832348renohabc.pdf

PDF 179 KB Posted

Attached to
Vacant Unit Renovations - 1 Unit at McCulloh Homes
Solicitation number
PUR-1810-26
Issued by
Baltimore City, Maryland

About this file

This is an Invitation for Bid (IFB PUR-1810-26) issued by the Housing Authority of Baltimore City (HABC) in Maryland for the complete renovation of a vacant residential unit at 502 Preston Street. The scope of work encompasses general construction, bathroom renovations, kitchen installation, mechanical and plumbing inspections and repairs, electrical upgrades, door and window replacement, painting and drywall repair, and flooring installation. The project requires the contractor to supply all labor, materials, supervision, equipment, insurance, permits including a Unit of Occupancy Permit, and incidentals necessary for completion in compliance with applicable federal, state, and local regulations. A mandatory site visit is scheduled for Wednesday, July 15, 2026, at 11:30 a.m. at 502 Preston Street, with Deborah Pittman (410-302-7266) as the contact person. Sealed bids must be submitted via Bonfire by 2:00 p.m. EST on Wednesday, July 22, 2026. The contract award will be made to the lowest responsive and responsible bidder, with HABC reserving the right to reject any or all bids. The contractor must substantially complete all work within thirty (30) calendar days after issuance of the Notice to Proceed.

Bidders must comply with the General Wage Decision (MD20260061, Modification No. 0, dated 05/18/2026) and HABC Service Contracts Insurance Requirements, which mandate that the successful bidder name the Housing Authority as additionally insured. Contractors and their staff are required to carry photo identification while working on HABC sites and are solely responsible for equipment, material, and premise security, work area protection, and debris management. All contractors must adhere to EPA Lead-Based Paint Renovation, Repair and Painting (RRP) Program Rules. The successful bidder must furnish certified copies of insurance policies covering all work for the contract duration, and HABC reserves the right to immediately cancel the contract award without prior notice if required insurance certificates or other documents are not submitted. No specific bid amount, pricing structure, or funding source is detailed in the IFB, and no incumbent contractor information is provided.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Housing Authority of Baltimore City Invitation for Bid

PUR-1810-26

Renovation of 502 Preston

The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations

502 Preston

General:

1. Remove and properly dispose of all Trash, Furniture and Miscellaneous Items in the Unit.

2. Supply and Install roll shades in all windows

3. Remove all existing appliances and range hood

4. Supply and Install closet shelving/closet rod

5. Supply and Install interior handrail in stairwell of unit

6. Final Cleaning of Entire Unit (Including All window sill & wells) to Make Ready for Occupancy.

Bathrooms:

1. Supply and Install Exhaust Fan and cover in bathroom

2. Supply and Install Vanity Cabinet w/ Vanity Bowl and faucet

3. Supply and install new 16-inch elongated toilets and seats

4. Supply and Install New Medicine Cabinet with Mirror

5. Supply and Install New 5-piece bathroom Accessories

6. Supply and Install New Bathtub

7. Supply and Install New Ceramic tile 12 x 12 Stone Gray Color

8. Supply and Install Delta Tub Faucet and drain cover plate with stopper

9. Supply and Install trap(metal) and supply lines under bathroom sink

10. Supply and Install Shower Rods and hardware

Kitchen:

1. Supply and Install Kitchen Cabinets with HUD Severe Use base and wall cabinets

2. Supply and Install countertop Postformed Wilsonart Black Granite Laminate countertops

3. Supply and Install Broan #4100 range hood

4. Supply and Install Black backsplash behind stove and side wall

5. Supply and install single bowl stainless steel kitchen sink and faucet

6. Supply and Install (metal) traps and supply lines under kitchen sink

Mechanical / Plumbing:

1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks.

2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit

3. Inspect and Repair Drain, Water & Vent (Bathroom and Kitchen, toilets) run snake through sink in kitchen and

Bathroom drain pipes

Electrical:

1. Supply and Install all Switches / Receptacles, GFI’s , A/C outlet and metal cover plates. (White)

2. Supply and Install Electric Service Panel for Gaps/Missing Breakers/Doors.

3. Supply and Install all light fixtures with LED integrated light fixtures

4. Supply and Install all vents and covers throughout unit

5. Install all baseboards Heaters in unit(site will supply)

Doors & Windows:

1. Supply and Install all New Interior doors and New hardware (Do Not Paint Door Hinges)

2. Supply and Install (Front and Back) Exterior and Screen doors with front mail slot and hardware

3. Supply and Install Address Stencil overtop of entry door

Painting/Drywall Repair:

1. Supply all materials to Paint the Entire Units to Include:

• Walls and ceilings shall be painted with two finish coats eggshell latex.

• Kitchen and bathroom walls & ceilings, and all doors, wood windows and wood trim shall receive a semi-gloss final finish coat.

• Paint All radiators front and back. Bath and Kitchen (Semi-Gloss), Bedrooms and all other areas (Flat)

• The Contractor shall be responsible for all drywall repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management.

• Scrape and Paint All outside Canopy (Terracotta Red) and all outside handrails (Black)and drain pipe

• Paint shall be Sherwin Williams “Pro-Mar 200” in HABC Antique White color (or brand of equal color, finish, durability, etc.).

• The Contractor shall follow United States Environmental Protection Agency (EPA) Lead-Based Paint

Renovation, Repair and Painting (RRP) Program Rules.

Flooring:

1. Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit

2. All floors must be level before applying flooring…

3. Supply and Install all treads and risers with vinyl treads and risers

4. Supply and install 6” baseboards and 3/4 Round shoe molding and caulk throughout unit.

Total Bid Amount: $_______________

The Site Visit is Wednesday, July 15, 2026, at 11:30am starting at 502 Preston St. The Contact person is Deborah Pittman 410-302-7266.

Notes:

1. Contractor must be in compliance with Attachment- 2 General Decision Number: MD20260061, Modification No. 0, Date of Modification 05/18/2026.

2. The Successful Bidder must be in compliance with Attachment-3 HABC Service Contracts- Insurance Requirements (A through C), and upon notification of award, must name the Housing Authority as additionally insured as related to work performed under this contract.

3. Contractors and their respective staff are required to have photo ID while working on HABC sites.

4. Contractor will always be responsible for protecting the work area or site and maintaining it in a safe condition.

5. Contractor shall always keep work area or sites free from accumulation of excess debris.

6. Upon completion of the work, or at the end of the day, whichever is less, Contractor shall leave all work areas secured.

7. Contractor shall be aware that children, elderly, and the disabled may be present at work area or site.

8. Contractor is solely responsible for the security of all equipment, material and premises during the performance of the work.

Attachment - 1 HABC Service Contracts- Insurance Requirements Attachment - 2 General Wage Decision - MD20220061 Dated 05/18/2026.

Attachment - 3 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier

Covered Transactions Attachment – 4 Form HUD-5370-EZ General Contract Conditions for Small Construction/Development Contracts Attachment - 5 Section 3 Clause Attachment - 6 Section 3 Requirements

Fix completion date of 30 days upon NTP date:

Name, Address and Telephone Number of Bidder

Printed Name and Title of Authorized Official of Bidder

Signature of Authorized Official of Bidder Date

Please complete the appropriate information, sign and return via Bonfire by 2:00 p.m. EST on Wednesday July 22, 2026.

AWARD OF CONTRACT

Contract Award: HABC will analyze bids and award a requirements contract to the lowest responsive and responsible bidder. In addition, HABC reserves the right to take any of the following actions without liability to any bidder:

(1) HABC may: (a) reject any and all bids received; (b) waive any minor irregularities or technicalities in bids received;

(c) make a single award or multiple awards to more than one (1) bidder for supply of all or any combination of the items delineated in Attachment 1; (d) accept any item or combination of items bid unless precluded elsewhere in the solicitation; (e) amend this solicitation as permitted by applicable law at any time during the solicitation process; or (f) cancel this solicitation in its entirety or any portion thereof at any time during the solicitation process including after award. HABC's reservation of rights shall in no way affect the formation of a contract upon written notice of award by HABC to the successful bidder. If multiple awards are made, the intent shall be to make awards which, at the sole determination of HABC, are in its best interest, based on HABC’s needs and requirements. HABC makes no guarantees as to amount of award, if any.

(2) HABC may reject any bid as unacceptable if it is materially unbalanced as to the prices for the various items of work to be performed. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.

Term of Contract: The Contractor proposes to substantially complete all the work within Thirty (30) calendar days after issuance of the Notice to Proceed. Signature: ________________________________

Proof of Insurance: The successful bidder shall furnish to HABC a certified copy of the policy or policies covering all work as required in the contract, as evidence that the insurance required is maintained and in force for the entire duration of the contract. HABC may, at its sole discretion, immediately cancel the contract award without prior notice to the successful bidder upon any failure to submit any of the required Certificates of Insurance or any other document required under the IFB. Any and all existing agreements between HABC and the successful bidder shall immediately become null and void upon such cancellation without liability to such bidder. (see attached Service Contract – Insurance Requirements)

Invitation for Bid
PUR-1810-26
Renovation of 502 Preston
AWARD OF CONTRACT