This document contains a qualification requirement for a Shipping and Storage Container, Cable for the F-16 aircraft, as well as details of a related federal contract opportunity. The qualification requirement specifies the process and criteria an offeror must satisfy to qualify as an approved source, including notifying the government of intent to qualify, certifying facilities and testing capabilities, verifying engineering data and manufacturing processes, conducting approved qualification testing at the offeror's expense, and providing a qualification article for evaluation. It estimates qualification costs of $1,250 and time of 180 days to complete. The related federal contract opportunity is a solicitation to procure F-16 Cable Assemblies, open only to qualified sources, with the qualification package attached for prospective offerors to review requirements to try to become qualified in time for award.
View the file
Other files for this federal contract opportunity
Show all 50
F-16 SST Cable Assembly has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALIFICATION REQUIREMENTS
NSN: 8145‐01‐560‐8298
P/N: 8407191‐1 Noun: Shipping and Storage Container, Cable Application: F‐16 SST Tester
Section C
SECTION C:
1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE
a. Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Shipping and Storage Container, Cable. Source Approval Request (SAR) packages shall be generated in accordance with Attachment 6 of AFMCI 23‐113 (Pre‐Award Qualification of New or Additional Parts Sources and the Use of the Source Approval Request), this Qualification Requirement, and any other specific guidance provided by the ESA.
b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that he has, or has access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror shall make his facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
c. Data Verification: The offeror must verify that he has a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA‐approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA‐approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 416 SCMS/GUEAA. The offeror shall also identify its sources for materials and its standards for internally used processes. If the item considered is a safety critical item or contains critical characteristics, then the offeror must also provide evidence in the form of a management process in which they will manage Critical Safety Items (CSIs) and all of the critical characteristics and critical safety processes.
e. Test and Evaluation and/or Verification: The offeror, at his own expense, shall prepare and submit to 416 SCMS/GUEAA for their prior approval, a qualification test plan/procedure detailing how he intends to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawings 8407191‐1 and 8426411‐1. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on‐site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the
P/N: 8407191‐1 occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.
f. Qualification Article Verification: The offeror must provide, at his own expense, a pre‐contract award qualification article for evaluation by the government. This article must comply with all of the requirements of Drawing 8407191‐1 and 8426411‐1. This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the manufacturing capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 187 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post‐contract award first article exhibit may be required to verify production capability.
g. Qualification Requirement Cost Estimate: Estimated likely costs for government testing and evaluation, which will be incurred by the potential offering party to become qualified: $1250.
h. Qualification Time Completion Estimate: It is the estimate of the design control activity that completion of this qualification effort should require 180 days. This is based on complexity of the Shipping and Storage Container, Cable and other factors. This is not a deadline, but a notification to a potential offeror of the time we believe will be required. Events that occur during the qualification process may cause this time requirement to increase or perhaps decrease, depending on individual circumstances.
i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.
j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.
P/N: 8407191‐1
2. SOURCE QUALIFICATION WAIVER REQUIREMENTS
Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post‐contract award first article exhibit to verify production capability:
a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc.).
b. QWC2: The potential source is qualified on the right‐hand article and requests to be qualified on the left‐hand article. If the right‐and left‐hand articles are mirror images of each other, then approval can generally be given.
c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.
d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.
e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.
f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.
g. QWC7: Other