Enclosure_7.pdf

PDF 178 KB Posted

Attached to
NASA Earth Science Magnetic Tape Data Recovery
Solicitation number
80GSFC18Q0008
Issued by

About this file

Enclosure 7

View the file

Other files

File Type Posted
Amendment_01.pdf PDF
Attachment_A.pdf PDF
Attachment_B.pdf PDF
Enclosure_5.pdf PDF
Enclosure_1_-_Model_BPA.pdf PDF
Enclosure_4.pdf PDF
SF1449.pdf PDF
Enclosure_2.pdf PDF
Enclosure_6.pdf PDF
Enclosure_3.pdf PDF
Attachment_C.pdf PDF
Cover_Letter.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENCLOSURE 7 RFQ No. 80GSFC18Q0008

PAST PERFORMANCE QUESTIONNAIRE

PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS

(Updated June, 2017)

Sections 1-3 provide for contract-related descriptive information and identification of the evaluator.

Section 4 lists the major work elements within our Statement of Work (SOW). Please provide your assessment of the “relevant experience” and “performance” associated with our SOW evidenced within the contract for which you are a reference. “Experience” means a contractor who has performed work in the specific SOW

Element. “Did not Perform” means that the specific SOW element was not performed under the contract.

Section 5 evaluates the contractor’s technical, schedule, and cost performance and management. (Additional pages may be used for comments if desired). If you cannot answer any questions, please circle “N/R” for Not

Rated.

The following definitions are offered for your use in assigning a performance rating for each of the factors in

Sections 5 and 6:

Very High

(VH)

The Offeror’s relevant past performance is of exceptional merit;

indicating exemplary performance in a timely, efficient, and economical manner; very minor (if any) problems with no adverse effect on overall performance.

High

(H)

The Offeror’s relevant past performance demonstrates very effective performance that would be fully responsive to contract requirements with contract requirements accomplished in a timely, efficient, and economical manner for the most part with only minor problems with little identifiable effect on overall performance.

Moderate

(M)

The Offeror’s relevant past performance demonstrates effective performance; fully responsive to contract requirements; reportable problems, but with little identifiable effect on overall performance.

Low

(L)

The Offeror’s relevant past performance meets or slightly exceeds minimum acceptable standards; adequate results; reportable problems with identifiable, but not substantial, effects on overall performance.

Very Low

(VL)

The Offeror’s relevant past performance does not meet minimum acceptable standards in one or more areas; remedial action required in one or more areas; problems in one or more areas which, adversely affect overall performance.

N/R Not Rated

Section 6 provides for evaluation of the contractor’s management of cost and award/incentive fee history.

RETURN THIS QUESTIONNAIRE TO NASA Goddard Space Flight Center

BY: March 9, 2018, 3:00pm EST Attn: Ian Sherry, Code 210.5

Greenbelt, MD 20771

Phone: 301-286-9061

Email: Ian.P.Sherry@nasa.gov mailto:Ian.P.Sherry@nasa.gov

1. Contract Information

A. Name of Company/Division Being Evaluated: _____________________

B. Address: _____________________________________________

C. Contractor Cage Code and/or DUNS number

D. Contract Number: _______________________________________

E. Contract Type: _________________________________________

F. Period of Performance (including options): From: ______ To: _______

G. Total Contract Value: _____________________________________

H. Award Information: Competitive: Yes___ No___

Basis of Selection: Technical___ Cost/Price___

Other (specify)_________________________

2. Description of Contract

Briefly describe the services provided under this contract:

During the contract performance being evaluated, this firm was the:

Prime Contractor____ Significant Subcontractor ____ Team Member ____

Other (describe)____________________________________________

Does a corporate or business relationship exist between the firm being evaluated and your organization?

Yes ___ No ___. If yes, please describe: ___________________________

3. Evaluator Information

Name: ____________________________________________________

Title: ____________________________________________________

Agency/Company: ____________________________________________

Address: __________________________________________________

Phone: ______________ Date Questionnaire Completed: _______________

Role in Program/Contract: _____________________________________

Length of Involvement in this Program/ Contract: _____________________

ENCLOSURE 7 80GSFC17Q0008

4. SOW Survey Relevance Ratings: Please check the appropriate blocks for Relevance (Performed or Did Not Perform)

SOW ELEMENT

PERFORMED

DID NOT

PERFORM

Recovery/transcription of 7-track tapes

Recovery/transcription of 9-track tapes

Recovery/transcription 3480 tapes

Recovery/transcription of 8mm tapes

Recovery data from sticky/baking tapes to remove excess moisture

Recovering data from tapes with alignment issues

Recovering data from tapes with damaged hubs/cartridges

This form contains Source Selection Information when completed. See FAR 3.104.

5. General Performance Survey

NO PERFORMANCE QUESTIONS

PERFORMANCE RATING

(Please Circle)

QUALITY

1. Quality of services and support provided VH H M L VL N/R

2. Timely identification and mitigation of risks VH H M L VL N/R

3.

Ability to identify and correct performance deficiencies in a timely manner

VH H M L VL N/R

4.

Comment:

SCHEDULE

Timeliness, quality, and accuracy of schedule estimates and reporting

VH H M L VL N/R

5. Ability to meet/exceed schedule milestones VH H M L VL N/R

6.

COST

Ability to establish realistic cost estimates and adhere to estimated costs

VH H M L VL N/R

7. Ability to anticipate, identify and control cost growth. VH H M L VL N/R

8.

BUSINESS/MANAGEMENT

Communicating/interfacing with Government and overall responsiveness to Government requests

VH H M L VL N/R

9.

Ability to effectively manage the contract including subcontractor performance, if applicable

VH H M L VL N/R

10.

Ability to recruit and retain highly skilled personnel, including ability to fill key vacancies in a timely manner.

VH H M L VL N/R

11.

Adequacy of Contractor’s system(s) for processing task orders and/or changes.

VH H M L VL N/R

12.

Section 6:

What is the Contract Value:

Initial Value Current Value

Estimated Cost: $___________ $____________

Fee: $___________ $____________

Total Value: $___________ $_____________

What are the total contract expenditures to date (cost/fees to date based on invoices, reports, etc)?

What is the Annual Contract Value to Date (The current contract expenditures to date divided by the number of years of performance to date)?

For example (note, these example numbers may not relate to this specific procurement):

Assume your contract is a current five year contract, is still ongoing, and the latest cost report reflects a cost/fee of

$12,500 through the first 2 years and 4 months (to date). In this example, current/total Contract Expenditures incurred to Date are $12,500 and associated period of performance for those expenditures, expressed in years, is

2.33 years.

Therefore, the Average Annual Cost/Fee Incurred to Date: $5,364 ($12,500/2.33 years)

Was there a cost overrun? ( ) Yes ( ) No

If yes, please explain:

If this was an award fee contract, what are the individual and/or average ratings of performance by your organization? Please attach any available award fee letters or database entries.

Please comment on particularly strong/weak points of Contractor’s performance (technical, schedule, and/or cost).

If the Overall Contract Performance Rating below is less than Very High, please provide some explanation in this section on why a higher rating was not provided.

Overall Contract Performance Rating (circle one)

Very High High Moderate Low Very Low

If less than Very High Performance Rating, please explain:

Please add any other comments you may feel are pertinent.

Rater’s Signature Date

File details come from the government source that posted it.