Attachment_H_-_Price_Breakdown_(Revised).pdf
PDF 98 KB Posted
- Attached to
- Aerospace Communications Facility (ACF) Federal contract opportunity
- Solicitation number
- 80GRC019R0001
About this file
Attachment H - Price Breakdown (Revised)
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT H:
PRICE BREAKDOWN (REVISED)
FOR
AEROSPACE COMMUNICATIONS FACILITY
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
GLENN RESEARCH CENTER
21000 BROOKPARK ROAD, CLEVELAND, OHIO 44135
01 GENERAL REQUIREMENTS
02 EXISTING CONDITIONS
03 CONCRETE
05 METALS
06 WOOD, PLASTICS AND COMPOSITES
07 THERMAL and MOISTURE PROTECTION
08 OPENINGS
09 FINISHES
10 SPECIALTIES
11 EQUIPMENT
12 FURNISHINGS
13 SPECIAL CONSTRUCTION
14 CONVEYING EQUIPMENT
21 FIRE SUPPRESSION
22 PLUMBING
23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
25 INTEGRATED AUTOMATION
26 ELECTRICAL
27 COMMUNICATIONS
28 ELECTRONIC SAFETY and SECURITY
31 EARTHWORK
32 EXTERIOR IMPROVEMENTS
33 UTILITIES
41 MATERIAL PROCESSING AND HANDLING EQUIPMENT
OPTION 1- EXTERIOR STAIR 4
OPTION 2 - ELECTRICAL VEHICLE CHARGING STATION
OPTION 3 - LOW-OXYGEN DETECTION SYSTEM
OPTION 4 - ROOF OPENING FOR ANTENNA MOUNTING
OPTION 5 - ELECTRONIC SECURITY DEVICES
OPTION 6 - ARCHITECTURAL OUTFITTING ITEMS
Instructions to Offerors: Complete the Total Cost ($) for each category listed. If any given category has no cost, enter ($0). Enter costs in terms of whole dollars (include no cents). Subtotal and Total values should total correctly. Costs must correspond with amounts provided on the Bid Schedule.
TOTAL COST ($)
NASA John H. Glenn Research Center Building 330, Aerospace Communications Facility
OFFEROR:
Cleveland, Ohio SOLICIATION No.:
TOTAL COST PROPOSED - BASE WORK PLUS ALL OPTIONS
TOTAL COST PROPOSED - BASE WORK
GENERAL CONDITIONS
CONTRACTOR BOND, OVERHEAD and PROFIT
DIVISION BUILDING COMPONENT
SUBTOTAL ALL TRADES WORK (Prevailing Wage)
| Attachment H- Price Breakdown |
| Coversheets 2 |
| Attachment H- Price Breakdown |
| Table 1 |
| NASA ACF Standardized Proposal Cost Template |
| Table 1 |
File details come from the government source that posted it.