RFP_80GSFC19R0003_Questions_and_Responses_Set_1.pdf

PDF 353 KB Posted

Attached to
Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Solar Array Panels Federal contract opportunity
Solicitation number
80GSFC19R0003
Issued by
National Aeronautics and Space Administration Goddard Space Center

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80GSFC19R0003

Questions and Reponses Set #1

RFP Questions and Reponses Set #1

Questions regarding PACE Solar Array Panels Specification (PACE-PWR-SPEC-0062-REV-A) are listed below:

Q1: Are higher resolution images of Figure 4-5 through Figure 4-10 available?

The numerical values in the images are too small. Zooming in makes the numerical values larger, but also fuzzy.

Answer 1: See attachments Panel1, Panel 2, Panel 3, Qual Panel

Q2: Is the small table following Table 6-5 an addendum to Table 6-5?

Table 6-5 starts on page 32. The table spills over to the top of page 33. Also on page 33 is a short two-column table. Initially, it looks like it may be intended as an addendum to Table 6-5 with additional data points. However, a few of the energy level (first column) values in the dangling table are already included in Table 6-5. If the small table without a caption is an addendum to Table 6-5, are we to use the original values in Table 6-5 or the new value in the small table where energy levels are replicated? (400, 200, 100 & 80)

Answer 2: It is a duplicate that keeps showing up. See updated SPEC Attachment Release_Pace

PWR SPEC

Question related to the PACE Solar Array Compliance Matrix Form (Enclosure L.2) is listed below:

Q3: The header for the 3rd column is TM Req. Please clarify what TM Req. stands for.

Answer 3: TM Req. means "Technical Merit Requirement”