JPSS-2 - RFP Questions and Responses 6.15.21.docx
DOCX document 18 KB Posted
- Attached to
- JPSS-2 Payload Processing Service Federal contract opportunity
- Solicitation number
- 80KSC021R0037
About this file
This solicitation requests proposals for payload processing services for the Joint Polar Satellite System-2 spacecraft to be launched on an Atlas V rocket. The National Aeronautics and Space Administration Kennedy Space Center requires processing facilities and services including encapsulation and transport of the spacecraft through an exit door no less than 19.8 feet wide. The solicitation instructs offerors to submit proposals by June 15, 2021 via the provided Box link and per the submission instructions. It identifies the applicable North American Industry Classification System code, small business size standard, and states that this acquisition provides for full and open competition.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 05 - Attachment 5 - Definitions.pdf | ||
| 00 - SF 1449.pdf | ||
| 01 - Attachment 1 - JPSS-2 Statement of Work.pdf | ||
| 03 - Attachment 3 - Data Requirements List.pdf | ||
| 04 - Attachment 4 - Acronyms and Abbreviations.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JPSS-2 Questions and Responses 80KSC021R0037
Preliminary_LSSP_JPSS-2 May 2021 Questions
Questions/Response Posted 6/15/2021
1. Preliminary LSSP JPSS-2 Req. 2622: Please confirm quantity. Are 20 rolls required or 150?
Response:
This is a typo in the Req. 2622. The requirement is to provide one hundred and fifty (150) rolls of silicone-free cleanroom tape and a dispenser (or scissors) in change room for securing of gloves to sleeves of cleanroom suits. Use LSP approved supplier and part number: Ultratape -2149 2"wide 24-vard Length or equivalent.
Original Requirement:
| 2622 |
| PPF CR |
| Consumables & Garments |
| Cleanroom Tape |
| Provide twenty (150) rolls of silicone-free, cleanroom tape and a dispenser (or scissors) in change room for securing of gloves to sleeves of cleanroom suits. |
Use LSP approved supplier and part number:
Ultratape -2149, 2” wide, 24-yard Length or equivalent.
PPF/TBD
Updated Requirement:
| 2622 |
| PPF CR |
| Consumables & Garments |
| Cleanroom Tape |
| Provide twenty one hundred and fifty (150) rolls of silicone-free cleanroom tape and a dispenser (or scissors) in change room for securing of gloves to sleeves of cleanroom suits. |
Use LSP approved supplier and part number:
Ultratape -2149 2"wide 24-vard Length or equivalent.
PPF/TBD
2. Preliminary LSSP JPSS-2 Req. 4015: Please confirm that the 25’ door width requirement is only for a “side” door. Please verify that exiting through a “front” door (e.g. the same door used for transporter ingress) can be accomplished with a door that can accommodate the hardware width of 19.80’.
Response:
For 4015, “side door” is meant to indicate floor level door that can accommodate the transporter to roll in, collect the encapsulated assembly (EA) and roll out. Whether it is a front, back, or side door doesn’t matter. The user prefers a door width of 25 feet, but requires enough width for the actual hardware size of 19.8’ width to pass.
Original Requirement:
| 4015 |
| PPF CR ULA |
| Facility Specs |
| LV Area B Exit Door |
| LV Area B requires an exit door for Encapsulated Assembly (EA) exit from the facility. |
If the EA departure from the facility is through side door, a door of 25’ wide x 50’ tall minimum is required to accommodate the 4M Extended Payload Fairing on the Kamag transporter (actual hardware dimension of 19.8’ wide and 45’ 5.01” tall).
If the Encapsulated Assembly is hoisted out of the facility the exit door required is 25’ wide x 48’ tall, nominal, to accommodate the actual hardware size of 19.80’ wide x 43’6.1” tall.
PPF/TBD
Updated Requirement:
| 4015 |
| PPF CR ULA |
| Facility Specs |
| LV Area B Exit Door |
| LV Area B requires an exit door for Encapsulated Assembly (EA) from the facility. If the EA departure from the facility is through a floor level side door, a door of 25' wide x 5O' tall minimum is preferred, but must required to accommodate the 4M Extended Payload Fairing on the Kamag transporter with (actual hardware dimension of 19.8' wide and 45'5.01"tall). |
If the Encapsulated Assembly is hoisted out of the facility, the exit door required is preferred to be 25' wide x 48' tall, nominal to but must accommodate the actual hardware size of 19.80' wide x 43'6.1"tall.
PPF/TBD