transportation Certification Committee (MDOT)

2. City of Baltimore, Minority Business Certification Council

Projects funded by the Federal Highway Administration are limited to the certification listed under #1

(MDOT).

More detailed information regarding the County’s MBE/WBE Program can be obtained from the County MBE Office, telephone (410) 887-3407. See Executive Order dated December 6, 2022.

MBE/WBE Participation Summary and Forms A, B, C, D and E enclosed in this proposal booklet.

NOTE: If you do not complete and submit the enclosed forms with your bid or offer to the County, the County may, in its sole discretion, deem your bid or offer NON-RESPONSIVE and accordingly the COUNTY WILL NOT CONSIDER YOU FOR CONTRACT AWARD.

The County reserves the right to require the low bidder to produce evidence indicating that the company’s financial condition is equal to, or better than, that enjoyed by the company at the time of prequalification. This additional information may be in the form of a financial statement or other evidence satisfactory to the Office of Budget and Finance.

Bidders’ attention is directed to the requirement that a permit must be obtained from the Baltimore County Bureau of Highways and Bureau of Traffic Engineering prior to cutting any County road for the purpose of obtaining sub-surface soils information, and permission must be obtained from the State Highways Administration prior to making any openings in a State road.

Under no circumstances shall a bidder enter upon any property outside a County or State road for the purpose of securing sub-surface soils information until permission is received from the property owner. The fact that the County has obtained a utility easement does not give the bidder the right to enter upon the property.

Prevailing index price of asphalt cement/ton $807.50.

INCLEMENT WEATHER POLICY: If Baltimore County General Government Offices are open or open with liberal leave the day the bids are due, the bids are due as stated in the bid documents (date and time).

ONLY when the Baltimore County General Government Offices are OFFICIALLY CLOSED the day the bids are due, the bid date will be postponed and an Addendum will be issued the next business (or next day buildings are officially open) day the county offices are open with the new bid date and time.

BID TABULATIONS: All bid tabulations will be confidential until after final award, at which time the total bid amounts for all bidders, as well as the complete bid tabulations for the top three (3) bidders, can be inspected by others when requested in writing pursuant to the Maryland Public Information Act.

ALTERNATIVE SOURCES OF CONTRACT BONDS: In the event your company is unable to qualify for bonding through a traditional commercial surety company, you may qualify for the required bonds through the State of Maryland, Department of Commerce (DOC). The Maryland Small Business Development Financing Authority (MSBDFA, pronounced Mis-Bid-Fa), an agency of DOC, operates a Surety Bond Program designed to assist small businesses, based in Maryland, that are unable to obtain adequate bonding on reasonable terms in the commercial marketplace. MSBDFA provides bid, payment and performance bonds for contracts funded by government agencies, regulated utilities and private entities. The penal sums of the bonds are limited to the aggregate amount of $2,500,000 and companies may pre-qualify for multiple bonds within pre-approved terms and conditions. MSBDFA also provides lines of credit, term loans and loan guarantees to help qualified businesses purchase equipment and real property, make improvements to leased property, refinance existing debt and assist them with their working capital needs. For more information on how to apply, you may contact:

Meridian Management Group, Inc. (MMG), (the Program’s Manager), 826 E. Baltimore Street, Baltimore, Maryland 21202, Telephone: (410) 333-4270. Or visit their website at www.mmgcapitalgroup.com for information, applications and a checklist of required documents and reports that must accompany the application.

http://www.mmgcapitalgroup.com/

Rev. 01/13 VI-6

S E C T I O N I I

SPECIAL PROVISIONS

GP-SECTION 4.10(C) REVISED

09/2024

MAINTENANCE BOND

Per the Baltimore County Department of Public Works and Transportation September 2023 Standard Specifications for Construction and Materials, Section GP – 4.10 (C) states, the contractor is required to post a maintenance bond in the amount of five (5) percent of the total cost of the contract or withhold five (5) percent retainage for two (2) years from the date of Final Acceptance.

BALTIMORE COUNTY, MARYLAND

BOND NO. _______________________

CONTRACT NO. __________________

MAINTENANCE BOND

THIS MAINTENANCE BOND is entered into on this _______________ day of __________________, 20____, by and between ______________________________________ as principal (“Principal”) and _____________________________________, a business entity that is authorized to transact business in the State of Maryland and is organized and existing under the laws of the State of __________________________, as surety ("Surety"), are held and firmly bound unto Baltimore County, Maryland, a body corporate and politic of the State of Maryland (“County”), as Obligee.

WHEREAS, the above-named Principal has entered into a written contract known as Contract Number _______________________ dated ______________________, 20___ with Obligee for (the "Agreement"), the terms of which are hereby incorporated by reference; and

WHEREAS, Principal has completed construction under the Agreement; and

WHEREAS, the Agreement includes a warranty on the quality of the Work performed that runs for a period of two (2) years from the date of the County’s final acceptance and that runs for two

(2) additional years beyond the repair date if any repair is done during the warranty period; and

WHEREAS, Principal is required to cause this instrument to be executed and delivered to Obligee as security for maintenance during the warranty period in an amount equal to 5% of the total value of the Contract.

NOW, THEREFORE, the Principal and Surety are held and firmly bound unto the Obligee in the sum of $________________________________________________________________ Dollars ($ _________________), lawful money of the United States of America, for the payment of which sum of money the Principal and Surety do bind themselves and their personal representatives, legal representatives, successors, and assigns, jointly and severally, firmly by this maintenance bond.

The conditions of this bond are as follows:

1. The Principal shall, for a period of two (2) years from and after the date of completion and acceptance of same by Obligee, replace all defects arising in the Work, whether resulting from defective materials, equipment, design furnished or workmanship. After such period, this obligation shall be null and void; otherwise it shall remain in full force and effect.

2. In the event of a default on the part of the Principal that may be the subject of a claim under this bond, Obligee shall mail, by certified mail, to Surety at the address listed below, a written statement that a claim is being made under the bond and, with substantial accuracy, the amount of the claim. Surety shall have no obligation to Obligee under this bond until the notice of claim is mailed.

3. When the Obligee has satisfied the condition of Paragraph 2 that a notice of claim be mailed, the Surety shall promptly and at the Surety's expense send an answer to Obligee within 30 days after the date of the claim. The answer shall state the amounts that are undisputed and the basis for challenging any amounts that are disputed. The answer shall be accompanied by payment (or arrangements for immediate payment) of any undisputed amounts.

4. Surety expressly waives any right to receive notice of extensions of time or alterations or modifications to the Agreement that may be granted by Obligee and agreed upon by Principal, and any such extensions, alterations, or modifications shall not affect the obligation of the Surety under this bond.

5. This bond is a specialty governed by the twelve-year statute of limitations period set forth in the Annotated Code of Maryland Courts and Judicial Proceedings §5-102.

WITNESS OR ATTEST: (Principal – Contractor Name)

_________________________ By:

Type Name:_____________________

Type Title: ______________________

Date: ___________________________

(Surety)

___________________________ By:_____________________________

Type Name:_____________________

Type Title:______________________

Type Address:____________________

Date:____________________________

Bid Submission

Old Frederick Road Slope Stabilization from MD 144 (Frederick Rd) to Bryans Mill Way

PROJ # J-10000932

Submitted to:

Baltimore County Department of Public Works and Transportation

May 2026

OLD FREDERICK ROAD SLOPE STABILIZATION FROM

MD 144 (FREDERICK RD) TO BRYANS MILL WAY

PROJ. # 10000932

BALTIMORE COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION

TABLE OF CONTENTS

SPECIAL PROVISIONS PAGE

NUMBER

SP 1 – GENERAL REQUIREMENTS

SP 1 - 1 General SP-1 SP 1 - 2 Location and Description of Work SP-1 SP 1 - 3 Contract Documents – Design Intent SP-1 SP 1 - 4 Environmental Protection SP-3 SP 1 - 5 Support and/or Protection of Existing Utilities SP-5 SP 1 - 6 Support of Excavation SP-5 SP 1 - 7 Dewatering, Drainage and Pumping SP-6 SP 1 - 8 Maintenance of Traffic SP-7 SP 1 - 9 Steel Plating and Solid Sheeting SP-8 SP 1 - 10 Submittals SP-8 SP 1 - 11 Equal Or Approved Equal SP-15 SP 1 - 12 As-Built Drawings SP-16 SP 1 - 13 Force Majeure and Damages SP-16 SP 1 - 14 Progress Schedule SP-18 SP 1 - 15 Preservation and Restoration of Property SP-19 SP 1 - 16 Site Video SP-19 SP 1 - 17 Guarantee SP-19 SP 1 - 18 Labor Standards and Anti-Kickback Regulations SP-20 SP 1 - 19 O.S.H.A. Standards and Safety SP-20 SP 1 - 20 Progress Meetings SP-20 SP 1 - 21 Temporary Services SP-20

SP 2 – CATEGORY 200 – GRADING

SP 2 - 1 Section 201 - Roadway Excavation (Class 1) SP-22 SP 2 - 2 Section 204 - Embankment and Subgrade SP-23

SP 3 – CATEGORY 400 – STRUCTURES

SP 3 - 1 Section 456 - Architectural Treatment SP-24 SP 3 - 2 Section 499 - Working Drawings SP-25

SP 4 – CATEGORY 600 – SHOULDERS

SP 4 - 1 Section 611 - Concrete Traffic Barriers SP-26

SPECIAL PROVISIONS PAGE

NUMBER

SP 5 – CATEGORY 700 – LANDSCAPING

SP 5 - 1 Section 707 - Meadow Establishment SP-27 SP 5 - 2 Section 710.02 - Landscaping – Tree, Shrub Installation, and

Establishment

SP-34

SP 5 - 3 Section 710.03.22(a) - Landscaping – Period of Maintenance SP-36

SP 6 – CATEGORY 900 – MATERIALS

SP 6 - 1 Section 916 - Soil and Soil-Aggregate Borrow SP-37

SP 7 – TECHNICAL SPECIFICATIONS

SP 7 - 1 Section 100 - Temporary Construction Access Road SP-38

SP 8 – BID ITEMS

SP 8 - 1 Measurement and Payment SP-40 ITEM 1 Clearing and Grubbing SP-41 ITEM 2 Engineer’s Office No. 2 (SHA Type B Engineer’s Office) SP-41 ITEM 3 Maintenance of Traffic SP-41 ITEM 4 Temporary Traffic Signs High Performance Wide Angle

Retroreflective Sheeting

SP-41

ITEM 5 Type III Barricade for Maintenance of Traffic SP-42 ITEM 6 Temporary Safety Fence SP-42 ITEM 7 Construction Stakeout SP-42 ITEM 8 Mobilization and Demobilization SP-42 ITEM 9 Temporary Construction Access Road Surface SP-43 ITEM 10 Temporary Support of Embankment SP-43 ITEM 11 Class 1 Excavation SP-43 ITEM 12 Select Borrow SP-43 ITEM 13 Swale Inlet Protection SP-44 ITEM 14 Stabilized Construction Entrance SP-44 ITEM 15 Filter Bag SP-44 ITEM 16 15 inch Clear Water Diversion Pipe SP-44 ITEM 17 Sump Pit SP-45 ITEM 18 Rock Outlet Protection III (Rip Rap for Sediment Control) SP-45 ITEM 19 Super Silt Fence SP-45 ITEM 20 Super Fence Diversion (Diversion Fence) SP-45 ITEM 21 Temporary Asphalt Berm SP-46 ITEM 22 Silt Fence SP-46 ITEM 23 Sandbags SP-46 ITEM 24 2.0 in Hot Mix Asphalt Superpave 12.5mm, PG 64-22, Level 2 SP-46 ITEM 25 5 inch White Pavement Thermoplastic Pavement Markings SP-47 ITEM 26 5 inch Yello Pavement Thermoplastic Pavement Markings SP-47

SPECIAL PROVISIONS PAGE

NUMBER

ITEM 27 Thermoplastic Pavement Marking Legends and Symbols SP-47 ITEM 28 Milling Existing Asphalt Pavement 2 inch Depth SP-47 ITEM 29 42 inch Single Slope Concrete Traffic Barrier Single Face Type 3 SP-48 ITEM 30 Posted Mounted Delineator SP-48 ITEM 31 Placing Salvaged Topsoil 4 inch Depth SP-48 ITEM 32 Temporary Seeding SP-48 ITEM 33 Temporary Straw Mulching SP-49 ITEM 34 Upland Meadow Establishment SP-49 ITEM 35 Soil Stabilization Matting SP-49 ITEM 36 Tree, Shrub, and Perenial Installation and Establishment SP-49 ITEM 37 Selective Tree Trimming for Tree T-204 SP-50 ITEM 38 Tree Root Pruning SP-50 ITEM 39 Square Perforated Tubular Steel Sign Posts SP-50 ITEM 40 Square Tubular Steel Anchor Bases SP-50 ITEM 41 Sheet Aluminum Signs SP-51 ITEM 42 Remove Existing Ground Mounted Signs and Supports SP-51

Old Frederick Road Slope Stabilization from MD 144 (Frederick Rd) to Bryans Mill Way

PROJ. #: 10000932

SP-1

SP 1 - GENERAL REQUIREMENTS

SP 1 -1 GENERAL

A. The Special provisions are hereby made a part of the Contract. In case of any conflict with the latest version of the “Standard Specifications, General Provisions,” these Special Provisions shall govern.

B. All work to be performed under this Contract shall be done in strict compliance with the latest version of the Baltimore County Standard Specifications for Construction and Materials.

SP 1 – 2 LOCATION AND DESCRIPTION OF WORK

A. Work includes stabilization of the existing embankment along the west side of Old Frederick Road between Frederick Road and Bryans Mill Way in Catonsville. The existing steep embankment is experiencing sloughing and erosion on the middle portion of the hillside during stormwater events. The proposed stabilization of the embankment consists of regrading the slope to a flatter 2H:1V over an approximately length of 500ft. Work includes landscaping along the regraded slope and impacted areas within the Limit of Disturbance. Road work includes milling and overlaying the roadway over an approximately length of 800ft. Within the area of the regraded slope, the proposed roadway width will be narrowed to a proposed one 10’-0” wide lane of northeast-bound traffic and a SHA standard 42” Single Slope Barrier to accommodate the regraded slope. The proposed barrier will be cast with architectural form liner. Work includes new signing and pavement markings for the proposed traffic pattern.

B. The work to be done under this Contract includes furnishing all labor, tools, materials and equipment and performing all work required for the construction of the stabilized slope and roadway complete in place, and open to traffic. Work shall consist of excavation, support of excavation and dewatering, off-site disposal of all excavated material, furnishing and installing the barrier, backfill, asphalt pavement restoration, maintenance and traffic signing and pavement markings, and erosion and sediment control, and landscaping.

C. Construction shall only take place between 7 am – 6 pm.

SP 1 – 3 CONTRACT DOCUMENTS - DESIGN INTENT

A. The latest version of the Baltimore County Department of Public Works Standard Specifications for Construction and Materials and the Standard Details for Construction, as amended, of either Baltimore County or the State Highway Administration, insofar as the same may be applicable except as modified herein and are hereby made a part of the Contract and these Special Provisions.

B. Contract Drawings to be followed for this Contract shall be those approved drawings on file at the office of the Engineer. The Contract Drawings contain information as to amount, location, dimension and detail of the work to be performed in accordance with the

SP-2

Specifications. No deviation shall be permitted from the Contract Drawings and Specifications unless authorized in writing by the Engineer. Deviation by the Contractor from the Contract Documents without the Engineer’s prior written approval shall be at the Contractor’s risk and expense, including the expense of removal and restoration if so ordered.

C. Any discrepancies found between the Drawings and Specifications or any inconsistencies in the Drawings or Specifications shall be immediately reported to the Engineer, in writing, who shall promptly correct such inconsistencies or ambiguities in writing. Where conflicts arise, the more durable, high quality (i.e. more expensive, as judged solely by the Engineer) component shall be utilized, and assumed to be part of the base bid, unless such alternate has been agreed to in writing by the Owner prior to submission of bids. Work done by the Contractor after his discovery of such discrepancies, inconsistencies or ambiguities prior to corrections directed by the Engineer shall be done at the Contractor’s risk. In the case of discrepancy or omission, the Engineer will determine the intent of the design in issuing clarifying or corrective instructions.

D. In order to fulfill the requirements of the Contract, conformance is required with both the Contract Drawings and Specifications. The Contractor is not released from responsibility for performing work called for in the Contract Drawings but not in the Specifications or vice versa; mention of work in either part is sufficient to include it under the Contract. In all cases, the decision of the Engineer will be final.

E. It is the intent of the Drawings and Specifications to provide the Contractor with such information and instructions as may be necessary to complete this contract and to provide a complete and workable installation. The Contractor shall perform all work in accordance with the lines, grades, cross sections and dimensions shown on the plans. The Contractor shall furnish, unless otherwise provided in these plans and specifications, all materials, implements, machinery, equipment, tools, supplies, transportation and labor necessary for the prosecution and completion of the work. All materials and equipment installed as part of the permanent installation shall be new.

F. Completeness: Any apparatus, appliance, material or work not shown on the drawings but mentioned in the specifications, or vice-versa, or any incidental accessories necessary to make the work complete and perfect in all respects and ready for operation, even if not particularly specified, shall be provided by the Contractor without additional expense to the County.

G. Schematics may not be shown to scale on drawings, but the work shown on the schematic shall be provided by the Contractor without additional cost to the County.

H. Adequacy: With submission of bid, the Contractor shall give written notice to the Engineer of any materials or apparatus believed inadequate or unsuitable; in violation of laws, ordinances, rules or regulations of Authorities having jurisdiction; and any necessary items of work omitted. In the absence of such written notice, it shall be understood that the Contractor has included the cost of all required items in his/her proposal and that he/she

SP-3

will be responsible for the approved satisfactory functioning of the entire system without extra compensation.

SP 1 – 4 ENVIRONMENTAL PROTECTIONS

The Contractor, and its subcontractors, in the performance of this Contract, shall comply with all applicable Federal, State and local laws and regulations concerning environmental pollution control and abatement as well as the specific requirements stated elsewhere in the Contract Documents.

The Contractor shall take all precautions necessary in order to avoid pollution of water in adjacent watercourses or water storage areas, including wells.

All earthwork, equipment movement, control of water in excavations and other operations which may create silting, shall be conducted in a manner to keep water pollution to an absolute minimum.

Water used during the Contract work which has become polluted with oil, harmful or objectionable chemicals, sewage or other pollutants, shall be disposed of in a manner that will not affect nearby waters and land. The Contractor shall not, under any circumstances, discharge pollutants into any watercourse.

The Contractor shall take all precautions necessary in order to avoid noise and air pollution during the course of the Contract.

The Contractor shall maintain all work areas free from dust which would contribute to air pollution.

Approved temporary methods of stabilization consisting of sprinkling, chemical treatment, or similar methods will be permitted to control dust. Sprinkling, where used, must be repeated at such intervals as to keep all parts of the disturbed area at least damp at all times. Dust control shall be performed as the work proceeds and whenever the dust nuisance or hazard occurs. The use of road oils and waste oils to control dust is prohibited.

The Contractor shall keep clean all streets, driveways and sidewalks affected by his operations.

Trucks hauling excavated materials, cement, sand, stone, or other loose materials from or to the site shall be tight so that no spillage will occur. Before trucks start away from the site, their loads shall be carefully trimmed to prevent spillage.

The Contractor shall provide all labor, materials, equipment and services necessary for, and incidental to, the complete and satisfactory application of temporary sediment control measures throughout the time of the Contract as specified herein. In order to prevent and to provide for abatement and control of any environmental pollution arising from the construction activities of the Contractor and his subcontractors in the performance of the Contract, the Contractor and his subcontractors shall comply with all applicable Federal, State and local laws and regulations concerning environmental pollution control and abatement.

It shall be the Contractor’s responsibility to adhere to the “Standards and Specifications for Soil Erosion and Sediment Control in Developing Areas” as approved and adopted by the State of Maryland, Department of Water Resources, an agency of the Department of Natural Resources;

SP-4

and furthermore, the Contractor also shall adhere to the provisions of the Standard Specifications, Section 308, and any revisions thereof or additions thereto and all sections referred to therein.

The Contractor shall notify the County’s Project Engineer indicating the source of all borrow material and the disposal site for excess material. The Contractor shall be responsible for obtaining sediment control permits from the appropriate agency for off-site disposal of excess material.

Surface drainage from cuts and fills within the construction limits, whether or not completed, and from borrow and waste disposal areas shall, if turbidity producing materials are present, be held in suitable sedimentation ponds or shall be graded to control erosion within acceptable limits.

Temporary erosion and sediment control measures, such as berms, dikes, silt fences, drains or sedimentation basins, if required to meet the above standards, shall be provided and maintained until permanent drainage and erosion control facilities are completed and operative. The area of bare soil exposed at any one time by construction operations shall be held to a minimum. Fills and waste areas shall be constructed by selective placement of materials to eliminate silts or clays on the surface that will erode and contaminate adjacent rivers, streams, lakes, or ponds. Further protection of any excavation storage area, waste area, or fill area shall be provided by the Contractor by the installation and maintenance of a silt fence, as shown on the Contract Drawings, around the down slope perimeter of such areas.

The cost for any excavation and/or fill and incidentals involved in connection with the construction of erosion, sediment and pollution control devices required on this project shall be included in the prices bid in the Contract.

In general, the Contractor shall erect sediment control devices prior to beginning any other earthwork under the Contract. Areas through which vehicular access to and from the site will be gained shall be stabilized by the Contractor in accordance with the Standard for Stabilized Construction Entrance. Swales, ditches, stockpiles of earth and topsoil and other cleared or graded areas shall be temporarily stabilized with seed and mulch. All areas disturbed by the Contractor shall be seeded and sodded to the satisfaction of the Engineer.

Temporary Drainage

The Contractor shall conduct their work in such a manner that the efficiency of the existing surface drainage and pipe storm drain system will not be diminished.

The Contractor shall keep all drainage and water courses unobstructed, or provide equal courses effectively placed, to prevent accumulations of surface water.

Stream Flow Protection

The dewatering or pumping out of trenches, utility line structures, or newly excavated areas directly into a stream which causes turbidity and/or erosion of stream banks will be prohibited.

The Contractor shall make use of sediment traps, filters or other methods as stated in “Erosion and Sediment Control Provisions”, included in Section 308 of the Standard Specifications and Materials for Construction. The restrictions contained herein shall be strictly enforced, and the Contractor is cautioned to make every effort possible to comply with these regulations and

SP-5

shall conduct their operations in such a manner to keep to an absolute minimum the amount of sedimentation introduced into any stream.

Upon completion of the project and after such devices have served their purpose, such devices shall be removed from the project by the Contractor at their own expense.

The Contractor shall not allow the site of the work to become littered with trash and waste materials but shall maintain the site in a neat and orderly condition throughout the period of the work.

Cleaning up, including the restoration of areas of construction, shall proceed as quickly as is practicable after the construction is completed in any given area. This period, between construction completion and final cleanup, normally shall not exceed two (2) weeks.

Within ten (10) days after completion of the work and before final acceptance, the Contractor shall, without charge, tear down and remove all temporary structures built by him, remove all rubbish of all kinds from any ground which he has occupied, and shall leave the work site in a clean and orderly condition.

If at any time during the course of the work, the cleanup operation in any given area should become delinquent in the opinion of the Engineer, he may order that construction be stopped until such delinquent cleanup is completed.

The Contractor shall not be entitled to any additional compensation or extension of time of completion should such stoppage of construction be ordered by the Engineer.

Burning will be allowed only if approved in writing by the Fire Marshal and authorized in writing by the Engineer. The specific time, location and manner of burning shall be subject to the approval of the Engineer. Fires shall be confined to a closed vessel, guarded at all times, and shall be under constant surveillance until they have burned out or have been extinguished. All burning shall be so thorough that the materials will be reduced to ashes.

SP 1 – 5 SUPPORT AND/OR PROTECTION OF EXISTING UTILITIES

A. The Contractor shall support all existing utilities within the excavation.

B. Contractor shall submit the proposed method of support to the Engineer for approval.

C. All work, materials, labor, etc. to support and/or protect existing utilities is considered incidental to the force main installation. No separate payment will be made for the exposing, supporting and/or protecting existing utilities.

SP 1 – 6 SUPPORT OF EXCAVATION

A. The Contractor shall provide temporary support of excavation for all excavations.

B. Excavation support and protection plans are a delegated design that is the Contractor’s responsibility and shall be submitted for review as detailed shop drawings. Detailed shop drawings shall include detailed drawings, design calculations, and a comprehensive engineering analysis which shall be designed and sealed by a Professional Engineer

SP-6

registered in the State of Maryland who is experienced in the design of earth retaining structures. Submittal shall include the following information:

1. Design assumptions, analysis, calculations, and information on the Contractor’s proposed method of installation and removal of all support of excavation systems.

2. Maximum design load to be carried by the support of excavation system members and include the impact of live loads and groundwater.

3. Detailed support of excavation drawings showing all pertinent dimensions, spacing, and relationships among the components of the support of excavation systems.

Include construction sequence and scheduling.

4. Bracing methods.

5. Detailed sequence of construction and bracing removal.

6. Detailed drawings and descriptions of the method to be used by the Contractor to monitor the support of excavation system, adjacent utilities and utility support systems, and ground/structure movements.

C. Temporary support of excavation systems can consist of but are not limited to, tight driven steel sheet piling, soldier piles with timber or concrete lagging, wooden sheeting and shoring, proprietary support systems, and/or ground modification methods. The method(s) selected by the Contractor shall provide for stable excavation sides and satisfy all federal, state, and local safety regulations.

D. The Contractor shall cut off all bracing and sheeting where bracing and sheeting interferes with appurtenance structures and the contractor is responsible for removing all excess material from the site.

E. All work, materials, labor, etc. associated with the furnishing, installation, and removal of support of excavation systems is considered incidental to the force main installation and no additional payment will be made.

SP 1 – 7 DEWATERING, DRAINAGE AND PUMPING

A. The Contractor shall submit for approval their proposed procedure for any dewatering. The Contractor shall design, furnish, install, maintain, and operate all necessary dewatering equipment and structures at the Contractor’s expense.

B. The Contractor shall design their dewatering system to ensure that trenches remain open and conform to OSHA standards for safety. Disposal of drainage water from dewatering devices shall be accomplished in a manner that conforms to Maryland Standards and Specifications for Soil Erosion.

C. The Contractor shall design their dewatering system so that the dewatering is localized to the construction area. The Contractor shall be responsible for all damage and shall assume

SP-7

all expense for any buildings, structures, walls, poles, etc., that are affected by the dewatering.

SP 1 – 8 MAINTENANCE OF TRAFFIC

A. There will be a full roadway closure in effect for the entire reconstruction period of the project primarily due to the safety concerns during construction given the narrow width of the road limiting space for construction activities at the base of the embankment.

The roadway will be closed at MD 144 and just west of Bryans Mill Way to maintain access to resident driveways. For northeast-bound Old Frederick Road traffic, the detour route starts at MD 144. Detour vehicles would travel east on MD 144, turn left to head north on Oella Avenue, and turn left again to head southwest on Old Frederick Road. For southwest-bound Old Frederick Road traffic, detour vehicles would travel northeast towards Oella Avenue, turn right to head south on Oella Avenue, turn right again to head west on MD 144.

B. All existing driveway access must be maintained at all times.

The contractor is to be responsible for the fabrication, installation and maintenance of all traffic control devices. Said devices shall be in accordance with the Manual on Uniform Traffic Control Devices. Also, the contractor may be required to furnish additional signs should conditions warrant. Regarding the control of traffic through work areas, Part 6 “Temporary Traffic Control” of The Manual on Uniform Traffic Control Devices (Latest Edition) shall be utilized.

Once the contractor has received their notice to proceed, the Division of Traffic Engineering will inventory the existing permanent traffic control devices throughout the construction area. Should it be necessary for any devices to be removed by the contractor, his personnel, or their sub-contractor during construction, the contractor shall be responsible for the safe storage of these devices. Should they become damaged, defaced, lost, etc., the contractor will be billed for replacement of these permanent devices. The contractor will also be responsible for the re-installation of any permanent devices removed during construction.

The Lump Sum Bid for “Maintenance of Traffic” shall, in addition to the requirements stated above and in Section 104, including furnishing, erecting, moving, maintaining, barricades (including TYPE III barricades), traffic barrels, lights, etc., during construction. Also included shall be the cost of flagman and arrow boards.

The price bid for “Temporary Traffic Signs” shall, in addition to the requirements stated in Section 104.08, included furnishing, erecting, moving and/or relocating, maintaining, replacing as needed, removal and disposal of all temporary traffic signs needed during construction. Signs will be paid for once following their initial approved installation. This will apply to all temporary traffic signs, including signs mounted on portable supports for temporary conditions, as described in Section 104.08.03.

SP-8

SP 1 – 9 STEEL PLATING AND SOLID SHEETING

A. If steel plates are used, they shall be used to cover open trenches in roadways during non-working hours. The cost for this work, material, labor, etc., shall be included in the lump sum price for Maintenance of Traffic.

B. If steel plates are used, solid sheeting and shoring shall be used for the limits of the steel plating. The cost for this work, material, labor, etc., shall be included in the unit price bid for sanitary sewer pipe.

SP 1 – 10 SUBMITTALS

A. Ten (10) days after notice to proceed, the Contractor shall submit a submittal schedule listing as near as practicable by specification section number, all submittals required and approximate date submittal will be forwarded.

B. Submittals shall be provided in proper sequence and time with due regard to the time required for the review approval and transmittal as per the approved project schedule. The Contractor shall submit a list of anticipated submittals. Submittals shall be listed by specification number. If a specification has multiple materials, pieces of equipment, etc.

the Contractor shall explicitly indicate the different items intended to be submitted for each submittal. Anticipated submittal lists only listing specification name and numbers will not be accepted.

C. Submittals are generally defined as all drawings, diagrams, illustrations, catalog cut sheets, product data sheets, brochures, schedules, bills of material, and other data, certified correct for construction, which are prepared by the Contractor, their subcontractors, suppliers or distributors, or equipment fabricators or manufacturers, and which illustrate the manufacture, fabrication, construction, installation of the work, or a portion thereof.

D. The Contractor’s attention is specifically directed to the fact that working drawings are required, and shall be submitted, for each and every element of the work including, but not limited to, excavation support systems, dewatering systems, precast concrete structures, piping, valves, maintenance of traffic, erosion and sediment control systems, and all other shop drawings which may be necessary, in the opinion of the Engineer, to comply with the all-inclusive intent of this requirement.

E. Each submittal shall be assigned a sequential number; Submittal No. 1, 2, 3, 4, etc. for purposes of easy identification, and shall retain its assigned number, with appropriate subscript, on required resubmissions. Changing manufacturers or models during the course of the submittal process shall not be cause for assigning a new submittal number. Once an item of work has been assigned a submittal number, that item of work shall retain the same number for the duration of the project. The following stamp shall be affixed to each submittal and appropriately completed.

SP-9

Resubmittals shall be labeled with the letter “R” followed by the number of the resubmission. Example: The Contractor’s tenth submittal, being resubmitted for the first time shall be numbered Submittal No. 10R1, resubmitted for the second time shall be numbered Submittal No. 10R2, etc.

F. All shop drawings shall be in conformity with the Contract Drawings and Special Provisions. All shop drawings except diagrams, illustrations, brochures and schedules shall be to appropriate scale, but in no case smaller than ¼” = 1’-0”, and shall give all dimensions required for manufacture, fabrication, assembly, installation and incorporation in the work. All shop drawings shall be complete, accurate and distinct, and shall show outline and section views, details, kinds of materials to be used, the kind of machine work and finish to be applied, and the installed locations of the said materials, equipment, accessories, appurtenances and related items.

G. Certification of Materials and Installations:

1. The Contractor shall furnish certification from each manufacturer, or from an approved testing laboratory, that all material used in the work is in accordance with these and all referenced specifications.

2. Upon completion of the work, and before acceptance by the County, the Contractor shall furnish the County with a certificate from each of the manufacturers that the equipment and material furnished by him has been erected and installed in a satisfactory manner and is ready for continuous service and operation.

CHECKED AND APPROVED FOR SUBMISSION

(CONTRACTOR’S NAME)

JOB________________________________________

CONTRACT NO.______________________________

DATE_____________________ BY_______________

SUBMITTAL NUMBER_________________________

ITEM________________________________________

CONTRACT REFERENCES:

SPECIFICATION_______________________________

DRAWING_______________________________

SP-10

3. Machinery and equipment for which manufacturer certification is specified will not be accepted, nor payment made therefore, without such certification.