Definitions

View the file

Other files for this federal contract opportunity

Other files attached to WCCPP - Landsat 9, newest first.
File Type Posted
80KSC019Q0008_Modification_001.pdf PDF
Questions_and_Responses.pdf PDF
Questions_and_Responses.pdf PDF
80KSC019Q0008_WCCPP-LANDSAT_9.pdf PDF
Attachment_2_-_Launch_Site_Support_Plan_-_Preliminary_March_2019.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_4_-_Acronyms_and_Abbreviations.pdf PDF
Attachment_3_-_Data_Requirements_List.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

DEFINITIONS

Launch Services Program

Landsat 9

West Coast Commercial Payload Processing for the

National Aeronautics and Space Administration

RFP 80KSC019Q0008 Attachment 5 West Coast Commercial Payload Processing Definitions

Definitions

Airlock: An area, with a controlled environment, designed to accept the payload and its transporter. The airlock provides isolation from both the outside and cleanroom environment, and allows stabilization of temperature, humidity, and minimization of contamination.

Anomaly: Any unexpected event. This may be a communications problem, an excursion outside of facility cleanliness specifications, or other unwanted occurrence.

Baseline LSSP The LSSP is an agreement between the NASA LSIM, the spacecraft customer representative, and the LSC as to the NASA-provided products and services necessary for successful, cost-effective spacecraft launch site processing at VAFB. The Baseline LSSP contains the final spacecraft launch site requirement and the LSP and Supplier commitments to satisfy those requirements.

Canning: Building up the transportation canister used to transport the Spacecraft and associated vehicle launch hardware.

Cleanroom: An environmentally controlled area for processingspacecraft. A facility or area where contamination such as hydrocarbons, non-volatile residue, and particulate are limited to predefined levels based on the class of the cleanroom. Monitoring of contamination levels is mandatory to ensure they stay within specifiedlimits.

Control Room: An area which houses Spacecraft provided electrical GSE and personnel during payload testing and launch operations.

Delay: A Government or Contractor delay of either IFO date or the LD.

A Delay will commence when the delaying party provides written notice specifying the duration of the delay.

Facility Departure Date: The date that all spacecraft hardware and personnel vacate the facility as specified in Article 20, Milestone Performance and Payment.

Grace Period: An allowable period of time for delays of the LD (if notification of delay is made after initial facility occupancy date.) During the grace period, delay damages are waived. The total cumulative grace period used for any one mission cannot exceed 1 week.

West Coast Payload Processing Definitions

Initial Facility Occupancy (IFO) Date: The initial facility occupancy date as specified in Article 20, Milestone Performance and Payment. This date reflects the initial arrival of spacecraft personnel or mission-related personnel, hardware, equipment, or supplies at the facility. This does not include early access to the facility prior to IFO to accommodate communications installation and checks. This communications installation saccess is limited to two weeks, and will not count against the Occupancy Period.

Launch Date (LD): The launch date as specified in Article 20, Milestone Performance and Payment.

Occupancy Period: The period of time from the IFO date to the Facility Departure Date, plus any applicable grace period.

Launch Service Contractor (LSC): Contractor providing Launch Vehicle services and responsible for processing Launch Vehicle hardware (e.g. Payload Attach Fitting) in the PPF.

Mission: The overall flow or processing and launch of the Spacecraft and Launchvehicle.

NASA LSP: The Government customer responsible for ensuring safe and successful integration of the spacecraft onto the launch vehicle, and all corresponding operations.

NISN: NASA Integrated Science Network. The NASA communications infrastructure used to provide connectivity betweengeographically dispersed locations for voice, video and data.

Payload: Any of a class of satellite or probe that is ultimately tobe placed into space. It may also be referred to as a Spacecraft or an Observatory.

Preliminary LSSP The LSSP is an agreement between the NASA LSIM, the spacecraft customer representative, and the LSC as to the NASA-provided products and services necessary for successful, cost-effective spacecraft launch site processing at VAFB. The Preliminary LSSP is signed only by the LSIM, and contains the spacecraft requirements as complete as possible at that time, but it does not contain the final commitments to show how LSP and its sub-suppliers will satisfy those customer requirements.

West Coast Payload Processing Definitions

Propellant: Any of a class of solid, liquid, or gaseous substances used to produce thrust. Propellants may be toxic, corrosive, or capable of producing severe injury due to cold.

Range: The Government or Government agency responsible for controlling Government resources on VAFB.

Spacecraft: Any of a class of satellite or probe that is ultimately tobe placed into space. It may also be referred to as a Payload or an Observatory.

Spacecraft Customer: The Government or Contractor organization responsible for processing a Spacecraft in the PPF.

Target Launch The Launch date, for a specific mission, as specified in the Contract.