This statement of work outlines requirements for a miniCAST 5301D real soot generator to be delivered to NASA Langley Research Center. The document specifies purchasing one unit of the miniCAST 5301D from JING LTD with the ability to generate particle sizes between 50-200 nm at concentrations up to 10E8/cm3. Additional key specifications and features include total exhaust gas output of 7 l/min plus 20 l/min of dilution air, a maximum mass output of 0.5 g/h, automatic internal ignition process and temperature control, data logging and interface capabilities, and a 24 VDC power requirement. The period of performance stipulates delivery within 5-6 months at the location of 21 Langley Blvd. MS 483 in Hampton, Virginia. The related federal contract opportunity on NASA's Shared Services Center website under solicitation number 80NSSC23843637Q is also for the miniCAST 5301D product from JING LTD.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements JING LTD miniCAST 5301D

2. Characteristics, Scope, and Specs Quantity Description 1 miniCAST 5301D

Real Soot Generator miniCAST Model 5301 Type D for Diesel / Kerosene

• Particle size: 50-200 nm

• Particle concentration: up to 10E8 /cm3

• Total exhaust gases: 7 l/min + dilution air 20 l/min

• Mass output: up to 0.5 g/h

• Total exhaust gases: 7 l/min + dilution air 20 l/min

• Operation mode: preset and advanced/customize

• High precision mass flow control

• Automatic internal ignition process

• Flame sight control

• Temperature control in flame chamber

• Internal gas sensor/alarm

• Emergence stop (Hardware and remote by software)

• PC Software for fully automatic operation with improved monitoring and automatic stop

• Warnlamp tower

• Data-logging

• Interface USB

• Power 24 VDC

3. Place of Performance NASA Langley Research Center 21 Langley Blvd. MS 483 23681 Hampton VA

4. Period of Performance

The lead time is 5-6 months.