Amendment_P00004.docx
DOCX document 969 KB Posted
- Attached to
- Occupational Health Services Federal contract opportunity
- Solicitation number
- 80MSFC19R0041
About this file
80MSFC19R0041P00004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Source_Selection_Statement.pdf | ||
| Amendment_P00005_Post_Industry_Day_Q_and_A.docx | DOCX document | |
| SF30-P00005.pdf | ||
| SF30_P00004.pdf | ||
| Amendment_P00004_RFP_Attachment_L-1_Excel_Pricing_Model.xlsx | XLSX spreadsheet | |
| SF30_P00004_Page_2.docx | DOCX document | |
| Attachment_B_Solicitation_Change_Log.docx | DOCX document | |
| Attachment_A_Post_Industry_Day_Q_and_A.docx | DOCX document | |
| SF30-Amendment_3.pdf | ||
| 80MSFC19R0041P00001.pdf | ||
| 80MSFC19R0041P00001 SF30.pdf | ||
| Industry_Briefing.pptx | PPTX presentation | |
| Attendee_List.docx | DOCX document | |
| 80MSFC19R0041_Occupational_Health_Services_(OHS)_Attachment_L-1,_Excel_Pricing_Model.xlsx | XLSX spreadsheet | |
| 80MSFC19R0041_Occupational_Health_Services_(OHS)_Request_for_Proposal.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION A - SOLICITATION/CONTRACT FORM
80MSFC19R0041P00004
A-1
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
1852.216-78 FIRM FIXED PRICE (DEC 1988)
The total firm fixed price of this contract is $ TBP.
(End of clause)
MSFC 52.216-92 MATRIX OF CONTRACT LINE ITEMS (CLINs) (OCT 2017)
The current total contract value is as specified below. To separately track the components of the value, separate CLINs have been established as follows:
| CLIN |
| DESCRIPTION |
| VALUE |
| OPTION STATUS |
| 001 |
| Base Period – 10/01/2019 - 09/30/2020 |
| $ Insert CLIN value |
| N/A |
| 002 |
| IDIQ Base Period |
| $TBD |
| N/A |
| 003 |
| No-Cost Medical Services |
| $0 |
| N/A |
| 004 |
| Option 1 – 10/01/2020 - 09/30/2021 |
| $ Insert CLIN value |
| Not exercised |
| 005 |
| IDIQ Option 1 |
| $TBD |
| Not exercised |
| 006 |
| No-Cost Medical Services |
| $0 |
| Not exercised |
| 007 |
| Option 2 – 10/01/2021 - 09/30/2022 |
| $ Insert CLIN value |
| Not exercised |
| 008 |
| IDIQ Option 2 |
| $TBD |
| Not exercised |
| 009 |
| No-Cost Medical Services |
| $0 |
| Not exercised |
| 010 |
| Option 3 – 10/01/2022 - 09/30/2023 |
| $ Insert CLIN value |
| Not exercised |
| 011 |
| IDIQ Option 3 |
| $TBD |
| Not exercised |
| 012 |
| No-Cost Medical Services |
| $0 |
| Not exercised |
| 013 |
| Option 4 – 10/01/2023 - 09/30/2024 |
| $ Insert CLIN value |
| Not exercised |
| 014 |
| IDIQ Option 4 |
| $TBD |
| Not exercised |
| 015 |
| No-Cost Medical Services |
| $0 |
| Not exercised |
| Total Value of Base and All Exercised Options |
| $ Insert Value |
Note: If exercised, the total potential value of the six-month period permitted by the Option to Extend Services clause (FAR 52.217-8) will not exceed one-half of the mission services price plus one-half of the maximum IDIQ of the prior contract year. Periods of less than six months will be prorated to reflect the reduced term.
(End of clause)
MSFC 52.216-90 IDIQ CONTRACT VALUE BY PERIOD OF PERFORMANCE (MAY 2017)
The maximum potential not-to-exceed (NTE) value for the indefinite-delivery, indefinite-quantity (IDIQ) component of this contract including options, is $5,000,000. This contract provides for performance of fixed price task orders. The NTE IDIQ value shall not be exceeded without the prior written approval of the Contracting Officer.
The IDIQ values for each period of performance are set forth below:
| PERIOD OF PERFORMANCE |
| MINIMUM VALUE |
| MAXIMUM VALUE |
| Base Contract |
| 10/01/19-09/30/20 |
| $0 |
| $1,000,000 |
| Option 1 |
| 10/01/20-09/30/21 |
| $0 |
| $1,000,000 |
| Option 2 |
| 10/01/21-09/30/22 |
| $0 |
| $1,000,000 |
| Option 3 |
| 10/01/22-09/30/23 |
| $0 |
| $1,000,000 |
| Option 4 |
| 10/01/23-09/30/24 |
| $0 |
| $1,000,000 |
Note: Unused IDIQ value for any period may be rolled over to subsequent periods, provided that the total cumulative value does not exceed the NTE value established above.
MSFC 52.216-91 SUPPLIES AND/OR SERVICES TO BE PROVIDED AND TYPE OF CONTRACT (JUN 2017)
(a) The contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to perform and/or deliver the services in accordance with Attachment J-1, Performance Work Statement (PWS).
(b) This is a firm-fixed-price (FFP) mission services type contract with FFP indefinite-delivery, indefinite-quantity (IDIQ) component and a no-cost medical services component. The purpose of this contract is to acquire a broad range of occupational health services for MSFC. This contract provides three methods for the acquisition of these services:
(1) FFP mission services work that can be identified in advance, both in sufficient detail and quantities, is identified in PWS Section 1.0, Introduction, through Section 7.0, Respiratory Protection Services.
(2) Work that cannot be sufficiently identified or quantified in advance, but which is within the general scope of this contract, is identified as IDIQ. IDIQ includes all support identified in Attachment J-1 PWS, Section 8.0, Indefinite-Delivery Indefinite-Quantity Effort. IDIQ work may be authorized by the Government Contracting Officer as FFP task orders (TOs), using the labor rates and prices in Attachment J-4 IDIQ Rate and Price Schedules. The Government may order IDIQ services in accordance with the procedures set forth in NFS Clause 1852.216-80 Task Ordering Procedure, Alternate II.
(3) No-cost mission services work, where services shall be performed at no cost to the Government, is identified in PWS Section 9.0, No-Cost Medical Services.
(End of clause)
MSFC 52.227-91 DATA REQUIREMENTS (JUN 2017)
(a) The contractor shall furnish all data identified and described in the data requirements list (DRL) of the data procurement document (DPD) which is attached to this contract. All expenses associated therewith are included in the estimated cost or firm fixed price of this contract, or any associated task orders if applicable.
(b) The Government reserves the right to delay the delivery of any or all data requirements descriptions (DRDs) specified in the DRL and such right may be exercised at no increase to the estimated cost or firm fixed price of this contract or any associated task orders.
(c) Nothing contained in this clause shall relieve the contractor from delivering data that is not identified and described in the DRL/DPD, but required under another section of this contract.
(d) To the extent that data required to be delivered under a DRD is also required to be delivered under another section of the contract, the requirements established by both the DRD and such other contract section shall apply. In the event of a conflict between the data requirements of the DPD and another contract section, the specific contract section will take precedence.
(End of clause)
MSFC 52.237-92 DEDUCTIONS FOR FAILURE TO MEET ACCEPTABLE PERFORMANCE LEVELS (JUN 2017)
(a) The contractor’s performance will be evaluated on a quarterly basis. The Government will apply deductions for failure to meet acceptable performance levels (APLs) utilizing the methodology and required performance levels specified elsewhere in this contract.
(b) The Government will hold recurring performance evaluation meetings (PEMs) with the contractor, based on a schedule determined by the contracting officer (CO), to discuss performance against the established standards and any associated deductions, if applicable. More frequent meetings may be held if determined necessary by the CO.
(c) The contractor shall apply any required deductions for failure to meet APLs on the next invoice/voucher submitted following the period being evaluated.
(d) Notwithstanding the foregoing, the Government’s rights under this clause to reduce fee or contract value for less than optimal performance is in addition to the rights of the Government prescribed in Clauses 52.246-4 Inspection of Services—Fixed Price and 52.249-8 “Default (Fixed-Price Supply and Service).”
B-4
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
MSFC 52.211-93 DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK (FEB 2001)
The Description/Specifications/Statement of Work is Attachment J-1.
C-1
SECTION D - PACKAGING AND MARKING
1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (JAN 2011)
(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item’s operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:
NASA/George C. Marshall Space Flight Center Attn:AS41 Central Receiving Facility Bldg. 4631 Marshall Space Flight Center, AL 35812
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
D-2
SECTION E - INSPECTION AND ACCEPTANCE
52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)
E-1
SECTION F - DELIVERIES OR PERFORMANCE
52.242-15 STOP-WORK ORDER (AUG 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work order is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either—
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if—
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon a proposal submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
52.247-34 F.O.B. DESTINATION (NOV 1991)
MSFC 52.211-94 PERIOD OF PERFORMANCE (MAY 2017)
The period of performance for this contract is from October 1, 2019 through September 30, 2020.
(End of clause)
MSFC 52.237-91 PLACE OF PERFORMANCE (JUL 2018)
The Contractor shall perform the work under this contract at Marshall Space Flight Center, the National Space Science and Technology Center (NSSTC), Wynn Drive-leased facilities, and at such other locations as may be approved in writing by the Contracting Officer.
F-2
SECTION G - CONTRACT ADMINISTRATION DATA
1852.223-71 AUTHORIZATION FOR RADIO FREQUENCY USE (APR 2015)
1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT REPRESENTATIVE (APR 2015)
1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (APR 2018)
(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.
(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC’s Vendor Payment information web site at: https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.
(c) Payment requests.
(1) The payment periods are stipulated in the payment clause(s) contained in this contract.
(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:
(i) Vouchers.
(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.
(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.
(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.
(D) Progress reports, as required.
(ii) Invoices.
(A) Description of goods and services delivered as part of the contract’s terms and conditions, including the dates of delivery/performance.
(B) Progress reports, as required.
(C) Date goods and services were performed.
(iii) Fee vouchers.
(A) Listing of all provisionally-billed fee by period or date earned since contract award.
(B) A reconciliation of all billed and earned fee.
(C) A clear explanation of the fee calculations.
(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.
(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.
(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.
(End of clause)
1852.245-71 INSTALLATION—ACCOUNTABLE GOVERNMENT PROPERTY (JUN 2018)
(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:
NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory Management Manual;
NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management Procedural Requirements;
NASA Procedural Requirement (NPR) 4300.1, NASA Personal Property Disposal Procedural Requirements;
The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities. In accordance with FAR 52.245-1(h)(1) the contractor shall be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.
(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:
(i) The Contractor’s purchase order shall require the vendor to deliver the property to the installation central receiving area.
(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.
(iii) The Contractor shall establish a record for Government titled property as required by FAR 52.245-1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.
(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245-1, Government Property (as incorporated in this contract), until its return to the installation. NASA Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.
(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph (a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the Contracting Officer.
(c) The following property and services are provided if checked:
| [X] |
| (1) Office space, work area space, and utilities. Government telephones are available for official purposes only. |
| [X] |
| (2) Office furniture. |
| [X] |
| (3) Property listed in Attachment J-8, Installation-Accountable Facilities, Property and Services |
(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the Government upon its entry into Government records.
(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the Contracting Officer’s prior written approval.
| [ ] |
| (4) Supplies from stores stock. |
| [ ] |
| (5) Publications and blank forms stocked by the installation. |
| [X] |
| (6) Safety and fire protection for Contractor personnel and facilities. |
| [X] |
| (7) Installation service facilities: See Attachment J-8, Installation-Accountable Facilities, Property and Services |
| [X] |
| (8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty. |
| [X] |
| (9) Cafeteria privileges for Contractor employees during normal operating hours. |
| [X] |
| (10) Building maintenance for facilities occupied by Contractor personnel. |
| [X] |
| (11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the Contracting Officer. |
1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP 2017)
(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:
(1) NPD 8800.14, Policy for Real Estate Management.
(2) NPR 8831.2, Facilities Maintenance and Operations Management.
(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor’s expense.
(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.
(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.
(End of clause)
MSFC 52.204-91 SECURITY AND BADGING REQUIREMENTS (NOV 2016)
Performance of this contract will require access to facilities, information technology systems, and other resources at the Marshall Space Flight Center and/or the Michoud Assembly Facility. To obtain and maintain access, the Contractor shall comply with the applicable requirements from the latest revision of (1) NASA Procedural Requirements (NPR) 1600.1, “NASA Security Program Procedural Requirements,” (2) NPR 1600.4, “Identity and Credential Management,” (3) Marshall Procedural Requirements (MPR) 1600.1, “MSFC Security Program Procedural Requirements,” (4) MPR 1600.4, “MSFC Identity, Credential, and Access Management,” and (5) NASA Advisory Implementing Instruction (NAII) 1600.4, “Foreign National Access Management.”
G-5
SECTION H - SPECIAL CONTRACT REQUIREMENTS
52.227-17 RIGHTS IN DATA--SPECIAL WORKS (DEC 2007)
1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING (DEC 2015)
1852.223-72 SAFETY AND HEALTH (SHORT FORM) (JUL 2015)
1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)
1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)
1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES (JAN 2011)
(a) The contractor shall protect the confidentiality, integrity, and availability of NASA Electronic Information and IT resources and protect NASA Electronic Information from unauthorized disclosure.
(b) This clause is applicable to all NASA contractors and sub-contractors that process, manage, access, or store unclassified electronic information, to include Sensitive But Unclassified (SBU) information, for NASA in support of NASA’s missions, programs, projects and/or institutional requirements. Applicable requirements, regulations, policies, and guidelines are identified in the Applicable Documents List (ADL) provided as an attachment to the contract. The documents listed in the ADL can be found at: http://www.nasa.gov/offices/ocio/itsecurity/index.html. For policy information considered sensitive, the documents will be identified as such in the ADL and made available through the Contracting Officer.
(c) Definitions. (1) IT resources means any hardware or software or interconnected system or subsystem of equipment, that is used to process, manage, access, or store electronic information.
(2) NASA Electronic Information is any data (as defined in the Rights in Data clause of this contract) or information (including information incidental to contract administration, such as financial, administrative, cost or pricing, or management information) that is processed, managed, accessed or stored on an IT system(s) in the performance of a NASA contract.
(3) IT Security Management Plan—This plan shall describe the processes and procedures that will be followed to ensure appropriate security of IT resources that are developed, processed, or used under this contract. Unlike the IT security plan, which addresses the IT system, the IT Security Management Plan addresses how the contractor will manage personnel and processes associated with IT Security on the instant contract.
(4) IT Security Plan—this is a FISMA requirement; see the ADL for applicable requirements. The IT Security Plan is specific to the IT System and not the contract. Within 30 days after award, the contractor shall develop and deliver an IT Security Management Plan to the Contracting Officer; the approval authority will be included in the ADL. All contractor personnel requiring physical or logical access to NASA IT resources must complete NASA’s annual IT Security Awareness training. Refer to the IT Training policy located in the IT Security Web site at https://itsecurity.nasa.gov/policies/index.html.
(d) The contractor shall afford Government access to the Contractor’s and subcontractors’ facilities, installations, operations, documentation, databases, and personnel used in performance of the contract. Access shall be provided to the extent required to carry out a program of IT inspection (to include vulnerability testing), investigation and audit to safeguard against threats and hazards to the integrity, availability, and confidentiality of NASA Electronic Information or to the function of IT systems operated on behalf of NASA, and to preserve evidence of computer crime.
(e) At the completion of the contract, the contractor shall return all NASA information and IT resources provided to the contractor during the performance of the contract in accordance with retention documentation available in the ADL. The contractor shall provide a listing of all NASA Electronic information and IT resources generated in performance of the contract. At that time, the contractor shall request disposition instructions from the Contracting Officer. The Contracting Officer will provide disposition instructions within 30 calendar days of the contractor’s request. Parts of the clause and referenced ADL may be waived by the contracting officer, if the contractor’s ongoing IT security program meets or exceeds the requirements of NASA Procedural Requirements (NPR) 2810.1 in effect at time of award. The current version of NPR 2810.1 is referenced in the ADL. The contractor shall submit a written waiver request to the Contracting Officer within 30 days of award. The waiver request will be reviewed by the Center IT Security Manager. If approved, the Contractor Officer will notify the contractor, by contract modification, which parts of the clause or provisions of the ADL are waived.
(f) The contractor shall insert this clause, including this paragraph in all subcontracts that process, manage, access or store NASA Electronic Information in support of the mission of the Agency.
(End of clause)
1852.225-70 EXPORT LICENSES (FEB 2000)
(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.
(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at Marshall Space Flight Center [insert name of NASA installation], where the foreign person will have access to export-controlled technical data or software.
(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.
(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.
(End of clause)
1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (MAR 1989)
(a) Of the total price of items CLIN 001 through CLIN 002, the sum of $TBD is presently available for payment and allotted to this contract. It is anticipated that from time to time additional funds will be allocated to the contract in accordance with the following schedule, until the total price of said items is allotted:
SCHEDULE FOR ALLOTMENT OF FUNDS
TBD $TBD
(b) The Contractor agrees to perform or have performed work on the items specified in paragraph (a) of this clause up to the point at which, if this contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause would, in the exercise of reasonable judgment by the Contractor, approximate the total amount at the time allotted to the contract. The Contractor is not obligated to continue performance of the work beyond that point. The Government is not obligated in any event to pay or reimburse the Contractor more than the amount from time to time allotted to the contract, anything to the contrary in the Termination for Convenience of the Government clause notwithstanding.
(c)(1) It is contemplated that funds presently allotted to this contract will cover the work to be performed until TBD.
(2) If funds allotted are considered by the Contractor to be inadequate to cover the work to be performed until that date, or an agreed date substituted for it, the Contractor shall notify the Contracting Officer in writing when within the next 60 days the work will reach a point at which, if the contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause will approximate 75 percent of the total amount then allotted to the contract.
(3)(i) The notice shall state the estimate when the point referred to in paragraph (c)(2) of this clause will be reached and the estimated amount of additional funds required to continue performance to the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it.
(ii) The Contractor shall, 60 days in advance of the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, advise the Contracting Officer in writing as to the estimated amount of additional funds required for the timely performance of the contract for a further period as may be specified in the contract or otherwise agreed to by the parties.
(4) If, after the notification referred to in paragraph (c)(3)(ii) of this clause, additional funds are not allotted by the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, the Contracting Officer shall, upon the Contractor’s written request, terminate this contract on that date or on the date set forth in the request, whichever is later, pursuant to the Termination for Convenience of the Government clause.
(d) When additional funds are allotted from time to time for continued performance of the work under this contract, the parties shall agree on the applicable period of contract performance to be covered by these funds. The provisions of paragraphs (b) and (c) of this clause shall apply to these additional allotted funds and the substituted date pertaining to them, and the contract shall be modified accordingly.
(e) If, solely by reason of the Government’s failure to allot additional funds in amounts sufficient for the timely performance of this contract, the Contractor incurs additional costs or is delayed in the performance of the work under this contract, and if additional funds are allotted, an equitable adjustment shall be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the items to be delivered, or in the time of delivery, or both.
(f) The Government may at any time before termination, and, with the consent of the Contractor, after notice of termination, allot additional funds for this contract.
(g) The provisions of this clause with respect to termination shall in no way be deemed to limit the rights of the Government under the default clause of this contract. The provisions of this Limitation of Funds clause are limited to the work on and allotment of funds for the items set forth in paragraph (a) of this clause. This clause shall become inoperative upon the allotment of funds for the total price of said work except for rights and obligations then existing under this clause.
(h) Nothing in this clause shall affect the right of the Government to terminate this contract pursuant to the Termination for Convenience of the Government clause of this contract.
(End of clause)
MSFC 52.209-91 ASSOCIATE CONTRACTOR AGREEMENTS (ACA) (APR 2017)
(a) The contractor shall enter into an ACA for any portion of the contract requiring cooperation and coordination with another NASA contractor in order to achieve successful contract performance.
(b) ACA shall include the following:
(1) Identification of the parties and the relevant NASA contract (see paragraph (e)).
(2) The specific area(s) of the contract requiring cooperation and coordination.
(3) A description of the proposed interfaces for each area.
(4) The specific nature of the cooperation and coordination for each area in terms of sharing technical data, knowledge, expertise, and/or other resources.
(5) Obligations regarding the protection of proprietary information and/or other restrictions on personnel.
(6) The identification of any organizational conflict of interest (OCI) created as a result of the ACA. (Resolution of identified OCIs shall be appended to the OCI plan in accordance with Data Requirements Description 1642MA-001.)
(7) Expiration date or event.
(c) Prior to execution, a copy of each ACA shall be provided to the Contracting Officer for review and comment. However, notwithstanding the review and comment by the Contracting Officer, the Contractor shall remain fully responsible for the ACA and the successful performance of this contract. Furthermore, the Government shall not be liable in any manner for either a breach of the ACA by a party or the failure to resolve a disagreement with an associate contractor.
(d) Initial ACAs shall be in place within three months of contract award. Subsequent ACAs required during contract performance shall be executed within three months of written notification from the Contracting Officer.
(e) An initial ACA is required for each of the following relevant NASA contracts:
| Contract |
| Services |
| Contractor |
| NNM17AA25C MSFC and MAF Protective Services (MMPS) |
| Security, Building Access, Lock and Key |
| Security Walls, LLC |
| 80MSFC18P0007 MSFC Emergency Medical Services Provider |
| Oversight of Automated External Defibrillator (AED) Program |
| Huntsville Emergency Medical Services Inc. (HEMSI) |
MSFC 52.209-92 DISCLOSURE OF ORGANIZATIONAL CONFLICT OF INTEREST (OCI) AFTER CONTRACT AWARD (MAY 2017)
(a) If the Contractor identifies an actual or potential organizational conflict of interest that has not already been adequately disclosed and resolved (or waived in accordance with FAR 9.503), the Contractor shall make a prompt and full disclosure in writing to the Contracting Officer. This disclosure shall include a description of the action the Contractor has taken or proposes to take in order or resolve the conflict. This reporting requirement also includes subcontractors’ actual or potential organizational conflicts of interest not adequately disclosed and resolved prior to award.
(b) Organizational Conflict of Interest Plan. If there is an OCI plan in the contract, the Contractor shall periodically update the plan, based on changes such as changes to the legal entity, the overall structure of the organization, subcontractor arrangements, contractor management, ownership, ownership relationships or modification of the work scope.
(End of clause)
MSFC 52.209-94 RESOLUTION OF ORGANIZATIONAL CONFLICTS OF INTEREST (MAY 2017)
(a) The Organizational Conflict of Interest (OCI) Plan and its obligations (which includes any appended resolution strategies related to identified OCIs), are hereby incorporated in the contract by reference.
(b) Changes. (1) Either the Contractor or the Government may propose changes to the OCI Plan. Such changes are subject to the mutual agreement of the parties and will become effective only upon incorporating the change into the plan by contract amendment.
(2) In the event that the Government and the Contractor cannot agree upon a mutually acceptable change, the Government reserves the right to make a unilateral change to the OCI Plan as necessary, with the approval of the head of the contracting activity, subject to Contractor appeal as provided in the Disputes clause.
(c) Violation. The Contractor shall report any violation of the OCI Plan, whether by its own personnel or those of the Government or other contractors, to the Contracting Officer. This report shall include a description of the violation and the actions the Contractor has taken or proposes to take to mitigate and avoid repetition of the violation. After conducting such further inquiries and discussions as may be necessary, the Contracting Officer and the Contractor shall agree on appropriate corrective action, if any, or the Contracting Officer shall direct corrective action.
(d) Breach. Any breach of the above restrictions or any nondisclosure or misrepresentation of any relevant facts required regarding OCI to be disclosed may result in termination of this contract for default or other remedies as may be available under law or regulation.
(e) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (e), in subcontracts where the work includes or may include tasks related to the OCI. The terms “Contractor” and “Contracting Officer” shall be appropriately modified to reflect the change in parties and to preserve the Government’s rights.
(End of clause)
MSFC 52.223-90 ASBESTOS MATERIAL (AUG 2015)
During performance of this contract, Contractor personnel performing work in MSFC buildings may come in contact with materials containing asbestos. MSFC Buildings 4200, 4201, and 4663 are of special concern since they are known to contain a sprayed on fire insulation on or above the ceiling, usually located on the metal or concrete structure of the buildings. Examples of asbestos-containing material are floor tile, pipe and lagging insulation, exterior siding, roofing felt, and many other building materials. To facilitate communication, MSFC has established a website where the inventory of asbestos-containing material, their condition and approximate location are provided. The URL for this website is http://ais.ndc.nasa.gov/default.aspx. If the Contractor is unable to access this URL, they may contact the Contracting Officer or MSFC’s Environmental Engineering and Occupational Health (EEOH) Office (organization code AS10) for assistance. Prior to performing tasks which may disturb building material containing asbestos or suspected asbestos, the Contractor shall notify MSFC’s EEOH Office for assistance. The Contractor shall also be responsible for ensuring that all Contractor personnel working onsite are made aware of and comply with the requirements of this clause.
(End of clause)
MSFC 52.223-91 HAZARDOUS MATERIAL REPORTING (FEB 2016)
(a) If during the performance of this contract, the Contractor transports or accepts delivery of any hazardous materials (hazardous as defined under the latest version of Federal Standard No. 313, including revisions adopted during the term of the contract) on-site to Marshall Space Flight Center, the hazardous material shall be processed through MSFC Central Receiving to be bar-coded for inventory. Alternative receiving points may be designated if approval is granted in accordance with MWI 8550.5, “Hazardous Material Management.” Chemical containers shall be managed in accordance with the provisions of MWI 8550.5. The Contractor shall be responsible for ensuring that all Contractor/subcontractor personnel are made aware of and comply with this clause.
(b) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material; or with clauses regarding hazardous materials, which may be contained in the contract and/or order.
(End of clause)
MSFC 52.223-92 ENVIRONMENTAL - GENERAL CLAUSE (AUG 2010)
Contractors performing on-site shall comply with all applicable Environmental policies and procedures including, but not limited to, MPD 8500.1, “MSFC Environmental Management Policy” and MPR 8500.1, “MSFC Environmental Engineering and Occupational Health Program.” MSFC contractors performing on-site activities that could potentially impact the environment shall be responsible for following all established NASA/MSFC environmental procedures. These procedures and other applicable policies and procedures are available by contacting the NASA/MSFC Environmental Engineering & Occupational Health Office. Failure to comply with environmental policies and procedures, may result in damage to the environment, and could potentially result in regulatory penalties against NASA and/or the Contractor, and Contractor loss of access to NASA/MSFC facilities.
(End of clause)
MSFC 52.223-95 PREVENTION OF AND RESPONSE TO THREATENING OR VIOLENT BEHAVIOR IN THE WORKPLACE (MAR 2017)
The Contractor shall comply with all applicable Contractor responsibilities set forth in Marshall Procedural Requirements (MPR) 1600.2, “Prevention of and Response to Threatening or Violent Behavior in the Workplace”.
(End of clause)
MSFC 52.223-96 MEDICAL SERVICES (SEPT 2018)
Contractors with employees requiring NASA-specific and Occupational Health and Safety Association (OSHA) required medical certification health examinations may utilize the MSFC Medical Center’s service provider for such services; however, the Contractor is responsible for all associated costs and payments. The MSFC Medical Center’s service provider is located in Building 4249 and is generally open between 7:00 a.m. and 4:30 p.m., Monday through Thursday and 7:00 a.m. to 3:30 p.m. every other Friday (excluding Government holidays, Center-approved closures, early dismissals, or delayed openings), coinciding with the MSFC flexible work schedule.
Contractors should utilize the MSFC emergency medical services system for any incident that occurs at MSFC and which requires emergency medical treatment by dialing 911. Additional emergency contact numbers are accessible from the MSFC “Safety, Health and Environmental - SHE” Web site located on the ExplorNet Web page https://explornet.msfc.nasa.gov/groups/safety-health-and-environmental-she. Refer to MWI 1800.1, “MSFC Occupational Medicine” and MWI 3410.1, “Personnel Certification Program” for additional information.
(End of clause)
MSFC 52.223-97 MANDATORY AND REQUIRED TRAINING (JUNE 2016)
All Contractor personnel performing work onsite at MSFC or MAF shall complete, in a timely manner, all applicable mandatory and required training courses listed below, as well as any other current or future training requirements specified in the Statement of Work, Performance Work Statement, Specifications, Applicable Documents (including NASA, MSFC and Organizational level directives), Data Requirements Descriptions, other contract clauses and/or the System for Administration, Training, and Educational Resources for NASA (SATERN). SATERN provides web-based access to many required training courses. Contractor employees may be provided access to SATERN. The Contractor shall maintain training records for each employee, documenting the completion of this and any other required training. A list of the mandatory and required training including their titles, delivery method, frequency and target audience is accessible from the MSFC ExplorNet Web page at: https://explornet.msfc.nasa.gov/docs/DOC-15683. The content of the list and the training itself are subject to change without notice.
Training for its employees and subcontractors shall be the responsibility of the Contractor. Some certification courses are offered to the Contractor on a limited space available basis, and MSFC makes no obligation to provide this training to Contractor personnel. MSFC Contractors may develop their own training for those courses not provided, or obtain it from a qualified outside vendor – this does not give rise to an equitable adjustment to contract value. The course material to be used for certification courses developed by a Contractor and/or verification of certification by an outside vendor, shall be submitted to the MSFC Industrial Safety Branch/SHE Training Subcommittee for approval and the training is subject to audit by the Government.
(End of clause)
CREDIT RESULTING FROM NO-COST MEDICAL SERVICES
(a) The contractor shall reimburse to the Government an amount equal to the following percentages of total monthly gross revenues resulting from the performance of the “No-Cost Medical Services” as specified in the Performance Work Statement Section 9.0, of the contract:
| Base Period |
| Option 1 |
| Option 2 |
| Option 3 |
| Option 4 |
| % |
| % |
| % |
| % |
| % |
(b) The contractor shall submit any credit(s) due the Government as a separate invoice concurrently with the standard invoice in accordance with NFS clause 1852.232-80 Submission of Vouchers/Invoices for Payment.
(c) The contractor shall maintain complete records of all revenues resulting from performance of these services and make such records available to the Government upon request.
H-9
SECTION I - CONTRACT CLAUSES
52.202-1 DEFINITIONS (NOV 2013)
52.203-3 GRATUITIES (APR 1984)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)
52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015)
52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015)
(a) Definition.
United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) Display of fraud hotline poster(s). Except as provided in paragraph (c)—
(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites—
(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and
(ii) Any DHS fraud hotline poster subsequently identified by the Contracting Officer.
(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.
(3) Any required posters may be obtained as follows:
Inspector General Hotline Poster http://oig.nasa.gov/hotline.html
(i) Appropriate agency name(s) and/or title of applicable Department of Homeland Security fraud hotline poster); and
(ii) The website(s) or other contact information for obtaining the poster(s).)
(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in all subcontracts that exceed $5.5 million, except when the subcontract—
(1) Is for the acquisition of a commercial item; or
(2) Is performed entirely outside the United States.
(End of clause)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2016)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016)
52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-DELIVERY CONTRACTS (OCT 2016)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)
52.209-9 UPDATES OF PUBLICLY AVAILABLE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.