Enon Water Main
Solicitation number
26153
Issued by
Stafford County, Virginia

About this file

Summary of Stafford County, Virginia IFB #26153 - Enon Water Main Project

This is a technical specifications document for Stafford County, Virginia's Invitation for Bid (IFB) #26153 for the Enon Water Main project, issued by the Stafford County Department of Procurement. The project scope requires the contractor to furnish and install approximately 6,250 linear feet of new 24-inch water main connecting the new elevated Enon Road Tank to a connection near Centreport Village. Appurtenant work includes valves, fire and flushing hydrants, air release valves, vacuum appurtenances, interconnections, clearing, site access, access roads, erosion control, and restoration work. The specifications encompass comprehensive general requirements across nine divisions, including summary of work, project meetings, submittals, regulatory requirements, quality control, construction facilities, work zone traffic control, field engineering, and closeout procedures. The contractor is responsible for all labor, materials, equipment, temporary facilities, and permits except those specifically identified for owner procurement. Work must comply with Commonwealth of Virginia Department of Health Waterworks Regulations, Virginia Uniform Statewide Building Code, Virginia Department of Transportation requirements, and Stafford County design and construction standards.

The contract documents specify that the contractor shall obtain a detailed project schedule within 20 days of contract execution and maintain monthly progress reporting throughout construction. Shutdowns of existing facilities require a minimum of 10 days' notice to the owner, and all facility disruptions are prohibited on Mondays, Fridays, and during Thanksgiving and Christmas weeks. The contractor must provide pre- and post-construction video surveys and digital photography documenting existing and final conditions. The specifications mandate that all work zone traffic control, maintenance of traffic including flagger service, signage, and temporary detours be included in the lump sum bid price with no additional compensation unless specifically authorized by the owner as a change order. A certified Traffic Control Supervisor must be assigned to provide 24-hour management throughout the project duration. Record drawings must be maintained on-site and updated monthly as a condition for monthly progress payments, with final documentation submitted in CADD format upon project completion.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stafford County, Virginia

IFB #26153

Enon Water Main Technical Specifications

Contact: procurement@staffordva.gov

540-658-4336

July 24, 2026

Attachment A

Table of Contents

342-15 PROJECT NAME: ENON WATER MAIN IFB#26153 TABLE OF CONTENTS

DIVISION 1 – GENERAL REQUIREMENTS

Section Title

01110 Summary of Work

01310 Project Meetings

01330 Submittals

01410 Regulatory Requirements

01420 References

01450 Quality Control

01500 Construction Facilities Needed and Temporary Controls

01511 Work Zone Traffic Control

01512 Maintaining Traffic

01720 Field Engineering

01730 Cutting and Patching

01770 Closeout Procedures

01780 Project Record Documents

DIVISION 2 – SITE CONSTRUCTION

02200 Earthwork, Excavation, Trenching and Backfilling

02370 Erosion and Sediment Control

02442 Guided Boring

02510 Ductile Iron Pipe Watermain and Appurtenances

02512 Thrust Restraint

02513 Disinfection of Water Distribution Systems

02514 Leakage Tests

02700 Paving and Surfacing

02920 Lawns and Grasses

Table of Contents

342-15 PROJECT NAME: ENON WATER MAIN IFB#26153 TABLE OF CONTENTS

DIVISION 3 – CONCRETE

Section Title

03200 Concrete Reinforcement

03300 Cast-in-Place Concrete

03400 Precast Concrete

DIVISION 9 – FINISHES

09900 Special Coatings

APPENDICES

A Geotechnical Report

B Permits

C Easements/Conditions

342-15 PROJECT NAME: ENON WATER MAIN SECTION 01110

SECTION 01110

SUMMARY OF WORK

PART 1 – GENERAL

1.01 SECTION INCLUDES

A. Description of Work

B. Contractor Use of Site and Premises

C. Intent of Contract Documents

D. Copies of Contract Documents Furnished to Contractor

E. Supplemental Drawings

F. Coordination

1.02 DESCRIPTION OF WORK

A. Project Scope: Contractor shall furnish and install approximately 6,250 LF of new 24-inch water main connecting the new elevated Enon Road Tank to a connection near Centreport Village (hereinafter referred to as the Project).

Appurtenant work shall include valves, fire and flushing hydrants, air release valves and vacuum appurtenances, interconnections and all associated clearing, site access, including access roads, erosion control, restoration as well as all other miscellaneous work as described in the Contract Documents, Specifications and Drawings.

B. Work included: Contractor shall furnish all labor, superintendence, materials, plant, power, light, heat, fuel, water (except for initial pressure testing and disinfection), tools, appliances, equipment, supplies, and other means of construction necessary or proper for performing and completing the above-described Work (herein the Work). Contractor shall obtain and pay for all required permits, except those listed in Section 01410, which will be obtained by the Owner. Contractor shall protect the Work during construction and perform and complete the Work in a manner consistent with safety of life and property and in strict accordance with the Contract Documents. Contractor shall clean up and maintain the work site (the Site) during and after construction. Contractor shall repair, restore and clean structures and property that may be damaged or disturbed during the performance of the Work, at no additional cost to the Owner.

C. Contractor's Plant and Equipment: Contractor shall be solely responsible for the adequacy of his plant and equipment.

D. All references to Sections in this document shall be interpreted as sections of this document, and references to Specifications to those applicable to this project, unless indicated otherwise.

1.03 CONTRACTOR'S USE OF SITE AND PREMISES

A. Unfavorable Construction Conditions: During unfavorable weather, wet ground, or other unsuitable construction conditions, Contractor shall confine his operations to work which will not be affected adversely by such conditions. No portion of the Work shall be constructed under conditions which would adversely affect the quality or efficiency thereof, unless special means or precautions are taken by the Contractor to proceed in a proper and satisfactory manner. Contractor shall, however, maintain suitable all-weather access to all portions of the Site.

B. Site Administration: Contractor shall be responsible for all areas of the Site used by him and all subcontractors in the performance of the Work. He shall exert full control over the actions of all employees, subcontractor(s) and other persons in the use and preservation of property and existing facilities except such controls as may be specifically reserved for the Owner or others.

Contractor will require all persons on the Site to observe the same regulations as he requires of his employees, subcontractor(s); and representatives.

Owner’s employees, Authorized Representatives, Consultants, the Engineer and the Engineer's employees will not be subject to the provisions of this paragraph.

1.04 INTENT OF CONTRACT DOCUMENTS

A. Contract Documents Complementary: All work called for in the Contract Documents applicable to this Contract but not shown in the Drawings in their present form; or, shown in the Drawings and not specifically called for in the Specifications, shall be of like effect as if shown or mentioned in both. Work not specified in either the Drawings or in the Specifications but involved in carrying out their intent or in the complete and proper execution of the Work is required and shall be performed by the Contractor as though it were specifically delineated or described, at no additional cost to the Owner.

B. Omission or Silence of Contract Documents: The apparent silence of the Contract Documents as to any detail, or the apparent omission from them of a detailed description concerning the Work or materials to be furnished, shall be regarded as meaning that only the best general practice is to prevail and that only materials and workmanship of the best quality shall be used and interpretation of these Specifications and made upon that basis.

1.05 COPIES OF DOCUMENTS FURNISHED TO CONTRACTOR

A. Number of Copies to be Furnished: Contractor will be furnished at no cost, with one (1) printed and one (1) electronic copy (PDF) of the Contract Documents. Additional copies of Contract Documents when requested will be furnished electronically to the Contractor.

B. Copies of Contract Documents for Subcontractors: Contractor shall, without expense of the Owner, furnish each of its subcontractors, manufacturers, and materials, such copies of the Contract Documents as may be required for the Work.

C. Record Copy of Contract Documents: Contractor shall keep one record copy of all Specifications, Drawings, Addenda, modifications, and shop drawings at Contractor’s office at the Site, if applicable, in good order and annotated to show all changes made during the construction process in accordance with Section 01780.

Owner will inspect the record set of drawings and specifications monthly prior to preparation of the monthly progress payment; and, in the event said drawings and specifications are not up to date, the monthly progress payment may be withheld until the record set of drawings and specifications are brought up to date. Such documents shall be made available to the Engineer and shall be delivered to the Owner upon completion of the Work.

1.06 SUPPLEMENTAL DRAWINGS

A. Supplemental Drawings: When, in the opinion of the Engineer, it becomes necessary to explain more fully the Work, or to illustrate the Work further, or to show any changes which may be required; drawings known as Supplemental Drawings with specifications pertaining thereto will be prepared by the Engineer and one hardcopy and one electronic copy shall be given to the Contractor.

B. Clarification Procedure: Contractor may request clarification of the Drawings, Supplemental Drawings and/or Specifications from the Engineer through the following procedure:

1. Forms: The standard clarification form shall be used. The upper portion of this form shall be completed and signed by the Contractor. The completed form shall be forwarded to the Engineer for a response.

Contractor should indicate a preferred reply date:

a. Engineer will assign the clarification a sequential number.

b. Engineer will review the clarification with the appropriate parties and the Owner, if necessary.

c. Engineer will complete and sign the lower portion of the clarification.

d. One copy of the completed clarification will be returned to the Contractor.

e. The completed clarification distribution list will be noted on the clarification form.

f. One copy of the completed clarification will be sent to the Owner.

2. Clarification Log: A clarification log will be maintained by the Owner and will be used to review the status of outstanding clarifications during each progress meeting.

1.07 COORDINATION

A. Contractor to Verify: Prior to execution of the Work, Contractor shall verify all dimensions, quantities and details shown on the Drawings and Supplemental Drawings as well as, equipment, material, finishes, and other such listings or other data received from the Engineer, and shall notify him of all errors, omissions, conflicts and discrepancies. This shall not relieve the Contractor of full responsibility for unsatisfactory work, faulty construction, or improper operation resulting therefrom, or from rectifying such conditions at his own expense. Contractor shall not be allowed to take advantage of any errors or omissions. All equipment, materials, finishes, and other such listings are given for the convenience of the Engineer and Contractor and are not guaranteed to be complete. Contractor shall assume all responsibility for the making of estimates of the size, kind, and quality of materials and equipment included in the Work to be done under the Contract.

1.08 COORDINATION WITH OTHER CONTRACTORS

A. Owner has the right to employ other contractors at the Site. During progress of the Work, other contractors may be engaged in other work on the Project or on other projects at the Site. In such event, Contractor shall coordinate the Work with the work of other contractors, at no additional cost to the Owner.

1.09 SATISFACTORY COMPLETION OF WORK

A. All work, whether it be within a highway right-of-way, neighboring jurisdictions, or private easements, shall be completed to the satisfaction of the Owner. It is hereby understood that the Owner shall be the final approving body as to the acceptability of the Work, regardless of prior approval from other jurisdictions.

PART 2 – PRODUCTS

Not Used

PART 3 – EXECUTION

Not Used

END OF SECTION 01110

342-15 PROJECT NAME: ENON WATER MAIN SECTION 01310

SECTION 01310

PROJECT MEETINGS

PART 1 – GENERAL

1.01 SECTION INCLUDES

A. Pre-Construction Meetings

B. Progress Meetings

1.02 PRE-CONSTRUCTION MEETING

A. General: Prior to the commencement of the Work, a Pre-Construction conference/meeting shall be scheduled at the Site.

B. Pre-construction Conference: The Conference shall be attended by the following:

1. The Contractor and his Superintendent

2. The principal subcontractor(s)

3. The representatives of principal suppliers and manufacturers as appropriate.

4. The Engineer and his resident project representative.

5. The Authorized Representative(s) of the Owner.

6. Governmental representatives as appropriate.

7. Others, as requested by Contractor and/or the Owner.

C. Purpose: The purpose of the Pre-Construction Conference is to designate responsible personnel and to establish a working relationship. Matters requiring coordination will be discussed, and procedures for handling such matters, established. The agenda will include, but shall not be limited, to the following items:

1. Transmittal, review, and distribution of Contractor’s submittals.

2. Processing application for payment.

3. Maintaining record documents.

4. Critical work sequencing.

5. Field decisions, Change Orders and Work Orders.

6. Project Schedule

7. Submittal Schedule

8. Cash Flow Projections

9. Use of premises, office and storage areas, security, housekeeping, and Owner’s needs.

10. Major equipment deliveries and priorities.

11. Contractor’s assignments for safety and first aid.

342-15 PROJECT NAME: ENON WATER MAIN SECTION 01310

1.03 PROGRESS MEETINGS

A. Purpose: The purpose of these meetings will be to review the progress of the Work: maintain coordination of efforts, discuss changes in scheduling, and resolve any other potential problems.

B. Scheduling: Owner and Contractor will schedule and hold regular progress meetings at least monthly or as required by progress of the Work. Contractor, the Engineer, and all subcontractors active on the Site shall be represented at each meeting. Contractor may, at his discretion, request attendance by representatives of his suppliers, manufacturers, and other subcontractors. In addition, the Contractor shall submit a two-week look ahead schedule at the Owner’s request.

PART 2 – PRODUCTS

END OF SECTION 01310

342-15 PROJECT NAME: ENON WATER MAIN SECTION 01330

SECTION 01330

SUBMITTALS

PART 1 – GENERAL

1.01 SECTION INCLUDES

A. Submittal Procedures

B. Progress Schedules

C. Shop Drawings

D. Samples

E. Product Data

F. Record Drawings

G. Pre and Post Construction Conditions Survey

1.02 SUBMITTAL PROCEDURES

A. Approval Requests: As the Work progresses and, in accordance with Contractor's accepted schedule, Contractor shall submit to the Owner a specific request in writing for each item of information or approval required of him by the Contract Documents. These requests shall be submitted sufficiently in advance of the date upon which the information or approval is required by the Contractor to allow for the time the Owner will take to act upon such submissions or resubmissions. Contractor shall not have any right to an extension of time due to delays caused by his failure to submit his requests for the required information or the required approval on time.

B. Electronic Transmittals: Contractor shall submit to Owner, to the corresponding electronic address provided in the Agreement, a single complete digital copy of each submittal, which shall be distributed by the Contractor as needed. Submittals shall be accompanied by a letter of transmittal containing the following information:

1. Submittal number: Number submittals sequentially.

2. Identification of the Contractor, subcontractor or supplier.

3. Project title, project number and division, and contract number.

4. Specification Section number, Section submittal number and suffix.

5. Drawing sheet and detail number as appropriate.

6. Contractor's stamp or certification stating that the products have been reviewed and are in accordance with the requirements of the Work and Contract Documents.

7. Listing of variations from Contract Documents and any limitations which may be detrimental to the Work.

C. Review by Owner: Drawings or descriptive data will be marked "Approved," "Approved as Noted," "Revise and Resubmit" or “Rejected," and Contractor's copies, together with a letter of transmittal, will be returned to the Contractor.

D. No Additional Copies Required: When the Drawings and data are returned marked "Approved”, no additional copies need be furnished.

E. Corrected Copies: When submittals are marked "Approved as Noted", a single digital corrected copy with changes highlighted shall be submitted. If additional new changes are proposed, they shall be submitted in accordance with numeral 1.02 of this Section.

F. Resubmittals: When the drawings and data are returned and marked, "Rejected" or "Revise and Resubmit", the corrections shall be made as noted thereon and as instructed by the Owner. Corrected copies shall be resubmitted in accordance with numeral 1.02 of this Section. When corrected copies are resubmitted, Contractor shall direct in writing specific attention to all revisions and shall list separately any revisions other than those called for by the Owner on previous submittals. A marked copy of the original submittal shall also accompany the resubmittal:

1. Resubmittals shall be given an alphabetic suffix to the Section submittal number of the original submittal to indicate which resubmittal it is (i.e.; #a indicates first resubmittal, #b indicates second and so forth).

2. Letter of Resubmittal: Contractor's letter of resubmittal shall list the date of his original submittal letter, the date of the Engineer's letter returning the submittal, and the dates of submission and return of any previous resubmittals.

1.03 PROGRESS SCHEDULES

A. Submit a detailed Project Schedule within 20 days after the execution of this Contract or as directed by the Owner for all work assigned under this contract.

B. Prepare schedules as a horizontal bar chart with separate bar for each major operation or portion of the Work identifying first workday of each week.

C. Provide space to show proposed and actual progress, notations and revisions.

D. Show complete sequence and direction of construction by activity with beginning and ending dates and stations of each element of construction.

E. Activities shall include receipt and unloading of pipe, installation of pipe, road crossings, anticipated shutdown of mains, hydrostatic testing, disinfection, flushing, and closures at minimum. Coordinate content with the proposal breakdown (required by Article 9 of the General Conditions).

F. Provide sub schedules to amplify critical activities.

G. Show accumulated percentage of completion of each item and total percentage of Work completed as of the 25th day of each month.

1.04 SHOP DRAWINGS

A. Shop Drawings: Contractor shall promptly prepare and submit layout, detail, and working drawings for such parts of the Work as specified. Drawings include, but are not limited to, shop drawings, catalog cut sheets, layout drawings in plan and elevation, installation drawings, elementary wiring diagrams, manufacturer’s data, etc. They shall provide complete details of all equipment, fabrications, and materials that will become a permanent part of the Work under this Contract. Contractor shall be responsible for securing all of the information, details, dimensions, drawings, etc., necessary to prepare the shop drawings required and necessary under this Contract and to fulfill all other requirements of this Contract. Contractor shall secure such information, details, drawings, etc., from all possible sources including the drawings, shop drawings prepared by subcontractors, engineers, suppliers, etc.

B. Schedule: A schedule of shop drawing submittals shall be submitted for the Owner's review within 20 days after the Notice to Proceed for each Project assigned under this Contract.

C. Project Information: Each shop drawing shall be dated and shall contain the name, number and division number of the Project, section(s) of the Specifications, names of equipment or materials, and/or the locations at which the equipment or materials are to be installed in the Work. The Owner may decline to consider any shop drawing that does not contain complete data on the Work and full information on related matters.

D. Requirements: Shop drawings shall present, where applicable, engineering data and descriptive information in sufficient detail to show the kind, size, arrangement, and operation of component materials and devices; external connections, anchorages, and support required; performance characteristics;

and dimensions needed for installation and correlation with other materials and equipment:

1. Numbering and Additional Considerations: Shop drawings shall be numbered consecutively and shall accurately and distinctly present the following:

a. All working and erection dimensions.

b. Arrangement and sectional views.

c. Necessary details, including complete information for making connections between the Work under this Contract and work under other contracts.

d. Types of materials and finishes.

e. A list and description of parts.

E. Review by Contractor:

1. Contractor shall check and approve all shop drawings before transmitting them to the Engineer to determine compliance with the requirements of the Contract Documents. Incomplete drawings or documents not in compliance with the Contract Documents shall not be submitted. All shop drawing submittals, regardless of origin, shall be stamped with the approval of the Contractor and identified with the Contractor's name and references to applicable specification paragraphs and Contract Drawings.

Each shop drawing submittal shall indicate the intended use of the item in the Work. When catalog pages are submitted, applicable items shall be clearly identified. The current revision, issue number, and date shall be indicated on all shop drawings and other descriptive data. Contractor's stamp of approval shall constitute a representation to the Owner and the Engineer that Contractor accepts full responsibility for determining and verifying all quantities, dimensions, field construction criteria, materials, catalog numbers, and similar data; that he has reviewed or coordinated each submittal with the requirements of the Work and the Contract Documents; and that the submittal fully meets the requirements of the Contract Documents or is specifically marked otherwise.

2. Deviations from Contract Requirements: If the shop drawings show deviations from the Contract requirements, Contractor shall make specific mention thereof as previously specified in this Section. Review of such submittals shall not constitute approval of the deviation. Review of the shop drawings shall constitute review of the subject matter thereof only and not of any structure, material, equipment, or apparatus shown or indicated. Such submittals shall, as pertinent to the deviation, indicate essential details of all changes proposed by the Contractor (including modifications to other facilities that may be a result of the deviation) and all required piping and wiring diagrams, all in accordance with the Work.

3. Completeness of Shop Drawings: Contractor shall accept full responsibility for the completeness of each submittal, and, in the case of a resubmittal, shall verify that all exceptions previously noted by the Engineer have been considered. If more than one resubmittal is required because of the Contractor's failure to account for exceptions previously noted, Contractor shall reimburse Owner for the Engineer's charges for reviewing all additional resubmittals.

F. Review of Shop Drawings by Owner: Review of shop drawings will be general and shall not relieve Contractor of responsibility for the accuracy of such drawings, or for the proper fitting and construction of the Work, or for the furnishing of materials or Work required by the Contract and not indicated on the shop drawings. No work called for in the shop drawings shall be done until the said drawings have been reviewed and approved by the Owner. Owner shall endeavor to complete shop drawing review and return shop drawings to Contractor within 21 calendar days of the date on which the Owner receives a complete package of all required information for each product submittal.

G. Resubmittals:

1. Resubmittals within 30 Days: Resubmittals shall be made within 30 days of the date of the letter returning the material to be modified or corrected, unless within 14 days, the Contractor submits an acceptable request for an extension of the stipulated period, listing the reasons the resubmittal cannot be completed within that time.

2. Additional resubmittals: Any need for more than one resubmittal or any other delay in obtaining the Owner's review of submittals will not entitle the Contractor to an extension of time unless a delay of the Work is directly caused by an authorized change in the Work or by the Owner's failure to return any submittal.

1.05 SAMPLES

A. General: When required, Contractor shall submit to the Engineer for review typical samples of materials and appliances. The samples shall be properly identified by tags and shall be submitted sufficiently in advance of the time when they are to be incorporated into the Work so that rejections thereof will not cause delay. An electronic letter of transmittal, from the Contractor requesting review must accompany all such samples.

1.06 PRODUCT DATA

A. General: Submit manufacturer’s standard product data when special fabrication is not required:

1. Products proposed for use in the Work shall be clearly designated for submittal to be considered for approval.

2. Manufacturer’s product data shall provide sufficient information for thorough review:

a. Attach supplemental information to detail how the product will be installed in the Work.

3. Line through extraneous information.

1.07 RECORD DRAWINGS

A. Contractor shall prepare and maintain Record Documents in accordance with the following requirements:

1. Mark changes, revisions, additions and deletions, to the record set of Drawings with colored pencils or felt-tipped pens.

2. Stamp each document “Record Drawings” in one half inch high printed outline letters.

3. Drawings: Legibly mark to record actual construction including:

a. Depths of various elements in relation to ground surface. Top pipe field elevations shall be provided at minimum 100-foot intervals along the pipeline and at all fitting locations.

b. Horizontal location of underground utilities, improvements and appurtenances referenced to construction baseline and permanent surface features and improvements.

c. Location of all sleeves, bends and other fittings, including method of restraint used.

d. Field changes of dimensions and details.

e. Changes made by Change Order or Work Order.

f. Details not included in original Drawings.

4. Specifications and Addenda: Legibly mark-up each section to record:

a. Manufacturer, trade name, catalog number, and supplier of each product and item of equipment installed.

b. Changes made by Change Order or Work Order.

c. Other matters not originally specified.

B. Contractor shall keep one record copy of all Specifications, Drawings, Addenda, Change Orders, Supplemental Drawings, and Shop Drawings at the Contractor’s office at the Site, in good order and annotated to show all changes made during the construction process.

C. Changes shall be recorded within 24 hours of receipt of information that a change has occurred.

D. Owner will inspect the record set of Drawings and Specifications monthly prior to preparation of the monthly progress payment. In the event they are not up to date, the Owner may withhold monthly progress payment until Contractor brings them up to date.

E. Record Documents shall be always made available to the Owner and shall be delivered to the Owner upon completion of the Work.

F. Prior to final payment, Contractor shall furnish Owner one complete set of all accepted Working Drawings, including:

1. Shop Drawings for equipment, piping, structural details, etc.

2. Manufacturer’s publications, submitted in lieu of prepared Shop Drawings, will not be required in reproducible form. However, five (5) sets of such material shall be furnished by the Contractor to the Engineer.

3. Record Drawings furnished shall be submitted in CADD format and corrected to include any departures from previously accepted Drawings, as indicated in Paragraph A above.

1.08 PRE AND POSTCONSTRUCTION VIDEO SURVEY AND

PHOTOGRAPHY

A. Contractor shall provide the Owner with a Pre-Construction digital video survey (the Pre Con Survey) of the project area, which shall also include digital photos. The Pre Con Survey shall be done as soon as possible, after the Notice-to-Proceed date, and must be done prior to any other work by the Contractor.

Contractor shall be responsible for documenting the pre-construction conditions within the project limits as needed or directed by the Owner. The Pre Con Survey shall clearly document existing site and structure conditions immediately adjacent to and within the Work limits and access routes for this Contract.

Video recording and photography should focus on documenting the pre-construction conditions of the existing site features within and immediately adjacent to the Work limits or as directed otherwise by the Owner. The video recording and photography shall document clearly, where possible, the conditions of existing features, including all structures within the LOD or immediately adjacent, dirt/gravel/asphalt travel ways, turnaround areas, and parking areas, before, during and after the water main installation and backfilling operations. After the video recording and photography are completed for each activity, the Contractor shall turn over documentation to the Owner, which shall keep the original CD/DVD/USB thumb drive and digital photographs. A survey of similar extent and detail shall be submitted along with the request for final completion of the project. This is to ensure restoration of the Work area has been completed to the Owner’s and property owner(s) satisfaction

Not used

PART 3 EXECUTION

END OF SECTION 01330

342-15 PROJECT NAME: ENON WATER MAIN SECTION 01410

SECTION 01410

REGULATORY REQUIREMENTS

PART 1 – GENERAL

1.01 SECTION INCLUDES

A. Partial outline of the major laws, codes and requirements to be followed on the project.

1.02 REFERENCES

A. Commonwealth of Virginia Department of Health Waterworks Regulations.

B. Building Officials and Code Administrators International (BOCA) BASIC/National Building Code.

C. Virginia Uniform Statewide Building Code (VUSBC)

D. Virginia Department of Transportation Road and Bridge Specifications

E. Stafford County Water and Sewer Design and Construction Standards

1.03 REGULATORY REQUIREMENTS

A. Compliance with the Law: Precautions shall be exercised at all times for the protection of people and property. The safety provisions of all applicable laws, building and construction codes including, but not limited to, the U.S.

Department of Labor Occupational Safety and Health Regulations for Construction promulgated under the Occupational Safety and Health Act of 1970 (PL 91-596) and under Section 107 of the Contract Work Hours and Safety Standards Act (PL 91-54), shall be observed. The U.S. Department of Labor Safety and Health Regulations shall be complied with except where state safety standards have been approved by the Secretary of Labor in accordance with provisions of the Occupational Safety and Health Act, in which case compliance with state and local standards is required.

B. Work on State Highways: Contractor shall obtain the Land Use Permit for work to be performed within the right-of-way of highways, roads, or other public areas under the control and jurisdiction of VDOT.

Contractor shall become familiar with the requirements of the Land Use Permit, particularly regarding maintenance of traffic, traffic control, traffic and pedestrian safety, final restoration of paved and unpaved surfaces, and restrictions on working hours, before commencing any portion of the Work on highways, roads and other public areas under the control and jurisdiction of VDOT.

Contractor shall comply with all VDOT requirements pertaining to the Work to be performed under the Contract. The VDOT plan approval letter is included in Appendix B of the Contract Documents and should be submitted with the VDOT LUP-A.

C. Owner has obtained a US Army Corps of Engineers (USACOE) Nationwide 58 Permit for work in Waters of the United States. Contractor shall follow all requirements of the Corps of Engineers Permit. The USACOE Nationwide 58 Permit is included in Appendix B of the Contract Documents.

D. Owner will obtain the Virginia Stormwater Management Permit (VSMP) for management of stormwater and groundwater discharges associated with the construction. Contractor shall follow all requirements of the Stormwater Discharge Permit and the Storm Water Pollution and Prevention Plan

(SWPPP).

Contractor shall complete and submit to the latest Virginia Department of Environmental Quality General (VDPDES) Permit for Discharges of Stormwater from Construction Activities (VAR10) Registration Statement.

The partially completed Registration Statement is included as part of the SWPPP in Appendix B.

E. Contractor shall conform to applicable sections of the Virginia State Board of Health “Waterworks Regulations” and these Specifications during installation, testing and disinfection of waterworks facilities.

F. Contractor shall submit for and obtain a Stafford County Grading Permit prior to commencement of any construction activities. Plans have been reviewed and approved by Stafford County Environmental staff.

1.04 PERMITS

A. Contractor shall obtain, keep current and pay all fees for any necessary construction permits from those authorities, agencies, or municipalities having jurisdiction over land areas, utilities, or structures which are located within the Contract Limits and which will be occupied, encountered, used, or temporarily interrupted by the Contractor's operations unless otherwise stated.

Record copies of all permits shall be furnished to the Owner.

B. When construction permits are accompanied by regulations or requirements issued by a particular authority, agency or municipality, it shall be the Contractor's responsibility to familiarize himself and comply with such regulations or requirements as they apply to his operations on this Project.

C. The permits obtained by the Owner shall be considered part of the Contract Documents. Copies of these permits are included in Appendix B of the Contract Documents and are listed below.

D. Contractor shall abide by the conditions of permits related to the Work and shall obtain proof of satisfaction of conditions from issuers of permits prior to acceptance of the Work by the Owner.

E. Contractor is responsible for providing a Responsible Land Disturber for this Work. This individual shall have successfully completed the VDOT Erosion and Sediment Control Contractor Certification training and shall comply with the requirements of the VDOT Erosion and Sediment Control Contractor Certification form, included as a Special Provision to the approved VDOT Land Use Permit.

F. Noise Variance: Contractor is responsible for obtaining this variance in accordance with Section 01500.

G. Trade Permits: Contractor shall be responsible for obtaining his own trade permits.

H. Contractor shall submit all required documentation for permits to be obtained without delay, allowing for adequate review time by approving authorities.

Any delay caused by the failure of Contractor to submit permit applications in a timely fashion or to respond to comments from reviewers, will not entitle Contractor to an extension of time.

Not Used

END OF SECTION 01410

342-15 PROJECT NAME: ENON WATER MAIN SECTION 01420

SECTION 01420

REFERENCES

PART 1 – GENERAL

1.01 SECTION INCLUDES

A. Abbreviations

B. Reference Standards

1.02 ABBREVIATIONS AND SYMBOLS

A. Technical Societies, organizations, other bodies: Reference to a technical society, organization, or body may be made in the Specifications by abbreviations in accordance with the following list:

AAMA Architectural Aluminum Manufacturers Association AASHTO American Association of State Highway and Transportation

Officials ACI American Concrete Institute ACPA American Concrete Pipe Association AFBMA Antifriction Bearing Manufacturers Association AGA American Gas Association AGMA American Gear Manufacturers Association AISC American Institute of Steel Construction AISI American Iron and Steel Institute AMCA Air Moving and Conditioning Association ANSI American National Standards Institute AREMA American Railway Engineering and Maintenance of Way

Association APA American Plywood Association ASCE American Society of Civil Engineers ASHRAE American Society of Heating, Refrigerating and Air Conditioning

Engineers ASME American Society of Mechanical Engineers ASSE American Society of Sanitary Engineering ASTM American Society for Testing and Materials AWPA American Wood Products Association AWWA American Water Works Association CISPI Cast Iron Soil Pipe Institute CMAA Crane Manufacturers Association of America CRSI Concrete Reinforcing Steel Institute DHI Door and Hardware Institute FGMA Flat Glass Marketing Association IEEE Institute of Electrical and Electronics Engineers IFI Industrial Fasteners Institute ISA International Society of Arboriculture NAAMM National Association of Architectural Metals NEMA National Electrical Manufacturers Association NFPA National Fire Protection Association Manufacturers OSHA Occupational Safety and Health Administration PCI Prestressed Concrete Institute SAE Society of Automotive Engineers SCPRF Structural Clay Products Research Foundation SMACNA Sheet Metal and Air Conditioning Contractors National Association SPI Society of the Plastics Industry

342-15 PROJECT NAME: ENON WATER MAIN SECTION 01420

SSPC Steel Structures Painting Council UL Underwriters’ Laboratories, Inc.

USACOE U.S. Army Corps of Engineers USBS U.S. Bureau of Standards USBR U.S. Bureau of Reclamation VDEQ Virginia Department of Environmental Quality VDH Virginia Department of Health VDOT Virginia Department of Transportation VMRC Virginia Marine Resources Commission VSWCB Virginia State Water Control Board

B. Common Abbreviations:

AWG American Wire Gauge CS Commercial Standard Fed Spec Federal Specifications IPS Iron Pipe Size MIL Military Specification NEC National Electrical Code PS Product Standard

1.03 REGULATORY REQUIREMENTS

A. Reference to Standards: Whenever reference is made to furnishing materials or testing thereof, to conform to the standards of any technical society, organization, or body, it shall be construed to mean the latest standard, code, or specification, adopted and published at the time of the Bid unless otherwise noted.

PART 2 – PRODUCTS

Not Used

END OF SECTION 01420

342-15 PROJECT NAME: ENON WATER MAIN SECTION 01450

SECTION 01450

QUALITY CONTROL

PART 1 – GENERAL

1.01 SECTION INCLUDES

A. Inspection Services

B. Inspection of Materials

C. Contractor's Quality Control

1.02 SUBMITTALS

A. Certificates of Manufacture: Contractor shall furnish Engineer authoritative evidence in the form of Certificates of Manufacture that all materials and equipment to be used in the Work have been manufactured and tested in conformity with the Contract Documents. These certificates shall include copies of the results of physical tests and chemical analyses, where necessary, that have been made directly on the product or on similar products of the manufacturer.

1.03 INSPECTION OF WORK

A. Work May Be Rejected at Any Time: During the progress of the Work and until the Date of Final Completion, Contractor shall, at all times, afford the Authorized Representatives every reasonable, safe, and proper facility for inspecting the Work at the Site. The observation and inspection of any work shall not relieve Contractor of any of his obligations to perform proper and satisfactory work as herein specified. If at any time an inspection, test, or analysis of the Work reveals faulty design, inferior, or defective materials, poor workmanship, improper installation, excessive wear, or nonconformity with the requirements of the Contract Documents, such work will be rejected and shall be replaced with satisfactory work at Contractor's expense.

Finished or unfinished work found not to be in strict accordance with the Contract Documents shall be replaced as directed, even though such work may have been previously approved and payment made therefore.

B. Removal of Rejected Work and Materials: Owner or its Authorized Representatives shall have the right to reject materials and workmanship which are defective or require correction. Rejected work and materials must be promptly removed from the Site, which must, at all times, be kept in a reasonably clean and neat condition.

C. Failure to Reject Inferior work and Materials: Failure or neglect on the part of the Owner or its Authorized Representatives to condemn or reject bad or inferior work or materials shall not imply an acceptance of such work or materials. Nor shall it be construed as barring the Owner or its Authorized Representatives at any subsequent time from recovering damages or a sum of money needed to build anew all portions of the Work in which inferior workmanship or improper materials were used.

D. Examination of Completed Work: Should it be considered necessary or advisable by the Owner or its Authorized Representatives at any time before final acceptance of the Work to make examinations of portions already completed, by removing or tearing out all or portions of such work;

Contractor shall, on request, promptly furnish all necessary facilities, labor, and material for that purpose. If such work is found to be defective in any respect, Contractor shall defray all expenses of such examination and of satisfactory reconstruction. If, however, such work is found to meet the requirements of the Contract, the cost of examination and restoration of the Work shall be considered an item of Extra Work to be paid for in accordance with the provisions of the Contract Documents.

E. Proper Operation of Equipment during Tests or Training: Contractor shall be fully responsible for the proper operation of equipment during tests and instruction periods and shall neither have nor make any claim for damage which may occur to equipment prior to the time when the Owner accepts the Work and issues a Certificate of Beneficial Use.

1.04 INSPECTION OF MATERIALS

A. Inspection During Manufacture, Preparation or Testing: Where required by the Contract Documents, Contractor shall give notice in writing to the Engineer sufficiently in advance of his intention to commence the manufacture or preparation of materials specially manufactured or prepared for use in or as part of the permanent construction. Such notice shall contain a request for inspection, date of commencement, and expected date of completion of the manufacture or preparation of materials. Upon receipt of such notice, the Engineer will arrange to have a representative present at such times during the manufacture or testing as may be necessary to inspect the materials, or he will notify Contractor that the inspection will be made at a point other than the point of manufacture or testing, or he will notify the Contractor that the inspection will be waived. Contractor must comply with these provisions before shipping any materials. Such inspection will not release the Contractor from the responsibility for furnishing materials meeting the requirements of the Contract Documents.

B. Testing Electrical and Mechanical Equipment: Tests of electrical and mechanical equipment and appliances shall be conducted in accordance with recognized test codes of the ANSI, ASME, or IEEE, unless otherwise stated herein.

1.05 COSTS OF INSPECTION

A. Inspection by the Owner or its Authorized Representatives: All inspection and testing of materials furnished under this Contract will be performed by the Owner or its Authorized Representatives without cost to the Contractor, unless otherwise expressly specified. Contractor shall reimburse Owner for expenditures incurred in making such tests on materials and equipment which were rejected for noncompliance.

B. Shop and Field Tests: The cost of shop and field tests of equipment and certain other tests specifically called for in the Contract Documents shall be borne by the Contractor, and such cost shall be deemed to be included in the Contract Sum.

C. Tests for Equivalent Materials and Equipment: Materials and equipment submitted by Contractor as equivalent to these specifically named in the Contract Documents may be tested by the Owner for compliance. Contractor shall reimburse the Owner for expenditures incurred in making such tests on materials and equipment rejected for noncompliance.

D. Inspection After Regular Hours: Contractor shall coordinate all work after normal working hours with the Owner’s project inspector. Any weekend or night work will require 72-hours notification from the Contractor. The Owner reserves the right to reject proposed weekend or night work.

1.06 FAILURE TO COMPLY WITH CONTRACTS

A. Rejection of Equipment or Material: If it is ascertained by testing or inspection that the material or equipment does not comply with the Contract, Contractor will be notified and directed to refrain from delivering said material or equipment, or to remove it promptly from the site or from the Work and replace it with acceptable material without cost to the Owner.

Failure of the Owner or its Authorized Representatives to ascertain noncompliance or to notify the Contractor of any noncompliance shall not relieve the Contractor from fulfilling his obligations under the terms and conditions of the Contract.

PART 2 – PRODUCTS

Not Used

PART 3 – EXECUTION

3.01 PREPARATION

A. Equipment and Machinery: Contractor shall have on hand sufficient proper equipment, material and/or machinery of adequate capacity to facilitate the Work and to handle all emergencies normally encountered in work of this character.

END OF SECTION 01450

342-15 PROJECT NAME: ENON WATER MAIN SECTION 01500

SECTION 01500

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

PART 1 – GENERAL

1.01 SECTION INCLUDES

A. General Requirements

B. Temporary Utilities

C. Temporary Construction

D. Barricades and Enclosures

E. Security

F. Temporary Controls

G. Access and Parking

H. Field Offices and Sheds

1.02 RELATED SECTIONS

A. Section 02370.

1.03 GENERAL REQUIREMENTS

A. Contractor to Furnish Temporary Facilities: All false work, scaffolding, ladders, hoist ways, braces, pumping plants, shields, trestles, roadways, sheeting, centering forms, barricades, drains, flumes, and the like, any of which may be needed in the construction of any part of the Work and which are not herein described or specified in detail, must be furnished, maintained and removed by the Contractor, at no cost to the Owner. Contractor shall be responsible for the safety and efficiency of such works and for any damage that may result from their failure or from their improper installation, construction, maintenance or operation.

B. First Aid: In addition to any other requirements, Contractor shall maintain a readily accessible, completely equipped first aid kit at each location where work is in progress.

C. Safety Responsibility: Contractor shall be solely responsible for safety and security at the Site. Contractor shall indemnify and hold harmless Owner and its Authorized Representatives for safety violations, or noncompliance with governing bodies and their regulations, and for accidents, deaths, injuries, or damage at the Site during occupancy or partial occupancy of the Site by Contractor or his Subcontractor(s) and while performing any part of the Work.

1.04 TEMPORARY UTILITIES

A. Water: Owner will provide water at no cost to Contractor for testing pipelines.

Additional water required for testing by Contractor will be provided at the Owner’s standard rates for the additional volume required beyond a reasonable number of attempts to meet required water quality requirements.

Contractor shall, if necessary, provide and lay water lines to the place of use;

secure all necessary permits and pay for all taps to water mains and hydrants.

B. Light and Power: Contractor shall provide at his own expense temporary lighting and power facilities required for the proper construction and inspection of the Work. If, in the Engineer's opinion, these facilities are inadequate, the Contractor will not be permitted to proceed with any portion of the Work affected thereby. Temporary lighting and power shall be maintained until the Work is accepted.

C. Heat: Contractor shall provide temporary heat, whenever required, for work being performed during cold weather and to prevent freezing of water pipes and other damage to the Work or existing facilities.

D. Sanitary Facilities: Contractor shall not be allowed to use any of the Owner’s existing sanitary facilities or those included in the Work. Contractor shall furnish and maintain adequate sanitary facilities for his personnel, including all subcontractor personnel, for the duration of the Contract; shall prohibit and prevent nuisances on the Site or on adjoining property and discharge any employee who violates this rule. Contractor shall also abide by any environmental regulations or laws applicable to the Work.

E. Connections to Existing Utilities:

1. Unless otherwise specified or indicated, the Contractor shall make all necessary connections to existing facilities including structures, drain lines, and utilities such as water, sewer, gas, telephone, and electricity. In each case, the Contractor shall receive permission from the Owner or the owning utility prior to undertaking connections. Contractor shall protect facilities against deleterious substances and damage.

2. Connections to existing facilities which are in service shall be thoroughly planned, and all required equipment, materials, and labor shall be on hand at the time of undertaking the connections. Work shall proceed continuously to complete connections in the minimum time. Operation of valves or other appurtenances on existing utilities, when required, shall be by or under the direct supervision of the owning utility.

1.05 TEMPORARY CONSTRUCTION

A. Temporary Bridges: Contractor will be required to place and design suitable temporary bridges where necessary for the maintenance of vehicular and pedestrian traffic. Contractor shall be responsible for the sufficiency and safety of all such temporary work or bridges and for any damage which may result from their failure or their improper construction, maintenance, or operation and will indemnify and hold harmless the Owner from all claims, suits or actions, and damages or costs of every description arising by reason of failure to comply with the above provisions.

1.06 BARRICADES AND ENCLOSURES

A. Protection of Workmen and Public: During the prosecution of the Work, Contractor shall put up and always maintain barriers and lights to prevent accidents. Contractor shall provide suitable barricades, lights, "Danger", "Caution" or "Street Closed" signs and watchmen at all places where the Work causes obstructions to the normal traffic or constitutes in any way a hazard to Owner’s personnel and/or the public.

B. Barricades and Lights:

1. Streets, Roads and Highways: All streets, roads, highways, and other public thoroughfares which are closed to traffic shall be protected by effective barricades which display acceptable warning signs meeting VDOT standards.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .