Attachment_3_-_Data_Requirements_List.pdf
PDF 28 KB Posted
- Attached to
- WCCPP - Landsat 9 Federal contract opportunity
- Solicitation number
- 80KSC019Q0008
About this file
DRL
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 80KSC019Q0008_Modification_001.pdf | ||
| Questions_and_Responses.pdf | ||
| Questions_and_Responses.pdf | ||
| Attachment_5_-_Definitions.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Attachment_4_-_Acronyms_and_Abbreviations.pdf | ||
| 80KSC019Q0008_WCCPP-LANDSAT_9.pdf | ||
| Attachment_2_-_Launch_Site_Support_Plan_-_Preliminary_March_2019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3
DATA REQUIREMENTS LIST
Launch Services Program
Landsat 9
West Coast Commercial Payload Processing for the
National Aeronautics and Space Administration
RFP 80KSC019Q0008 Attachment 3 West Coast Commercial Payload Processing Data Requirements List
1.0 Data Requirements List
The Data Requirements List (DRL) described in SOW 3.2.2 identifies critical elements of the contracted effort where aspects of payload processing insight are required by NASA and where NASA approval is required. The following DRL defines the scope of documentation required; however, NASA will utilize the Contractor’s existing documentation to the extent practicable if it meets compliance requirements. The submittal dates specified represent due dates to the Contracting Officer (CO). DRL approval may be assumed unless the Contractor is notified by NASA of disapproval within thirty (30) days, or as otherwise identified.
All DRLs shall be submitted electronically to the respective points of contact. All data requirements shall be delivered to the CO, with an informational copy to the Contracting Officer’s Representative (COR) and Launch Site Integration Manager (LSIM). The Contractor shall notify the CO in writing of DRL delivery.
DRL
Item
Document Submittal Date Insight (I) Approval
(A)
Subsequent Submittal/ Changes
1 Facility Handbook 10 Business Days
After Contract Award
I As Required
Mishap Reporting and Investigation
No Later Than 5 Days after Type A, B, or C Occurrence.
No Later Than 7 Days after all other
Occurrence.
I As Required
3 Orientation Presentation No Later Than
Ground Operations Review
I As Required
Certificate Of Facility Readiness (COFR)
See “Milestone Performance and Payment” Article
A As Required
Off-loading and Transport Operation Procedures and Transportation route survey
20 Days Prior to facility occupancy date A As Required
6 Facility Safety Manual 10 Business Days
After Contract Award
A As Required
7 Impound Plan 10 Business Days
After Contract Award
I As Required
Facility Environment History
10 Business Days After Contract
Award I As Required
10 Facility Manifest 10 Business Days
After Contract Award
I As Required
DRL 1 Facility Handbook
The facility handbook shall have a complete description of the facility and facility systems capabilities. As the facility or facilities systems are modified, the Contractor shall revise the Facility Handbooks and applicable safety documentation requirements to reflect the current facility and facility systems capabilities.
DRL 2 Mishap Reporting and Investigation
For Type A, B, C, and D mishaps and close calls, as defined in NPR 8621.1, reports shall be generated per requirements in SOW paragraph 3.1. A copy of the report shall be forwarded to the COR within five days for Type A, B, and C mishaps and seven days for all others.
DRL 3 Orientation Presentation
The presentation and hand-out material shall include: the Contractor’s key personnel contacts, facility layout, operation methodology, status of the processing facility and its associated systems, open deviation/waivers, anomalies currently open or under investigation, safety training information, delivery dates of commodities, and agreements for services. Also, the package shall address mission unique requirements, support and services. An overview of the processing facility and mission flow shall be provided.
DRL 4 Certificate of Facility Readiness (COFR)
The Contractor shall generate a detailed report on the facility, facility systems and facility support equipment documenting that the square footage required is provided for, and that contamination and environmental control, electrical, communication and video systems comply with the requirements as stated in the SOW and associated Appendices. As a minimum, the COFR shall:
Identify all systems by name
Identify each system as critical/non-critical
Provide a brief description of status and readiness of the facility and each facility system
Provide a copy of the certification for each systems proofload, calibration, compliance or inspection
List supporting documentation for each system
Provide a summary of facility modifications implemented since last NASA usage
Have an Open items, Issues, and Concerns Section with associated correction plan and date
Have an Exception, waivers, and deviation Section
Provide a Safety statement of readiness
DRL 5 Offloading and Transport Operation Procedures and Transportation Route Survey
The Contractor shall be notified of approval or disapproval within ten business days of submittal. For offloading Flight hardware and GSE, any operation procedures used shall be submitted by the Contractor. The survey will include but not be limited to: road conditions, overhead obstruction, bridge conditions and a map identifying the transportation route. Not earlier than one (1) business day prior to transportation, a final route survey shall be performed by driving the transport route.
DRL 6 Facility Safety Manual
The Facility Safety Manual should provide detailed description of the hazardous and critical systems in a facility in accordance with AFSPCMAN 91-710. As standard operating safety requirements for organizations occupying the facility change, the Contractor shall revise the safety manual to reflect current safety policy and criteria applicable to GSE and to ground operations processing at the facility. The Contractor shall also make the appropriate revisions if there are any mission-unique safety systems for a mission that drives the control or mitigation for a potential safety hazard other than those already addressed in the current Manual.
DRL 7 Impound Plan
The Contractor’s Impound Plan shall identify the procedures/actions, roles and responsibilities that will be implemented by the Contractor after a mishap occurs.
The Impound Plan shall include:
a. Identification of the location or space where impounded data, records, and equipment shall be stored and secured during an investigation
b. Procedures for release of impounded data, records, equipment, and facilities at the mishap site
Data and records, regardless of format, to be impounded may include, but are not limited to:
a. Check-out logs, test and check-out record charts, launch records, weather information, telemetry tapes, video tapes, audio tapes, time cards, training records, work authorization documents, inspection records, analyses, and problem reports.
b. Historical data associated with the specific equipment, operations, and operating personnel including, environmental, operational, psychological, and other factors bearing on the situation.
DRL 9 Facility Environment History
The latest facility environment history will be provided to include the latest RF survey results, the latest magnetic survey results and the latest cleanroom cleanliness results.
DRL 10 Facility Manifest
The latest facility manifest will be provided anytime changes have occurred that may have an impact on the NASA Spacecraft.. The facility manifest shall include the known payload processing commitments in the facility, whether they are commercial or Government, including the initial facility occupancy and processing durations, the facility readiness schedule (cleaning time, stabilization time), and planned facility outages.