832213padot112249.pdf
PDF 1 MB Posted
- Attached to
- I-376, Bath Tub Flooding Flood Wall Construction
- Solicitation number
- 112249
- Issued by
- Allegheny County, Philadelphia City, Pennsylvania
About this file
This is a Proposal Report for Project 112249, a Pennsylvania Department of Transportation (PennDOT) federally-funded construction project located in Allegheny County on State Route 376 in Pittsburgh. The project involves the reconstruction and raising of existing flood walls, stormwater management improvements, pump installations, and miscellaneous construction along a 3,198.90 linear-foot (0.606-mile) segment from the Fort Pitt Bridge Exit Ramp to approximately 200 feet east of the Grant Street interchange. The bid package includes extensive pavement work, concrete repairs and replacements, drainage system improvements, traffic control measures, and structural modifications. The project contains over 300 line items with quantities ranging from individual units to thousands of square yards, including 8,965 square yards of diamond grinding, 11,526 square yards of scarification, 4,928 linear feet of micropiles, and numerous concrete pavement sections of varying depths and types. The current let date is scheduled for July 30, 2026, with an anticipated notice to proceed on September 14, 2026, and required completion by August 19, 2027. No pre-bid meeting is required, and prequalification is mandatory for bidders.
The project cost range is $15,000,000 to $19,999,999.99, with structure work comprising 37 percent of the total contract value. The project is subject to federal requirements including Buy America and Build America, Buy America Act provisions, disadvantaged business enterprise (DBE) requirements, and Federal Highway Administration regulations. Wage rates apply, and the contract includes provisions for material storage prepayment, ride-quality incentives for pavement, liquidated damages, erosion and sediment control requirements, and post-construction stormwater management certifications. Multiple special provisions address traffic control, utility coordination, unmanned aircraft system prohibitions, right-to-know law compliance, and various construction standards. Payment will be made according to standard PennDOT specifications with quality assurance testing requirements, and the project is designated as an ECMS (Electronic Contract Management System) project with all addenda posted electronically.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL Report - Project 112249
July 2, 2026 11:30:16 AM Page 1 of 170
PROPOSAL REPORT
Project: 112249 Bid
Package: 1
Current Let: 07/30/2026 11:00:00 AM
Version: Current Addendum
Count: 0
District: 11 County: Allegheny
SR/SEC/
Group ID: 376/A69/---
Description
I-376, Bath Tub Flooding
July 2, 2026 11:30:16 AM Page 2 of 170
TABLE OF CONTENTS
BID PACKAGE SUMMARY
PROJECT ITEMS AND QUANTITIES
SPECIAL PROVISIONS
G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW C164A - a00164 CHANGES TO SPECIFICATIONS: SECTION 106 C166A - a00166 CHANGES TO SPECIFICATIONS: SECTIONS 107 AND 608 C167A - a00167 CHANGES TO SPECIFICATIONS: APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
C168A - a00168 CHANGES TO SPECIFICATIONS: SECTIONS 110, 404, AND 507 C169A - a00169 CHANGES TO SPECIFICATIONS: SECTION 419 C170A - a00170 CHANGES TO SPECIFICATIONS: SECTIONS 110, 501, 506, 530, 703, and 704 C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413 ... 45 C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876 G312A - a00312 Road Users Liquidated Damages (RULD) G501A - a00501 D11 Air Pollution Control G901B - a00901 ALTERNATE EROSION AND SEDIMENT POLLUTION CONTROL PLAN G1601A - a01601 E.E.O. COVERED AREA G2302A - a02302 Worker Protection and Investment N10420A - a10420 VERIFICATION OF VERTICAL CLEARANCES G35651B - a35535 Final Structure Files 00 - a35540 Incentive/Disincentive for SR 376 WB Full Closure and Detour 00 - a35545 Notice to Contractor - Acknowledgement of Appraisal of Permit Conditions and Material Storage
00 - a35550 Notice to Contractor - Pittsburgh Parking Authority Coordination 00 - a35555 Notice to Contractor - SR 376 Eastbound Ramp Overpass Restrictions 00 - a35560 Notice to Contractor - SR 8041 Ramp A Demolition Adjacent to Traffic G35565B - a35565 Requirements for Department Policies Special Provision G35721E - a35570 Resetting Segment Markers G35566A - a35575 Unmanned Aircraft System (UAS) Requirements S1050D - b01050 Section 105.14 - Borrow Areas, Waste Areas and Staging and Storing Areas P1061D - b01061 Electronic Submission of Material Certifications through ECMS P1062D - b01062 Electronic Submission of Material Certifications through ECMS for Lump Sum Component items
S501A - b0501A Sections 501, 704 and 1042 - Concrete Wearing Surfaces SRL-H S6012B - b06012 - SECTION 601.3(f) BACKFILLING TRENCH S6092B - b06092-SECTION 609.2(f) MISCELLANEOUS MATERIALS S9001D - b09001D Section 901 S1001A - b1001a Section 1001 - Cement Concrete Structures
July 2, 2026 11:30:16 AM Page 3 of 170
S1040A - b1040a Sections 1040, 1042 and 1090 Cleaning and Preparing Repair Areas 00 - c02021 Item 4202-0001 - Demolition Existing Knee Wall 00 - c05041 Item 4504-0001 - Pavement Relief Joint (H.E.S. Cement Concrete) 00 - c05073 Item 4507-0013 - Concrete Pavement Ride Quality Incentive, Type 1 (Including Latex Modified
00 - c05162 Item 4516-2009 - New Pavement Joint, Non-Skewed (Type D Joint) 00 - c06015 Item 4601-5901 - Cleaning Existing Pipe Culverts, Diameters up to and Including 36" 00 - c06052 Item 4605-2401 - Manhole Frame and Cover (Includes Existing Frame and Cover Removal)
00 - c06052 Items 4605-2771/2781 - Type C/Type M Frame and Bicycle Safe Grate (One Piece Cast Iron Grate)
I6091L - c06091 ITEM 0609-0009 - EQUIPMENT PACKAGE 00 - c09010 Item 4901-0460 - Full-Matrix Changeable Message Sign with Telecommunications, Queue Detection
00 - c09567 Item 4956-0712 - Omni-View Video Detection System (Fort Pitt Boulevard) 00 - c12010 Item 5201-0600 - ITS Device Field Enclosure, Structure Mount, Volume Less than 5 CF . 98 00 - c12013 Item 5201-3000 - ITS Device Testing, Complete (Temporary and Permanent) 00 - c12101 Item 5210-0100 - ITS Closed Circuit Television, Camera Subsystem, Structure Mount (Replace
I19992A - c19992 ITEM 1999-9999 - TRAINEES 00 - c90005 Item 9000-0005 - Maintenance of Project 00 - c90006 Item 9000-0006 - Coordination of the Relocation of Homeless and the Removal of Associated
00 - c90010 Item 9000-0010 - Rumble Pad Construction Entrance 00 - c90011 Item 9000-0011 - Weighted Sediment Filter Tube 00 - c90015 Item 9000-0015 - Micropile Drilling Operation and Sediment Containment 00 - c90016 Item 9000-0016 - Dewatering of Sump Chambers 00 - c90100 Item 9000-0100 - 6" Steel Pipe Bollard 00 - c90103 Item 9000-0103 - Closed Circuit Television Inspection (Drainage System) 00 - c90104 Item 9000-0104 - Pittsburgh Water CCTV Inspection and Locating 00 - c90106 Item 9000-0106 - Utility Test Hole 00 - c90110 Item 9000-0110 - Saw and Seal Latex Modified Concrete Wearing Surface 00 - c90111 Item 9000-0111 - Remove and Reset Permanent Impact Attenuator 00 - c90112 Items 9000-0112/0113 - Barrier and Joint Sealing (Moment Slab) / (At-Grade Structural Slab)
00 - c90114 Item 9000-0114 - Sealing Monitoring Wells 00 - c90115 Item 9000-0115 - Remove, Store, and Reset Chain Link Fence 00 - c90116 Item 9000-0116 - Remove, Store, and Reset Catwalk 00 - c90150 Item 9000-0150 - Duquesne Light Company Service Fee 00 - c90151 Items 9000-0151/0152 - Replace/Relocate Pittsburgh Parking Authority Lighting Cabinets
00 - c90153 Items 9000-0153/0154 - Temporary Support of Existing Pittsburgh Parking Authority Lighting
July 2, 2026 11:30:16 AM Page 4 of 170
00 - c90200 Item 9000-0200 - Offset Inlet Support Riser 00 - c90205 Item 9000-0205 - Unforeseen Drainage Repairs I63A - c90300 ITEMS 9000-0300/0301 - RECESSED WET-REFLECTIVE TAPE PAVEMENT
MARKINGS, WHITE/BLACK
00 - c90350 Item 9000-0350 - Omni-View Video Detection System (Upgrade) 00 - c90351 Item 9000-0351 - Signal Retiming 00 - c90400 Item 9000-0400 - Removal of Existing Decorative Railing 00 - c90401 Item 9000-0401 - Unforeseen Concrete Repair 00 - c90403 Item 9000-0403 - Furnish and Install Ladder Rungs 00 - c90404 Item 9000-0404 - Removal of Portion of Existing Floodwall B 00 - c90405 Item 9000-0405 - Removal of Portion of Existing Floodwall C1 00 - c90406 Item 9000-0406 - Removal of Portion of Existing Floodwall C2 00 - c90407 Item 9000-0407 - Removal of Portion of Existing Mon-Wharf Wall 00 - c90408 Item 9000-0408 - Removal of Portion of Existing SR 8041 Barrier 00 - c90410 Item 9000-0410 - Asbestos Abatement 00 - c90500 Item 9000-0500 - Process Mechanical System 00 - c90501 Items 9000-0501/0502 - Sump Pump Discharge Piping 00 - c90503 Items 9000-0503/0504 - Standpipe 00 - c90509 Item 9000-0509 - Removal of Existing Sump Pump Equipment 00 - c90510 Item 9000-0510 - Unforeseen Mechanical, Electrical, and Automation Work 00 - c90600 Item 9000-0600 - Process Control and Enterprise Management Systems 00 - c90700 Item 9000-0700 - Sump Electrical System 00 - c90800 Item 9000-0800 - Temporary Sign Cover 00 - c90801 Item 9000-0801 - Cloth Overlay Sign, Reflectorized 00 - c90802 Item 9000-0802 - Tow Truck and Operator 00 - c90803 Item 9000-0803 - Snow Removal and Ice Control 00 - c91201 Items 9000-1201/1202 - Temporary Support of Existing ITS Equipment 00 - c91205 Item 9000-1205 - Remove Radar Detector 00 - c912065 Item 9000-1206 - Complete Power Supply System (Permanent) 00 - c91207 Item 9000-1207 - Complete Power Supply (Temporary) 00 - c91207 Item 9000-1208 - Unforeseen Traffic Signal Work (ITS) I68C - c95101 ITEM 9000-5101 - ELECTRONIC TICKETING (E-TICKETING) FOR
CONSTRUCTION AGGREGATE
I70C - c95103 ITEM 9000-5103 - ELECTRONIC TICKETING (E-TICKETING) FOR
CONSTRUCTION CONCRETE
I9011B - c99011 D11 Item 9000-9011 - Off-Duty Uniformed Police Officer 00 - c99990 Item 9000-9990 - Incident Management Plan Implementation 00 - c99991 Items 9007-1430/1450 - Drilling Through Obstructions, Obstruction Drilling I2032D - c99992 ITEM 9203-0101 - TEMPORARY EXCAVATION SUPPORT AND PROTECTION
SYSTEM, FLOODWALL B
I2032D - c99993 ITEM 9203-0102 - TEMPORARY EXCAVATION SUPPORT AND PROTECTION
SYSTEM, FLOODWALL C2
July 2, 2026 11:30:16 AM Page 5 of 170
00 - c99995 Items 9605-2701 Thru 2705 - Inlet, Grate Type 1 Thru 5 00 - c99996 Item 9608-0001 - Emergency Demobilization and Remobilization
July 2, 2026 11:30:16 AM Page 6 of 170
BID PACKAGE SUMMARY
Project: 112249 Bid Package: 1
Project Type: Standard Posted:
Federal Project Status: PENNDOT Oversight NHS State Type of Work: MISCELLANEOUS
Prequalification Required: Yes Pre-Bid Meeting: None
408 Version: 2026-IE
Scheduled Let: 07/30/2026 11:00:00 AM Project Cost Range: $15,000,000.00 - $19,999,999.99 Anticipated NTP: 09/14/2026 Structure Work: 37.00%
Required Completion: 08/19/2027 DBE: 0% Wage Rates: Yes
Description:
The description and location of the project is as follows:For the reconstruction and raising of the existing flood walls, stormwater management/pump improvements, and other miscellaneous construction. All within a length of 3,198.90 linear feet (0.606 miles) as indicated on the approved drawings included in the Bid Package for STATE ROUTE 376, SECTION A69, in ALLEGHENY COUNTY, CITY OF PITTSBURGH, Commonwealth of Pennsylvania.This project being situated as follows: From approximately the Fort Pitt Bridge Exit Ramp at Segment 0695, Offset 1392 (Station 1090+12) to approximately 200 feet east of the Grant Street interchange at Segment 0705, Offset 0602 (Station 653+92).
Additional Information:
This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
July 2, 2026 11:30:16 AM Page 7 of 170
PROJECT ITEMS AND QUANTITIES
Alt Item Work Class Code Unit Of
Measure Quantity Unit Price PDP Spec
Prov Add Action
0201-0001 A Lump Sum 1.0000 N
CLEARING AND GRUBBING
4202-0001 B Lump Sum 1.0000 N Proj
DEMOLITION EXISTING KNEE WALL
0203-0001 C Cubic Yard 3,396.0000 N
CLASS 1 EXCAVATION
0203-0006 G4 Linear Foot 3,262.0000 N
SAW CUTTING
0204-0100 C1, S1, T1 Cubic Yard 310.0000 N
CLASS 3 EXCAVATION
0205-0292 C1, S4 Cubic Yard 184.0000 N
STRUCTURE BACKFILL
0212-0014 C3, H, M2 Square Yard 388.0000 N
GEOTEXTILE, CLASS 4, TYPE A
0313-0637 E Ton 61.0000 N SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, 10 TO < 30 MILLION ESALs, 25.0 MM MIX
0350-0106 C, E Square Yard 357.0000 N
SUBBASE 6" DEPTH (NO. 2A)
0350-0120 C, E Cubic Yard 15.0000 N
SUBBASE (NO. 2A)
0360-0001 E Square Yard 213.0000 N
ASPHALT TREATED PERMEABLE BASE COURSE, 4" DEPTH
0501-0015 G Square Yard 47.0000 N
PLAIN CEMENT CONCRETE PAVEMENT, VARIABLE DEPTH
0501-0020 G, G1, K Square Yard 56.0000 N
PLAIN CEMENT CONCRETE PAVEMENT, 4" DEPTH
0501-0034 G Square Yard 3.0000 N
PLAIN CEMENT CONCRETE PAVEMENT, 11" DEPTH
0501-0086 G Square Yard 700.0000 N
ACCELERATED PLAIN CEMENT CONCRETE PAVEMENT, 12" DEPTH
0501-0136 G Square Yard 1,235.0000 N
H.E.S. PLAIN CEMENT CONCRETE PAVEMENT, 12" DEPTH
0501-0199 G Square Yard 357.0000 N
REINFORCED CEMENT CONCRETE PAVEMENT, 7" DEPTH
July 2, 2026 11:30:16 AM Page 8 of 170
0501-0203 G Square Yard 3,576.0000 N
REINFORCED CEMENT CONCRETE PAVEMENT, 11" DEPTH
0501-0204 G Square Yard 465.0000 N
REINFORCED CEMENT CONCRETE PAVEMENT, 12" DEPTH
0501-0303 G Square Yard 2,769.0000 N
H.E.S. REINFORCED CEMENT CONCRETE PAVEMENT, 11" DEPTH
0501-0304 G Square Yard 1,837.0000 N
H.E.S. REINFORCED CEMENT CONCRETE PAVEMENT, 12" DEPTH
4504-0001 G1, G4 Linear Foot 28.0000 N Proj
PAVEMENT RELIEF JOINT (H.E.S. CEMENT CONCRETE)
4507-0013 X Dollar 25,000.0000 $1.00 Y Proj CONCRETE PAVEMENT RIDE QUALITY INCENTIVE, TYPE 1 (INCLUDING LATEX MODIFIED CONCRETE OVERLAY)
0514-0001 G1, G2 Square Yard 8,965.0000 N
DIAMOND GRINDING OF CONCRETE PAVEMENT
0516-2007 G1, G4 Linear Foot 2,361.0000 N
PATCHING JOINT
4516-2009 G1, G4 Linear Foot 156.0000 N Proj
NEW PAVEMENT JOINT, NON-SKEWED (TYPE D JOINT)
0521-0001 G4 Linear Foot 285.0000 N
TRANSVERSE JOINT CLEANING AND SEALING
0525-0031 G3 Square Foot 210.0000 N
CONCRETE PAVEMENT PARTIAL-DEPTH REPAIR, TYPE 1, ACCELERATED
0525-0034 G3 Square Foot 235.0000 N
CONCRETE PAVEMENT PARTIAL-DEPTH REPAIR, TYPE 2, ACCELERATED
4601-5901 H1 Linear Foot 2,503.0000 N Proj CLEANING EXISTING PIPE CULVERTS, DIAMETERS UP TO AND INCLUDING 36" (INCLUDING DRAINAGE STRUCTURES)
4605-2401 K Set 8.0000 N Proj
MANHOLE FRAME AND COVER (INCLUDES EXISTING FRAME AND COVER REMOVAL)
4605-2771 K Set 17.0000 N Proj
TYPE C FRAME AND BICYCLE SAFE GRATE (ONE PIECE CAST IRON GRATE)
4605-2781 K Set 1.0000 N Proj
TYPE M FRAME AND BICYCLE SAFE GRATE (ONE PIECE CAST IRON GRATE)
0608-0001 X Lump Sum 1.0000 N
MOBILIZATION
0609-0002 X Lump Sum 1.0000 N
INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES, TYPE A
0609-0009 X Lump Sum 1.0000 N Std
EQUIPMENT PACKAGE
July 2, 2026 11:30:16 AM Page 9 of 170
0627-3020 J1 Linear Foot 2,013.0000 N
TEMPORARY BARRIER, TEST LEVEL 3, BARRIER DEFLECTION DISTANCE < /=2'
0630-0045 K Linear Foot 36.0000 N
PLAIN CEMENT CONCRETE CURB, 8" HEIGHT, INCLUDING REMOVAL OF EXISTING CURB
0633-0200 K Linear Foot 595.0000 N
PLAIN CONCRETE MOUNTABLE CURB, TYPE A
0680-0121 K2, S1 Square Yard 655.0000 N
MEMBRANE WATERPROOFING SYSTEM INSTALLED ON OTHER SURFACES
0686-0060 X Lump Sum 1.0000 N
CONSTRUCTION SURVEYING, TYPE D, MODIFIED
0689-0005 X Lump Sum 1.0000 N
CPM SCHEDULE, WITH UPDATES
0690-0002 X Dollar 5,000.0000 $1.00 Y
SEMI-FORMAL FACILITATION
0698-0001 S2 Each 2,545.0000 N
POST-INSTALLED CONCRETE ANCHORS, PERMANENT
0845-0001 M2 Dollar 10,000.0000 $1.00 Y
UNFORESEEN WATER POLLUTION CONTROL
0860-0000 M2 Each 30.0000 N
INLET FILTER BAG FOR TYPE M INLET
0867-0012 M2 Linear Foot 1,971.0000 N
COMPOST FILTER SOCK, 12" DIAMETER
0901-0001 Q Lump Sum 1.0000 N
MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION
0901-0102 Q Each 2.0000 N
SHADOW VEHICLE
0901-0120 Q Each 2.0000 N
SPEED DISPLAY SIGN
0901-0203 Q Each 2.0000 N
ARROW PANEL
0901-0231 Q Day 289.0000 N
ADDITIONAL WARNING LIGHTS, TYPE B
0901-0240 Q, R Square Foot 1,100.0000 N
ADDITIONAL TRAFFIC CONTROL SIGNS
0901-0270 Q Each 39.0000 N
SEQUENTIAL WARNING LIGHTS
0901-0320 O Linear Foot 9,233.0000 N
July 2, 2026 11:30:16 AM Page 10 of 170
4" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, YELLOW
0901-0331 O Linear Foot 12,577.0000 N
6" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, WHITE
0901-0334 O Linear Foot 118.0000 N
24" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, WHITE
0901-0460 Q Each 10.0000 N
FULL-MATRIX CHANGEABLE MESSAGE SIGN WITH TELECOMMUNICATIONS
4901-0460 Q Each 4.0000 N Proj
FULL-MATRIX CHANGEABLE MESSAGE SIGN WITH TELECOMMUNICATIONS QUEUE DETECTION
0910-5173 C1, P8 Linear Foot 50.0000 N
1-1/2" EXPOSED CONDUIT
0910-5313 C1, P8 Linear Foot 100.0000 N
1 1/2" LIQUIDTIGHT FLEXIBLE NON-METALLIC CONDUIT
0931-0003 R Square Foot 40.0000 N
POST MOUNTED SIGNS, TYPE B, STEEL SQUARE POST
0933-0001 R Square Foot 146.0000 N
POST MOUNTED SIGNS, TYPE D
0935-0001 R Square Foot 2.0000 N
POST MOUNTED SIGNS, TYPE F
0936-0001 R Square Foot 2,566.0000 N
STRUCTURE MOUNTED EXTRUDED ALUMINUM CHANNEL SIGNS
0936-0200 R Square Foot 25.0000 N
STRUCTURE MOUNTED FLAT SHEET ALUMINUM SIGNS
0937-0200 J1, R Each 26.0000 N
BARRIER MOUNTED DELINEATOR, SIDE-MOUNT TYPE R, (Y/B)
0937-0201 J1, R Each 33.0000 N
BARRIER MOUNTED DELINEATOR, SIDE-MOUNT TYPE R, (W/B)
0937-0210 J1, R Each 26.0000 N
BARRIER MOUNTED DELINEATOR, TOP-MOUNT TYPE S, (Y/B)
0937-0211 J1, R Each 33.0000 N
BARRIER MOUNTED DELINEATOR, TOP-MOUNT TYPE S, (W/B)
0937-0215 J1, R Each 6.0000 N
BARRIER MOUNTED DELINEATOR, SIDE-MOUNT TYPE R, (Y/R)
0937-0216 J1, R Each 5.0000 N
BARRIER MOUNTED DELINEATOR, SIDE-MOUNT TYPE R, (W/R)
0937-0221 J1, R Each 6.0000 N BARRIER MOUNTED DELINEATOR, TOP-MOUNT TYPE S, YELLOW POST WITH YELLOW/RED SHEETING
July 2, 2026 11:30:16 AM Page 11 of 170
0937-0222 J1, R Each 5.0000 N
BARRIER MOUNTED DELINEATOR, TOP-MOUNT TYPE S, WHITE POST WITH WHITE/RED SHEETING
0939-0001 R Square Foot 30.0000 N
POST MOUNTED SIGNS, TYPE M
0950-0002 P Dollar 20,000.0000 $1.00 Y
UNFORESEEN TRAFFIC SIGNAL WORK
4956-0712 P Each 3.0000 N Proj
OMNI-VIEW VIDEO DETECTION SYSTEM (FORT PITT BOULEVARD)
0958-0281 P, Q Each 26.0000 N
TEMPORARY TIMING ADJUSTMENTS TO EXISTING PERMANENT TRAFFIC SIGNAL CONTROLLER
0963-0001 O2, O3 Square Foot 145.0000 N
PAVEMENT MARKING REMOVAL
0963-0004 O2, O3 Linear Foot 1,727.0000 N
4" PAVEMENT MARKING REMOVAL
0963-0006 O2, O3 Linear Foot 2,480.0000 N
6" PAVEMENT MARKING REMOVAL
0964-0002 O Linear Foot 3,848.0000 N
4" YELLOW EPOXY PAVEMENT MARKINGS
0964-0005 O Linear Foot 3,840.0000 N
6" WHITE EPOXY PAVEMENT MARKINGS
0964-0008 O Linear Foot 2,636.0000 N
8" WHITE EPOXY PAVEMENT MARKINGS
0964-0021 O Linear Foot 106.0000 N
24" WHITE EPOXY PAVEMENT MARKINGS
0964-0256 O3 Linear Foot 30.0000 N WHITE EPOXY LEGEND, "YIELD LINE" , 24" X 36" TRIANGLE, (MIN 4 TRIANGLES PER LINE)
0966-0014 O1 Each 18.0000 N
SNOWPLOWABLE RAISED PAVEMENT MARKER TWO WAY HOLDER WITH REFLECTOR (Y/R)
0966-0015 O1 Each 17.0000 N
SNOWPLOWABLE RAISED PAVEMENT MARKER TWO WAY HOLDER WITH REFLECTOR (W/R)
0966-0018 O1 Each 40.0000 N
SNOWPLOWABLE RAISED PAVEMENT MARKER TWO WAY HOLDER WITH REFLECTOR (W/B)
1001-0980 G4, S9 Square Yard 3,808.0000 N
MECHANICAL TEXTURING WITH LONGITUDINAL SAWED GROOVES
1001-1080 S2 Cubic Yard 619.0000 N
CLASS AA CEMENT CONCRETE
1001-1160 S2 Cubic Yard 8.0000 N
CLASS HES CEMENT CONCRETE
July 2, 2026 11:30:16 AM Page 12 of 170
1002-0052 S7 Pound 73,194.0000 N
REINFORCEMENT BARS, EPOXY COATED
1002-0140 S7 Each 799.0000 N
MECHANICAL SPLICE SYSTEM FOR NO. 5 REINFORCEMENT BARS, EPOXY COATED
1007-0200 X Each 5.0000 N
MICROPILES VERIFICATION LOAD TEST
1007-0220 X Lump Sum 1.0000 N
MICROPILES MOBILIZATION
1007-0230 K1 Cubic Foot 183.0000 N
MICROPILES GROUT
1007-0330 C6, U Linear Foot 4,928.0000 N
MICROPILES 7" DIAMETER, PLAIN STEEL
1019-0040 K2 Square Yard 1,842.0000 N
PROTECTIVE COATING FOR REINFORCED CONCRETE SURFACES (PENETRATING SEALERS, REINFORCED
CONCRETE SUBSTRUCTURE SURFACES)
1039-0010 S9 Square Yard 3,808.0000 N
CONCRETE BRIDGE DECK SURFACE PREPARATION, HYDRODEMOLITION
1040-0120 S9 Square Foot 837.0000 N
CONCRETE BRIDGE DECK REPAIR ACCELERATED, TYPE 2 USING ASC
1040-0130 S9 Square Foot 279.0000 N
CONCRETE BRIDGE DECK REPAIR ACCELERATED, TYPE 3 USING ASC
1040-0210 S9 Square Foot 32.0000 N
CONCRETE BRIDGE BARRIER REPAIR ACCELERATED, TYPE 2 USING ASC
1041-0020 F3, S2 Square Yard 11,526.0000 N
SCARIFICATION, 1/2" DEPTH
1042-0031 S3 Square Yard 3,808.0000 N
3 HOUR ACCELERATED LATEX MODIFIED CONCRETE WEARING SURFACE, 1 1/2" DEPTH
1042-0070 S3 Cubic Yard 152.0000 N
3 HOUR ACCELERATED LATEX MODIFIED CONCRETE, VARIABLE DEPTH
1045-0020 K2 Square Yard 161.0000 N
PROTECTIVE COATING FOR REINFORCED CONCRETE SURFACES (EPOXY RESIN)
1050-0040 T3 Pound 519.0000 N
FABRICATED STRUCTURAL STEEL, GALVANIZED
5201-0600 P1, P2, P4, P5 Each 2.0000 N Proj
ITS DEVICE FIELD ENCLOSURE, STRUCTURE MOUNT, VOLUME LESS THAN 5 CF (FLOODWALL)
5201-3000 P1, P2, P3, P4, P5 Lump Sum 1.0000 N Proj
ITS DEVICE TESTING, COMPLETE (TEMPORARY AND PERMANENT)
July 2, 2026 11:30:16 AM Page 13 of 170
5210-0100 P1 Each 2.0000 N Proj ITS CLOSED CIRCUIT TELEVISION, CAMERA SUBSYSTEM, STRUCTURE MOUNT (REPLACE EXISTING)
1999-9999 Z Hour 1,000.0000 N Std
TRAINEES
9000-0005 Q Dollar 100,000.0000 $1.00 Y Proj
MAINTENANCE OF PROJECT
9000-0006 X Dollar 10,000.0000 $1.00 Y Proj COORDINATION OF THE RELOCATION OF HOMELESS AND THE REMOVAL OF ASSOCIATED TRASH AND DEBRIS
9000-0010 M2 Each 3.0000 N Proj
RUMBLE PAD CONSTRUCTION ENTRANCE
9000-0011 M2 Linear Foot 170.0000 N Proj
WEIGHTED SEDIMENT FILTER TUBE
9000-0015 C1, M2 Lump Sum 1.0000 N Proj
MICROPILE DRILLING OPERATION AND SEDIMENT CONTAINMENT
9000-0016 X Lump Sum 1.0000 N Proj
DEWATERING OF SUMP CHAMBERS
9000-0100 R Each 14.0000 N Proj
6" STEEL PIPE BOLLARD
9000-0103 H1 Dollar 75,000.0000 $1.00 Y Proj
CLOSED CIRCUIT TELEVISION INSPECTION (DRAINAGE SYSTEM)
9000-0104 H1 Hour 48.0000 N Proj
PITTSBURGH WATER CCTV INSPECTION AND LOCATING
9000-0106 X Each 5.0000 N Proj
UTILITY TEST HOLE
9000-0110 G1, G4 Linear Foot 1,319.0000 N Proj
SAW AND SEAL LATEX MODIFIED CONCRETE WEARING SURFACE
9000-0111 J3 Each 2.0000 N Proj
REMOVE AND RESET PERMANENT IMPACT ATTENUATOR
9000-0112 S2 Square Yard 252.0000 N Proj
BARRIER AND JOINT SEALING (MOMENT SLAB)
9000-0113 S2 Square Yard 882.0000 N Proj
BARRIER AND JOINT SEALING (AT-GRADE STRUCTURE SLAB)
9000-0114 X Dollar 10,000.0000 $1.00 Y Proj
SEALING MONITORING WELLS
9000-0115 J2 Linear Foot 52.0000 N Proj
REMOVE, STORE, AND RESET CHAIN LINK FENCE
9000-0116 X Each 1.0000 N Proj
REMOVE, STORE, AND RESET CATWALK
July 2, 2026 11:30:16 AM Page 14 of 170
9000-0150 P8 Dollar 10,000.0000 $1.00 Y Proj
DUQUESNE LIGHT COMPANY SERVICE FEE
9000-0151 P8 Dollar 125,000.0000 $1.00 Y Proj
REPLACE/RELOCATE PITTSBURGH PARKING AUTHORITY LIGHTING CABINETS (STANWIX STREET)
9000-0152 P8 Dollar 125,000.0000 $1.00 Y Proj
REPLACE/RELOCATE PITTSBURGH PARKING AUTHORITY LIGHTING CABINETS (WOOD STREET)
9000-0153 P8 Dollar 50,000.0000 $1.00 Y Proj TEMPORARY SUPPORT OF EXISTING PITTSBURGH PARKING AUTHORITY LIGHTING CABINETS (STANWIX STREET)
9000-0154 P8 Dollar 50,000.0000 $1.00 Y Proj TEMPORARY SUPPORT OF EXISTING PITTSBURGH PARKING AUTHORITY LIGHTING CABINETS (WOOD STREET)
9000-0200 K Each 4.0000 N Proj
OFFSET INLET SUPPORT RISER
9000-0205 H Dollar 75,000.0000 $1.00 Y Proj
UNFORESEEN DRAINAGE REPAIRS
9000-0300 O Linear Foot 816.0000 N Std
RECESSED WET-REFLECTIVE TAPE PAVEMENT MARKINGS, WHITE
9000-0301 O Linear Foot 816.0000 N Std
RECESSED WET-REFLECTIVE TAPE PAVEMENT MARKINGS, BLACK
9000-0350 P Each 3.0000 N Proj
OMNI-VIEW VIDEO DETECTION SYSTEM (UPGRADE)
9000-0351 P Each 5.0000 N Proj
SIGNAL RETIMING
9000-0400 J2 Linear Foot 233.0000 N Proj
REMOVAL OF EXISTING DECORATIVE RAILING
9000-0401 S2 Dollar 30,000.0000 $1.00 Y Proj
UNFORESEEN CONCRETE REPAIR
9000-0403 X Each 54.0000 N Proj
FURNISH AND INSTALL LADDER RUNGS
9000-0404 T1 Lump Sum 1.0000 N Proj
REMOVAL OF PORTION OF EXISTING FLOODWALL B
9000-0405 T1 Lump Sum 1.0000 N Proj
REMOVAL OF PORTION OF EXISTING FLOODWALL C1
9000-0406 T1 Lump Sum 1.0000 N Proj
REMOVAL OF PORTION OF EXISTING FLOODWALL C2
9000-0407 T1 Lump Sum 1.0000 N Proj
REMOVAL OF PORTION OF EXISTING MON-WHARF WALL
9000-0408 T1 Lump Sum 1.0000 N Proj
July 2, 2026 11:30:16 AM Page 15 of 170
REMOVAL OF PORTION OF EXISTING SR 8041 BARRIER
9000-0410 B1 Dollar 25,000.0000 $1.00 Y Proj
ASBESTOS ABATEMENT
9000-0500 S2 Lump Sum 1.0000 N Proj
PROCESS MECHANICAL SYSTEM
9000-0501 H Each 1.0000 N Proj
SUMP PUMP DISCHARGE PIPING (STANWIX STREET SUMP)
9000-0502 H Each 1.0000 N Proj
SUMP PUMP DISCHARGE PIPING (WOOD STREET SUMP)
9000-0503 H Linear Foot 285.0000 N Proj
STANDPIPE (STANWIX STREET SUMP)
9000-0504 H Linear Foot 150.0000 N Proj
STANDPIPE (WOOD STREET SUMP)
9000-0509 X Lump Sum 1.0000 N Proj
REMOVAL OF EXISTING SUMP PUMP EQUIPMENT
9000-0510 X Dollar 50,000.0000 $1.00 Y Proj
UNFORESEEN MECHANICAL, ELECTRICAL, AND AUTOMATION WORK
9000-0600 S2 Lump Sum 1.0000 N Proj
PROCESS CONTROL AND ENTERPRISE MANAGEMENT SYSTEMS
9000-0700 P8 Lump Sum 1.0000 N Proj
SUMP ELECTRICAL SYSTEM
9000-0800 Q Square Foot 1,065.0000 N Proj
TEMPORARY SIGN COVER
9000-0801 Q Square Foot 5,508.0000 N Proj
CLOTH OVERLAY SIGN, REFLECTORIZED
9000-0802 Q Dollar 100,000.0000 $1.00 Y Proj
TOW TRUCK AND OPERATOR
9000-0803 Q Dollar 150,000.0000 $1.00 Y Proj
SNOW REMOVAL AND ICE CONTROL
9000-1201 P8 Lump Sum 1.0000 N Proj
TEMPORARY SUPPORT OF EXISTING ITS EQUIPMENT (STANWIX STREET SUMP)
9000-1202 P8 Lump Sum 1.0000 N Proj
TEMPORARY SUPPORT OF EXISTING ITS EQUIPMENT (WOOD STREET SUMP)
9000-1205 P Each 1.0000 N Proj
REMOVE RADAR DETECTOR
9000-1206 P8 Each 2.0000 N Proj
COMPLETE POWER SUPPLY SYSTEM (PERMANENT)
July 2, 2026 11:30:16 AM Page 16 of 170
9000-1207 P8 Each 2.0000 N Proj
COMPLETE POWER SUPPLY SYSTEM (TEMPORARY)
9000-1208 P8 Dollar 10,000.0000 $1.00 Y Proj
UNFORESEEN TRAFFIC SIGNAL WORK (ITS)
9000-5101 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION AGGREGATE
9000-5103 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION CONCRETE
9000-9011 X Dollar 200,000.0000 $1.00 Y Std
OFF DUTY UNIFORMED POLICE OFFICER
9000-9990 X Dollar 50,000.0000 $1.00 Y Proj
INCIDENT MANAGEMENT PLAN IMPLEMENTATION
9007-1430 C6 Dollar 25,000.0000 $1.00 Y Proj
DRILLING THROUGH OBSTRUCTIONS, OBSTRUCTION DRILLING
9007-1450 X Dollar 80,000.0000 $1.00 Y Proj
MOBILIZATION FOR DRILLING OF UNFORSEEN OBSTRUCTIONS
9203-0101 C1, S5 Lump Sum 1.0000 N Std
TEMPORARY EXCAVATION SUPPORT AND PROTECTION SYSTEM, FLOODWALL B
9203-0102 C1, S5 Lump Sum 1.0000 N Std
TEMPORARY EXCAVATION SUPPORT AND PROTECTION SYSTEM, FLOODWALL C2
9605-2701 K Each 26.0000 N Proj
INLET, GRATE TYPE 1
9605-2702 K Each 4.0000 N Proj
INLET, GRATE TYPE 2
9605-2703 K Each 2.0000 N Proj
INLET, GRATE TYPE 3
9605-2704 K Each 2.0000 N Proj
INLET, GRATE TYPE 4
9605-2705 K Each 2.0000 N Proj
INLET, GRATE TYPE 5
9608-0001 X Dollar 500,000.0000 $1.00 Y Proj
EMERGENCY DEMOBILIZATION AND REMOBILIZATION
July 2, 2026 11:30:16 AM Page 17 of 170
SPECIAL PROVISIONS
Special Provision: G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) Addendum:
Action:
Item(s) Associated:
Header:
APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL)
Provision Body:
APPLICABLE DESIGNATED SPECIAL PROVISIONS. The following Designated Special Provisions are found in Appendix C and apply to this bid proposal.
DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects.
DSP8. F.A.R. - Required Contract Provisions Federal-Aid Construction Contracts FHWA-1273 (Revised October 23, 2023). Also attached to the Proposal/Contract.
DSP9. Special Supplement - Anti-Pollution Measures - August 26, 1999.
DSP12. Executive Order 11246, with Appendix A and B.
DSP13. Buy America.
DSP15. Commonwealth Standard Terms and Conditions.
DSP16. Lobbying Certification Form. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).
DSP17. Federal Audit Clause.
DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances.
DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities.
Project Specific Details:
Special Provision: G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW Addendum:
CONTRACT PROVISIONS - RIGHT TO KNOW LAW
Provision Body:
July 2, 2026 11:30:16 AM Page 18 of 170
I. Contract Provisions – Right to Know Law 8-K-1532
a. The Pennsylvania Right-to-Know Law (RTKL), 65 P.S. §§ 67.101-3104, applies to this Contract.
b. If the Department needs assistance in any matter arising out of the RTKL related to this Contract, the Department will notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Department.
c. Upon written notification from the Department that it requires assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor will:
1. Provide the Department, within 10 calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Department reasonably believes is Requested Information and may be a public record under the RTKL; and
2. Provide such other assistance as the Department may reasonably request, in order to comply with the RTKL with respect to this Contract.
d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, notify the Department and provide, within 7 calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.
e. The Department will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Department determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Department determine that the Requested Information is clearly not exempt from disclosure, provide the Requested Information within 7 calendar days of receipt of written notification of the Department’s determination.
f. Failing to provide the Requested Information within the time period required by these provisions, indemnify and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of this failure, including any statutory damages assessed against the Department.
g. The Department will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.
h. The Contractor may file a legal challenge to any Department decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, indemnify the Department for any legal expenses incurred by the Department as a result of such a challenge and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of the failure, including any statutory damages assessed against the Department, regardless of the outcome of such legal challenge. As between the parties, agree to waive all rights or remedies that may be available as a result of the Department’s disclosure of Requested information pursuant to the RTKL.
i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and continue as long as the Requested Information remains in the Contractor's possession.
Special Provision: C164A - a00164 CHANGES TO SPECIFICATIONS: SECTION 106
July 2, 2026 11:30:16 AM Page 19 of 170
Header:
CHANGES TO SPECIFICATIONS: SECTION 106
Provision Body:
SECTION 106—CONTROL OF MATERIAL
106.10(a) Buy America Provisions. Revise last paragraph to read as follows:
Products manufactured of foreign steel or iron materials may be used, provided the cumulative cost of such products as they are delivered to the project does not exceed 0.1% of the total contract amount, or $2,500, whichever is greater.
Add 106.11 BUILD AMERICA, BUY AMERICA ACT PROVISIONS.
106.11 BUILD AMERICA, BUY AMERICA ACT PROVISIONS—
(a) Build America, Buy America Act. The Federal Bipartisan Infrastructure Law (Public Law 117-58) includes the Build America, Buy America Act that requires all iron, steel, manufactured products, and construction materials used to be produced in the United States.
The term produced in the United States defined as:
1. Iron or Steel Products. All manufacturing processes from the initial melting stage through the application of coatings occurred in the United States according to Section 106.10(a).
2. Manufactured Product. Final assembly of all manufactured products permanently incorporated into the project must be manufactured in the United States.
2.a A manufactured product, not predominantly steel or iron, is defined as an article, material, or supply that has been processed into a specific form and shape, or combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies.
2.b Predominantly steel or iron is defined as greater than or equal to 50 percent of the total cost of the manufactured product.
2.c Manufactured products that are predominantly steel or iron must comply with Buy America provisions according to Section 106.10(a).
2.d If an article, material, or supply meets this definition but could also be classified as an excluded material or other product category, that article, material, or supply is not a manufactured product.
2.e Mixtures of excluded materials delivered to a work site without final form for incorporation into a project are also not manufactured products.
2.f Manufactured products where the final assembly did not occur in the United States may be used, provided the cumulative cost of such manufactured products is no more than the lesser of $1 million or 5% of total applicable costs for the project.
3. Construction Materials.
3.a All manufacturing processes for construction materials occurred in the United States.
3.b Construction materials includes an article, material, or supply that is or consists primarily of:
non-ferrous metals, plastic and polymer-based products including polyvinylchloride, composite building materials, and polymers used in fiber optic cables, glass including optic glass, lumber, or drywall
July 2, 2026 11:30:16 AM Page 20 of 170
Items that consist of two or more of the listed materials that have been combined together through a manufacturing process, and items that include at least one of the listed materials combined with a material that is not listed through a manufacturing process, should be treated as manufactured products, rather than as construction materials.
3.c Limitation with Respect to Aggregates. Shall not include cement and cementitious materials, aggregates such as stone, sand, or gravel, or aggregate binding agents or additives.
3.d Construction materials where all manufacturing processes did not occur in the United States may be used, provided the cumulative cost of such construction materials is no more than the lesser of $1 million of 5% of total applicable costs for the project.
Special Provision: C166A - a00166 CHANGES TO SPECIFICATIONS: SECTIONS 107 AND 608
CHANGE TO SPECIFICATIONS: SECTIONS 107, AND 608
Provision Body:
SECTION 107—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS. Revise to read as follows:
107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS—Install and maintain erosion and sediment (E&S) pollution control devices as indicated or submit an alternate plan for accomplishing equal or better temporary and permanent erosion and water pollution control. If an alternate plan is submitted, do not start work until the plan is approved by the County Conservation District and the Department. If a National Pollutant Discharge Elimination System (NPDES) Permit is involved, do not start work until the plan is approved by the DEP or the authorized County Conservation District and the Department. Concrete clean out areas, either contractor designed or indicated within the contract documents, are incidental to the contract items.
When a general or individual NPDES Permit is involved:
At the preconstruction conference, submit a Preparedness, Prevention and Contingency (PPC) Plan and identify a licensed professional (Professional Engineer, Geologist, Land Surveyor or Landscape Architect) registered in the Commonwealth and if applicable, their designee to be present onsite and responsible for implementing critical stages of the
Do not start earth disturbance activities until an environmental preconstruction meeting is held with DEP or delegated
CCD.
Within 14 days of completing the construction of a stormwater control measure (SCM) as determined by the licensed professional or designee, submit a completed Chapter 102 SCM Construction Certification Form for each SCM to the Representative through PPCC. Form CS-102 has information required to complete the Chapter 102 Form(s). Ensure the General Project and SCM Information, Construction Information, and Licensed Professional Certification sections are completed by the identified licensed professional responsible for overseeing the critical stages of the approved PCSM plan.
Prepare an as-built (record) PCSM Plan to be sealed and signed by the identified licensed professional registered in the Commonwealth. All construction survey, plan preparation, and engineering required for the as-built (record) PCSM Plan will approved Post Construction Stormwater Management (PCSM) Plan.
July 2, 2026 11:30:16 AM Page 21 of 170 be incidental to the contract items. The as-built (record) PCSM Plan must accurately reflect deviations from the approved PCSM Plan including, but not limited to, plan locations, dimensions, inverts/elevations, materials used and grading. Update the as-built (record) PCSM Plan as construction of the project’s PCSM features progresses. Have the identified licensed professional immediately notify the Representative of all deviations from the approved PCSM Plan. Deviations to the approved PCSM Plan must be submitted for approval. Assist with the determination and documentation if the as-built deviations require a permit amendment or if the PCSM features must be removed and replaced as indicated on the PCSM Plan.
Assist the Representative in performing visual site inspections weekly and after each precipitation event greater than 0.25 inches to ensure the project's E&S Best Management Practices (BMPs) are functioning properly. Immediately initiate corrective actions, at no additional cost to the Department, upon notification by the Representative of noncompliance with the provisions of this section that the Representative has determined requires immediate corrective action under Department policies. For all other notifications of noncompliance, initiate corrective actions within 24 hours. Failure or refusal to promptly comply with such notice upon receipt may, at the Department’s sole discretion, result in: the withholding payment of estimates for work completed until the requirements of the E&S Plan are met, assessment of E&S noncompliance liquidated damages as specified in Section 108.07(d) or issuance of a written order stopping all or part of the work until the corrective action has been taken and the requirements of the E&S Plan are met. No claims for extension of time, costs, or damages arising from, related to, or based upon such notices of noncompliance or stop orders will be granted, paid, or considered.
Nothing in this Section is to be interpreted to relieve the Contractor of its obligation to fully and timely comply with all applicable laws and any permits for the project. The time periods set forth in this Section do not supersede any more stringent time periods required by applicable laws or permits for the project.
If corrective action or noncompliance with the provisions of this Section result from design errors/omissions or a precipitation event exceeding the design storm criteria as specified in applicable Department publications; the cost and/or time required for the performance of the corrective actions for noncompliance notices or stop work orders will be considered as specified in Section 110.03 and Section 108.06, as applicable.
Utilize Department, DEP, or other authorized agency’s form(s) included in the contract or project permits unless directed otherwise by the Representative, DEP, the County Conservation District or other authorized regulatory agency.
For the purpose of determining compliance with the provisions of this section, “substantial completion” will be considered to have been attained when all of the following project milestones have been reached:
Either a semi-final or final inspection has been performed, physical work is complete, and an Environmental Commitments and Mitigation Tracking System (ECMTS) Sheet has been executed if applicable to the project.
Earth disturbance activity has been permanently stabilized and sufficient vegetative growth has been achieved to meet permit conditions (uniform 70% perennial vegetative cover) and agreed to by DEP or delegated CCD.
Installation of PCSM SCMs have occurred if applicable. Upon completion of PCSM conversions and facilities, the County Conservation District must approve the removal of all remaining E&S BMPs.
Once a project with a general or individual NPDES Permit has reached substantial completion, submit to the Representative a DEP Notice of Termination (NOT) Form ensuring Sections 2, 3, 4, 7 and 8, are fully executed. The NOT is to be accompanied by the required as-built (record) PCSM Plan, the final certification by the licensed professional and the Contractor’s executed portion of the ECMTS Construction Tracking Signature Sheet.
608 MOBILIZATION
Section 608.4(b)3. Revise to read as follows:
3. When all physical work has been satisfactorily completed and the following certificates and documents, as required, have been properly furnished, the final payment will be made as specified in Section 608.4(a):
Certified Payroll Records
Final DBE/DB payment amounts and, if necessary, shortfall justification
Material Certifications
Form CS-4225H, Highway Lighting In-Service Guarantee Notification
July 2, 2026 11:30:16 AM Page 22 of 170
As built drawings for Design/Build projects
Form RW-397A, Right to Enter (a property) and Release Form from property owner, if applicable
Form CS-4345, Borrow and/or Waste Management
Contractor Evaluations of the design of the project; and
Work Order Information (i.e. Force Account documentation)
Post Construction Stormwater Management As-built drawings and all documentation required for submission of the Notice of Termination for projects with NPDES permits.
Special Provision: C167A - a00167 CHANGES TO SPECIFICATIONS: APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
Addendum:
CHANGES TO SPECIFICATIONS : APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
Provision Body:
APPENDIX C—DESIGNATED SPECIAL PROVISIONS. Revise to read as follows:
APPENDIX C
DESIGNATED SPECIAL PROVISIONS
General: This appendix to Publication 408 contains standard required provisions. The Contractor shall comply with the below appendices, as applicable.
Standard Documents: Designated Special Provisions (DSPs) that are referenced in this Appendix are:
DSP4. Diverse Business (DB) Requirements for Non-Federally Funded Construction Projects. This provision is applicable to contracts funded with state funds, without federal funds.
DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects. This provision is applicable to any Federally-funded (in part or whole) contract for a construction project.
DSP8. F. A. R.—Required Contract Provisions Federal-Aid Construction Contracts – FHWA-1273 (Revised October 23, 2023). See attachments to the Proposal. This provision is applicable to any federally funded (in part or whole) contract for a construction project.
DSP9. Special Supplement—Anti-Pollution Measures – August 26, 1999. This provision is applicable to all contracts.
DSP12. Executive Order 11246, with Appendices A and B. This provision is applicable to contracts with federal funds (in part or whole).
DSP13. Buy America. This provision is applicable to contracts with federal funds (in part or whole, and to state-funded projects when any federal funds were allocated at any phase of the work on the overall-project but not under the current contract (for example, design), even if the construction contract is 100% state-funded.
July 2, 2026 11:30:16 AM Page 23 of 170
DSP15. Commonwealth Standard Terms and Conditions. This provision is applicable to all contracts.
DSP16. Lobbying Certification Form. This provision is applicable to contracts with federal funds and a contract amount $100,000 or greater. If applicable, the Contractor shall complete this form and return it to PennDOT during contract execution. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).
DSP17. Federal Audit Clause. This provision is applicable to contracts with federal funds. As used in this DSP, “[Name of Subrecipient]” refers to the Contractor.
DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances. This provision is applicable to contracts with federal funds. The Contractor’s signature on an agreement will be deemed a signature on this exhibit.
As used in this DSP, the term “Subrecipient” refers to the Contractor.
DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities. This provision is applicable to contracts with federal funds (in part or whole).
APPENDIX C—DESIGNATED SPECIAL PROVISION 20 (DSP20) FAR 52.240-1 - PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN ENTITIES (NOV 2024). Revise to read as follows:
APPENDIX C
DESIGNATED SPECIAL PROVISION 20 (DSP20)
FAR 52.240-1 -PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED
BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN ENTITIES (NOV 2024)
(a) Definitions. As used in this clause—
American Security Drone Act-covered foreign entity means an entity included on a list developed and maintained by the Federal Acquisition Security Council (FASC) and published in the System for Award Management (SAM) at https://www.sam.gov (section 1822 of the National Defense Authorization Act for Fiscal Year 2024, Pub. L. 118-31, 41 U.S.C. 3901 note prec.).
FASC-prohibited unmanned aircraft system means an unmanned aircraft system manufactured or assembled by an American Security Drone Act-covered foreign entity.
Unmanned aircraft means an aircraft that is operated without the possibility of direct human intervention from within or on the aircraft (49 U.S.C. 44801(11)).
Unmanned aircraft system means an unmanned aircraft and associated elements (including communication links and the components that control the unmanned aircraft) that are required for the operator to operate safely and efficiently in the national airspace system (49 U.S.C. 44801(12)).
(b) Prohibition. The Contractor is prohibited from—
(1) Delivering any FASC-prohibited unmanned aircraft system, which includes unmanned aircraft (i.e., drones) and associated elements (sections 1823 and 1826 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.);
(2) On or after December 22, 2025, operating a FASC-prohibited unmanned aircraft system in the performance of the contract (section 1824 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.); and
(3) On or after December 22, 2025, using Federal funds for the procurement or operation of a FASC-prohibited unmanned aircraft system (section 1825 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.).
(c) Procedures. The Contractor shall search SAM at https://www.sam.gov for the FASC-maintained list of American Security Drone Act-covered foreign entities prior to proposing, or using in performance of the contract, any unmanned aircraft system. Additionally, the Contractor shall ensure any effort or expenditure associated with a FASC-prohibited unmanned aircraft system is consistent with a corresponding exemption, exception, or waiver determination expressly stated in the contract.
(d) Exemptions, exceptions, and waivers. The prohibitions in this clause do not apply where the agency has determined an exemption, exception, or waiver applies and the contract indicates that such a determination has been made. [See sections 1823
July 2, 2026 11:30:16 AM Page 24 of 170 through 1825 and 1832 of Public Law 118-31 (41 U.S.C. 3901 note prec.) for statutory requirements pertaining to exemptions, exceptions, and waivers.].
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.
Special Provision: C168A - a00168 CHANGES TO SPECIFICATIONS: SECTIONS 110, 404, AND 507
CHANGE TO SPECIFICATIONS: SECTIONS 110, 404, AND 507
Provision Body:
SECTION 110—PAYMENT
Section 110.06 MATERIAL STORED OR ON HAND. Revise to read as follows:
110.06 MATERIAL STORED OR ON HAND—
(a) Stored Material. The Representative may authorize payment for certain material, using Form CS-110, before its incorporation into the work. Upon the Contractor's request submitted through the PennDOT Project Collaboration Center’s (PPCC) Material-Stored Material (CS-110) workflow and the Representative's acceptance in PPCC, the Contractor may be paid 100% of the cost of the material, less the pro‑rata share of the retainage, if any; provided the quantity of stored material does not exceed the total estimated quantity required to complete the project and the cost is at least $1,000 but does not exceed 90% of the contract price of the applicable contract item or component item. Load-Transfer Units are only eligible for 90% of the cost of the material. The cost of the material is that amount to be paid by the Contractor as evidenced by invoices. Fabricated structural steel that is to receive a protective coating may be approved for prepayment at 75% of the contract price of the applicable contract item or component item, before application of the coating, provided the structure has been fully fabricated and preassembly of field connections has been made.
Payment for stored material will not be authorized until the material has been delivered to the project site or an approved location in the vicinity of the project, is inspected by the Representative to ensure the material is in a satisfactory condition and of sufficient quantity, is stored in an approved manner, and conforms to the requirements specified in this Section and Section 106.03. Identify stored material by project designation and set apart from other materials. Fabricated precast/prestressed bridge structure elements indicated on an S-number structure plan are eligible for prepayment when they are approved to ship. Other materials to be stored less than 30 days are not eligible for prepayment. In determining eligibility for prepayment, the beginning date for evaluating whether the required 30-day minimum storage period will be met will be the date the material is delivered to the project or approved storage location, or the date the invoice is submitted to the Department, whichever is the latter. Material originally determined to be ineligible for prepayment due to the minimum storage period requirement, that is then stored for more than 30 days, is eligible for prepayment on the next estimate, provided the invoice has been submitted to the Department.
This is the start of the file's text. The full file is on GovTribe.