Statement of Work for Manufacture of Water Test Volute and Discharge Duct
Description: Manufacture and Leak Check of Volute Housing and Discharge Duct Requested Delivery: 20 weeks from award
The task may require but not necessarily include rough and finish turning, multi‐axis milling, welding, deburring, passivation, inspection, and cleaning. Drawings of the requested parts are provided to assist in understanding the requirement. After manufacture, assembly and leak check of the manufactured hardware is required.
Government Furnished Information The following drawings and specifications are provided for reference:
1) MER02960 Volute Housing, Welded Configuration, Water Flow
2) MER02963 Inlet Housing, Water Flow
3) MER02966 Transition Housing, Water Flow
4) MER02969 Insert, Total Pressure Sensor, Housing & Discharge Duct
5) MER03115 Pipe Flange Adapter, 3" Class 600 to 6" Class 600
6) MER03117 Volute Housing, Machined, Parts for, Water Flow
7) MER03118 Flange Weldment, Volute Discharge, Water Flow
8) MER03120 Plug, Sight Window Location
9) MER03126 Housing & Discharge Duct, Proof Test Assembly, Water Flow
10) MER03127 Closeout, Inlet Duct
11) MSFC‐RQMT‐1282 Requirements for Surface Preparation and Application of Dry Film
Lubricants
12) MSFC‐SPEC‐50M60434 Preparation and Application of Dry Film Lubricant
13) MSFC‐SPEC‐3679 Process Specification – Welding Aerospace Hardware
Solid models of these items are also available in STEP format on request.
Manufacture The following items and quantities shall be manufactured according to the drawings and specifications provided in the Government Furnished Information.
Item Part Number Description Quantity Required
1) MER02960‐001 Volute Housing, Welded Configuration, Water Flow 1
2) MER02963‐001 Inlet Housing, Water Flow 1
3) MER02966‐001 Transition Housing, Water Flow 1
4) MER02969‐001 Insert, Total Pressure Sensor, Housing & Discharge Duct 1
5) MER03115‐001 Pipe Flange Adapter, 3" Class 600 to 6" Class 600 1
6) MER03120‐005 Plug, Sight Window Location 8
7) MER03127‐001 Closeout, Inlet Duct 1
Assembly and Leak Check Fit, function, and integrity of the manufactured hardware shall be verified by assembling the components as defined in drawing MER03126 and performing a leak check with water as described here. All MER03126 assembly items not specifically identified in the Manufacture section above but necessary for the leak check shall be provided by MSFC upon request.
Verification #1 ‐ Visible Leak Inspection:
The assembly shall be supported, filled with potable water, purged of trapped gas, and subjected to a continuous pressure of between 725 and 735 pounds per square inch (gauge).
The source of all visible water leaks shall be identified and corrected before proceeding to the second verification.
Verification #2 – Pressure versus Time:
The assembly shall be supported, filled with water, and purged of trapped gas. The assembly shall be pressurized to between 725 and 735 pounds per square inch (gauge) and isolated from the pressure source. The difference in initial and final internal pressures after 10 minutes of isolation shall not exceed 5 psi.
Deliverables The following items and quantities shall be delivered to MSFC at the end of the period of performance:
Item Part Number Description Quantity Required
1) MER02960‐001 Volute Housing, Welded Configuration, Water Flow 1
2) MER02963‐001 Inlet Housing, Water Flow 1
3) MER02966‐001 Transition Housing, Water Flow 1
4) MER02969‐001 Insert, Total Pressure Sensor, Housing & Discharge Duct 1
5) MER03115‐001 Pipe Flange Adapter, 3" Class 600 to 6" Class 600 1
6) MER03120‐005 Plug, Sight Window Location 8
7) MER03127‐001 Closeout, Inlet Duct 1
8) Material certifications for all manufactured components As Required
9) Inspection reports for all manufactured components As Required including documentation of any non‐conformances or corrections
10) Documentation of leak check verifications As Required
Shipping Deliverables shall be packed for shipment to:
NASA Marshall Space Flight Center Central Receiving 4631 Saturn Rd Bldg 4631 Huntsville, AL 35812 Attn: Stephen Skelley (256‐544‐1574)
MSFC‐provided equipment shall be packed in its original shipping container(s) and maintained at contractor’s location for return to MSFC. MSFC will cover the expense of returning MSFC‐ provided equipment to MSFC.
File details come from the government source that posted it.