AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

PAGE OF PAGES

3. EFFECTIVE DATE 5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.

7. ADMINISTERED BY (If other than Item 6) CODE

FACILITY CODECODE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code)

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

1. CONTRACT ID CODE

16B. UNITED STATES OF AMERICA 16C. DATE

SIGNED

15B. CONTRACTOR/OFFEROR 15C. DATE

SIGNED

(Signature of Contracting Officer)(Signature of person authorized to sign)

15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

is not

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by orletter provided electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, E. IMPORTANT: Contractor is not, is required to sign this document and return

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is extended, copies to issuing office.

4. REQUISITION/PURCHASE REQ. NO.

1 3

P00003

NASA

Stennis Space Center Office of Procurement Building 1100 Room 251H Stennis Space Center MS 39529-6000

NASA

Stennis Space Center Office of Procurement Building 1100 Room 251H Stennis Space Center MS 39529-6000

X

80SSC019R0004

12/21/2018

X X

See Continuation Sheet If Applicable appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

CHECK ONE

(X)

See Continuation Sheet If Applicable electronic communication, orlettereach

80SSC019R0004P00003 Page 1

P00003 Changes

The purpose of this amendment is to:

1.) Revise Attachment 2 – Task Order One Statement of Work: Paragraph “Lifting Operations:”

from April 2019 to May 2019.

2.) Revise Attachment 2 – Task Order One Statement of Work: Change Period of Performance:

from 75 Calendar days ARO to 75 Calendar days after issuance of Notice to Proceed.

3.) Incorporate Attachment 6 – Acknowledgement of SBU_ITAR Information into Section J of the solicitation. See Section L of the solicitation for instructions pertaining to Attachment 6.

THIS MUST BE SUBMITTED WITH YOUR PROPOSAL.

4.) Incorporate the following verbiage (in red) to Section L of the solicitation; paragraph (m) Instructions Regarding Submission of Offers; List of Required documents –

The following is a list of required documents provided for the Offeror’s convenience. There may be other documents, either required or necessary for effective evaluation, which do not appear on this list. It is the offeror’s responsibility to ensure that the proposal submitted is complete in every respect and not rely solely on this list to prepare its proposal.

Completed SF 1449 Blocks 12, 17a, 17b, 30a, 30b, 30c as applicable.

Offeror’s proposal and the information required by this Request for Proposal (RFP) including the Pricing Sheet Task Order One – Pathfinder Lift (Attachment 3), Pricing Sheet for Period of Performance Extension (Attachment 3A), Past Performance Form (Attachment 5), Acknowledgement of SBU_ITAR Information (Attachment 6), and a Technical Proposal to include a list of equipment and a list of personnel by labor classification required to complete Task Order One.

5.) Provide responses to questions received.

Q1: Can an alternate lift orientation be offered as an option?

A1: No. Alternative proposals will not be considered. FAR 52.212-1(e) does state “Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.” However, for this procurement NASA has a firm requirement and does not intend to consider alternatives.

Therefore, the solicitation will be amended to remove the submission of alternative proposals as an option.

Q2: Can the crane be mobilized and stored at the Site?

A2: Yes, crane mobilization and storage is acceptable with prior approval from NASA. The date of the mobilization, duration of storage, location of storage, and other relevant details

80SSC019R0004P00003 Page 2 require prior review and approval from NASA and shall not interfere with current or planned testing activities.

6.) Remove paragraph (e) from FAR Clause 52.212-1 located in Section L of the solicitation.

All other terms and conditions remain unchanged.

80SSC019R0004P00003 Page 3