This is a bid proposal and contract document issued by the Virginia Department of Transportation (VDOT) for a 2026 plant mix asphalt resurfacing project on Interstate Route 64 at the Hampton Roads Bridge Tunnel (HRBT) in Hampton and Norfolk, within the Hampton Roads District. The project involves applying nontracking tack coat, asphalt concrete, temporary pavement markers, temporary pavement markings, maintenance of traffic, mobilization, flexible pavement planing, and type B class I pavement line markings across various locations. Approximate quantities include 4,985.32 gallons of nontracking tack coat, 5,482.75 tons of asphalt concrete, 453 temporary pavement markers, 56,089 linear feet of 4-inch temporary pavement markings, 2,980 linear feet of 8-inch temporary pavement markings, 49,843.2 square yards of flexible pavement planing, and 27,894 linear feet of pavement line markings. Bids were submitted electronically at 10:00 AM on Wednesday, May 27, 2026, through the Bidx platform. A mandatory pre-bid showing conference was held on May 5, 2026, at 9:00 AM at the VDOT HRBT Admin Building in Hampton, with attendance required for bid eligibility. The contract completion date is November 16, 2026. The award will be made to the lowest responsive and responsible bidder, with the award date not to exceed 60 days after bid opening.
Bidders must submit a bid bond equal to five percent of the bid dollar value and comply with VDOT's prequalification requirements. The contract includes a mandatory 3.0 percent small, women-owned, and minority-owned (SWAM) business participation requirement. Asphalt material prices are subject to monthly adjustment based on statewide average asphalt cement prices published by VDOT, and fuel adjustment is available for eligible items at the contractor's option. The contract incorporates Virginia Department of Transportation Road and Bridge Specifications dated 2020 and 2022, Virginia Work Area Protection Manual version 11.0, and the Virginia MUTCD version 11.0. The project includes early completion incentives up to $400,000 if work is completed within four agreed-upon weekends, with disincentive assessments ranging from $50,000 to $250,000 per period for delays. An emergency demobilization provision is included for potential rapid reopening of the bridge tunnel, requiring one lane open within one hour of notification and both lanes open within two hours if no milled surface remains. The contractor is prohibited from opening milled surfaces to traffic and must complete overlay before reopening.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER NO.: 569
CONTRACT ID. NO.: CM527PMZ128662
Form C-6a
Rev. 3-22-05
CNSP (S) 1-9-06
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL AND CONTRACT
ROUTE NUMBER: 64
FHWA NUMBER: NONE
PROJECT NUMBER: PM5Z-144-27F, N501
COUNTY: HAMPTON, NORFOLK
DISTRICT: HAMPTON ROADS
DESCRIPTION: 2026 PLANT MIX INTERSTATE - HRBT
LOCATION: VARIOUS
DATE BID SUBMITTED: 10:00 AM WEDNESDAY, MAY 27, 2026
Form C-118 Rev. 2-1-24
COMMONWEALTH OF VIRGINIA
NOTICE TO BIDDERS
As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.
1. Bids shall be filed electronically through Bidx (https://bidx.com/site/home) at the times designated in the Notice of Advertisement for Bids. For information see (https://cabb.virginiadot.org/)
2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.
3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.
4. A bid total shall be shown in each space provided.
5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative you may complete the bottom line of the Form C-24. This form may be mailed or faxed but must be received prior to the opening of the bids.
6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.
https://bidx.com/site/home https://cabb.virginiadot.org/
Form C-24
Rev. 7-6-05
PROPOSAL GUARANTY
KNOW ALL MEN BY THESE PRESENTS, THAT WE _______________________________________ as principal, and ________________________________________ Surety, are held and firmly bound unto the
Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE
BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.
SIGNED, sealed and dated this day of , 20
WHEREAS, the above said principal is herewith submitting its proposal for:
PROJECT NUMBER: PM5Z-144-27F, N501
NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.
(Principal*) (Surety Company)
By: By:
(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)
(Principal*) (Address)
(Officer, Partner or Owner) (Seal) (Surety Company)
(Principal*) (Attorney-in-Fact**) (Seal)
(Officer, Partner or Owner) (Seal) (Address)
*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.
Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.
Electronic Bid Bond ID Company/Bidder Name Signature and Title
**Attach copy of Power of Attorney
Form C-48
Rev. 10-8-2025
COMMONWEALTH OF VIRGINIA
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION FORM (ALL BIDDERS)
PROJECT NO. PM5Z-144-27F, N501
CONTRACT ID. NO. CM527PMZ128662
FHWA NO. NONE
DATE SUBMITTED
All bidders, including SWAM bidding as Prime Contractors, shall complete and submit the following information as requested in this form within ten (10) business days after the opening of bids.
The bidder certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The bidder also certifies he/she has had direct contact with the named firms regarding participation on this project.
BIDDER_________________________________SIGNATURE________________________________
TITLE_____________________________________________________________________________
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)
VENDOR
NUMBER
NAME OF SUBCONTRACTOR/SUPPLIER
TELEPHONE NUMBER
SWAM OR
NON-SWAM
UTILIZED
(Y/N)
NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.
BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.
Form C-7
Rev. 2-2-24
TERMS OF THE PROPOSAL\CONTRACT
COMMONWEALTH OF VIRGINIA
SUBMITTED: 10:00 AM WEDNESDAY, MAY 27, 2026
PROJECT NUMBER: PM5Z-144-27F, N501
ROUTE NUMBER: 64
FHWA NUMBER: NONE
DESCRIPTION: 2026 PLANT MIX INTERSTATE - HRBT
LOCATION: VARIOUS
DISTRICT: HAMPTON ROADS COUNTY: HAMPTON, NORFOLK
I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;
that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.
COMPLETION DATE: NOVEMBER 16, 2026
BID TOTAL $
Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.
(Names of Individual(S),Firm(S) Or Corporation)
Street Address City State Zip Code Vendor#/Fin#
Print Name Signature Title
In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.
Contract Execution Date By
CHIEF ENGINEER
VIRGINIA DEPARTMENT OF TRANSPORTATION
Virginia Department of Transportation 04/27/2026Date Printed:
Schedule of Items Page: 2
Proposal ID: CM527PMZ128662 PM5Z-144-27F, N501
Order No.: 569
Oversight/State Project No.:
Federal Project No.: NONE
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0010 310SD20-0002
NONTRACKING TACK COAT GAL
4,985.320
0020 315SD20-0036
ASPH. CONC. TY. SM-12.5E
MAINT
TON
5,482.750
0030 512SD20-0044
TEMP. PAVE. MARKER 1 WAY EA
453.000
0040 512SD20-0046
TEMP. PVMT MRKG TY. A, 4" LF
56,089.000
0050 512SD20-0048
TEMP. PVMT MRKG TY. A, 8" LF
2,980.000
0060 512SP20-0002
MAINTENANCE OF TRAFFIC
PLANT MIX
LUMP SUM _________._____LUMP SUM
ATTD 512
0070 513SD20-0001
MOBILIZATION LUMP SUM _________._____LUMP SUM
0080 513SX20-0001
MOBILIZATION EMERGENCY
DEMOBILIZATION
EA
1.000
ATTD
0090 515SD20-0013
FLEXIBLE PAVE.PLANING 0"-
2"
SY
49,843.200
0100 704SD20-0007
TYPE B CLASS I PVMT LINE
MRKG 6"
LF
27,894.000
Section: 0001 _________._____Total:
Total Bid: _________._____
Page
Bid Items Eligible For Fuel Adjustment
CM527PMZ128662
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision for Optional Adjustment for Fuel. If you choose to have Fuel Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
FORM C-21B
Rev 12-21-05
0001 REGULAR BID ITEMSSECTION:
ltem Description Fuel Factor gal/unit Option Item
Number
_______ASPH. CONC. TY. SM-12.5E MAINT 3.500315SD20-0036
_______FLEXIBLE PAVE.PLANING 0"-2" 0.071515SD20-0013
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Page
Bid Items Eligible For Asphalt Adjustment within this Project
CM527PMZ128662
Contract ID:
Order No.:
0001 REGULAR BID ITEMSSECTION:
ltem Description Item
Number
NONTRACKING TACK COAT310SD20-0002
ASPH. CONC. TY. SM-12.5E MAINT315SD20-0036
Form C-111S
6-7-16
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
MINIMUM SWAM REQUIREMENTS
PROJECT NUMBER: PM5Z-144-27F, N501
Federal Project No.: NONE
* * * INSTRUCTIONS * * *
THIS FORM CAN BE USED BY THE CONTRACTOR TO SUBMIT THE NAMES OF SWAM FIRMS TO BE UTILIZED ON THE PROJECT. THE CONTRACTOR SHALL INDICATE THE DESCRIPTION OF THE CATEGORY (S, M, SP or H) AND THE TYPE OF WORK THAT EACH SWAM WILL PERFORM AND THE ALLOWABLE CREDIT PER ITEM(S). ADDITIONAL SHEETS TO SHOW THE ALLOWABLE CREDIT PER ITEM MAY BE ATTACHED IF NECESSARY. PLEASE NOTE: THE AMOUNT OF ALLOWABLE CREDIT FOR A SWAM SUPPLIER IS 60% OF THE TOTAL COST OF THE MATERIALS OR SUPPLIES OBTAINED AND 100% FOR A SWAM MANUFACTURER OF THE MATERIALS AND SUPPLIES OBTAINED. A CONTRACTOR MAY COUNT 100% OF THE FEES PAID TO A SWAM HAULER FOR THE DELIVERY OF MATERIALS AND SUPPLIES TO THE PROJECT SITE, BUT NOT
FOR THE COST OF THE MATERIALS AND SUPPLIES THEMSELVES.
SWAM REQUIREMENT 3.0 %
PERCENT ATTAINED BY BIDDER %
NAMES(S) AND CERTIFICATION NO.
OF SWAM(S) TO BE USED
USED AS
SUBCONTR. (S)
MFG. (M)
SUPPLIER (SP)
HAULER (H)
TYPE OF WORK AND ITEM
NO(S)
$ AMOUNT OF
ALLOWABLE
CREDIT PER
ITEM
TOTAL $
TOTAL CONTRACT VALUE $ x REQUIRED SWAM % = $
I/WE CERTIFY THAT THE PROPOSED SWAM(S) SUBMITTED WILL BE USED ON THIS CONTRACT AS STATED HEREON AND ASSURE THAT DURING THE LIFE OF THE CONTRACT. I/WE WILL MEET OR EXCEED THE PARTICIPATION
ESTABLISHED HEREON BY THE DEPARTMENT.
BY
BIDDER SIGNATURE
BY
TITLE DATE
Form C-112S
6-7-16
CERTIFICATION OF BINDING AGREEMENT
WITH
SMALL, WOMEN-OWNED, AND MINORITY-OWNED BUSINESS FIRMS
PROJECT NO: PM5Z-144-27F, N501
Federal Project No.: NONE
This form is to be submitted in accordance with the Department’s Special Provision for Section 107.15.
It is hereby certified by the below signed Contractors that there exists a written quote, acceptable to the parties involved preliminary to a binding subcontract agreement stating the details concerning the work to be performed and the price which will be paid for the aforementioned work. This document is not intended to, nor should it be construed to, contain the entire text of the agreement between the contracting parties.
This document does not take the place of, nor may it be substituted for, an official subcontracting agreement in those situations that may require such an agreement. A copy of the fully executed subcontract agreement shall be submitted to the Engineer within fourteen (14) business days after contract execution.
It is further certified that the aforementioned mutually acceptable quote and fully executed subcontract agreement represent the entire agreement between the parties involved and that no conversations, verbal agreements, or other forms of non-written representations shall serve to add to, delete, or modify the terms as stated.
The prime Contractor further represents that the aforementioned mutually acceptable quote and fully executed subcontract agreement shall remain on file for a period of not less than one year following completion of the prime's contract with the Department or for such longer period as provisions of governing Federal or State law or regulations may require. For purposes of this form, the term Prime Contractor shall refer to any Contractor utilizing a SWAM subcontractor, regardless of tier, in which they are claiming SWAM credit toward the contract goal.
Contractors further jointly and severally represent that said binding agreement is for the performance of a "commercially useful function" as that term is employed in 49 C.F.R. Part 26.55 (c), (d).
SWAM Contractor
By:
Signature Title
Date:
*Subcontractor
* TO BE SIGNED BY THE SUBCONTRACTOR ONLY IF THEY HAVE A CONTRACT WITH THE ABOVE SWAM FIRM
Prime Contractor
FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.
*CN100-000026-09 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 12-11-25 (SPCN) 1
CN103-000120-01 SECTION 103.02—AWARD OF CONTRACT 6-17-25 (SPCN) 1
CN104-000110-00 SEC. 104.01—INTENT OF CONTRACT R-7-12-16 (SPCN) 2
CN105-000140-00 SECTION 105.14—MAINTENANCE DURING CONSTRUCTION 12-20-24 2
CN105-000150-00 SECURITY REQUIREMENTS FOR PCMS 1-30-26 (SPCN) 3
CN105-000610-00 SEC. 105.06—SUBCONTRACTING R-7-12-16 (SPCN) 4
CN107-002110-01 SEC. 107.21(D) CONST. LOADING OF STRUCT. 10-30-17 (SPCN) 4
CN108-000110-00 SEC. 108.01—PROSECUTION OF WORK R-7-12-16 (SPCN) 5
CN108-000144-00 INCENTIVES ON ROUTES WITH METHOD A DENSITY & RIDEABILITY REQ.
5-21-25 (SPCN) 5
CN510-000100-00 LOCATE/REPLACE PAVEMENT MARKERS R-7-12-16 (SPCN) 6
CN512-000100-00 TABLE V-1, ADT GROUPS 7-12-16 (SPCN) 6
CN512-000120-00 SEC. 512—MAINTAINING TRAFFIC (IMPACT ATTEN. SER.) 7-13-16_(SPCN) 6
*DRUG-FREE WORKPLACE 7-3-19 (SPCN) 6
CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 (SPCN) 7
WORK ZONE LAW ENFORCEMENT ASSISTANCE FOR PAVEMENT SCHEDULES 4-22-24 8
LIMITATIONS OF OPERATIONS – SECTION 108.02 4-8-26 (SPCN) 8
EARLY COMPLETION INCENTIVE/DISINCENTIVE 4-23-26 (SPCN) 8
MATERIAL TRANSFER VEHICLE (MTV) NOT REQUIRED 2-7-20 (SPCN) 10
EMERGENCY DEMOBILIZATION 4-23-26 (SPCN) 10
SECTION 310.03(B) NON-TRACKING TACK COAT 4-8-26 (SPCN) 10
MANDATORY PRE-BID SHOWING CONFERENCE 4-21-26 (SPCN) 11
CONTRACTOR OPTION FOR TYPE B-II MARKINGS ON SYMBOLS AND MESSAGES 11
SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 12
SP105-000100-00 INFORMAL PARTNERING R-7-12-16 13
*SP109-000100-05 ASPHALT MATERIAL PRICE ADJUSTMENT 7-8-24 15
SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 17
SP109-000140-00 ELECTRONIC WEIGH TICKETS FOR SCHEDULE WORK 5-28-25 19
SP208-000100-00 SEC. 208—SUBBASE & AGGR. BASE MATERIAL (CHCC) 7-12-16 25
*SP211-000100-04 SEC. 211—ASPHALT CONCRETE 05-01-25 27
SP305-000100-01 SHOULDER RENOVATION 10-3-16 29
SP305-000110-00 STABILIZED/PAVED SHOULDER OVERLAY R-7-12-16 33
*SP315-000320-01 PAVEMENT SHOULDER WEDGE 9-16-19 35
SP315-000710-01 RIDEABILITY (FOR ASPHALT CONCRETE PAVE.) 8-3-17 39
SP512-000120-04 SEC. 512—MAINTAINING TRAFFIC FOR RESURF. PROGRAM 6-12-23 43
SP515-000100-00 COLD PLANE (MILL) ASPHALT CONC. OPERATIONS 7-12-16 47
*SP704-000100-06 SEC. 704—PAVEMENT MARKINGS AND MARKERS 6-12-23 52
SP801-000100-01 LANE CLOSE COORD (LCC)/LANE CLOSE IMPLEMENT (LCI) 9-20-17 69
PUBLIC NOTICE OF PARKING RESTRICTIONS (PLANT MIX) R-7-12-16 71
SEC. 105.03 – PROJ. COMMUNICATION & DECISIONS (ASP. SCHED. ONLY) 10-7-16 75
SEC. 107.15—USE OF SWAM BUSINESSES 6-7-21 77
SQ107-001620-00 PREVAILING WAGE RATES 5-11-2021 94
TYPE E ASPHALT CONCRETE MIXTURES FOR RESURFACING PROGRAM 5-25-23 100
SQ704-000110-00 PAVEMENT MARKINGS AND MARKERS (DATA LOGGER SYSTEM) 9-25-20 103
SS109-002020-01 SEC 109 — MEASUREMENT AND PAYMENT 5-1-23 105
SS211-002020-03 SEC 211 – ASPHALT CONCRETE 3-18-24 108
SS220-002020-01 SEC 220 – CONCRETE CURING MATERIALS 8-28-20 114
SS223-002020-02 SEC 223 – STEEL REINFORCEMENT 4-4-23 115
TABLE OF CONTENTS FOR PROVISIONS
SS234-002020-01 SEC 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 116
SS235-002020-01 SEC 235 – RETROREFLECTORS 5-6-22 117
SS236-002020-01 SEC 236 – WOOD PRODUCTS 5-14-21 118
SS246-002020-02 SEC 246 – PAVEMENT MARKING 5-6-22 122
SS248-002020-02 SEC 248 – STONE MATRIX ASPHALT CONCRETE 3-18-24 130
SS305-002020-02 SEC 305 – SUBGRADE AND SHOULDERS 12-20-23 132
SS308-002020-01 SEC 308 - SUBBASE COURSE 7-13-21 134
SS309-002020-01 SEC 309 - AGGREGATE BASE COURSE 7-13-21 135
SS315-002020-05 SEC 315 – ASPHALT CONCRETE PLACEMENT 5-27-25 136
SS317-002020-01 SEC 317— STONE MATRIX ASPHALT CONCRETE PLACEMENT 6-21-24 156
SS318-002020-01 SEC 318 — PAVEMENT INTERLAYERS 8-2-23 158
SS319-002020-02 SEC 319 – THIN HOT MIX ASPHALT CONCRETE OVERLAY 3-18-24 159
SS407-002020-02 SEC 407 – STEEL & METAL STRUCT 11-01-22 163
SS411-002020-01 SEC 411 – PROT. COAT. OF METAL 11-01-22 165
SS512-002020-03 SEC 512 – MAINTAINING TRAFFIC 7-1-22 166
SS704-002020-02 SEC 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 180
HAMP. ROADS BRIDGE TUNNEL SECURITY 4-20-26 (SPCN) 186
LIMITATIONS OF OPERATIONS 4-20-26 187
NO PLAN ASSEMBLY 189
cn100-000026-09 GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS (SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)
This project shall be constructed according to: the Plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the Virginia Work Area Protection Manual, version 11.0; the Virginia MUTCD version 11.0;
and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this Contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.
Special Provision Copied Notes in this Contract are designated with “(SPCN)” after the date.
The information at the top and left of each Special Provision Copied Note in this Contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this Contract is file reference information for Department use only.
12-11-25 (SPCN)
cn103-000120-01 SECTION 103.02—AWARD OF CONTRACT of the Specifications is replaced in its entirety with the following:
103.02 – Award of Contract
The Board, or the Commissioner as authorized under § 33.2-209 of the Code of Virginia, will award the Contract to the lowest responsive and responsible bidder without discrimination on the grounds of race, color, gender, national origin, status as a military family, or other basis prohibited by law, subject to the provisions, if applicable, in § 2.2-4324 of the Code of Virginia.
The award date will not be later than midnight on the 60th day after the opening of bids. If the Board, or the Commissioner as authorized by law, has not awarded the Contract within this period due to any circumstances not attributable to the bidder, the bidder may withdraw his bid without penalty or prejudice unless the time limit is extended by mutual consent.
After approval for the award of contracts, the Department will provide written notice of award to the successful bidder and will post the Ballots on the Department’s bidding webpage. The Ballot serves as public Notice of Award for a contract. The date of the Notice of Award is the “Approved” date appearing at the top of the Ballot that lists the Contract.
6-17-25 (SPCN)
cn104-000110-00 SECTION 104.01—INTENT OF CONTRACT of the Specifications is replaced by the following:
The intent of the Contract is to provide for the completion of all work specified therein.
The Contractor shall base his bid on the cost of completing all work specified in the Contract.
Budgetary constraints as deemed necessary by the Department may be imposed at any time during the life of the Contract. This may affect the number of routes paved and thus the final quantity of work to be performed.
If prior to initiating or during the performance of the work, the Engineer determines that the cost of completion of all work specified in the Contract will exceed the limits of the budgeted funds, the Contractor will be notified immediately. With such notice the Engineer will specify which routes will be deleted according to the Department’s predetermined listing of priorities.
If after routes are deleted and work proceeds, budgets revisions indicate that the cost of work to be completed by the Contractor will fall below the limits of the budgeted funds, the Department will determine which of the previously deleted routes will be returned to the Schedule to be completed at the contract unit price.
10-21-08; Reissued 7-12-16 (SPCN) [formerly cn104-010100-00] cn105-000140-00 SECTION 105.14—MAINTENANCE DURING CONSTRUCTION of the Specifications is amended by the following:
Section 105.14(a)3 – Flagging Traffic is replaced with the following:
3. Flagging Traffic: Flaggers shall be able to communicate to the traveling public in English while performing the job duty as a flagger at the flagger station.
All flaggers shall possess a valid, current flagger certification card, be it a physical or electronic card, at all times while performing flagging duties.
Flaggers shall be certified by the VDOT Basic or Intermediate Work Zone Traffic Control Training course or by the ATSSA’s classroom Flagger Certification Program.
The following constitutes a valid flagger certification card:
• Cards issued by VDOT following completion of the Basic Work Zone course;
• Cards issued by VDOT following completion of the Intermediate Work
Zone course;
• Cards issued by ATSSA following completion of a Flagger course;
• Cards issued by VDOT following completion of the Flagger-only course, provided the cards were issued on or before December 31, 2024, and have not yet reached the expiration date (two years after date of issuance).
https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn104-000110-00docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn104-010100-00.docx
Flaggers who fail to possess a valid, current, flagger certification card, or refuse to allow inspection of same upon request, shall be removed from the flagging site, and operations requiring flagging shall be suspended by the Engineer. Suspended operations requiring flagging may resume once a certified flagger arrives on-site to perform flagging duties in accordance with applicable requirements. Flaggers improperly performing duties may be subject to flagger certification revocation at the sole discretion of the Engineer.
12-20-24 (SPCN)
cn105-000150-00 SECURITY REQUIREMENTS FOR PORTABLE CHANGEABLE MESSAGE SIGNS— The Contractor shall secure portable changeable message sign (PCMS) control cabinets with a grade 3 or stronger standard lock at all times unless maintenance is actively being conducted on the sign.
A password shall be required to change the PCMS message. The Contractor shall change the manufacturer's default password for ALL electronic signs. Electronic signs that support the use of complex passwords shall include at least 14 characters consisting of the following criteria:
• At least one special character
• At least one alphabetical character
• At least one numerical character
• A combination of upper-case and lower-case letters
Electronic signs that do not support the use of complex passwords shall be changed using the maximum number of characters and character types permitted by the manufacturer.
Password credentials are prohibited from being stored, displayed, or written on or within the sign. Any QR codes affixed to the sign shall be removed.
For all PCMS with remote or wireless accessibility, the Engineer will authorize remote access prior to this functionality being enabled. Prior to authorization, the Contractor shall update the PCMS to the most recent compatible software and firmware version available from the manufacturer. Following authorization and prior to use, the Contractor shall establish a remote connection to verify that access to the PCMS is password protected.
Electronic signs shall only post approved and documented messages. The Contractor shall log all messages posted with date and times for each public message.
The Contractor has the option for their signs to be connected to the Department’s Operations Technology (OT) network for management by Traffic Operations Center (TOC) staff. By using this method, messages are transmitted and posted by the TOC control room staff with all records and logging managed within the VDOT Advanced Traffic Management System (ATMS). Electronic message signs connected to the OT network shall follow the security requirements described below:
1. All electronic signs connected to the network shall be secured with a digital lock installed on the sign control cabinet.
2. Connected signs shall only be remotely accessible through secure communications that originated from the Department’s OT network.
3. Connected signs shall only be posted with messages from the
Department’s ATMS systems or designated backup systems.
4. Community strings (both public and private strings) shall be changed from default settings.
5. All vendor cloud connections shall be removed from the connected sign.
TOC system administration staff will configure VPN connections exclusively to the Department’s OT network.
6. All connected electronic signs shall adhere to the Cabinet Security
Standards found in the Department’s OT Cybersecurity Program Manual.
1-30-26 (SPCN)
cn105-000610-00 SECTION 105.06—SUBCONTRACTING of the Specifications is amended to replace the first paragraph with the following:
No portion of the Contract shall be subcontracted or otherwise disposed of without the written consent of the Engineer, except for work that is $25,000 or less per subcontractor, where the cumulative total of the sublets not requiring the Engineer’s written consent will not exceed 10 percent of the original contract value. This will not, however, waive the requirements for prequalification, and will be considered part of the percentage the Contractor is allowed to subcontract.
The Contractor shall notify the Engineer of the name of the firm to whom the work will be subcontracted, and the amount and items of work involved. Such notification shall be made and verbal approval given by the Engineer prior to the subcontractor beginning work.
5-15-08; Reissued 7-12-16 (SPCN) [formerly cn105-060100-00] cn107-002110-01 SECTION 107.21(d) CONSTRUCTION LOADING OF STRUCTURES of the
Specifications is replaced with the following:
(d) Construction Loading of Structures: In the course of planning and prosecuting the work for the asphalt maintenance schedules in the Contract, the Contractor shall consider the size and weight limitation of any existing structure(s) affecting the prosecuting the work in a schedule when contemplating construction loads, equipment access, haul and delivery routes of materials, and other related activities. If the size or weight limitation of an existing structure changes after the receipt of bid date for the Contract and remains so up to and including the actual prosecution of work for a schedule in the Contract, preventing or limiting access across the structure, and the Contractor determines this limitation impacts his operations; he shall notify the Engineer of such change. If the Engineer confirms such change has occurred, the change will be considered a change to the character of the work according to the provisions of Section 104.02(b) of the Specifications and is eligible for adjustments according to the provisions therein.
10-30-17 (SPCN) [formerly cn107-210100-01] https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn105-000610-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn105-060100-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn107-002110-01.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/BK104-002016-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn107-210100-01.docx cn108-000110-00 SECTION 108.01—PROSECUTION OF WORK is amended to add the following:
Once the Contractor has begun work on a given schedule or portion thereof he shall endeavor to prosecute such work fully and continuously according to the details and requirements of the Contract to its completion. In the event the Contractor has to temporarily suspend the work on a given schedule or portion thereof he shall notify the Engineer at least 24 hours in advance of the time and date he plans to pull off the work site. Prior to leaving the work site, the Contractor shall ensure the work site has been properly and safely secured to protect the traveling public according to the provisions of the Virginia Work Area Protection Manual, the MUTCD, Section 512 of the Specifications, and other requirements included in the Contract.
8-17-10; Reissued 7-12-16 (SPCN) [formerly cn108-010100-00] cn108-000144-00
INCENTIVES ON ROUTES WITH METHOD A DENSITY AND RIDEABILITY REQUIREMENTS
On all routes where both Method A density (per Section 315 and Section 317) and Special Provision for Rideability (For Asphalt Concrete Pavement) requirements are applicable, the Engineer will apply the incentives in accordance with the following:
1. Whenever the Contractor receives a net disincentive for rideability on any given lane within a segment of work as delineated in the Contract and the Contractor receives a disincentive for density on any lots within the given lane within a segment of work as delineated in the Contract, no incentives will be applied.
2. Whenever the Contractor receives a net disincentive for rideability on any given lane within a segment of work as delineated in the Contract, the Engineer will determine the density payment incentive per lane, in accordance with the following:
For Incentive-Disincentive- General:
𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑛𝑠𝑖𝑡𝑦 𝐼𝑛𝑐𝑒𝑛𝑡𝑖𝑣𝑒 𝑃𝑎𝑦𝑚𝑒𝑛𝑡 = 𝑁𝑒𝑡 𝐷𝑒𝑛𝑠𝑖𝑡𝑦 𝐼𝑛𝑐𝑒𝑛𝑡𝑖𝑣𝑒 (𝑝𝑒𝑟 𝑙𝑎𝑛𝑒) × [1 − ( 𝑆𝑢𝑚 𝑜𝑓 0.01 𝑚𝑖𝑙𝑒 𝑟𝑖𝑑𝑒 𝑑𝑖𝑠𝑖𝑛𝑐𝑒𝑛𝑡𝑖𝑣𝑒 𝑙𝑒𝑛𝑔𝑡ℎ (𝑓𝑡)
𝐿𝑎𝑛𝑒 𝑙𝑒𝑛𝑔𝑡ℎ (𝑓𝑡)
For Incentive-Disincentive- Single-lift Construction:
𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑛𝑠𝑖𝑡𝑦 𝐼𝑛𝑐𝑒𝑛𝑡𝑖𝑣𝑒 𝑃𝑎𝑦𝑚𝑒𝑛𝑡 = 𝑁𝑒𝑡 𝐷𝑒𝑛𝑠𝑖𝑡𝑦 𝐼𝑛𝑐𝑒𝑛𝑡𝑖𝑣𝑒 (𝑝𝑒𝑟 𝑙𝑎𝑛𝑒) × [1 − ( 𝑆𝑢𝑚 𝑜𝑓 0.1 𝑚𝑖𝑙𝑒 𝑟𝑖𝑑𝑒 𝑑𝑖𝑠𝑖𝑛𝑐𝑒𝑛𝑡𝑖𝑣𝑒 𝑙𝑒𝑛𝑔𝑡ℎ (𝑓𝑡)
3. Whenever the Contractor receives a disincentive for density on any particular lots within any given lane within a segment of work as delineated in the Contract, the lots receiving disincentive shall not be eligible for a rideability bonus. The Engineer will determine the payment incentive per lane by subtracting the lots receiving the disincentive in accordance with the following:
𝑇𝑜𝑡𝑎𝑙 𝑅𝑖𝑑𝑒𝑎𝑏𝑖𝑙𝑖𝑡𝑦 𝐼𝑛𝑐𝑒𝑛𝑡𝑖𝑣𝑒 𝑃𝑎𝑦𝑚𝑒𝑛𝑡 = 𝑁𝑒𝑡 𝑅𝑖𝑑𝑒𝑎𝑏𝑖𝑙𝑖𝑡𝑦 𝐼𝑛𝑐𝑒𝑛𝑡𝑖𝑣𝑒 × [1 − ( 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑑𝑒𝑛𝑠𝑖𝑡𝑦 𝑙𝑜𝑡𝑠 (𝑓𝑡)
5-21-25 (SPCN)
https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn108-000110-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn108-010100-00.docx cn510-000100-00 LOCATING, REMOVING AND DISPOSING OF RECESSED PAVEMENT MARKERS AND RAISED SNOW-PLOWABLE MARKERS — The Contractor shall locate, remove and dispose of existing recessed pavement markers and raised snow-plowable markers prior to resurfacing. The cavity left by the removal of the existing recessed pavement markers shall be cleaned of debris, filled with the approved mix for resurfacing and compacted. Locating, removing and disposing of recessed pavement markers and raised snow-plowable markers;
cleaning and filling the cavity, and compacting the material placed in the cleaned cavity will not be measured for payment. The cost for performing this work shall be included in the price bid for other appropriate items of work.
10-17-10; Reissued 7-12-16 (SPCN) cn512-000100-00 TABLE V-1, ADT GROUPS — The Specifications are amended to include the following table:
TABLE V-1
Average Daily Traffic (ADT) Groups
Traffic Group ADT Traffic Group ADT
I 0-9 X 2,000-2,999
II 10-24 XI 3,000-3,999
III 25-49 XII 4,000-4,999
IV 50-99 XIII 5,000-5,999
V 100-249 XIV 6,000-9,999
VI 250-399 XV 10,000-14,999
VII 400-749 XVI 15,000-19,999
VIII 750-999 XVII 20,000-29,999
IX 1,000-1,999 XVIII 30,000-39,999
XIX 40,000 & over
7-12-16 (SPCN)
cn512-000120-00 SECTION 512—MAINTAINING TRAFFIC of the Specifications is amended as follows:
Section 512.03(i)—Impact Attenuator Service is amended to replace the second paragraph with the following:
Only Type 1 re-directive low-maintenance impact attenuators in accordance with Section 505 shall be used on highways with posted speed limits greater than 50 mph or with an ADT greater than 25,000 vehicles per day.
7-13-16_(SPCN)
DRUG-FREE WORKPLACE– The Contractor shall:
• Provide a Drug-Free Workplace for the Contractor’s employees.
• Post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition.
https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn510-000100-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn512-000100-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn512-000120-00.docx
• State in all solicitations or advertisements for employees placed by or on behalf of the Contractor that the Contractor maintains a Drug-Free Workplace.
• Include the provisions of the foregoing clauses in every Subcontract or purchase order of over $10,000, so that the provisions will be binding upon each Subcontractor or vendor.
For the purposes of this provision, “Drug-Free Workplace” means a site for the performance of work done in connection with the Contract. The Contractors employees, and those of his Subcontractors, shall be prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession, or use of any controlled substance or marijuana during the performance of the Work.
7-3-19 (SPCN)
cq107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY
Section 107.14(a)1 – Required by §2.2-4201 and §2.2-4311 of the Code of Virginia is replaced with the following:
1. Required by §2.2-4201 and §2.2-4311 of the Code of Virginia: During the performance of this Contract, the Contractor agrees as follows:
a. The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where religion, sex, or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause, including the names of all contracting agencies with which the Contractor has contracts of over $10,000.
b. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that such contractor is an equal opportunity employer. However, notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this chapter.
c. If the Contractor employs more than five employees, the Contractor shall (i) provide annual training on the Contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the Department of Human Resource Management, and (ii) post the Contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the Contractor owns or leases for business purposes and (b) the Contractor's employee handbook.
The Contractor shall include the provisions of subdivisions a, b, and c in every subcontract or purchase order of over $10,000, so that such provisions shall be binding upon each subcontractor or vendor.
Nothing contained in this chapter shall be deemed to empower any agency to require any contractor to grant preferential treatment to, or discriminate against, any individual or any group because of race, color, religion, sex, or national origin on account of an imbalance that may exist with respect to the total number or percentage of persons of any race, color, religion, sex, or national origin employed by such contractor in comparison with the total number or percentage of persons of such race, color, religion, sex, or national origin in any community or in the Commonwealth.
5-11-22 (SPCN)
WORK ZONE LAW ENFORCEMENT ASSISTANCE FOR PAVEMENT SCHEDULES
Where there is no existing agreement (such as currently exists with Virginia State Police for projects on the Interstate System) between the Department and the applicable Law Enforcement Entity: in order to facilitate the furnishing of Officers to projects, the Contractor shall be responsible for obtaining law enforcement assistance in active work zones, as necessary and as agreed upon by the Contractor and the Engineer. Law enforcement assistance may be needed for situations such as: night time operations, congested areas, operating (normal green-yellow-red) signalized intersections, lane closures, or road closures.
When Law Enforcement officers are operating within signalized intersections, work shall proceed as stipulated in the VWAPM and Section 46.2-834 of the Highway Laws of Virginia.
Once the Engineer has agreed with the Contractor that Law Enforcement Officers are needed for a given activity, the Contractor shall arrange directly with the Law Enforcement Entity for the Officers to be on the project. The Law Enforcement Entity will invoice the Contractor directly, showing hours of service per Officer, rounded to the nearest half-hour, and the Contractor shall pay the invoice. Once the invoices have been paid, the Contractor shall provide copies of these invoices (marked as paid) to the Department for reimbursement. All coordination activities performed by the Contractor in order to schedule Law Enforcement Officers shall be incidental to the Work.
If this SPCN is in conflict with any other Specification found elsewhere in the Contract regarding any flagging operations or assistance by Law Enforcement Officers, this SPCN shall govern.
4-22-24 (SPCN)
LIMITATIONS OF OPERATIONS – Section 108.02 of the Specifications is amended to include the following:
(c) PLANING OR MILLING PAVEMENT – No open milled surfaces shall be allowed and at no time shall the roadway be opened to traffic prior to completing the overlay.
4-8-26 (SPCN)
EARLY COMPLETION INCENTIVE/DISINCENTIVE
Early Completion is defined as completing all of the Work as detailed in the Plans and Specifications to the Department's satisfaction for Final Acceptance for each weekend or lane of pavement completed. The number of weekends agreed upon will not change except for an extension of the Contract time limit for a Compensable Delay as defined by Section 109.05(e) of the Specifications. The Department will pay an incentive in accordance with the table below if the Contractor completes the Work prior to the date/time shown above as adjusted by the Engineer for Compensable Delay. The incentive is capped at $400,000 for the entire project. If the Contractor does not complete the Work within the four weekends agreed upon, as adjusted by the Engineer for Compensable Delay, the Department will assess a disincentive as per the table shown below. The disincentive will be assessed, not as a penalty, but as agreed compensation for damages resulting from the Contractor's delay in completion of construction operations on the Department and road users. The disincentive amount is calculated based on Department related traffic control and maintenance costs, detour costs, or daily road user costs, as applicable. The Contractor waives any defense as to the validity of any disincentives stated in the Contract, the Specifications, or this Special Provision, and assessed by the Department against the Contractor on the grounds that such disincentives are void as penalties or are not reasonably related to actual damages.
Incentives per initial four weekends of work (no incentives paid for additional weekends needed).
Incentives are not cumulative, one amount earned per weekend if eligible.
Both Lanes Open to Traffic Incentive
Prior to 6:01pm Sunday $20,000
Prior to 3:01pm Sunday $50,000
Prior to 12:01pm Sunday $100,000
Disincentives applied to Full Directional Closure taking place outside of the allowable hours listed in the Temporary Traffic Control Plan as well as to any additional Full Directional Closure periods needed.
Disincentives are added cumulatively for each period or portion of that period needed to complete work.
Disincentives will not be pro-rated and will be charged as a whole.
Additional Closure Period Disincentive
Weekday 5:01am to 12:00pm $250,000
Weekday 12:01pm to 6:00pm $250,000
Weekday 6:01pm to 9:00pm $150,000
Weeknight or Friday 9:01pm to Saturday 5:00am $75,000
Saturday 5:01am to Saturday 6:00pm $150,000
Saturday 6:01pm to Sunday 12:00am $75,000
Sunday 12:01am to Sunday 12:00pm $50,000
Sunday 12:01pm to Sunday 9:00pm $100,000
Sunday 9:01pm to Monday 5:00am $50,000
4-23-26 (SPCN)
MATERIAL TRANSFER VEHICLE (MTV) NOT REQUIRED — A Material Transfer Vehicle (MTV) will not be required during the placement of asphalt mixes designated for locations specified in this Contract.
2-7-20 (SPCN)
EMERGENCY DEMOBILIZATION - Emergency Demobilization shall consist of ceasing work operations, removing equipment and personnel from the project site, maintaining traffic through temporary work zones when an emergency reopening of the Hampton Roads Bridge Tunnel is ordered by the Engineer. All work shall be in accordance with the Work Area Protection Manual (WAPM), the Virginia Supplement to the MUTCD, the MUTCD, the Standard Drawings, and the Contract, as directed by the Engineer.
The Contractor shall have one lane open to traffic within one hour of notification by the Engineer and both lanes open to traffic if no milled surface is remaining within two hours of notification by the Engineer.
Traffic shall be prohibited from travelling on a milled surface.
Type A Temporary Pavement Markings shall be installed if no markings are present prior to opening both lanes to traffic.
The Contractor shall cover detour signs as required by the Engineer.
The Contractor shall provide an Emergency Demobilization Plan, adhering to the requirements herein to the Engineer two weeks prior to start of work.
If the Department issues an Emergency Demobilization order, the Contractor shall not incur any disincentives, or other fees for delays attributable to the Emergency Demobilization, calculated on an hour‑for‑hour basis.
Measurement and Payment:
Emergency Demobilization will be measure in units of each and paid for at the Contract unit price per each. The price shall include moving personnel, materials, and equipment from the site, temporary signs, group two channelizing devices, portable changeable message signs, Asphalt Concrete SM-12.5E, and Type A Temporary Pavement Markings, and Remobilization.
Payment will be made under:
Pay Item Pay Unit
Emergency Demobilization Each
4-23-2026 (SPCN)
SECTION 310.03(b) NON-TRACKING TACK COAT of the Specifications is amended to replace the first sentence of the first paragraph with the following:
The Contractor shall apply nontracking tack coat between May 1 and November 20.
4-8-26 (SPCN)
MANDATORY PRE-BID SHOWING CONFERENCE
Bidders are advised that there will be a mandatory Pre-Bid Showing conference to be held at the following time and place:
Date: 05/05/2026 Time: 9:00AM Location: VDOT HRBT Admin Building: 204 National Avenue, Hampton, Virginia, 23663 Point of Contact: Maurice Hardin, Hampton Roads District Maintenance 757-600-7036 (cell) Maurice.hardin@vdot.virginia.gov
A photo-ID will be required (example: a valid Driver’s License or a valid passport).
Bids will only be accepted from those bidders who are represented at this mandatory Pre-Bid showing conference. Attendance at this mandatory showing conference will be evidenced by the representative’s signature on the Department’s attendance roster.
Bidders are invited to bring a copy of the solicitation proposal with them. Any changes resulting from this mandatory Pre-Bid Showing Conference and Site Visit will be issued in a written addendum to the solicitation proposal.
4-21-26 (SPCN)
CONTRACTOR OPTION FOR TYPE B-II MARKINGS ON SYMBOLS AND
MESSAGES – The Contractor may use Type B, Class II material for pavement message and symbol markings instead of Type B, Class I designated in the Contract, if approved by the Engineer. This substitution shall be at no additional cost to the
Department.
8-3-2023 (SPCN)
SP102-000120-00 [formerly SP102-010100-00]
SPECIAL PROVISION FOR
NON-DISCRIMINATION IN EMPLOYMENT AND CONTRACTING PRACTICES
January 10, 2017
I. Description
This Special Provision implements Executive Order 61, ensuring equal opportunity and access for all Virginians in state contracting and public services.
II. Non-Discrimination
The Contractor shall maintain a non-discrimination policy, which prohibits discrimination by the Contractor on the basis of race, sex, color, national origin, religion, sexual orientation, gender identity, age, political affiliation, disability, or veteran status. This policy shall be followed in all employment practices, subcontracting practices, and delivery of goods or services. The Contractor shall also include this requirement in all subcontracts valued over $10,000.
III. Measurement and Payment
Conformance with this Special Provision will not be measured for individual payment, and will be considered incidental to the Work.
https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/SP102-000120-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/SP102-010100-00.docx
SP105-000100-00
INFORMAL PARTNERING
January 14, 2008c; Reissued July 12, 2016
I. DECLARATION AND DESCRIPTION
The Virginia Department of Transportation (VDOT) is firmly committed to the formation of a partnering relationship with the Contractor, all subcontractors, suppliers, FHWA representatives;
where appropriate, other federal agencies, local government officials, utilities representatives, law enforcement and public safety officials, consultants, and other stakeholders to effectively and efficiently manage and complete each construction or maintenance contract to the mutual and individual benefits and goals of all parties. Partnering is an approach to fulfilling this commitment where all parties to the contract, as well as individuals and entities associated with or otherwise affected by the contract, willingly agree to dedicate themselves by working together as a team to fulfill and complete the construction or maintenance contract in cost effective ways while preserving the highest standards of safety and quality called for by the Contract combined with the goals of on time/on budget completion. The approach must still allow for the fact that the members of the team share many common interests yet have differing authorities, interests, and objectives that must be accommodated for the project to be viewed as successful by all parties. It is recognized by VDOT that partnering is a relationship in which:
● Trust and open communications are encouraged and expected by all participants
● All parties move quickly to address and resolve issues at the lowest possible level by approaching problems from the perspectives and needs of all involved
● All parties have identified common goals and at the same time respect each other’s individual goals and values
● Partners create an atmosphere conducive to cooperation and teamwork in finding better solutions to potential problems and issues at hand
II. INFORMAL PARTNERING STRUCTURE
It is the business intent of the Department that informal partnering will be required on this project, whereby the spirit and principles of partnering are practiced from onsite field personnel to executive level owners and employees. The VDOT Field Guide to Partnering available on the VDOT website http://www.virginiadot.org/business/resources/partnerfinalallowres.pdf will be the standard reference guide utilized to structure and guide partnering efforts. This guide will be systematically evaluated to incorporate better practices as our partnering efforts evolve. Of particular note is the need for effective and responsive communication between parties to the partnering relationship as emphasized in Section 105.03(d) of the Specifications.
Informal partnering need not require the services of a professional…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .