- Bridge Rehabilitation, Rt 395
- Solicitation number
- 126560
- Issued by
- Arlington County, Virginia
About this file
This is a Bid Proposal and Contract document from the Virginia Department of Transportation (VDOT) for bridge rehabilitation work on Route 395 in Arlington County. The project involves bridge rehabilitation extending 1.66 miles north of Route 120 to 0.68 miles south of Route 110 in the Northern Virginia (NOVA) district. The contract encompasses extensive structural repairs and maintenance work including bridge deck grooving, concrete patching, bearing replacement, partial beam/girder replacement, waterproofing, pavement marking, guardrail work, and traffic control measures. The bid was submitted on Wednesday, July 22, 2026, at 10:00 AM through the electronic bidding platform Bidx. The project completion date is set for October 29, 2028, with a substantial completion incentive/disincentive structure offering $2,000 per calendar day for completion before September 14, 2028 (capped at $60,000), or a $2,000 per day desincentive for delays after that date (capped at $60,000). The contract requires prequalification, adherence to Virginia Department of Transportation specifications, and compliance with all provisions outlined in the proposal documents.
Bidders must submit a five percent bid bond and comply with prevailing wage requirements established by the Department of Labor, with wage rates ranging from $13.64 per hour for flaggers to $36.85 per hour for electricians, plus applicable fringe benefits. The contract is federally funded and subject to FHWA Form 1273 requirements, Davis-Bacon Act provisions, equal employment opportunity mandates, and nondiscrimination requirements. Contractors must include detailed subcontractor/supplier solicitation forms and vendor surveys with their bids. Optional fuel adjustment and steel price adjustment provisions are available for eligible bid items. The contract includes security requirements for portable changeable message signs, environmental protections for nesting birds and bat species, and specific traffic control measures including truck-mounted attenuators and temporary pavement markings. The document specifies the use of approved materials and manufacturers, with detailed specifications referencing Virginia's 2020 Road and Bridge Specifications and 2016 Road and Bridge Standards. Award notification will be issued via ballot posted on VDOT's bidding webpage within 60 days of bid opening.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER NO.: A87
CONTRACT ID. NO.: C0000126560B40
Form C-6a Rev. 3-22-05
CNSP (F) 1-9-06
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL AND CONTRACT
ROUTE NUMBER: 395
FHWA NUMBER: BFP-395-4(206)
PROJECT NUMBER: 0395-000-937, B640
COUNTY: ARLINGTON
DISTRICT: NOVA
DESCRIPTION: BRIDGE REHABILITATION
FROM:
TO:
1.66 MI. N. OF RTE. 120
0.68 MI. S. OF RTE. 110
DATE BID SUBMITTED: 10:00 AM WEDNESDAY, JULY 22, 2026
Form C-118 Rev. 2-1-24
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
NOTICE TO BIDDERS
As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.
1. Bids shall be filed electronically through Bidx (https://bidx.com/site/home) at the times designated in the Notice of Advertisement for Bids. For information see (https://cabb.virginiadot.org/)
2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.
3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.
4. A bid total shall be shown in each space provided.
5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative you may complete the bottom line of the Form C-24. This form may be mailed or faxed but must be received prior to the opening of the bids.
6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.
https://bidx.com/site/home http://cabb.virginiadot.org/
Form C-24
Rev. 7-6-05
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
PROPOSAL GUARANTY
KNOW ALL MEN BY THESE PRESENTS, THAT WE _______________________________________ as principal, and ________________________________________ Surety, are held and firmly bound unto the
Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE
BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.
SIGNED, sealed and dated this Day of , 20
WHEREAS, the above said principal is herewith submitting its proposal for:
PROJECT NUMBER: 0395-000-937, B640
NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.
(Principal*) (Surety Company)
By: By:
(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)
(Principal*) (Address)
(Officer, Partner or Owner) (Seal) (Surety Company)
(Principal*) (Attorney-in-Fact**) (Seal)
(Officer, Partner or Owner) (Seal) (Address)
*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.
Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.
Electronic Bid Bond ID# Company/Bidder Name Signature and Title
**Attach copy of Power of Attorney
Form C-48 Rev. 10-03-25
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION,
AND VENDOR SURVEY FORM (ALL VENDORS)
PROJECT
NO.
0395-000-937, B640
CONTRACT I.D.
NO.
C0000126560B40
FHWA NO. BFP-395-4(206)
DATE SUBMITTED
All vendors submitting a bid as a Prime Contractor shall complete and submit with their bids the following information as requested for (1) Subcontractor/Supplier Solicitation, and Utilization, and (2) for Vendor Survey.
The vendor certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The vendor also certifies he/she has had direct contact with the named firms regarding participation on this project.
Vendor Signature:
Vendor ID No. Title:
Vendor’s Address: ____________________________________
City: __________________
State: __________________ Zip Code: _________
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)
VENDOR
NUMBER
NAME OF SUBCONTRACTOR/SUPPLIER TELEPHONE
NUMBER
UTILIZED
(Y/N)
NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.
BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.
FEDERAL LAW REQUIRES ALL VENDORS SUBMITTING BIDS OR OFFERS PROVIDE THE INFORMATION
REQUESTED IN THIS FORM.
Form C-48 Rev. 10-03-25
VENDOR SURVEY
WHEN SUBMITTING A BID OR OFFER AS A PRIME CONTRACTOR, THE BIDDER MUST SUBMIT A
VENDOR SURVEY FOR THEMSELVES AND A VENDOR SURVEY FOR EACH SUBCONTRACTOR
AND SUPPLIER WHO SUBMITTED A BID OR QUOTE TO THE BIDDER.
VENDOR’S FULL LEGAL NAME: ________________________________________
VENDOR ID NO.: __________________
ADDRESS: ____________________________________
CITY: ____________________________________
STATE: _______________ ZIP CODE: _________
VENDOR’S YEARS IN BUSINESS: _____________
VENDOR’S ANNUAL GROSS RECEIPTS: ____ $ 0 - 25 million ____ $ 25 - 50 million ____ $ 50 - 75 million ____ More than $75 million
THE UNDERSIGNED, ON BEHALF OF VENDOR IDENTIFIED ABOVE, ACKNOWLEDGES AND CERTIFIES THAT THIS FORM ACCURATELY STATES THE INFORMATION CONTAINED HEREIN TO THE BEST OF VENDOR’S
KNOWLEDGE.
Printed Full Legal Name of Person Signing for Vendor
Signature: ____________________________________________
Form C-7
Rev. 2-2-24
SHEET 1
TERMS OF THE PROPOSAL\CONTRACT
SUBMITTED: 10:00 AM WEDNESDAY, JULY 22, 2026
PROJECT NUMBER: 0395-000-937, B640
ROUTE NUMBER: 395
FHWA NUMBER: BFP-395-4(206)
DESCRIPTION: BRIDGE REHABILITATION
FROM:
TO:
1.66 MI. N. OF RTE. 120
0.68 MI. S. OF RTE. 110
DISTRICT: NOVA COUNTY: ARLINGTON
I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;
that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.
COMPLETION DATE: OCTOBER 29, 2028
BID TOTAL $
Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.
(Names of Individual(S),Firm(S) Or Corporation)
Street Address City State Zip Code Vendor#/Fin#
Print Name Signature Title
In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.
Contract Execution Date By
CHIEF ENGINEER
VIRGINIA DEPARTMENT OF TRANSPORTATION
Virginia Department of Transportation 06/04/2026Date Printed:
Schedule of Items Page: 2
Proposal ID: C0000126560B40 0395-000-937, B640
Order No.: A87
Oversight/State Project No.:
Federal Project No.: BFP-395-4(206)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0010 108SP20-0001
BASELINE PROGRESS
SCHEDULE
LUMP SUM _________._____LUMP SUM
ATTD
0020 108SP20-0002
PROGRESS SCHEDULE
UPDATES
EA
24.000
ATTD
0030 303SD20-0001
REGULAR EXCAVATION CY
3.000
0040 303SD20-0030
INLET PROTECTION TYPE A EA
2.000
0050 303SD20-0031
INLET PROTECTION TYPE B EA
3.000
0060 303SD20-0034
TEMP. SILT FENCE TYPE A LF
285.000
0070 308SD20-0012
AGGR. BASE MATL. TY. I NO.
21B
TON
93.000
0080 308SX20-0002
AGGR. MATERIAL NO. 1 CY
13.000
0090 311SD20-0002
COVER MATL. AGGR. NO. 68 TON
2.000
0100 314SP20-0010
AGGR. NO. 78 SY
20.000
ATTD
0110 314SX20-0005
AGGREGATE CEMENT
AGGREGATE BASE MATERIAL
TON
47.000
ATTD
0120 315SD20-0002
ASPHALT CONCRETE TY. SM-
12.5D CONST
TON
26.000
0130 315SD20-0003
ASPHALT CONCRETE TY. SM-
12.5E CONST
TON
23.000
Schedule of Items Page: 3
Proposal ID: C0000126560B40 0395-000-937, B640
Order No.: A87
Oversight/State Project No.:
Federal Project No.: BFP-395-4(206)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0140 315SD20-0004
ASPHALT CONCRETE TY. IM-
19.0A CONST
TON
31.000
0150 315SD20-0010
ASPHALT CONCRETE BM-25.0 TON
135.000
0160 315SD20-0104
SAW-CUT ASPHALT
CONCRETE (UP TO 14")
LF
1,630.000
0170 316SD20-0003
HYDRAULIC CEM. BASE
COURSE 9"
SY
280.000
0180 404SD20-0020
BRIDGE DECK GROOVING
MAINT.
SY
1,653.000
0190 410SX20-0011
PIER PROTECTION SYSTEM
54", CONST
LF
245.000
ATTD
0200 411SX20-0004
RECOAT EX. STR. (FED. STR.
NO. 301/VA STR. NO. 2041)
LUMP SUM _________._____LUMP SUM
0210 411SX20-0006
DISPOSAL OF MATERIAL
(FED. STR. NO. 301/VA STR.
NO. 2041)
LUMP SUM _________._____LUMP SUM
0220 412SD20-0013
CRACK REPAIR TYPE B LF
10.000
0230 412SD20-0017
EMBEDDED GALVANIC
ANODES SUBSTRUCTURE
EA
534.000
0240 412SD20-0017
EMBEDDED GALVANIC
ANODES SUPERSTRUCTURE
EA
346.000
0250 412SD20-0033
PATCHING TYPE B SY
10.000
Schedule of Items Page: 4
Proposal ID: C0000126560B40 0395-000-937, B640
Order No.: A87
Oversight/State Project No.:
Federal Project No.: BFP-395-4(206)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0260 412SD20-0035
PATCHING TYPE C SY
2.000
0270 412SD20-0046
BACK WALL
RECONSTRUCTION HES
LF
133.000
0280 412SD20-0048
JACKING AND BLOCKING
BEAM
EA
36.000
0290 412SD20-0049
CONC. SUPERSTR. SURFACE
REPAIR
SY
23.000
0300 412SD20-0061
CONCRETE SUBSTRUCT.
SURFACE REPAIR
SY
56.000
0310 412SD20-0062
RECONSTRUCT BRIDGE
SEAT TYPE A
EA
19.000
0320 412SX20-0009
BR.SUPERSTR. WID./REPAIR
REPLACE BEARING
EA
36.000
ATTD
0330 412SX20-0013
BR.SUPERSTR. WID./REPAIR
DEBRIS SHIELD
LUMP SUM _________._____LUMP SUM
ATTD
0340 412SX20-0013
BR.SUPERSTR. WID./REPAIR
MODIFY DRY STANDPIPE
ARM AND VALVE ASSEMBLY
LUMP SUM _________._____LUMP SUM
ATTD
0350 412SX20-0015
BR.SUPERSTR. WID./REPAIR
DECK SLAB CLOSURE
SY
180.000
ATTD
0360 412SX20-0015
BR.SUPERSTR. WID./REPAIR
WATERPROOFING COATING
SY
863.000
ATTD
Schedule of Items Page: 5
Proposal ID: C0000126560B40 0395-000-937, B640
Order No.: A87
Oversight/State Project No.:
Federal Project No.: BFP-395-4(206)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0370 412SX20-0020
BR. SUBSTR. WID./REPAIR
PARTIAL BEAM/GIRDER
REPLACEMENT
SUBSTRUCTURE
LB
500.000
ATTD
0380 412SX20-0022
BR. SUBSTR. WID./REPAIR
SLOPE PROTECTION REPAIR
LUMP SUM _________._____LUMP SUM
ATTD
0390 412SX20-0024
BR. SUBSTR. WID./REPAIR
WATERPROOFING COATING
SY
759.000
ATTD
0400 413SX20-0003
ENV.& WORKER PROTECT.
(FED. STR. NO. 301/VA STR.
NO. 2041)
LUMP SUM _________._____LUMP SUM
0410 416SD20-0003
WATERPROOFING – EPOXY
RESIN TYPE EP-3B/EP-3T
SUBSTRUCTURE
SY
42.000
0420 416SD20-0003
WATERPROOFING – EPOXY
RESIN TYPE EP-3B/EP-3T
SUPERSTRUCTURE
SY
692.000
0430 420SD20-0019
ADHESIVE BASED JT.
SEALER CL. I, 1-1/2" MAINT.
LF
86.000
0440 420SD20-0020
ADHESIVE BASED JT.
SEALER CL. I, 2" MAINT.
LF
37.000
0450 420SD20-0023
ADHESIVE BASED JT.
SEALER CL. II, 2" MAINT.
LF
17.000
0460 425SD20-0005
TYPE A MILLING 1-3/4" SY
1,653.000
0470 425SD20-0013
FURN.VERY ERLY
MOD.CONC. 2-1/4"- 2-3/4"
CY
94.000
Schedule of Items Page: 6
Proposal ID: C0000126560B40 0395-000-937, B640
Order No.: A87
Oversight/State Project No.:
Federal Project No.: BFP-395-4(206)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0480 425SD20-0015
PLACE VERY EARLY
MOD.CONC.OVERLAY
SY
1,653.000
0490 425SD20-0022
TYPE A HYDRO-DEMOLITION
1/2"
SY
1,653.000
0500 426SD20-0009
PARTIAL BEAM/GIRDER
REPLACEMENT
SUPERSTRUCTURE
LB
2,550.000
0510 430SX20-0001
NBIS ACCESS, UNDER
BRIDGE (FED. STR. NO.
301/VA STR. NO. 2041)
DAY
4.000
0520 502SD20-0015
CURB, RADIAL CG-3 LF
191.000
0530 502SD20-0036
MEDIAN BARRIER MB-7D LF
166.000
0540 502SD20-0038
MEDIAN BARRIER MB-7F LF
74.000
0550 502SD20-0053
MEDIAN STRIP MS-1 SY
123.000
0560 502SX20-0011
MEDIAN BARRIER 54"
CONCRETE BARRIER TO MB-
7F TRANSITION
LF
10.000
ATTD
0570 502SX20-0011
MEDIAN BARRIER MODIFIED
MEDIAN BARRIER MB-7D
LF
7.000
ATTD
0580 504SD20-0003
HYDR. CEMENT CONC.
SIDEWALK 4"
SY
6.000
0590 504SD20-0005
GEOTEXTILE DRAINAGE
FABRIC
SY
105.000
Schedule of Items Page: 7
Proposal ID: C0000126560B40 0395-000-937, B640
Order No.: A87
Oversight/State Project No.:
Federal Project No.: BFP-395-4(206)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0600 505SD20-0019
GUARDRAIL HEIGHT
TRANSITION GR-MGS4
EA
3.000
0610 505SD20-0055
FIXED OBJECT ATTACH. GR-
FOA-5
EA
3.000
0620 505SD20-0073
REMOVE EXISTING
GUARDRAIL
LF
706.000
0630 505SP20-0001
IMPACT ATTEN. TY.1 TL-3,
LOW MAINTENANCE
EA
1.000
0640 505SP20-0037
CSB-3 TYPE 1 LF
56.000
ATTD
0650 505SP20-0038
CSB-TW EA
1.000
ATTD
0660 508SD20-0002
DEMO. OF PVMT.
COMBINATION (RIGID AND
FLEXIBLE)
SY
630.000
0670 510SX20-0031
MODIFY EXIST. DROP INLET EA
1.000
ATTD
0680 510SX20-0039
REMOVE EXIST.
COMBINATION CURB AND
GUTTER
LF
706.000
0690 512SD20-0003
TRAFFIC BARRIER SERVICE
MB-11A
LF
2,000.000
0700 512SD20-0014
TEMPORARY SIGN SF
1,012.000
0710 512SD20-0023
TRUCK MOUNTED
ATTENUATOR
HR
2,800.000
Schedule of Items Page: 8
Proposal ID: C0000126560B40 0395-000-937, B640
Order No.: A87
Oversight/State Project No.:
Federal Project No.: BFP-395-4(206)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0720 512SD20-0024
GROUP 2 CHANNELIZING
DEVICES
DAY
7,900.000
0730 512SD20-0026
ELECTRONIC ARROW BOARD HR
2,720.000
0740 512SD20-0054
TEMP. PVMT MRKG TY. E, 6" LF
1,210.000
0750 512SD20-0062
TEMP. PVMT MRKG TY. D, CL.
III, 6"
LF
410.000
0760 512SD20-0063
TEMP. PVMT MRKG TY. D, CL.
III, 8"
LF
800.000
0770 512SD20-0069
IMPACT ATTENUATOR IA-1 EA
2.000
0780 513SD20-0001
MOBILIZATION LUMP SUM _________._____LUMP SUM
0790 517SD20-0001
CONSTRUCTION SURVEYING
CONSTR.
LUMP SUM _________._____LUMP SUM
0800 603SD20-0001
PERMANENT SEED LB
15.000
0810 700SD20-0195
CONDUIT PVC 3" LF
3.000
0820 703SD20-0051
ILLUMINATED TRAFFIC
CONTROL SIGN
EA
3.000
0830 704SD20-0006
TYPE B CLASS I PVMT LINE
MRKG 4"
LF
3,162.000
0840 704SD20-0009
TYPE B CLASS I PVMT LINE
MRKG 12"
LF
550.000
Schedule of Items Page: 9
Proposal ID: C0000126560B40 0395-000-937, B640
Order No.: A87
Oversight/State Project No.:
Federal Project No.: BFP-395-4(206)
Contractor:
Section: 0001 _________._____Total:
Total Bid: _________._____
Page
Bid Items Eligible For Fuel Adjustment
C0000126560B40
A87
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision for Optional Adjustment for Fuel. If you choose to have Fuel Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
FORM C-21B
Rev 12-21-05
0001 REGULAR BID ITEMSSECTION:
ltem Description Fuel Factor gal/unit Option Item
Number
_______REGULAR EXCAVATION 0.290303SD20-0001
_______AGGR. BASE MATL. TY. I NO. 21B 0.600308SD20-0012
_______COVER MATL. AGGR. NO. 68 0.600311SD20-0002
_______AGGR. NO. 78 0.006314SP20-0010
_______ASPHALT CONCRETE TY. SM-12.5D CONST 3.500315SD20-0002
_______ASPHALT CONCRETE TY. SM-12.5E CONST 3.500315SD20-0003
_______ASPHALT CONCRETE TY. IM-19.0A CONST 3.500315SD20-0004
_______ASPHALT CONCRETE BM-25.0 3.500315SD20-0010
_______DEMO. OF PVMT. COMBINATION (RIGID AND FLEXIBLE) 0.200508SD20-0002
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Steel Price Adjustment
C0000126560B40
A87
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision. If you choose to have Steel Price Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
Rev 12-21-08
FORM C-21C
0001 REGULAR BID ITEMSSECTION:
ltem Description Option Item
Number
_______GUARDRAIL HEIGHT TRANSITION GR-MGS4505SD20-0019
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Asphalt Adjustment within this Project
C0000126560B40
A87
Contract ID:
Order No.:
0001 REGULAR BID ITEMSSECTION:
ltem Description Item
Number
ASPHALT CONCRETE TY. SM-12.5D CONST315SD20-0002
ASPHALT CONCRETE TY. SM-12.5E CONST315SD20-0003
ASPHALT CONCRETE TY. IM-19.0A CONST315SD20-0004
ASPHALT CONCRETE BM-25.0315SD20-0010
Determination of Major Items
1C0000126560B40Contract ID:
ltem Description Item
Number
BR.SUPERSTR. WID./REPAIR DECK SLAB CLOSURE412SX20-0015
FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.
CN100-000026-09 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 12-11-25 (SPCN) 1
CN103-000100-01 SEC 103.02—AWARD OF CONTRACT 6-17-25 (SPCN) 1
CN105-000140-00 SEC 105.14—MAINTENANCE DURING CONSTRUCTION 12-20-24 (SPCN) 1
CN105-000150-00 SECURITY REQUIREMENTS FOR PCMS 1-30-26 (SPCN) 2
CN221-000100-00 SEC 221.02—DETAIL REQUIREMENTS 1-15-25 (SPCN) 3
CN245-000100-01 SEC 245.03—TESTING & DOCUMENTATION 1-10-24 (SPCN) 3
CN505-000100-01 IMPACT ATTENUATOR 1-24-19 (SPCN) 5
CN512-000120-00 SEC 512—MAINTAINING TRAFFIC (IMPACT ATTEN. SER.) 7-13-16 (SPCN) 6
CN512-000130-00 TEMPORARY CONTRAST MARKINGS 2-26-19 (SPCN) 6
CN512-000310-00 POLICE PATROLS R-7-12-16 (SPCN) 6
CN522-000300-00 PROTECT NESTING BIRDS DURING BRIDGE MAINT. 7-24-20 (SPCN) 6
*DRUG-FREE WORKPLACE 7-3-19 (SPCN) 7
CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 (SPCN) 7
PIER PROTECTION SYSTEM (MEASUREMENT & PAYMENT) 10-20-20 (SPCN) 8
CQ512-000321-00 CONTRACTOR MAINT. OF TEMP. MARKINGS 6-13-17 (SPCN) 8
PROTECTION OF BAT SPECIES 1-17-18 (SPCN) 9
SECTION 510 – RELOCATING OR MODIFYING EXIST. MISC. ITEMS 4-16-26 (SPCN) 9
SLOPE PROTECTION REPAIR 4-17-26 (SPCN) 10
SECTION 412—WIDENING, REPAIRING, AND RECONSTR. EXIST. STRUCT. 5-12-26 (SPCN) 11
SECTION 416 – WATERPROOFING 5-12-26 (SPCN) 14
DEBRIS SHIELD 5-12-26 (SPCN) 14
SUBSTANTIAL COMP. INCENT./DISINCENT. 12-12-19 (SPCN) 15
SP0F0-000100-00 PREDETERMINED MIN. WAGE RATES R-7-12-16 16
SP0F0-000130-02 FHWA 1273—REQ. PROVISIONS, FED-AID 10-3-23 21
SP0F0-000150-01 AFFIRMATIVE ACTION / EEO NOTICE 7-17-17 48
SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 54
SP105-000100-00 INFORMAL PARTNERING R-7-12-16 55
SP107-000110-00 C-45–SWPPP GEN. PERMIT–CONTRACTOR CERTIFICATION R-10-27-16 57
*SP107-000120-00 ELEC. SUBMISSION OF DBE AND PAYROLLS 1-21/20 58
SP107-001510-06 INTERIM DBE REQUIREMENTS 1-26-26 60
SP107-003100-00 MADE IN THE USA REQUIREMENTS 10-03-25 64
SP108-000110-01 PROG. SCHED. FOR CAT. II PROJECTS 3-21-22 71
*SP109-000100-05 ASPHALT MATERIAL PRICE ADJUSTMENT 7-8-24 90
SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 92
SP109-000120-01* PRICE ADJUSTMENT FOR STEEL 7-2-19 94
SP109-000130-01 ELECTRONIC OR PRINTED WEIGH TICKETS 3-10-25 99
SP314-000100-00 ASPHALT SURFACE TREATMENT R-7-12-16 105
SP505-000300-00 CONSTANT SLOPE CONCRETE BARRIER 4-28-25 110
SP512-000140-00 WORK ZONE NO CELL PHONE SIGNS 3-18-20 113
SP801-000100-01 LANE CLOSE COORD (LCC)/LANE CLOSE IMPLEMENT (LCI) 9-20-17 115
SEC. 105.06—SUBCONTRACTING (FEDERAL FUNDED PROJECTS) 2-9-17_(SP) 117
SQ107-001300-00 PREVAILING WAGE RATES 10-12-2023 118
SS109-002020-01 SEC 109 — MEASUREMENT AND PAYMENT 5-1-23 122
SS211-002020-03 SEC 211 – ASPHALT CONCRETE 3-18-24 125
SS220-002020-01 SEC 220 – CONCRETE CURING MATERIALS 8-28-20 131
SS223-002020-02 SEC 223 – STEEL REINFORCEMENT 4-4-23 132
SS234-002020-01 SEC 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 133
SS235-002020-01 SEC 235 – RETROREFLECTORS 5-6-22 134
SS236-002020-01 SEC 236 – WOOD PRODUCTS 5-14-21 135
SS246-002020-02 SEC 246 – PAVEMENT MARKING 5-6-22 139
TABLE OF CONTENTS FOR PROVISIONS
SS248-002020-02 SEC 248 – STONE MATRIX ASPHALT CONCRETE 3-18-24 147
SS305-002020-02 SEC 305 – SUBGRADE AND SHOULDERS 12-20-23 149
SS305-002020-02 SEC 305 – SUBGRADE AND SHOULDERS 12-20-23 151
SS308-002020-01 SEC 308 - SUBBASE COURSE 7-13-21 153
SS309-002020-01 SEC 309 - AGGREGATE BASE COURSE 7-13-21 154
SS315-002020-05 SEC 315 – ASPHALT CONCRETE PLACEMENT 5-27-25 155
SS317-002020-01 SEC 317— STONE MATRIX ASPHALT CONCRETE PLACEMENT 6-21-24 174
SS318-002020-01 SEC 318 — PAVEMENT INTERLAYERS 8-2-23 176
SS319-002020-02 SEC 319 – THIN HOT MIX ASPHALT CONCRETE OVERLAY 3-18-24 177
SS321-002020-02 SEC 321 – TRENCH WIDENING 5-4-23 181
SS407-002020-02 SEC 407 – STEEL & METAL STRUCT 11-01-22 183
SS411-002020-01 SEC 411 – PROT. COAT. OF METAL 11-01-22 185
SS512-002020-03 SEC 512 – MAINTAINING TRAFFIC 7-1-22 186
SS704-002020-02 SEC 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 199
MODIFICATION OF STANDPIPE ARM AND VALVE ASSEMBLY 4-16-26 205
MAINTAINING AND PROTECTING UTILITIES DURING CONSTRUCTION 4-16-26 206
AGGREGATE – CEMENT AGGREGATE BASE MATERIAL 5-11-26 207
MEDIAN BARRIER – 54” CONCRETE BARRIER TO MB-7F 5-12-26 210
MEDIAN BARRIER – MODIFIED MEDIAN BARRIER MB-7D 5-12-26 212
BRIDGE CLEARANCE INFORMATION 214
LIMITATION OF OPERATIONS FOR NORTHERN VIRGINIA DISTRICT 218
cn100-000026-09 December 11, 2025 (SPCN)
GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS (SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)
This project shall be constructed according to: the Plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the Virginia Work Area Protection Manual, version 11.0;
the Virginia MUTCD version 11.0; and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this Contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.
Special Provision Copied Notes in this Contract are designated with “(SPCN)” after the date.
The information at the top and left of each Special Provision Copied Note in this Contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this Contract is file reference information for Department use only.
cn103-000100-01 June 17, 2025 (SPCN)
SECTION 103.02—AWARD OF CONTRACT of the Specifications is replaced in its entirety with the following:
103.02 – Award of Contract
The Board, or the Commissioner as authorized under § 33.2-209 of the Code of Virginia, will award the Contract to the lowest responsive and responsible bidder without discrimination on the grounds of race, color, gender, national origin, status as a military family, or other basis prohibited by law. In the event of a tie bid, the tie will be decided by lot.
The award date will not be later than midnight on the 60th day after the opening of bids. If the Board, or the Commissioner where authorized by law, has not awarded the Contract within this period due to any circumstances not attributable to the bidder, the bidder may withdraw his bid without penalty or prejudice unless the time limit is extended by mutual consent.
After approval for the award of contracts, the Department will provide written notice of award to the successful bidder and will post the Ballots on the Department’s bidding webpage. The Ballot serves as public Notice of Award for a contract. The date of the Notice of Award is the “Approved” date appearing at the top of the Ballot that lists the Contract.
cn105-000140-00 December 20, 2024 (SPCN)
SECTION 105.14—MAINTENANCE DURING CONSTRUCTION of the Specifications is amended by the following:
Section 105.14(a)3 – Flagging Traffic is replaced with the following:
3. Flagging Traffic: Flaggers shall be able to communicate to the traveling public in English while performing the job duty as a flagger at the flagger station.
All flaggers shall possess a valid, current flagger certification card, be it a physical or electronic card, at all times while performing flagging duties.
Flaggers shall be certified by the VDOT Basic or Intermediate Work Zone Traffic Control Training course or by the ATSSA’s classroom Flagger Certification Program.
The following constitutes a valid flagger certification card:
• Cards issued by VDOT following completion of the Basic Work Zone course;
• Cards issued by VDOT following completion of the Intermediate Work Zone course;
• Cards issued by ATSSA following completion of a Flagger course;
• Cards issued by VDOT following completion of the Flagger-only course, provided the cards were issued on or before December 31, 2024, and have not yet reached the expiration date
(two years after date of issuance).
Flaggers who fail to possess a valid, current, flagger certification card, or refuse to allow inspection of same upon request, shall be removed from the flagging site, and operations requiring flagging shall be suspended by the Engineer. Suspended operations requiring flagging may resume once a certified flagger arrives on-site to perform flagging duties in accordance with applicable requirements. Flaggers improperly performing duties may be subject to flagger certification revocation at the sole discretion of the Engineer.
cn105-000150-00 January 30, 2026 (SPCN)
SECURITY REQUIREMENTS FOR PORTABLE CHANGEABLE MESSAGE SIGNS — The Contractor shall secure portable changeable message sign (PCMS) control cabinets with a grade 3 or stronger standard lock at all times unless maintenance is actively being conducted on the sign.
A password shall be required to change the PCMS message. The Contractor shall change the manufacturer's default password for ALL electronic signs. Electronic signs that support the use of complex passwords shall include at least 14 characters consisting of the following criteria:
• At least one special character
• At least one alphabetical character
• At least one numerical character
• A combination of upper-case and lower-case letters
Electronic signs that do not support the use of complex passwords shall be changed using the maximum number of characters and character types permitted by the manufacturer.
Password credentials are prohibited from being stored, displayed, or written on or within the sign. Any QR codes affixed to the sign shall be removed.
For all PCMS with remote or wireless accessibility, the Engineer will authorize remote access prior to this functionality being enabled. Prior to authorization, the Contractor shall update the PCMS to the most recent compatible software and firmware version available from the manufacturer. Following authorization and prior to use, the Contractor shall establish a remote connection to verify that access to the PCMS is password protected.
Electronic signs shall only post approved and documented messages. The Contractor shall log all messages posted with date and times for each public message.
The Contractor has the option for their signs to be connected to the Department’s Operations Technology (OT) network for management by Traffic Operations Center (TOC) staff. By using this method, messages are transmitted and posted by the TOC control room staff with all records and logging managed within the VDOT Advanced Traffic Management System (ATMS). Electronic message signs connected to the OT network shall follow the security requirements described below:
1. All electronic signs connected to the network shall be secured with a digital lock installed on the sign control cabinet.
2. Connected signs shall only be remotely accessible through secure communications that originated from the Department’s OT network.
3. Connected signs shall only be posted with messages from the Department’s ATMS systems or designated backup systems.
4. Community strings (both public and private strings) shall be changed from default settings.
5. All vendor cloud connections shall be removed from the connected sign. TOC system administration staff will configure VPN connections exclusively to the Department’s OT network.
6. All connected electronic signs shall adhere to the Cabinet Security Standards found in the
Department’s OT Cybersecurity Program Manual.
cn221-000100-00 January 15, 2025 (SPCN)
SECTION 221.02—DETAIL REQUIREMENTS of the Specifications is amended by replacing the first paragraph with the following:
Guardrail shall consist of rail or cable elements and fastenings fabricated to develop continuous beam or cable strength when installed. Guardrail materials shall conform to AASHTO M180-18 and M30 specification requirements supplied by manufacturers included on the Department’s Approved List 12.
cn245-000100-01 January 10, 2024 (SPCN)
SECTION 245.03—TESTING AND DOCUMENTATION of the Specifications is amended by the following:
Section 245.03(e) – Prefabricated Geocomposite Pavement Underdrain is replaced by the following:
Prefabricated Geocomposite Pavement Underdrain: Prefabricated geocomposite pavement underdrain shall consist of a polymeric drainage core allowing water inflow from both sides, encased in a nonwoven filter fabric envelope having sufficient flexibility to withstand bending and handling without damage.
Prefabricated geocomposite pavement underdrain shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the pavement environment and shall have a thickness of not less than 3/4 inch. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
https://covgov.sharepoint.com/:w:/r/sites/TM-VDOT-SC-Specifications-External/_layouts/15/Doc.aspx?sourcedoc=%7BF1622882-4C64-446A-AE11-E07A4F78D1F2%7D&file=cn221-000100-00.docx&action=default&mobileredirect=true
Physical Properties Test Method Requirements
Compressive strength ASTM D1621, D2412, and
D6364
Min. 40 psi at 20% max.
deflection immediately after
24 hrs of specimen conditioning at 0 deg F and at
125 deg F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 0.1)
ASTM D4716 Min. 15 gal/min/ft width for
12-in specimen length
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over both sides of the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
Section 245.03(f) – Geocomposite Wall Drains is replaced by the following:
Geocomposite Wall Drains: Prefabricated geocomposite wall drain shall consist of a polymeric drainage core with a nonwoven filter fabric (single sided or double sided) having sufficient flexibility to withstand bending and handling without damage. Geocomposite wall drains shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the roadway. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Property Test Method Requirements
Compressive strength ASTM D1621, D2412, and D6364
Min. 40 psi at 20% max.
deflection immediately after 24 hrs of specimen conditioning at 0 degree F and at 125 degree F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 1.0)
ASTM D4716 Min. 15 gal/min/ft width (for 12-in specimen length)
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
Section 245.03(g) – Geomembrane Moisture Barrier is replaced by the following:
Geomembrane Moisture Barrier: Geomembrane moisture barrier shall be resistant to biological attack.
Geomembrane shall be constructed of PVC and shall conform to the requirements of ASTM D7176 for PVC 30 or higher grades. In addition, geomembrane shall comply with the requirements of ASTM D7408 for bond seam strength and peel strength.
cn505-000100-01 January 24, 2019 (SPCN)
IMPACT ATTENUATOR — This work shall consist of replacing damaged impact attenuators, or installing new, by furnishing and installing impact attenuators in accordance with Section 505 of the Specifications and as directed by the Engineer. Replacement impact attenuators shall be a Type I (Re-Directive Low-
Maintenance) as designated on VDOT’s MASH Provisionally Approved Products List. Impact attenuators shall be installed in accordance with the manufacturer's specifications and instructions, Standard Drawing
IA-LM, and Section 505 of the Specifications.
If replacing an existing impact attenuator, the Contractor shall inspect the condition of the existing impact attenuator foundation pad for size, thickness, adequacy of reinforcement, slope, cracking, surface wear, shifting, undermining, settling, or other signs of age or deterioration which may be unsuitable for continued use. If any of these conditions are present, the Contractor shall notify the Engineer and request authorization prior to replacing the existing foundation pad.
If the existing foundation pad is suitable for continued use and existing bolt patterns are present, the Contractor shall confirm that installing new bolts will not negatively impact performance of the unit.
Anchor bolts shall be set into holes drilled with rotary impact drills of the sizes recommended by the manufacturer of the attenuator, and as approved by the Engineer. Bolt holes shall be cleaned with a bottle brush before installing the anchor bolts.
The Type I (Re-Directive Low-Maintenance) Impact Attenuator shall be bolted in place according to the attenuator manufacturer’s instructions, but not before the fresh concrete foundation, if applicable, has reached 28-day strength, determined in accordance with Section 217 of the Specifications.
If a transition is required, the appropriate manufacturer’s standard transition shall be used.
The work site shall be protected according to Section 512 of the Specifications and the VWAPM.
Installers and repair personnel shall be certified by the manufacturer. The Contractor shall submit two copies of the manufacturers’ installation instructions to the Engineer prior to beginning work.
The Contractor shall provide one training session to VDOT personnel at a location selected by the Engineer within the VDOT District where the impact attenuators were installed, when designated as a pay item. The training sessions shall be conducted by a manufacturer’s representative and cover impact attenuator maintenance and repair. The Department may add additional training sessions to be paid for at the unit price bid. Each session shall be structured such that the personnel trained will be able to perform maintenance and repair beginning within one year of the training.
The Contractor shall provide documentation tracing the steel in the finished product back to raw material in accordance with Buy America requirements.
Impact attenuator will be measured in units of each and will be paid for at the Contract Each price. This price shall include furnishing and installing pad, impact attenuator, and transitions.
Remove existing impact attenuator will be measured and paid for as remove existing guardrail terminal in accordance with Section 505 of the Specifications. This price shall include removing and disposing of existing impact attenuator.
Site Preparation will be measured and paid for as Guardrail terminal site preparation in accordance with Section 505 of the Specifications.
https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn505-000100-01.docx
Maintenance and Repair Training will be measured in units of each and will be paid for at the Contract each price.
Payment will be made under:
Pay Item Pay Unit
Impact attenuator (Type, Speed) Each
Maintenance and Repair Training Each cn512-000120-00 July 13, 2016 (SPCN)
SECTION 512—MAINTAINING TRAFFIC of the Specifications is amended as follows:
Section 512.03(i)—Impact Attenuator Service is amended to replace the second paragraph with the
Only Type 1 re-directive low-maintenance impact attenuators in accordance with Section 505 shall be used on highways with posted speed limits greater than 50 mph or with an ADT greater than 25,000 vehicles per day.
cn512-000130-00 February 26, 2019 (SPCN)
TEMPORARY CONTRAST MARKINGS – Type D, Class III contrast pavement markings shall be used for all longitudinal temporary pavement markings on bridge decks and hydraulic cement concrete riding surfaces if all of the following are met:
• The road has a speed limit of 45 MPH or greater.
• The hydraulic cement concrete riding surface in question is at least 300 feet in length.
• The temporary markings are planned for at least 15 days of use.
Type D, Class III contrast markings are not required for any markings that are parallel to and within two feet of existing guardrail or other longitudinal barrier.
cn512-000310-00 July 12, 2016 (SPCN)
POLICE PATROLS — The Contractor is advised that the Department will use Police patrols in construction work zones when traffic flow problems are anticipated, to enhance the safety of both the public and construction personnel, during the life of this contract.
cn522-000300-00 July 24, 2020 (SPCN)
PROTECTION OF NESTING BIRDS DURING BRIDGE MAINTENANCE — If bird nests are found on a bridge included in the Contract, the Contractor shall immediately notify the Engineer and suspend all work in the immediate vicinity of the nests until authorized to continue. The Contractor may proceed with other work activities that do not result in removal of nests or nest contents.
https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn512-000120-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn512-000130-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn512-000310-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2020%20Standard%20Specifications/cn522-000300-00.docx
DRUG-FREE WORKPLACE– The Contractor shall:
• Provide a Drug-Free Workplace for the Contractor’s employees.
• Post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition.
• State in all solicitations or advertisements for employees placed by or on behalf of the Contractor that the Contractor maintains a Drug-Free Workplace.
• Include the provisions of the foregoing clauses in every Subcontract or purchase order of over $10,000, so that the provisions will be binding upon each Subcontractor or vendor.
For the purposes of this provision, “Drug-Free Workplace” means a site for the performance of work done in connection with the Contract. The Contractors employees, and those of his Subcontractors, shall be prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession, or use of any controlled substance or marijuana during the performance of the Work.
7-3-19 (SPCN)
cq107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY
Section 107.14(a)1 – Required by §2.2-4201 and §2.2-4311 of the Code of Virginia is replaced with the following:
1. Required by §2.2-4201 and §2.2-4311 of the Code of Virginia: During the performance of this Contract, the Contractor agrees as follows:
a. The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where religion, sex, or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause, including the names of all contracting agencies with which the Contractor has contracts of over $10,000.
b. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that such contractor is an equal opportunity employer. However, notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this chapter.
c. If the Contractor employs more than five employees, the Contractor shall (i) provide annual training on the Contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the Department of Human Resource Management, and (ii) post the Contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the Contractor owns or leases for business purposes and (b) the Contractor's employee handbook.
The Contractor shall include the provisions of subdivisions a, b, and c in every subcontract or purchase order of over $10,000, so that such provisions shall be binding upon each subcontractor or vendor.
Nothing contained in this chapter shall be deemed to empower any agency to require any contractor to grant preferential treatment to, or discriminate against, any individual or any group because of race, color, religion, sex, or national origin on account of an imbalance that may exist with respect to the total number or percentage of persons of any race, color, religion, sex, or national origin employed by such contractor in comparison with the total number or percentage of persons of such race, color, religion, sex, or national origin in any community or in the Commonwealth.
5-11-22 (SPCN)
PIER PROTECTION SYSTEM shall be installed as shown on the Plans.
Pier protection system will be measured in feet and paid for at the Contract foot price for the height specified. This price shall include the barrier, reinforcing steel, footing, excavation for footing and backfilling as directed by the Engineer, and all miscellaneious hardware as detailed on the Plans within the pay limits shown in the Plans. This price shall include all materials, labor, tools, equipment, and incidentals necessary to complete the work.
Payment will be made under:
Pier protection system (height) Feet
10-20-20 (SPCN)
CONTRACTOR MAINTENANCE OF TEMPORARY MARKINGS – The second, third, and fourth paragraphs of Section 512.03(k)3 of the Specifications will also apply to Sections 512.03(k)1 and 512.03(k)2 of the Specifications.
6-13-17 (SPCN)
PROTECTION OF BAT SPECIES — If bats are observed roosting on a structure, the Contractor shall immediately notify the Engineer and suspend work in the immediate vicinity of the bats until authorized to continue.
1-17-18 (SPCN)
UPC: 126560 April 16, 2026 (SPCN)
SECTION 510 – RELOCATING OR MODIFYING EXISTING MISCELLANEOUS ITEMS– is amended as follows:
Section 510.02 – Materials is amended to include the following:
Cast-in-place concrete shall conform to Section 217 of the Specifications for Class A3.
Reinforcing steel shall conform to Section 223 of the Specifications, Grade 40 or 60.
Curing materials shall conform to Section 220 of the Specifications.
Section 510.03 – Procedures is amended to include the following portions of Section 302 of the Specifications:
Excavation and backfill operations shall be performed in accordance with Section 303 of the Specifications.
Concrete construction shall conform to Section 404 of the Specifications.
Reinforcing steel placement shall conform to Section 406 of the Specifications.
Removing portion of existing drop inlet shall conform to Section 413.02(b) of the Specifications. Existing reinforcing shall be maintained as needed to allow for proper lap length with new reinforcing.
Backfill material for areas where unsuitable material has been removed shall be placed and compacted in accordance with Section 303.04(g) of the Specifications.
Existing outlet pipe connection shall match existing details.
Backfilling shall be performed in accordance with Section 303.04(g) of the Specifications. Surplus material shall be removed, and the site shall be left in a neat, clean, and orderly condition.
When grade adjustment of existing structures is specified, frames and covers shall be removed and the walls and top slab shall be reconstructed as required. Cleaned frames shall be reset at the required elevation. Upon completion of the adjustment, the structure shall be cleaned of silt, debris, and foreign matter and shall be kept clean of such accumulation until final acceptance.
Section 510.04 Measurement and Payment is amended to include the following:
This price shall include demolishing portions of the existing drop inlet as shown in the Plans.
Modify Exist. Drop Inlet Each
UPC: 126560 April 17, 2026 (SPCN)
SLOPE PROTECTION REPAIR:
This work shall consist of furnishing and placing flowable fill as a backfill material to repair undermining at the East Abutment slope protection and fill the void areas below the joint between the slope protection berm and East Abutment stem. This work also shall consist of clearing all existing debris and vegetation, removing the existing joint seal at the East Abutment, installing preformed joint filler and hot-poured joint sealer, and placing welded wire fabric and A3 concrete as shown on the Plans. All repairs shall be true to the line, grade, and dimensions shown on the Plans or as established by the Engineer.
Preformed joint filler and hot-poured joint sealer shall be in accordance with Section 212 of the Specifications.
Welded wire fabric shall be in accordance with Section 223 of the Specifications.
Concrete shall be Class A3 conforming with Section 217 of the Specifications.
Flowable fill shall be in accordance with Sections 509.02 and 509.03 of the Specifications and the following.
Limits of slope protection repair shall be designated by the Engineer before construction. A hole shall be drilled in the existing slope protection large enough to pump flowable fill into the void areas beneath the slope protection. Void areas beneath the slope protection shall be filled to reset the slope protection. Void areas at the joint shall be filled as indicated on the Plans. The Contractor shall notify the Engineer if the actual quantity is to exceed the estimated quantity provided on the Plans.
Preformed joint filler and hot-poured joint sealer shall be placed along the full width of the East Abutment as shown on the Plans after placement of flowable fill.
For areas where the existing slab slope protection is removed as part of the repair work, welded wire fabric (#6 ga. wire mesh 6” c.c. e.w.) shall be placed with proper cover as shown on the Plans in 4” Class A3 concrete slab finish surface over the flowable fill.
Slope Protection Repair will be paid for at the Contract lump sum price. This price shall include clearing all existing debris and vegetation from the slope protection, furnishing and placing the flowable fill, securing and aligning new slope protection, removing existing joint material, furnishing and placing preformed joint filler and hot-poured joint sealer, furnishing and placing welded wire reinforcement and A3 concrete, and all materials, labor, tools, equipment, and incidentals necessary to complete the work.
Slope Protection Repair Lump Sum
UPC:…