This Addendum No. 001, dated August 31, 2026, amends the original drawings and specifications for the Taylor Schools Hoover Middle School MEP (Mechanical, Electrical, Plumbing) Upgrades project located at 27101 Beverly Road, Taylor, Michigan 48180, issued by The Collaborative on behalf of the Taylor School District. The project scope encompasses comprehensive HVAC system upgrades including the installation of new rooftop units (RTUs), air handling units (AHUs), heating hot water coils, exhaust fans, relief hoods, and associated ductwork and piping throughout the first floor and roof areas. Key clarifications provided in the addendum address structural support requirements, specifying that steel support is required only for pipe or duct openings larger than 28 inches in diameter, with Simpson Quick Frame systems to be used for all new RTU supports and exhaust fans exceeding 28 inches diameter. The addendum confirms this is a prevailing wage project and corrects the bid bond requirement from 10 percent to 5 percent. Significant drawing revisions documented include modifications to ceiling demolition and reflected ceiling plans to accommodate revised supply and return ductwork, RTU location shifts based on structural snow drift considerations, and adjustments to mechanical systems including changes to energy recovery unit controls and heating coil configurations across multiple building areas.
The addendum comprises four written pages and twenty updated drawings reflecting revisions across architectural, mechanical, and electrical disciplines. Notable changes include the addition of a service platform for RTU-3 under Alternate-2, relocation of RTU-2 per structural requirements, deletion of cooling functionality from AHU-2 in Alternate-2, and modifications to condensate piping and RTU service platform details on newly added sheet M5.01. All existing equipment must remain operational during construction, with coordination required between mechanical, structural, and other trades to ensure proper installation and sequencing. The project requires bidders to acknowledge receipt of this addendum in their bid forms, and all work must proceed in accordance with the contract documents, applicable codes including the 2021 Michigan Building Code and Michigan Mechanical Code, and the engineer's specifications.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 31, 2026
ADDENDUM NO. 001
To the Drawings and Specifications for:
Taylor Schools Hoover MS – MEP Upgrades
27101 Beverly Rd
Taylor, MI 48180
107445
Taylor School District
Prepared By:
The Collaborative
Telephone: (419) 242-7405
Fax: (419) 242-7400
Taylor School District
TO ALL BIDDERS:
This addendum supplements and amends the original drawings and specifications, and shall be taken into account in preparing proposals, and shall become a part of the contract documents. Receipt of this Addendum must be acknowledged in the Bid Form.
GENERAL
Question:
Duct penetrations are assumed to have steel support due to size of ductwork penetrations. Can you confirm if we will need to add steel for the following it’s not clear so just looking for clarification if we need to add steel supports for the following. Pipe portals, Exhaust fans, & relief hoods.
Answer:
Only need steel support for pipe or duct openings larger than 28” in diameter. We have the Simpson
Quick frames detail (On the roof plan) to be used for any new RTU supports.
Question:
Confirm if we need to reinforce any joist?
Answer:
Use the Simpson quick frames system below each new unit and SA and RA ducts. Same for any exhaust fans that are greater than 28" diameter up blast.
Clarifications:
1. This is a prevailing wage project
2. A 5% bid bond is required, not a 10% as listed
Drawings
Architectural Drawings
Drawing – D0.1.2 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN – AREA B
Item #1 Ceiling area of work expanded to accommodate supply and return ductwork revisions.
Drawing - A1.1.2 FIRST FLOOR PLAN – AREA B
Item #1 Sheet includes revisions to the floor horizontal mechanical units in the classrooms and adjacent casework. The existing casework and horizontal floor units will be removed. Exposed flooring
Taylor School District will be patched with new matching VCT tile. The existing piping and supply lines to the old units will also be removed and the wall will be finished to match adjacent. The new piping will attach to the new mechanical unit as shown in the mechanical drawings and will be protected with a sheet metal cover.
Any existing marker boards above floor horizontal mechanical unit and casework will be removed and returned to owner as required to install new piping to new mech unit.
Item #2 The existing piping and supply lines to the old units will be removed and the walls will be finished to match existing. The new piping will attach to the new mechanical unit as shown in the mechanical drawings and will be protected with a sheet metal cover. Any existing marker boards above floor horizontal mechanical unit and casework will be removed and returned to owner as required to install new piping to new mech unit.
Drawing - A1.1.7 ROOF PLAN – AREA A
Item #1 Service platform added to RTU-3 (Alternate-2) as indicated in sheet M1.30.
Drawing - A1.1.8 ROOF PLAN – AREA B
Item #1 RTU-2 shifted per structural comments regarding snow drift, as indicated in sheet M1.31.
Drawing - A1.3.2 FIRST FLOOR REFLECTED CEILING PLAN – AREA B
Item #1 Ceiling area of work expanded to accommodate supply and return ductwork revisions.
Mechanical Drawings
Drawing M0.00 – MECHANICAL GENERAL INFORMATION
Sheet 5.01 – Mechanical Details added to sheet index.
Drawing MD1.11 – MECHANICAL DEMOLITION FIRST FLOOR PLAN – UNIT B
Demolition of return ductwork revised to accommodate shift of RTU on new work roof plans.
Removal of thermostat in Media Center added to Alternate-1.
Drawing MD4.20 – ENLARGED MECHANICAL DEMOLITION PLANS - BALCONY
Demolition of supply ductwork revised to accommodate addition on HC-2 on new work plans.
Drawing M1.11 – MECHANICAL NEW WORK FIRST FLOOR PLAN – UNIT B
Supply and return ductwork revised to accommodate shift of RTU on new work roof plans.
Drawing M1.30 – MECHANICAL NEW WORK ROOF PLAN – UNIT A
Service platform added to RTU-3 (Alternate-2), as indicated.
Drawing M1.31 – MECHANICAL NEW WORK ROOF PLAN – UNIT B
RTU-2 (Alternate-1) shifted per structural comments regarding snow drift, as indicated.
Drawing M4.20 – ENLARGED MECHANICAL NEW WORK PLANS - BALCONY
HC-2 added to supply from AHU-2 (Alternate-2), as indicated. Associated supply ductwork and hydronic piping revised accordingly.
Taylor School District
Drawing M5.00 – MECHANICAL DETAILS
Roof gas pipe support detail revised, and heating coil piping diagram (2-way valve) detail removed.
Drawing M5.01 – MECHANICAL DETAILS.
Sheet M5.01 added, including details for RTU condensate piping and RTU service platform.
Drawing M6.01 – MECHANICAL SCHEDULES
“ALTERNATE: INDOOR AIR HANDLING ENERGY RECOVERY UNIT SCHEDULE (HEATING ONLY)”
revised. HC-2 added to “ALTERNATE: HEATING HOT WATER COIL SCHEDULE”.
Drawing M8.01 – MECHANICAL TEMPERATURE CONTROLS
“ENERGY RECOVERY UNIT CONTROL DIAGRAM” and associated sequence of operations revised to remove cooling from AHU-2 (Alternate-2).
Electrical Drawings
Drawing EP1.30
Shifted RTU connections based on mechanical changes.
Drawing EP1.31
Shifted RTU connections based on mechanical changes.
Drawing E4.20
Adjusted wire size for AHU-2 based on mechanical schedule changes.
Drawing E6.01
Adjusted load on breaker for AHU-2 based on mechanical schedule changes.
END OF ADDENDUM NO. 001 (04 Written Pages, 20 Drawings)
1301048954
Michael A.
Muse
N
OWNER JOB NO. ----
ISSUED FOR BIDDING08.11.2026
SHEET TITLE
SHEET NO.
D0.1.2
KEY PLAN
N.T.S.
FIRST FLOOR
DEMOLITION
REFLECTED
CEILING PLAN -
AREA B
Taylor Schools
Hoover Middle School - HVAC Upgrades
27101 Beverly Rd Taylor, MI 48180
TC JOB NO. 107445
ADDENDUM 00108.31.2026
PROJECT TITLE
1. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL
DRAWINGS FOR DEMOLITION SCOPE RELATED TO
EXISTING MEP SYSTEMS.
2. FOR ALL REMOVED FINISHES, FURNISHINGS,
CASEWORK, AND BUILDING ELEMENTS, REMOVE ALL
ASSOCIATED MOUNTING MATERIALS, ADHESIVES,
HARDWARE, AND RELATED ELEMENTS.
3. PATCH ALL DISTURBED SUBSTRATES AT LOCATIONS OF
REMOVED ELEMENTS AS REQUIRED TO CREATE
SMOOTH SURFACES FOR NEW CONSTRUCTION.
DEMOLITION GENERAL NOTES
(NOTE: NOT ALL NUMBERS ARE USED)
C: CEILINGS
C-1: REMOVE ACOUSTICAL PANEL CEILING TILES
TYP IN "HATCHED AREA"
C-2: REMOVE CORRESPONDING GYPSUM BOARD
CEILING SYSTEM FOR WORK.
C-3: REMOVE AND RETAIN CORRESPONDING
ACOUSTICAL PANEL CEILING TILES FOR WORK.
TYP IN "HATCHED AREA"
SEE MECHANICAL DRAWINGS
L: LIGHT FIXTURE
L-1: REMOVE AND RETAIN EXISTING LIGHT FIXTURE
AND COMPONENTS FOR REINSTALLATION
SEE REFLECTED CEILING PLAN
TYP
P: PLUMBING
P-1: REMOVE EXISTING SHOWER FIXTURE
SEE MECHANICAL DRAWINGS
CA: CASEWORK DEMO
CA-D: REMOVE EXISTING CASEWORK AND/OR SHELVING
MECHANICAL (M)
M-D: REMOVE EXISTING MECHANICAL UNIT
SEE MECHANICAL DRAWINGS
DEMOLITION KEYNOTES
ALT
#1
C-1
C-1
C-1
C-1
CL RM
STOR
VEST
GEN OFFICE
WAIT
VAULT
CL RM
CONF
WORK
OFF
AUDIO VIS.
TEACHERS
MEN
BOYS
GIRLS
J.C.
CONF
WAIT
CONF
BOOK
CLINIC
CONSUL
HALL
OFFICE
105A
OFFICE
CL RM
J.C.
BOYS
GIRLS
CL ROOM
MEDIA CENTER
CL RM
TYPING
SPEC. ED
WORK
110-A
ST
TLT
TLT
112A
CORR
VEST
CL RM
CL RM
CL RM
CL RM
OFF
CORR
CL RM
CL RM
CL RM
PREP
OFF
VEST
PREP
CL RM
CL RM
WET RM
CL RM
CL RM
150B
CL RM
150A
VEST
CORR
CL RM
C-3
C-3
C-3
C-3
C-3
C-3
C-3
C-3
C-3
C-3
C-3
C-3
CORR
LOBBY
CORR
CORR
CL RM
CL RM
CORR
CORR
C-3C-3
C-3
C-3
C-3
L-1
C-3
C-3C-3C-3
C-1
C-3C-3
C-3C-3C-3C-3
C-3 C-3
C-3
C-3
C-3
C-3
C-3
C-3
C-3
C-3
C-3
C-3 C-3
C-3
A R
E A
B
S E
E S
H E
E T
D 0.
1.
A R
E A
C
S E
E S
H E
E T
D 0.
1.
ALT
#1
C-1 C-1
C-1
C-1 C-1
C-1
C-1
C-1
C-1
WOMEN
MEN
CONS
CONS
TLT
TLT
PRIN
CL RM
CL RM
OFF
MECH-1
MECH-1
MECH-1
MECH-1
MECH-1
MECH-1
MECH-1
MECH-1
MECH-1
MECH-1 MECH-1
MECH-1
MECH-1MECH-1
MECH-1MECH-1
MECH-1MECH-1MECH-1
C-3
CL RM
L-1 L-1 L-1L-1 L-1 L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1L-1L-1
L-1 L-1
L-1 L-1
L-1
REMOVE
ANGLED CEILING
BUILD-OUT
SEE SHEET D0.1.3
REMOVE
ANGLED CEILING
BUILD-OUT
SEE SHEET D0.1.3
L-1
L-1
L-1
L-1
L-1
L-1 L-1
L-1 L-1
L-1
L-1
L-1
L-1
L-1L-1
L-1L-1L-1L-1L-1
L-1L-1
L-1
L-1L-1 L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1 L-1
L-1 L-1
L-1 L-1
PROTECT
FOLDING PARTION
FROM DAMAGE
TYP
PROTECT
FOLDING PARTION
FROM DAMAGE
TYP
PROTECT
FOLDING PARTION
FROM DAMAGE
TYP
PROTECT
FOLDING PARTION
FROM DAMAGE
TYP
L-1
SCALE: 1/8" = 1'-0"A2
FIRST FLOOR DEMOLITION REFLECTED CEILING PLANS - AREA B
A.
Muse
N
OWNER JOB NO. ----
ISSUED FOR BIDDING08.11.2026
SHEET TITLE
SHEET NO.
A1.1.2
KEY PLAN
N.T.S.
FIRST FLOOR
PLAN - AREA B
Taylor Schools
Hoover Middle School - HVAC Upgrades
27101 Beverly Rd Taylor, MI 48180
TC JOB NO. 107445
ADDENDUM 00108.31.2026
PROJECT TITLE
G2 A2.00
D1 A2.00
STOR
J.C.
GIRLS
BOYS
CONS
CONS
CONF
WAIT
CONSUL
CONF
BOOK
CLINIC
TLT
TLT
TLT
VAULT
WAIT
GEN OFFICE
PRIN
LOBBY
VEST
1VEST
OFFICE
105A
OFFICE
105 CL RM CL RM
GIRLS
BOYS
J.C.
MEN
WOMEN
MEN
TEACHERS
AUDIO VIS.
WORK
OFF
HALL
CONF
CL RM
CL ROOM
MEDIA CENTER
CL RM
CORR
VEST
TYPING
SPEC. ED
WORK
110-A
ST
TLT
TLT
112ACORR
PREP
OFF
CL RM
CORR
119 OFF
CORR
CL RM
CL RM
CL RM
116CL RM
CL RM
CL RM
CL RM
CL RM
CORR
CL RM
150A
CORR
VEST
CL RM
WET RM
CL RM
CL RM
PREP
OFF
CL RM
VEST
CL RM
CL RM
M-1
M-1 M-1
M-1 M-1
M-1
M-1
M-1
M-1
M-1
M-1
M-1
M-1
M-1
M-1
VCT-1
VCT-1 VCT-1
VCT-1 VCT-1
VCT-1
VCT-1
VCT-1
VCT-1
A R
E A
B
S E
E S
H E
E T
A 1.
1.
A R
E A
C
S E
E S
H E
E T
A 1.
1.
PLAN GENERAL NOTES:
1. COORDINATE SIZE AND LOCATION OF ALL HOUSEKEEPING
PADS AND/OR EQUIPMENT SUPPORTS WITH APPROPRIATE
EQUIPMENT MANUFACTURER.
2. COORDINATE SIZES AND LOCATIONS OF ALL
MISCELLANEOUS ACCESS PANELS REQUIRED. ACCESS
PANELS ARE SPECIFIED ARCHITECTURALLY BUT ARE TO
BE PROVIDED BY TRADES REQUIRING THEM. ALL
LOCATIONS MUST BE APPROVED BY ARCHITECT PRIOR TO
INSTALLATION.
3. FLOOR PLANS ARE DIMENSIONED TO ACTUAL WALL
THICKNESS UNLESS OTHERWISE NOTED.
4. DIMENSIONS FOLLOWED BY ± MUST BE FIELD REVIEWED
AND ALL NECESSARY ADJUSTMENTS MADE PRIOR TO
FABRICATION AND/OR INSTALLATION OF AFFECTED WORK.
NOTIFY ARCHITECT IF DISCREPANCIES ARISE BEFORE
PROCEEDING WITH THE WORK.
5. VERIFY QUANTITY, SIZES, AND LOCATIONS OF ALL FLOOR,
ROOF, AND WALL OPENINGS FOR MECHANICAL AND
ELECTRICAL WORK WITH THE APPROPRIATE TRADES.
PROVIDE ALL OPENINGS SHOWN OR REQUIRED FOR THE
COMPLETION OF THE WORK. PROVIDE ALL LINTELS
REQUIRED FOR THESE OPENINGS PER SPECIFICATIONS.
MECHANICAL (M):
M-1: NEW MECHANICAL UNIT
SEE MECHANICAL DRAWINGS
ELECTRICAL (E):
COORDINATE WITH ELEC FOR PLACEMENT OF WALL PANELS
SEE ELECTRICAL DRAWINGS
FINISH NOTES:
VINYL COMPOSTION TILE (VCT):
VCT-1: PATCH/INFILL FLOOR AREA FROM DEMOLISHED CABINET &
MECHANICAL FLOOR UNITS W/ NEW VCT TILE
MATCH EXISTING
TYP "GRID HATCHED AREA"
SCALE: 1/8" = 1'-0"A2
FIRST FLOOR PLAN - AREA B
REMOVE EXISTING
FLOOR MECHANICAL UNIT
SEE MECH & FIRST FLOOR
PLAN DRAWINGS
REMOVE EXISTING CASEWORK
AND/OR SHELVING SEE DEMO
MECH & FIRST FLOOR PLAN
DRAWINGS
REMOVE EXISTING MECHANICAL
SHEET METAL COVER
FINISH WALL TO MATCH ADJACENT
PATCH/INFILL EXPOSED &
DAMAGED VCT TILE WITH NEW
MATCH EXISTING
PATCH/INFILL EXPOSED & DAMAGED
VCT TILE WITH NEW
MATCH EXISTING
SEE FIRST FLOOR PLAN DRAWINGS
REMOVE AND
RETAIN EXIST
LIGHT FIXTURE &
COMPONETS
SEE ELEC & RCP
DRAWINGS
TYP
REMOVE AND RETAIN
CEILING TILE TO ACCESS EXIST MECH
SEE MECH & RCP DRAWINGS
TYP
REMOVE AND RETAIN EXISTING
BOARDS AS REQUIRED TO
INSTALL NEW PIPING
RETURN TO OWNER
SEE MECH DRAWINGS
NOT TO SCALE
A1
TYP EXIST CABINET AND MECH FLOOR UNIT
A.
Muse
N
OWNER JOB NO. ----
ISSUED FOR BIDDING08.11.2026
SHEET TITLE
SHEET NO.
A1.1.7
KEY PLAN
N.T.S.
ROOF PLAN -
AREA A
Taylor Schools
Hoover Middle School - HVAC Upgrades
27101 Beverly Rd Taylor, MI 48180
TC JOB NO. 107445
ADDENDUM 00108.31.2026
PROJECT TITLE
ROOF GENERAL NOTES:
1. MAINTAIN ROOF DRAINS IN FUNCTIONING CONDITION
TO ENSURE ROOF DRAINAGE AT END OF EACH
WORKDAY.
2. PREVENT DEBRIS FROM ENTERING OR BLOCKING ROOF
DRAINS AND CONDUCTORS.
3. PATCH ROOF SYSTEM AT ALL REMOVED
PENETRATIONS, CURBS, AND EQUIPMENT. REFER TO
MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS.
4. PATCH ROOF SYSTEM AND PROVIDE FLASHING AT ALL
NEW ROOF PENETRATIONS, CURBS, AND EQUIPMENT.
REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL
DRAWINGS.
5. SEE MECHANICAL, ELECTRICAL & PLUMBING DRAWINGS
FOR GENERAL ROOFING NOTES SPECIFIC TO THOSE
TRADES.
6. PROVIDE CRICKETS ON HIGH SIDE OF ROOFTOP UNITS
& OTHER EQUIPMENT, TYPICAL.
7. FINAL LOCATION OF ROOFTOP EQUIPMENT TO BE
COORDINATED WITH STRUCTURAL AND MECHANICAL
WORK.
8. PAINT ALL EXPOSED ROOFTOP NATURAL GAS LINES,
REFER TO SPECIFICATIONS.
9. ALL EQUIPMENT IS TO REMAIN OPERATIONAL DURING
CONSTRUCTION. COORDINATE REMOVAL AND OR
REPLACEMENT OF EQUIPMENT WITH OWNER.
10. ROOF SLOPES INDICATED ON THE DRAWINGS ARE TO
INDICATE DESIGN INTENT ONLY. CONTRACTOR SHALL
PROVIDE SHOP DRAWINGS FOR THE COMPLETE
ROOFING SYSTEM TO ENSURE PROPER DRAINAGE,
INCLUDING TAPERED INSULATION LAYOUT, FLOW
DIRECTIONS, DRAIN LAYOUT, AND CRICKET LOCATIONS.
REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
11. PROVIDE ROOF FLASHING FOR ALL ROOF MOUNTED
EQUIPMENT AND PENETRATIONS AT ALL NEW ROOFING
LOCATIONS. REFER TO PLUMBING, MECHANICAL &
ELECTRICAL DRAWINGS.
ROOF PLAN LEGEND:
EXISTING
MEMBRANE ROOF
SYSTEM
KEYNOTES:
(NOTE: NOT ALL NUMBERS ARE USED)
M-0 EXISTING MECHANICAL UNIT
SEE MECHANICAL DRAWINGS
M-1 NEW MECHANICAL UNIT
PROVIDE CRUB AND FLASHING AS NEEDED
SEE MECHANICAL DRAWINGS
XX-#
A B C D
E F G H J K
ALT
#1
ALT
#1
2' -6
M
IN
2'
-6
M
IN
2'-6"
MIN
2' -6
M
IN
INSTALL
BALLASTED
GUARD
STRUCT NOTE:
EXISTING JOISTS 6' O.C.
MUST HIT JOIST OR
ADD QUICK FRAMES BELOW
SEE SHEET A1.1.9
FOR STRUCT NOTES
STRUCT NOTE:
ADD QUICK FRAMES BELOW
UNIT BTW. EXIST. 32LJ AT +/- 7'-3" O.C.
SEE SHEET A1.1.9 FOR STRUCT NOTES
M-1
M-1
M-1
M-1
ROOF
ACCESS
HATCH
EXHUAST FAN
M-1
EXHUAST FAN
M-1
M-1
M-1
M-1
M-1
M-0
M-0
M-1 M-1
STRUCT NOTE:
EXISTING JOISTS 6' O.C.
MUST HIT JOIST OR
ADD QUICK FRAMES BELOW
SEE SHEET A1.1.9
FOR STRUCT NOTES
EQUIPMENT PLATFORM
SEE MECH DRAWINGS
FOR NOTES
AREA - A
SEE SHEET A1.1.7
AREA - C
SEE SHEET A1.1.9
A R
E A
B
S E
E S
H E
E T
A 1.
1.
A R
E A
C
S E
E S
H E
E T
A 1.
1.
A R
E A
B
S E
E S
H E
E T
A 1.
1.
A R
E A
A
S E
E S
H E
E T
A 1.
1.
ALT
#2
NEW ROOF
PENETRATION
TO GYM FAN
ROOM BELOW
NEW ROOF PENETRATION
TO GYM FAN ROOM BELOW
INSTALL
BALLASTED
GUARD
INSTALL
BALLASTED
GUARD
NEW ROOF
PENETRATION
NEW ROOF
PENETRATION
NEW ROOF
PENETRATION
NEW ROOF
PENETRATION
ROOF
ACCESS
HATCH
EXHUAST FAN
M-0
M-0 M-0
M-0
M-0
M-0
M-0
M-0
M-0
M-0
M-0
M-0
M-0
M-0
M-0
ACCU
AHU-1
SEE MECH
R
TU
S
E
M
C
H
RTU - SEE
MECH
SCALE: 1/8" = 1'-0"A2
ROOF PLAN - AREA A
A.
Muse
N
OWNER JOB NO. ----
ISSUED FOR BIDDING08.11.2026
SHEET TITLE
SHEET NO.
A1.1.8
KEY PLAN
N.T.S.
ROOF PLAN -
AREA B
Taylor Schools
Hoover Middle School - HVAC Upgrades
27101 Beverly Rd Taylor, MI 48180
TC JOB NO. 107445
ADDENDUM 00108.31.2026
PROJECT TITLE
ROOF GENERAL NOTES:
1. MAINTAIN ROOF DRAINS IN FUNCTIONING CONDITION
TO ENSURE ROOF DRAINAGE AT END OF EACH
WORKDAY.
2. PREVENT DEBRIS FROM ENTERING OR BLOCKING ROOF
DRAINS AND CONDUCTORS.
3. PATCH ROOF SYSTEM AT ALL REMOVED
PENETRATIONS, CURBS, AND EQUIPMENT. REFER TO
MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS.
4. PATCH ROOF SYSTEM AND PROVIDE FLASHING AT ALL
NEW ROOF PENETRATIONS, CURBS, AND EQUIPMENT.
REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL
DRAWINGS.
5. SEE MECHANICAL, ELECTRICAL & PLUMBING DRAWINGS
FOR GENERAL ROOFING NOTES SPECIFIC TO THOSE
TRADES.
6. PROVIDE CRICKETS ON HIGH SIDE OF ROOFTOP UNITS
& OTHER EQUIPMENT, TYPICAL.
7. FINAL LOCATION OF ROOFTOP EQUIPMENT TO BE
COORDINATED WITH STRUCTURAL AND MECHANICAL
WORK.
8. PAINT ALL EXPOSED ROOFTOP NATURAL GAS LINES,
REFER TO SPECIFICATIONS.
9. ALL EQUIPMENT IS TO REMAIN OPERATIONAL DURING
CONSTRUCTION. COORDINATE REMOVAL AND OR
REPLACEMENT OF EQUIPMENT WITH OWNER.
10. ROOF SLOPES INDICATED ON THE DRAWINGS ARE TO
INDICATE DESIGN INTENT ONLY. CONTRACTOR SHALL
PROVIDE SHOP DRAWINGS FOR THE COMPLETE
ROOFING SYSTEM TO ENSURE PROPER DRAINAGE,
INCLUDING TAPERED INSULATION LAYOUT, FLOW
DIRECTIONS, DRAIN LAYOUT, AND CRICKET LOCATIONS.
REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
11. PROVIDE ROOF FLASHING FOR ALL ROOF MOUNTED
EQUIPMENT AND PENETRATIONS AT ALL NEW ROOFING
LOCATIONS. REFER TO PLUMBING, MECHANICAL &
ELECTRICAL DRAWINGS.
ROOF PLAN LEGEND:
EXISTING
MEMBRANE ROOF
SYSTEM
KEYNOTES:
(NOTE: NOT ALL NUMBERS ARE USED)
M-0 EXISTING MECHANICAL UNIT
SEE MECHANICAL DRAWINGS
M-1 NEW MECHANICAL UNIT
PROVIDE CRUB AND FLASHING AS NEEDED
SEE MECHANICAL DRAWINGS
XX-#
ALT
#1
ALT
#1
M-1
M-1
M-1
EXHUAST FAN
EXHUAST FAN
EXHUAST FAN
M-1 M-1 M-1 M-1 M-1 M-1
M-1 M-1
M-1 M-1
M-1 M-1
M-1 M-1
M-1
M-1
M-1
M-1 M-1 M-1
M-1
M-1
EXHUAST FAN
EXHUAST FAN
EXHUAST FAN
M-0
M-0
M-0
ROOF STEP
M-1M-1
STRUCT NOTE:
ADD QUICK FRAMES BELOW
SEE SHEET A1.1.9
FOR STRUCT NOTES
A R
E A
B
S E
E S
H E
E T
A 1.
1.
A R
E A
C
S E
E S
H E
E T
A 1.
1.
NEW ROOF
PENETRATION
NEW ROOF
PENETRATION
NEW ROOF
PENETRATION
NEW ROOF
PENETRATION
M-0
M-0
M-0
M-0
M-0 M-0
M-0
M-0
M-0
M-0
M-0
M-0
M-0
ACCU
AHU-1
SEE MECH
RTU - SEE
MECH
SCALE: 1/8" = 1'-0"A2
ROOF PLAN - AREA B
A.
Muse
N
OWNER JOB NO. ----
ISSUED FOR BIDDING08.11.2026
SHEET TITLE
SHEET NO.
A1.3.2
KEY PLAN
N.T.S.
FIRST FLOOR
REFLECTED
CEILING PLAN -
AREA B
Taylor Schools
Hoover Middle School - HVAC Upgrades
27101 Beverly Rd Taylor, MI 48180
TC JOB NO. 107445
ADDENDUM 00108.31.2026
PROJECT TITLE
9'-0"
GYP-01
CEILING HEIGHT AS MEASURED
TO BOTTOM OF ELEMENT
CEILING TYPE/FINISH
CEILING FIXTURE LEGEND
NOTE: NOT ALL SYMBOLS SHOWN ARE USED ON DRAWINGS.
ELECTRICAL FIXTURES
SPEAKER
RECESSED ROUND INCANDESCENT
RECESSED SQUARE INCANDESCENT
RECESSED SQUARE WITH FLARE
FRAME (MERCURY OR INCANDESCENT)
2' x 4' RECESSED FLUORESCANT
2' x 2' RECESSED FLUORESCANT
1' x 4' SURFACE FLUORESCANT
4' x 4' RECESSED FLUORESCANT
MECHANICAL EQUIPMENT / FIXTURES
RETURN AIR GRILL (TO FIT 24"x24" GRID)
SUPPLY AIR DIFFUSER (TO FIT 24"x24"
GRID)
VENT TO CEILING SPACE (TO FIT
24"x24" GRID)
SUPPLY OR RETURN (IN CENTER OF
TILE)
MECHANICAL UNIT
SEE MECHANICAL DRAWINGS
CEILING MATERIAL LEGEND
GYPSUM BOARD OR SYNTHETIC VENEER
PLASTER CEILING / SOFFIT / BULKHEAD
SUSPENDED ACOUSTICAL PANEL
CEILING
EXPOSED OR EXISTING CONSTRUCTION
TO REMAIN
CEILING GENERAL NOTES
1. REFER TO ARCHITECTURAL PLANS AND SPECIFICATIONS
FOR ADDITIONAL INFORMATION ON MATERIALS AND
CONSTRUCTION.
2. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS
FOR FIXTURE TYPES AND ADDITIONAL INFORMATION
PERTAINING TO MECHANICAL AND ELECTRICAL WORK.
3. COORDINATE SIZE AND LOCATION OF ALL ACCESS
PANELS WITH TRADE REQUIRING THE SAME. ACCESS
PANELS ARE SPECIFIED ARCHITECTURALLY BUT ARE
REQUIRED TO BE PROVIDED BY TRADE. INDICATE ALL
LOCATIONS WITHIN FIXED GYPSUM BOARD CEILINGS
BEFORE INSTALLATION OF GYPSUM BOARD AND
RECEIVE WRITTEN APPROVAL FROM ARCHITECT
BEFORE PROCEDING WITH INSTALLATION.
4. COORDINATE INSTALLATION OF CEILING SUSPENSION
SYSTEMS WITH OTHER CEILING SPACE EQUIPMENT
SUPPORTS.
5. ALL SMOKE BARRIER PARTITIONS, HORIZONTAL EXIT
ENCLOSURES AND FIRE RATED PARTITIONS THAT
EXTEND TO DECK ABOVE SHALL BE MARKED EVERY
20'-0" HORIZONTALLY WITHIN THE CEILING SPACE: "FIRE
AND SMOKE BARRIER - PROTECT ALL OPENINGS."
6. ALL GYPSUM BOARD FASCIAS AT SOFFITS ADJACENT TO
ACOUSTICAL PANEL CEILINGS SHALL EXTEND 6"MINMUM
ABOVE ACOUSTICAL PANEL CEILINGS.
7. PROVIDE WOOD BLOCKING ABOVE GYPSUM BOARD
CEILINGS AS REQUIRED FOR MISCELLANEOUS
SUSPENDED ITEMS, INCLUDING CURTAIN TRACKS,
WINDOW SHADES, ACOUSTICAL BAFFLES, ETC.
8. CENTER ALL SPRINKLER HEADS IN CEILING PANELS
UNLESS SHOWN OTHERWISE.
9. CONTRACTOR TO PAINT ALL NON-FINISH ELEMENTS IN
AREAS NOTED AS EXP-PT TO INCLUDE, BUT NOT LIMITED
TO, STRUCTURE (BEAMS, JOISTS, STRUTURAL DECK,
ETC), FP/PLUMB LINES (PIPING, HANGERS, ETC),
MECHANICAL DUCTWORK AND PIPING (HANGERS,
STRAPPING, UNISTRUT, ETC), ELECTRICAL (CONDUITS,
HANGERS, BACKBOXES, ETC), AND TECHNOLOGY
(CONDUITS, HANGERS, BACKBOXES, ETC). COORDINATE
WITH ARCHITECT FOR QUESTIONS RELATED TO
ELEMENTS TO BE PAINTED.
CEILING LEGEND
ACOUSTICAL PANEL CEILINGS (APC):
APC1 REINSTALL SALVAGED ACOUSTICAL PANEL
CEILING TILES
TYP IN "HATCHED AREAS"
APC2 NEW CEILING ACOUSTICAL PANEL
CEILING TILES
MATCH EXISTING ADJACENT TILES
TYP IN "HATCHED AREAS"
GYPSUM BOARD CEILINGS (GYP) - SEE FINISH PLANS FOR
PAINT COLORS OR OTHER FINISHES:
GYP-PTX PAINTED GYP-01 (UNO) CEILING ON
SUSPENDED CEILING GRID SYSTEM OR
NSMF-X
L: LIGHT FIXTURE
L-1: REINSTALL EXISTING LIGHT FIXTURE
AND ELECTRICAL COMPONENTS
TYP (LIGHT FIXTURES ADJACENT TO HVAC
UNITS)
CEILING LEGEND
REFER TO THE FOLLOWING TAG FOR CEILING TYPE &
BOTTOM ELEVATION INFORMATION FOR EACH ROOM OR
ELEMENT UNLESS OTHERWISE NOTED.
MECH
UNIT
CL RM
VEST
LOBBY
CORR
J.C.
22 GIRLS
BOYS
CONF
CONS
WAIT
CONSUL
CONF
BOOK
HALL
CLINIC
TLT
TLT
GEN OFFICE
VAULT
TLT
WAIT
GEN OFFICE
PRIN
CL RM
WORK
HALL
AUDIO VIS.
TEACHERS
MEN
CL ROOM
MEDIA CENTER
CL RM
CORR
CORR
J.C.
BOYS
GIRLS
CL RM
CL RM
OFFICE
OFFICE
105A
VEST
VEST
CORR
CORR
ST
TLT
TLT
112A
WORK
110-A
TYPING
CL RM
CL RM
CL RM
CL RM
CORR
OFF
CL RM
CL RM
CL RM
CL RM
PREP
CL RM
OFF
CORR
PREP
CL RM
CL RM
CL RM
WET RM
CL RM
150B
CL RM
VEST
CORR
VEST
APC1
APC1
APC1
APC2
APC2
APC2 APC2
APC2
APC2
APC2
APC2
APC1APC1
APC1
APC1
CL RM
L-1
APC1
L-1
APC2
APC1
APC1
APC1
APC1
APC1 APC1
APC1APC1APC1
APC1
APC1
APC1
L-1 L-1 L-1 L-1 L-1
L-1 L-1
L-1L-1L-1
APC1
APC1
APC1
APC1
APC1
ALT
#1
ALT
#1
STOR
CONS
CONF
OFF
WOMEN
MEN
SPEC. ED
CL RM
OFF
APC1
APC1
APC2
APC2
APC2
APC2
APC2
APC2
L-1 L-1 L-1L-1 L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1L-1
L-1
L-1 L-1
APC1
L-1 L-1
L-1
L-1
L-1
L-1 L-1
L-1
L-1
L-1
L-1
APC2
NEW ROOF
PENETRATION
SEE MECH
NEW ROOF
PENETRATION
SEE MECH
APC1
L-1 L-1
L-1L-1
APC1 APC1
L-1
L-1
L-1
L-1
L-1
L-1L-1
L-1 L-1
L-1
L-1
L-1
APC1
APC1
APC1 APC1
APC1
APC1 APC1
APC1
APC1APC1
APC1
APC1
APC1
APC2
A R
E A
B
S E
E S
H E
E T
A 1.
3.
A R
E A
C
S E
E S
H E
E T
A 1.
3.
MECH
UNIT
MECH
UNIT
MECH
UNIT
MECH
UNIT
M E
C H
U N
IT
M E
C H
U N
IT
MECH
UNIT
MECH
UNIT
M E
C H
U N
IT
M E
C H
U N
IT
M E
C H
U N
IT
M
E C
H U
N
IT
M E
C H
U N
IT
M
E C
H U
N
IT
MECH
UNIT
SCALE: 1/8" = 1'-0"A2
FIRST FLOOR REFLECTED CEILING PLAN - AREA B
UN
IT
C
UN
IT
B
T T
T T
T
(E)HUV
FLOOR
MOUNTED
(E)HUV
FLOOR
MOUNTED (E)HUV
(E)HUV
FLOOR
MOUNTED (E)HUV
(E)HUV
(E)HUV
(E)HUV
CEILING
MOUNTED
(E)HUV
CEILING
MOUNTED
(E)HUV
(E)HUV
(E)HUV
CEILING
MOUNTED
(E)HUV
CEILING
MOUNTED
(E)HUV
CEILING
MOUNTED
(E)HUV
CEILING
MOUNTED
(E)HUV
CEILING
MOUNTED(E)HUV
CEILING
MOUNTED
(E)HUV
CEILING
MOUNTED
(E)HUV
CEILING
MOUNTED
(E)HUV
CEILING
MOUNTED
(E)HUV
CEILING
MOUNTED
(E)HUV
CEILING
MOUNTED
(E)CONV
(E)CONV
(E)CUH
CEILING
MOUNTED
(E)AC
(E)AC(E)HUV
CEILING
MOUNTED
(E)CUH
WALL
MOUNTED
(E)CUH
WALL
MOUNTED
T
T
T
(E)CONV
(E)CUH
(E)CUH
WALL
MOUNTED
(E)CUH
CEILING
MOUNTED
(E)12x12
EA UP
(E)RG
(E)SD
(E)RG(E)RG
(E)G
(E)SD(E)SD
(E)SD
(E)SD
(E)RG
(E)SD
(E)RG
(E)SD
(E)SD
(E)RG
(E)SD
(E)EG
(E)EG
(E)RG
(E)SD
(E)SD
(E)RG
(E)RG
(E)EG
(E)EG
(E)EG
(E)SD
(E)EG
(E)SG(E)SD
(E)SD (E)SD(E)RG (E)RG
(E)SD (E)SD(E)RG (E)RG
(E)SD (E)SD (E)RG
(E)SD (E)SD (E)RG
(E)SD (E)SD (E)RG
(E)SD (E)SD(E)RG (E)RG
(E)RG
(E)RG
(E)RG
(E)SD (E)SD(E)RG (E)RG
(E)SD (E)RG
(E)RG
(E)SD
(E)RG
(E)SD
(E)SD
(E)SD
(E)RG(E)RG
(E)SG (E)RG
(E)SG
(E)RG
(E)SG
(E)RG
(E)EG (E)EG (E)EG
(E)EG
(E)EG
(E)EG
(E)CONV
(E)3"
(E)4"
(E)EA UP
TO EF
(E)60x27 LOUVER
(E)60x27 LOUVER (E)60x27 LOUVER
(E)60x27 LOUVER (E)60x27 LOUVER
BLANKED OFF**
(E)60x27 LOUVER
(E)60x27 LOUVER
(E)60x27 LOUVER
(E)60x27 LOUVER
(E)24x24
UP TO IH
(E)24x24
UP TO IH
(E)24x24
UP TO IH
(E)24x24
UP TO IH
(E)24x24
UP TO IH
4 4
(E)EG
(E)EG
(E)EG
(E)EG
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E )H
HW
R
(E )H
HW
S
(E )H
HW
S
(E )H
HW
R
(E )H
HW
R
(E )H
HW
S
(E )H
HW
R
(E )H
HW
S
(E )H
HW
R
(E )H
HW
S
(E )H
HW
R
(E )H
HW
S
(E)EG(E)EG(E)EG
(E)RG
(E)RG (E)RG
(E)RG
(E)RG(E)RG
(E)RG (E)RG
(E)RG
(E)RG (E)RG
(E)RG
(E)RG(E)RG(E)RG(E)RG(E)RG
(E)RG
(E)RG
(E)EG
(E)SD
(E)SD
T T T T T T T
T
T
T
T
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
(E)12x10 EA
UP TO EF
(E)68x16 RA
ALTERNATE-1
ALTERNATE-1
(E)15x15 EA
UP TO EF
(E)GAS VALVE BOX
(E)GAS VALVE BOX
(E)GAS
VALVE BOX
J.C.
GIRLS
BOYS
CONS
CONS
CONF
WAIT
CONSUL
CONF
BOOK
CLINIC
TLT
TLT
TLT
9AULT
WAIT
GEN. OFFICE
PRIN
LOBBY
9EST
OFFICE
105A
OFFICE
CL ROOM
GIRLS
BOYS
J.C.
MEN
WOMEN
MEN
TEACHERS
AUDIO 9IS.
WORK
OFF
HALL
CONF.
CL ROOM
MEDIA CENTER
CL RM
CORR.
9EST
TYPING
109 SPEC. ED
WORK
110-A
ST
TLT
TLT
112A CORR
PREP
OFF
CORR
119 OFF
CORR
CL RM
CL RM
CL RM
CL RM
CL RM
CL RM
CL RM
CL RM
CORR
CORR
9EST
WET RM
PREP
OFF
9EST
(E)CASEWORK
21" DEPTH
FROM WALL
(E)CASEWORK
21" DEPTH
FROM WALL
(E)EA UP TO
EF ON ROOF
(E)CASEWORK
21" DEPTH
FROM WALL
(E)CASEWORK
21" DEPTH
FROM WALL
(E)CASEWORK
21" DEPTH
FROM WALL
(E)CASEWORK
21" DEPTH
FROM WALL
(E)CASEWORK
21" DEPTH
FROM WALL
(E)CASEWORK
21" DEPTH
FROM WALL
(E)CASEWORK
21" DEPTH
FROM WALL
(E)60x10
LOUVER
HIGH
WALL
(E)GAS VALVE BOX
ANGLED CEILING
BUILD-OUT FOR
EXISTING HUV
ANGLED CEILING
BUILD-OUT FOR
EXISTING HUV
(E)60x10 LOUVER
HIGH WALL
(E)60x10 LOUVER
HIGH WALL
(E)EG
OUTLINE FOR
CEILING BUILD-OUT
FOR EXISTING HUV
~9" DROP FLAT
(E)OA DUCT UP TO
INTAKE HOOD ON ROOF
(E)60x10 LOUVER
HIGH WALL
(E)60x10 LOUVER HIGH WALL(E)60x10 LOUVER
HIGH WALL
TO (E)HC-3
IN MEZZ
(E)G (E)G (E)1"(E)1"
6 6 6
(E)3"
(E)4"
(E )H
HW
S
(E )H
HW
R
2-1/2" HHWS/R
UP TO MECH
MEZZANINE
CL RM
CL RM
CL RM
CL RM
CL RM
146 CL RM
147 CL RM
150A
CL RM
CL RM
ALTERNATE-1
GENERAL DEMOLITION NOTES
A
THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL
EXTENT OF WORK TO BE PERFORMED. THE EXACT EXTENT OF
DEMOLITION SHALL BE DETERMINED BY THE NEW WORK.
B
ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL
BE PERFORMED AT A TIME APPROVED IN ADVANCE BY OWNER'S
REPRESENTATIVE SO AS NOT TO INTERFERE WITH THE PRESENT
BUILDING'S OPERATION.
C
PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE
SITE AND BECOME FAMILIAR WITH EXISTING SITE CONDITIONS,
SYSTEMS, AND UTILITIES. NOTIFY DESIGN PROFESSIONAL OF ANY
INTERFERENCES OR DISCREPANCIES.
D
ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED
COMPLETELY WITH ALL RELATED ITEMS INCLUDING HANGERS,
SUPPORTS, INSULATION, CONTROLS, ETC. CAP ALL OPEN-ENDED PIPES
AND DUCTS.
E
THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT
BEING REMOVED. ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING
RELOCATED AND OWNER-PROVIDED EQUIPMENT.
F
VERIFY DEPTH, SIZE, LOCATIONS, AND CONDITIONS OF EXISTING
UTILITIES IN THE FIELD, INCLUDING POINTS OF CONNECTION, PRIOR TO
STARTING WORK.
G
ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING
UNLESS OTHERWISE NOTED. ALL WORK INDICATED ON PLANS HAS BEEN
LOCATED PER EXISTING DRAWINGS AND/OR FIELD OBSERVATION AND
REQUIRES FIELD VERIFICATION.
H
ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE.
WHERE DUCT WORK PIPE INSULATION HAS BEEN DAMAGED DURING
DEMOLITION, THE CONTRACTOR SHALL REPAIR INSULATION AS
REQUIRED TO MATCH EXISTING.
DEMOLITION KEYED NOTES
REMOVE AIR CONDITIONING MINI SPLIT AND ALL ACCESSORIES
COMPLETE INCLUDING ALL SUPPORTS, CONTROLS AND REFRIGERANT
PIPING. CAP ALL PIPE PENETRATIONS THRU ROOF OR EXTERIOR WALL
AND SEAL WEATHER TIGHT. ASSOCIATED CONDENSING UNIT TO BE
DISCONNECTED AND REMOVED FROM EITHER ROOF OR SIDEWALL, SEE
ROOF PLAN FOR ADDITIONAL INFORMATION. PRIOR TO DEMO, VERIFY
WITH OWNER IF EXISTING UNITS SHOULD BE SALVAGED.
DISCONNECT AND REMOVE EXISTING FAN COIL UNIT ABOVE THE CEILING
INCLUDING ALL HANGERS, SUPPORTS, ACCESSORIES, AND CONTROLS.
REMOVE ALL ASSOCIATED DUCTWORK AND DIFFUSERS AS INDICATED.
REMOVE AND CAP ALL ASSOCIATED PIPING AS REQUIRED FOR
INSTALLATION OF NEW UNIT ABOVE THE CEILING, AS INDICATED.
COORDINATE WITH ALL TRADES FOR ADDITIONAL INFORMATION ON
DEMOLITION SCOPE FOR FAN COIL UNITS INDICATED.
DISCONNECT AND REMOVE AIR HANDLING UNIT COMPLETE INCLUDING
ALL ACCESSORIES, SUPPORTS, HANGERS, AND CONTROLS. DISCONNECT
AND TEMPORARILY CAP HEATING HOT WATER PIPING AND PREPARE TO
REWORK FOR NEW CONNECTION. REMOVE DUCTWORK AS INDICATED
AND PREPARE EXISTING DUCTWORK FOR NEW CONNECTIONS.
DISCONNECT AND REMOVE UNIT VENTILATOR COMPLETE INCLUDING ALL
ACCESSORIES, SUPPORTS AND HANGERS, AND CONTROLS. REMOVE ALL
EXISTING REFRIGERANT PIPING UP THRU ROOF, CAP AND SEAL EXISTING
ROOF PENETRATION WEATHER TIGHT. REMOVE AND CAP ALL
ASSOCIATED PIPING AS REQUIRED FOR INSTALLATION OF NEW UNIT
ABOVE THE CEILING, AS INDICATED. DISCONNECT AND REMOVE
EXISTING DUCTWORK FROM EITHER EXISTING INTAKE HOOD THRU ROOF
OR EXISTING INTAKE LOUVER THRU EXTERIOR WALL, AS INDICATED.
PREPARE EXISTING INTAKE HOOD OR INTAKE LOUVER FOR NEW
CONNECTIONS. COORDINATE WITH ALL TRADES FOR ADDITIONAL
INFORMATION ON DEMOLITION SCOPE FOR UNIT VENTILATORS
INDICATED.
REMOVE CABINET UNIT HEATER COMPLETE INCLUDING ALL
ACCESSORIES AND CONTROLS. HEATING HOT WATER PIPING TO REMAIN.
TEMPORARILY CAP AND PREPARE TO REWORK FOR NEW CONNECTION.
CUT AND CAP EXISTING GAS PIPING ABOVE CEILING IN CORRIDOR CLOSE
TO MAIN. ENSURE GAS PIPING IS UPSTREAM OF THE ASSOCIATED GAS
VALVE BOX LOCATED IN THE CLASSROOM PRIOR TO DEMOLITION.
REMOVE EXHAUST GRILLE AND EXHAUST DUCTWORK AS INDICATED
BACK THRU ROOF AND REMOVE EXISTING EXHAUST FAN (ON ROOF).
PREPARE ROOF OPENING FOR NEW DUCTWORK AND NEW EXHAUST FAN.
SEE DEMOLITION ROOF PLANS FOR ADDITIONAL INFORMATION.
DISCONNECT AND REMOVE INLINE EXHAUST FAN FOR LOCKER ROOMS
INCLUDING ALL ASSOCIATED HANGERS, SUPPORTS, CONTROLS AND
DUCTWORK, AS INDICATED. REMOVE EXISTING LOUVER AND SEAL
EXTERIOR WALL PENETRATION WEATHER TIGHT. PREPARE EXISTING
DUCTWORK FOR NEW CONNECTIONS.
9 DUCT OR PIPING CONTINUATION INTO MEZZANINE. SEE SHEET MD4.20
AND M4.20 FOR CONTINUATION AND ADDITIONAL INFORMATION.
REMOVE DUCTWORK AS INDICATED. PREPARE EXISTING DUCTWORK FOR
NEW CONNECTION. SEE NEW WORK PLANS FOR ADDITIONAL
INFORMATION.
REMOVE EXISTING EXHAUST DUCTWORK UP THRU ROOF AND EXISTING
EXHAUST FAN (ON ROOF). CAP EXISTING ROOF PENETRATION. SEE ROOF
PLAN FOR ADDITIONAL INFORMATION.
12 REMOVE EXISTING SHOWER HEADS IN SPACE AS INDICATED. CUT AND
CAP ALL PIPING AT FLOOR.
REMOVE RELIEF DUCTWORK THRU ROOF AND RELIEF HOOD ON ROOF.
CAP AND SEAL ROOF PENETRATION WEATHER TIGHT. SEE DEMOLITION
ROOF PLAN FOR ADDITIONAL INFORMATION.
X
SCALE:
MECHANICAL DEMOLITION FIRST FLOOR PLAN - UNIT B
1/8" = 1'-0"
UNIFIED BUILDING
SYSTEMS ENGINEERING
SHEET TITLE
SHEET NO.
PROJECT TITLE
UBS PROJECT : 047.26.03
69 S. GRATIOT AVE.
MT. CLEMENS, MI 48043
N
KEY PLAN
N.T.S.
A B
C
OWNER JOB NO.
TC JOB NO. 107445
TD\ORU SFKRROV
HRRYHU MLGGOH
SFKRRO - H9AC
USJUDGHV
27101 BHYHUO\ RG
TD\ORU� MI 48180
ISSUED FOR BIDDING08.11.2026
MECHANICAL
DEMOLITION FIRST
FLOOR PLAN - UNIT B
MD1.11
ADDENDUM 00108.31.2026
jalvord Highlight
(E)HV-5
(E)HHWS DN
(E)HHWR DN TO
CONV BELOW
(E)34x18 SA
INTO GYM
SEE LOWER LEVEL FOR
CONTINUATION
(E)34x18 SA
INTO GYM
SEE LOWER LEVEL
FOR
CONTINUATION
(E)OA INTAKE
LOUVER
OPEN TO BELOW
GYM FAN
ROOM
(E)24x36 RA DN
SEE LOWER LEVEL
FOR CONTINUATION
(E)24x36 RA OED
PLENUM RETURN TO
EXISTING UNIT
REMOVE ELBOW,
PREPARE DUCT THRU
FLOOR FOR NEW
CONNECTION.
(E)HHWR
(E)HHWS
(E)1"
(E)2"
SEE LOWER LEVEL
FOR CONTINUATION
OF PIPING
GENERAL DEMOLITION NOTES
A
THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL
EXTENT OF WORK TO BE PERFORMED. THE EXACT EXTENT OF
DEMOLITION SHALL BE DETERMINED BY THE NEW WORK.
B
ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL
BE PERFORMED AT A TIME APPROVED IN ADVANCE BY OWNER'S
REPRESENTATIVE SO AS NOT TO INTERFERE WITH THE PRESENT
BUILDING'S OPERATION.
C
PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE
SITE AND BECOME FAMILIAR WITH EXISTING SITE CONDITIONS,
SYSTEMS, AND UTILITIES. NOTIFY DESIGN PROFESSIONAL OF ANY
INTERFERENCES OR DISCREPANCIES.
D
ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED
COMPLETELY WITH ALL RELATED ITEMS INCLUDING HANGERS,
SUPPORTS, INSULATION, CONTROLS, ETC. CAP ALL OPEN-ENDED PIPES
AND DUCTS.
E
THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT
BEING REMOVED. ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING
RELOCATED AND OWNER-PROVIDED EQUIPMENT.
F
VERIFY DEPTH, SIZE, LOCATIONS, AND CONDITIONS OF EXISTING
UTILITIES IN THE FIELD, INCLUDING POINTS OF CONNECTION, PRIOR TO
STARTING WORK.
G
ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING
UNLESS OTHERWISE NOTED. ALL WORK INDICATED ON PLANS HAS BEEN
LOCATED PER EXISTING DRAWINGS AND/OR FIELD OBSERVATION AND
REQUIRES FIELD VERIFICATION.
H
ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE.
WHERE DUCT WORK PIPE INSULATION HAS BEEN DAMAGED DURING
DEMOLITION, THE CONTRACTOR SHALL REPAIR INSULATION AS
REQUIRED TO MATCH EXISTING.
DEMOLITION KEYED NOTES
DISCONNECT AND REMOVE AIR HANDLING UNIT COMPLETE INCLUDING
ALL SUPPORTS, HANGERS, ACCESSORIES, AND CONTROLS. REMOVE
DUCTWORK AND PIPING INDICATED AND PREPARE EXISTING DUCTWORK
AND PIPING FOR NEW CONNECTIONS.
REMOVE DUCTWORK, DUCT SLEEVE, AND LOUVER (WHERE APPLICABLE)
THROUGH WALL. COORDINATE WITH ARCHITECTURAL TRADES TO PATCH
WALL PENETRATION AS NECESSARY.
(E)12x12
EA DN
(E)12x12
EA UP
(E)32x20 SA INTO PLENUM(E)18x16 SA
INTO PLENUM
SEE LOWER LEVEL
FOR CONTINUATION
(E)26x20 SA
INTO PLENUM
SEE LOWER LEVEL FOR
CONTINUATION
(E)RA TO PLENUM
(E)HV-1
(E)12x12
EA DN
(E)12x10 EA
INTO PLENUM
SEE LOWER LEVEL
FOR CONTINUATION
(E)HC-3
(E)HC-2
(E)HHWS DN
(E)HHWR DN
SEE LOWER LEVEL
FOR CONTINUATION
(E)RA TO PLENUM
MAIN FAN
ROOM
OPEN TO BELOW
(E)HHWR
(E)HHWS
(E)2-1/2"
(E)1-1/2"(E)1"
(E)HV-3
(E)HV-4
(E)26x10
SA DN
(E)26x10
SA DN
BALCONY
MECH
STOR
(E)HHWR
(E)HHWS
SEE LOWER LEVEL
FOR CONTINUATION
OF PIPING
(E)2-1/2"
(E)1-1/2"
UNIFIED BUILDING
SYSTEMS ENGINEERING
SHEET TITLE
SHEET NO.
PROJECT TITLE
UBS PROJECT : 047.26.03
69 S. GRATIOT AVE.
MT. CLEMENS, MI 48043
N
KEY PLAN
N.T.S.
A B
C
OWNER JOB NO.
TC JOB NO. 107445
TD\ORU SFKRROV
HRRYHU MLGGOH
SFKRRO - H9AC
USJUDGHV
27101 BHYHUO\ RG
TD\ORU� MI 48180
ISSUED FOR BIDDING08.11.2026
ENLARGED
MECHANICAL
DEMOLITON PLANS -
BALCONY
MD4.20
SCALE:
ALTERNATE-2:
ENLARGED MECHANICAL DEMOLITON - BALCONY - GYM FAN ROOM
1/4" = 1'-0" SCALE:
ALTERNATE-1:
ENLARGED MECHANICAL DEMOLITON - BALCONY - MAIN FAN ROOM
1/4" = 1'-0"
SCALE:
ALTERNATE-2:
ENLARGED MECHANICAL DEMOLITON - BALCONY - MECH ROOM 65
1/4" = 1'-0"
M1.00
M1.00
M1.00
08.31.2026 ADDENDUM 001
HO HUB OUTLET
GAL GALLON
FFE FINISHED FLOOR ELEVATION
CIRC CIRCULATING
T & P TEMPERATURE AND PRESSURE
SP STATIC PRESSURE
SQUARE FOOT/SQUARE FEET
SERVICE SINK
SHOWER
SS
SqFt / SF
SH
POUNDS PER SQUARE INCH - GAUGEPSIG
REVOLUTIONS PER MINUTE
REDUCED PRESSURE ZONE
SUPPLY AIR
ROOF SUMP
RELIEF AIR
RETURN AIR
RPM
SA
RS
RPZ
REL.A
RA
POUNDS PER SQUARE INCH - ABSOLUTE
PRESSURE REDUCING VALVE
PRESSURE DROP (FEET OF WATER)
OPPOSED BLADE DAMPER
OPEN ENDED DUCT
OUTSIDE DIAMETER
ON CENTER / CENTER TO CENTER
OUTSIDE AIR
PD
PSIA
PRV
OBD
OED
OD
OC
OA
MANUAL AIR VENT
NOT IN CONTRACT
NORMALLY CLOSED
NOMINAL
NORMALLY OPEN
NOISE CRITERIA
MINIMUM
MISCELLANEOUS
MANHOLE
MANUFACTURER
MECHANICAL
NOM
NIC
N.C.
NO
NC
MAV
MIN
MISC
MFR
MECH
MH
1000 BRITISH THERMAL UNITS PER HOUR
POUNDS PER HOUR
LOCKED ROTOR AMPS
LEAVING WET BULB TEMPERATURE
LEAVING DRY BULB TEMPERATURE
MAXIMUM
LAVATORY
LEAVING AIR TEMPERATURE
INTERNAL STATIC PRESSURE
KILOWATT
INDIRECT WASTE
INCHES
INVERT
LRA
MAX
MBH
LWB
LDB
LBS/HR
LAV
ISP
INV
KW
LAT
IW
IN
WALL HYDRANT
WATER GAUGE
VENT THRU ROOF
WATER CLOSET
WET BULB TEMPERATURE
WASTE AND VENT
WG
WH
W
WC
WB
W&V
VTR
WASTE
HOUR
INVERT ELEVATION
HERTZ
INSIDE DIAMETER
HYDRANT
HORSEPOWER
HEATING
HYD
HZ
IE
ID
HTG
HR
HP
VOLUME DAMPER (MANUALLY ADJUSTABLE)
UNDERWRITERS LABORATORY
UNLESS NOTED OTHERWISE
TEMPERATURE CONTROL
TOTAL STATIC PRESSURE
UNDERGROUND
VD
UNO
UR
UL
URINAL
TSP
TYP
UG
TC
TYPICAL
SMOKE DETECTOR
MOTORIZED DAMPER
VOLUME DAMPER (MANUALLY ADJUSTABLE)
CO2 SENSOR
CROSS SECTION OF SUPPLY AIR DUCT
FLEXIBLE CONNECTION
LINEAR SLOT DIFFUSER
SUPPLY DIFFUSER
RETURN OR EXHAUST GRILLE
TRANSFER GRILLE
FLEXIBLE DUCT CONNECTION TO SUPPLY
CONCENTRIC TRANSITION (DOUBLE LINE)
CONCENTRIC TRANSITION (SINGLE LINE)
ECCENTRIC TRANSITION (SINGLE LINE)
ECCENTRIC TRANSITION (DOUBLE LINE)
RADIUS RECTANGULAR ELBOW
RADIUS ROUND ELBOW
ROUND ELBOW UP
RECTANGULAR ELBOW UP
RECTANGULAR ELBOW DOWN
ROUND ELBOW DOWN
RECTANGULAR TAKE-OFF (SINGLE LINE)
RECTANGULAR TAKE-OFF (DOUBLE LINE)
ROUND TAKE-OFF (SINGLE LINE)
ROUND TAKE-OFF (DOUBLE LINE)
SPIN-IN FITTING (WITH VOLUME DAMPER)
ELBOW (WITH TURNING VANES)
FULL LOAD AMPSFLA
GALLONS PER HOUR
GALLONS PER MINUTE
FLOOR
FEET
FEET PER MINUTE
FUNNEL FLOOR DRAIN
FLOOR SINK
FACE VELOCITY
FIRE VALVE CABINET
GPM
GPH
FVC
FV
FT
FS
FFD
FPM
FLR
FLEXIBLE CONNECTION
FIRE HOSE VALVE
FLOOR DRAIN
FACE AREA (COIL) / FREE AREA (LOUVER)
DEGREES FAHRENHEIT
FD
FHV
FC
FA
°F
ELECTRIC WATER COOLER
EXTERNAL STATIC PRESSURE
ELEVATION
ENTERING AIR TEMPERATURE
EXHAUST AIR
EXPANSION JOINT
EXHAUST FAN
ENERGY MANAGEMENT SYSTEM
ELECTRICALELECT
EWC
EWB
ESP
EMS
EJ
EL
EF
EAT
EDB
EA/EXH
DEGREES
DRY BULB TEMPERATURE
DOWN
EXISTING
DOMESTIC WATER HEATER
DRAIN TILE CONNECTION
DIRECT DIGITAL CONTROL
CABINET UNIT HEATER
CONTROL VALVE
CONVECTOR
DWH
(E)
DTC
DDC
DN
CV
DB
DEG
CUH
CONV
COOLING
CONTINUATION OR CONTINUED
CLEAN OUT
CAPACITY
BRITISH THERMAL UNIT
CUBIC FEET PER HOUR
CONSTANT AIR VOLUME
BACKWATER VALVE
CUBIC FEET PER MINUTE
CO
CONT
CLG
CFM
CFH
CAV
CAP
BWV
BTUH
BTU
ACCESS DOOR
AIR EXTRACTOR
BRAKE HORSEPOWER
BOTTOM OF DUCT
BACKFLOW PREVENTER
AUTOMATIC SPRINKLER RISER
ABOVE FINISHED FLOOR
AIR PRESSURE DROP
AUTOMATIC AIR VENT / AIR ADMITTANCE VALVE
ASR
BOD
BHP
BFP
APD
AFF
AAV
AE
AD
ENTERING WET BULB TEMPERATURE
ENTERING DRY BULB TEMPERATURE
BRITISH THERMAL UNITS PER HOUR
DESCRIPTION
MECHANICAL ABBREVIATIONS
ABBREV. DESCRIPTIONABBREV.
MECHANICAL ABBREVIATIONSMECHANICAL ABBREVIATIONS
ABBREV. DESCRIPTION
MECHANICAL SYMBOLS
ABBREV. DESCRIPTION
R
R
D
D
SD
INCLINED DROP IN DIRECTION OF AIR FLOW
(SINGLE LINE)
INCLINED DROP IN DIRECTION OF AIR FLOW
(DOUBLE LINE)
INCLINED RISE IN DIRECTION OF AIR FLOW
(SINGLE LINE)
INCLINED RISE IN DIRECTION OF AIR FLOW
(DOUBLE LINE)
DIFFUSER
DUCT
CROSS SECTION OF EXHAUST OR RETURN AIR
ORS OVERFLOW ROOF SUMP
RELATIVE HUMIDITYRH
OS&Y OUTSIDE SCREW AND YOKE
REQD REQUIRED
EXISTING DEVICES OR EQUIPMENT
NEW OR MODIFIED DEVICES OR EQUIPMENT
EXISTING SYSTEM COMPONENT TO BE REMOVED
DRAWING NOTATION
POINT OF NEW CONNECTION
SYMBOL
NEW WORK KEY NOTE NO. 1
DEMOLITION KEY NOTE NO. 1
EQUIPMENT TAG
DESCRIPTION
NEW
EXISTING
SMOKE DAMPER
FIRE DAMPER (HORIZONTAL)
FIRE DAMPER (VERTICAL)
NEW
EXISTING
EXISTING
NEW
EXISTING
NEW
EXISTING
NEW
HB HOSE BIBB
PT PRESSURE / TEMPERATURE PORT
FIRE HYDRANT
FIRE HOSE CABINET
FIRE HOSE RACK
FIRE DEPARTMENT CONNECTION
FHR
FHC
FDC
FH
AIR TERMINAL TAG:
IE: DIFFUSER TYPE = S-1
NECK SIZE = 12x12
CFM = 150 (TYPICAL FOR 2)
COMBINATION FIRE/SMOKE DAMPER
(HORIZONTAL)
COMBINATION FIRE/SMOKE DAMPER
(VERTICAL)
ECCENTRIC REDUCER
DESCRIPTION
MECHANICAL PIPING SYMBOLS
ABBREV.
PIPE ELBOW DOWN
DIRECTION OF FLOW
PIPE ELBOW UP
UNION
CONCENTRIC REDUCER
FLEXIBLE CONNECTION
PIPE GUIDE
PIPE ANCHOR
EXPANSION JOINT
CIRCULATING PUMP
BUTTERFLY VALVE
GLOBE VALVE
ANGLE VALVE
BALL VALVE
ISOLATION VALVE
PIPE CAP OR PLUG
TRAP (PLAN VIEW)
CENTRIFUGAL FAN
CHECK VALVE (SPRING)
PLUG VALVE
NEEDLE VALVE
FLOOR DRAIN / FUNNEL FLOOR DRAIN (ELEVATION)
CLEAN OUT (IN FLOOR)
ROOF SUMP
FLOOR DRAIN / FUNNEL FLOOR DRAIN (PLAN VIEW)
AUTOMATIC GAS SHUT-OFF VALVE
CHECK VALVE (SWING)
BACKFLOW PREVENTER
DIRECTION OF PIPE PITCH
HOSE BIBB, WALL HYDRANT
SPRINKLER HEAD (SIDEWALL)
SIAMESE CONNECTION (YARD)
FIRE HYDRANT
FLOW SWITCH
SPRINKLER HEAD (UPRIGHT)
SIAMESE CONNECTION (WALL MOUNTED)
OUTSIDE SCREW AND YOKE VALVE (OS&Y)
CLEAN OUT (IN LINE)
FLOW MEASURING DEVICE
COMBINATION FLOW MEASURING AND BALANCING DEVICE
BALANCING VALVE
AUTOMATIC AIR VALVEAAV
MANUAL AIR VALVEMAV
S = SUPPLY
R = RETURN
E = EXHAUST
T = TRANSFER
MINIMUM CIRCUIT AMPACITY MCA
MAXIMUM OVER-CURRENT PROTECTIONMOP
UNIT HEATERUH
PIPE TEE DOWN
STRAINER
CO
CO
WCO CLEAN OUT (WALL)
S
BFP
M WATER METER ASSEMBLY
PRESSURE REGULATING VALVE
SOLENOID VALVE
CONTROL VALVE (2-WAY / 3-WAY)
H
T
CO2
RETURN OR EXHAUST / SUPPLY AIR FLOW
M
MOTOR OPERATED DAMPER (AUTOMATIC)MOD
PUMPED SANITARY PIPING
HEATING HOT WATER SUPPLY PIPING
HEATING HOT WATER RETURN PIPING
SANITARY WASTE PIPING
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
FUEL OIL SUPPLY PIPING
DESCRIPTION
PIPING LEGEND
ABBREV.
DOMESTIC HOT WATER PIPING
DOMESTIC COLD WATER PIPING
PUMPED STEAM CONDENSATE RETURN PIPING
CONDENSATE DRAIN PIPING
STORM SEWER PIPING
STEAM PIPING
VENT PIPING
FUEL OIL RETURN PIPING
DRAIN TILE
REFRIGERANT LIQUID PIPING
REFRIGERANT SUCTION PIPING
FIRE PROTECTION PIPING
RAIN CONDUCTOR PIPING
GEO HEAT EXCHANGE RETURN
GEO HEAT EXCHANGE SUPPLY
CW
HW
HWR DOMESTIC HOT WATER RETURN PIPING
BOOSTED-DOMESTIC HOT WATER PIPINGBHW
BOOSTED-DOMESTIC COLD WATER PIPINGBCW
DOMESTIC 140°F HOT WATER PIPINGHW(140°F)
FOR
FOS
CHWR
CHWS
CD
CONDENSER WATER SUPPLY PIPING
CONDENSER WATER RETURN PIPINGCWR
CWS
NATURAL GAS PIPINGG
GXHR
GXHS
STEAM CONDENSATE RETURN PIPINGCR
HHWR
HHWS
HEAT PUMP LOOP SUPPLY PIPING
HEAT PUMP LOOP RETURN PIPINGHPLR
HPLS
NON POTABLE COLD WATER PIPINGNPCW
DT
F
PCR
LOW PRESSURE CONDENSATE PIPINGLPC
HIGH PRESSURE CONDENSATE PIPINGHPC
NITROGEN GAS PIPINGN
PSAN
RC
ORC OVERFLOW RAIN CONDUCTOR PIPING
RL
RS
SAN
ST
STM
HIGH PRESSURE STEAM PIPINGHPS
LOW PRESSURE STEAM PIPINGLPS
V
COMPRESSED AIR PIPINGCA
VACUUM PIPINGVAC
OXYGEN GAS PIPINGO2
MEDICAL AIR PIPINGMA
PUMPED STORM PIPINGPST
HOT GAS BY-PASS PIPINGHGB
TEMPERED WATER PIPINGTW
THERMOSTAT OR
TEMPERATURE SENSOR
HUMIDISTAT OR
HUMIDITY SENSOR
S-1 12x12 150-2
FURNISHEDFURN
INSTALLEDINST
AHU-1
FS
S
YEAR CODE
MICHIGAN BUILDING CODE
MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS
MICHIGAN PLUMBING CODE
MICHIGAN MECHANICAL CODE
INTERNATIONAL FUEL GAS CODE
APPLICABLE CODES
AND REGULATIONS
MICHIGAN UNIFORM ENERGY CODE2019
NFPA 101 WITH BFS AMENDMENTS2012
UNIFIED BUILDING
SYSTEMS ENGINEERING
SHEET TITLE
SHEET NO.
PROJECT TITLE
UBS PROJECT : 047.26.03
69 S. GRATIOT AVE.
MT. CLEMENS, MI 48043
OWNER JOB NO.
TC JOB NO. 107445
TD\ORU SFKRROV
HRRYHU MLGGOH
SFKRRO - H9AC
USJUDGHV
27101 BHYHUO\ RG
TD\ORU� MI 48180
ISSUED FOR BIDDING08.11.2026
MECHANICAL
GENERAL
INFORMATION
M0.00
DRAWING INDEX
SHT. NO. DESCRIPTION
M0.00 MECHANICAL GENERAL INFORMATION
M1.00 COMPOSITE MECHANICAL FIRST FLOOR PLAN
MD1.10 MECHANICAL DEMOLITION FIRST FLOOR PLAN - UNIT A
MD1.11 MECHANICAL DEMOLITION FIRST FLOOR PLAN - UNIT B
MD1.12 MECHANICAL DEMOLITION FIRST FLOOR PLAN - UNIT C
MD1.30 MECHANICAL DEMOLITION ROOF PLAN - UNIT A
MD1.31 MECHANICAL DEMOLITION ROOF PLAN - UNIT B
MD1.32 MECHANICAL DEMOLITION ROOF PLAN - UNIT C
MD4.20 ENLARGED MECHANICAL DEMOLITON PLANS - BALCONY
M1.10 MECHANICAL NEW WORK FIRST FLOOR PLAN - UNIT A
M1.11 MECHANICAL NEW WORK FIRST FLOOR PLAN - UNIT B
M1.12 MECHANICAL NEW WORK FIRST FLOOR PLAN - UNIT C
M1.30 MECHANICAL NEW WORK ROOF PLAN - UNIT A
M1.31 MECHANICAL NEW WORK ROOF PLAN - UNIT B
M1.32 MECHANICAL NEW WORK ROOF PLAN - UNIT C
M4.20 ENLARGED MECHANICAL NEW WORK PLANS - BALCONY
M5.00 MECHANICAL DETAILS
M5.01 MECHANICAL DETAILS
M6.00 MECHANICAL SCHEDULES
M6.01 MECHANICAL SCHEDULES
M8.00 MECHANICAL TEMPERATURE CONTROLS
M8.01 MECHANICAL TEMPERATURE CONTROLS
08.31.2026 ADDENDUM 001
jalvord Highlight
UN
IT
C
UN
IT
B
T
(E)CONV
(E)CONV
(E)CONV
(E)12x12
EA UP
(E)RG
(E)SD
(E)RG(E)RG
(E)G
(E)SD(E)SD
(E)SD
(E)SD
(E)RG
(E)SD
(E)RG
(E)SD
(E)SD
(E)RG
(E)SD
(E)EG
(E)EG
(E)RG
(E)SD
(E)SD
(E)RG
(E)RG
(E)EG
(E)EG
(E)EG
(E)SD
(E)EG
(E)SG(E)SD
(E)SD (E)SD(E)RG (E)RG
(E)SD (E)SD(E)RG (E)RG
(E)SD (E)SD (E)RG
(E)SD (E)SD (E)RG
(E)SD (E)SD (E)RG
(E)SD (E)SD(E)RG (E)RG
(E)RG
(E)RG
(E)RG
(E)SD (E)SD(E)RG (E)RG
(E)SD (E)RG
(E)RG
(E)SD
(E)RG
(E)SD
(E)SD
(E)SD
(E)RG(E)RG
(E)SG (E)RG
(E)SG
(E)RG
(E)SG
(E)RG
(E)EG (E)EG (E)EG
(E)EG
(E)EG
(E)EG
(E)CONV
(E)3"
(E)4"
(E)EA UP
TO EF
(E)60x27 LOUVER
(E)60x27 LOUVER (E)60x27 LOUVER
(E)60x27 LOUVER (E)60x27 LOUVER
BLANKED OFF**
(E)60x27 LOUVER
(E)60x27 LOUVER
(E)60x27 LOUVER
(E)60x27 LOUVER
(E)24x24
UP TO IH
(E)24x24
UP TO IH
(E)24x24
UP TO IH
(E)24x24
UP TO IH
(E)24x24
UP TO IH
(E)EG
(E)EG
(E)EG
(E)EG
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E)HHWS
(E)HHWR
(E )H
HW
R
(E )H
HW
S
(E )H
HW
S
(E )H
HW
R
(E )H
HW
R
(E )H
HW
S
(E )H
HW
R
(E )H
HW
S
(E )H
HW
R
(E )H
HW
S
(E )H
HW
R
(E )H
HW
S
(E)EG(E)EG(E)EG
(E)RG
(E)RG (E)RG
(E)RG
(E)RG(E)RG
(E)RG (E)RG
(E)RG
(E)RG (E)RG
(E)RG
(E)RG(E)RG(E)RG(E)RG(E)RG
(E)RG
(E)RG
(E)EG
T
T
T
(E)12x10 EA
UP TO EF
(E)68x16 RA
(E)15x15 EA
UP TO EF
(E)GAS VALVE BOX
(E)GAS VALVE BOX
(E)GAS
VALVE BOX
(E)EA UP TO
EF ON ROOF
(E)60x10
LOUVER
HIGH
WALL
(E)GAS VALVE BOX
ANGLED CEILING
BUILD-OUT FOR
EXISTING HUV
ANGLED CEILING
BUILD-OUT FOR
EXISTING HUV
(E)60x10 LOUVER
HIGH WALL
(E)60x10 LOUVER
HIGH WALL
(E)EG
OUTLINE FOR
CEILING BUILD-OUT
FOR EXISTING HUV
~9" DROP FLAT
(E)OA DUCT UP TO
INTAKE HOOD ON ROOF
(E)60x10 LOUVER
HIGH WALL
(E)60x10 LOUVER HIGH WALL(E)60x10 LOUVER
HIGH WALL
(E)G (E)G (E)1"(E)1"
(E)3"
(E)4"
(E )H
HW
S
(E )H
HW
R
2-1/2" HHWS/R
UP TO MECH
MEZZANINE
HUV-4 HUV-4
HUV-1
HUV-1
HUV-3
HUV-3 HUV-3
HUV-5
HUV-5HUV-5
HUV-4
HUV-4
HUV-3 HUV-1
HUV-5
3 3
3 3
HUV-1
HUV-1 HUV-1
HUV-1 HUV-1
HUV-1
HUV-3
HUV-4
CUH-3
CUH-3
CUH-3
CUH-2
CUH-3
T
T
T
T
T T T T T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
24x16 RA7
30x24 RA UP
TO RTU-2
ALTERNATE-1
34x30 SA UP
TO RTU-2
SA DUCT
OFFSET
J.C.
GIRLS
BOYS
CONS
CONS
18 CONF
WAIT
16 CONSUL
CONF
BOOK
CLINIC
TLT
TLT
TLT
9AULT
WAIT
GEN. OFFICE
PRIN
LOBBY
9EST
OFFICE
105A
OFFICE
CL RM
GIRLS
BOYS
J.C.
MEN
WOMEN
MEN
TEACHERS
AUDIO 9IS.
WORK
OFF
HALL
CONF.
CL RM
MEDIA CENTER
CL RM
CORR.
9EST
TYPING
SPEC. ED
WORK
110-A
ST
TLT
TLT
112A CORR
PREP
OFF
CORR
119 OFF
CORR
CL RM
CL RM
CL RM
116 CL RM
CL RM
CL RM
CL RM
CL RM
CORR
CORR
9EST
WET RM
PREP
OFF
9EST
CUH-3
RLRS
RLRS
RLRS
RL RSRLRS
RL
RS
RL
RS
RL
RS
RL
RS
RL RS
RLRS
RL
RSRL
RS
RL
RS
RL
RS
RL
RS
RL
RS
RL
RS
RL
RS
RL
RS
RL
RS
RL
RS
RLRS
RLRS
RLRS
RL
RS
24x36 RELIEF
OPENING THRU
ROOF TO GRH-1
24x36 RELIEF
OPENING THRU
ROOF TO GRH-1
20x16 TA 20x16 TA
ABOVE
CEILING
20x16 TA
ABOVE
CEILING
20x16 TA
ABOVE
CEILING
20x16 TA
ABOVE
CEILING
20x16 TA
ABOVE
CEILING
1/2" 3/4"
1/2" 3/4"
(350 CFM)
(500 CFM)
TYP. OF 6
IN MEDIA CENTER
(250 CFM)
TYP. OF 2
(200 CFM)(100 CFM)
(200 CFM)
(100 CFM)
(200 CFM)
8ALTERNATE-1
M M M M M
M M MM
M
M
M M
M
M
(350 CFM)
(350 CFM)
(350 CFM)
(350 CFM)
(350 CFM)
(350 CFM)
(350 CFM)
8 (350 CFM)
(350 CFM)
(100 CFM)
(100 CFM)
(200 CFM)
(200 CFM)
(500 CFM)
(200 CFM)
(200 CFM)
(200 CFM)
(100 CFM)
8(300 CFM)
CL RM
CL RM
CL RM
CL RM
CL RM
CL RM
CL RM
150A CL RM
CL RM
HVAC GENERAL NOTES
A
THESE DRAWINGS ARE DIAGRAMMATIC AND REPRESENT THE GENERAL
EXTENT OF THE WORK TO BE PERFORMED. PROVIDE AND EXECUTE ALL
HVAC SYSTEMS PER ENGINEER'S SPECIFICATION, AND LOCAL APPLICABLE
CODES INCLUDING AMENDMENTS, BULLETINS, ETC. AS WELL AS THE
STANDARDS OF INSTALLATION AND EQUIPMENT ESTABLISHED FOR THE
BUILDINGS, AND REQUIREMENTS OF THE OWNER.
B
EXCEPT FOR CHANGES AS MAY BE SPECIFICALLY APPROVED BY THE
ENGINEER OF RECORD. IN ACCORDANCE WITH ALTERNATES OF OPTIONS
AS STATED HEREINAFTER, ALL WORK MUST BE IN FULL ACCORDANCE
WITH THE INTENT OF THE PLANS AND SPECIFICATIONS. SYSTEMS ARE
TO BE COMPLETE, EFFICIENT, AND SATISFACTORY OPERATION WHEN
PROJECT IS DELIVERED TO THE OWNER.
C
THE CONTRACTOR AND EACH SUBCONTRACTOR COVENANTS AND
AGREES TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE
CONSULTING ENGINEER, ARCHITECT, AND OWNER FROM AND AGAINST
ANY LIABILITY, LOSS, DAMAGE, OR EXPENSE INCLUDING ATTORNEYS
ARISING FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF THE
CONTRACTOR, SUBCONTRACTORS, AND THEIR AGENTS/EMPLOYEES
PROPERLY TO DISCHARGE THE OBLIGATIONS ASSUMED BY HIM/HER IN
THE PERFORMANCE OF THE WORK, INCLUDING ANY ACT OR OMISSION
ALLEGEDLY RESULTING IN DEATH, PERSONAL INJURY, PROPERTY
DAMAGE, OR IMPROPER CONSTRUCTION PROTOCOL.
D
CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND APPROVAL
FROM GOVERNING AUTHORITIES AND FILE NECESSARY FORMS, PAY ALL
INSPECTION FEES.
E
CONTRACTOR TO EXAMINE ALL ADJOINING WORK BEFORE
COMMENCEMENT OF HIS/HER SCOPE OF WORK. REPORT ANY
DISCREPANCIES TO THE CONSTRUCTION MANAGER FOR REVIEW AND
APPROVAL. COORDINATE ALL WORK WITH OTHER TRADES TO ENSURE
THAT INSTALLATION IS MADE IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS.
F
PROVIDE REQUIRED CLEARANCE IN FRONT OF ELECTRICAL EQUIPMENT,
DUCTWORK/PIPING SHALL NOT INTERFERE WITH ELECTRICAL
EQUIPMENT CLEARANCE.
G
CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH
MANUFACTURER'S CERTIFIED DRAWINGS. ALL PIPING CONNECTIONS
SHALL BE MINIMUM 3/4" UNLESS NOTED OTHERWISE.
H FURNISH ADEQUATE LIABILITY INSURANCE AND BONDING DOCUMENTS
AS REQUIRED BY THE OWNER.
J
SUPPORT ALL ANCHORS SECURED TO THE BOTTOM OF FLOOR SLABS
SHALL BE DROP-IN OR SLEEVE ANCHOR TYPE. ALL SUPPORTING STEEL
SHALL BE PROVIDED BY THE CONTRACTOR.
K DUCTWORK/PIPING SHALL NOT BE INSTALLED IN A LOCATION THAT
RESTRICTS THE ACCESS TO MECHANICAL DEVICES REQUIRING ACCESS.
L THE CONTRACTOR SHALL PROVIDE ALL MISCELLANNEOUS SUPPORTING
STEEL FOR THE PROPER INSTALLATION OF MECHANICAL SYSTEMS.
M
BRANCH DUCTWORK TO GRILLES, REGISTERS, AND DIFFUSERS SHALL BE
THE SAME SIZE AS THE TERMINAL DEVICE NECK SIZE WHERE NO DUCT
SIZE IS INDICATED.
NEW WORK KEYED NOTES
INSTALL CEILING MOUNTED HORIZONTAL UNIT VENTILATOR COMPLETE
INCLUDING SUPPORTS, HANGERS, CONTROLS AND ACCESSORIES. EXTEND AND
CONNECT 1" HEATING HOT WATER SUPPLY AND RETURN PIPING TO NEW UNIT.
PROVIDE NEW ISOLATION AND CONTROL VALVES. EXTEND NEW
REFRIGERATION PIPING FROM ASSOCIATED CONDENSING UNIT ON ROOF TO
NEW UNIT. LINESETS TO BE SIZED PER MANUFACTURER'S REQUIREMENTS.
ROUTE OUTSIDE AIR DUCT TO EXISTING INTAKE HOOD ON ROOF. ROUTE
CONDENSATE PIPING THRU SIDEWALL TO EXTERIOR OR PROVIDE CONDENSATE
PUMP AND ROUTE UP THRU MECHANICAL PIPE CURB (WHICHEVER IS NEAREST).
TERMINATE ALL PENETRATIONS WEATHER TIGHT. REPLACE THERMOSTAT IN
PLACE OF EXISTING AND REUSE THERMOSTAT BOX IF APPLICABLE.
INSTALL CEILING MOUNTED HORIZONTAL UNIT VENTILATOR COMPLETE
INCLUDING SUPPORTS, HANGERS, CONTROLS AND ACCESSORIES.
EXTEND AND CONNECT 1" HEATING HOT WATER SUPPLY AND RETURN
PIPING TO NEW UNIT. PROVIDE NEW ISOLATION AND CONTROL VALVES.
EXTEND NEW REFRIGERATION PIPING FROM ASSOCIATED CONDENSING
UNIT ON ROOF TO NEW UNIT. LINESETS TO BE SIZED PER
MANUFACTURER'S REQUIREMENTS. ROUTE OUTSIDE AIR DUCT UP THRU
ROOF TO NEW INTAKE HOOD ON ROOF. ROUTE CONDENSATE PIPING
THRU SIDEWALL TO EXTERIOR OR PROVIDE CONDENSATE PUMP AND
ROUTE UP THRU MECHANICAL PIPE CURB (WHICHEVER IS NEAREST).
TERMINATE ALL PENETRATIONS WEATHER TIGHT. REPLACE
THERMOSTAT IN PLACE OF EXISTING AND REUSE THERMOSTAT BOX IF
APPLICABLE.
INSTALL CEILING MOUNTED HORIZONTAL UNIT VENTILATOR COMPLETE
INCLUDING SUPPORTS, HANGERS, CONTROLS AND ACCESSORIES. EXTEND AND
CONNECT 1" HEATING HOT WATER SUPPLY AND RETURN PIPING TO NEW UNIT.
PROVIDE NEW ISOLATION AND CONTROL VALVES. EXTEND NEW
REFRIGERATION PIPING FROM ASSOCIATED CONDENSING UNIT ON ROOF TO
NEW UNIT. LINESETS TO BE SIZED PER MANUFACTURER'S REQUIREMENTS.
ROUTE OUTSIDE AIR DUCT TO EXISTING INTAKE LOUVER THROUGH EXTERIOR
WALL. ROUTE CONDENSATE PIPING TO EXTERIOR THRU EXISTING LOUVER.
TERMINATE ALL PENETRATIONS WEATHER TIGHT. REPLACE THERMOSTAT IN
PLACE OF EXISTING AND REUSE THERMOSTAT BOX IF APPLICABLE.
INSTALL FLOOR MOUNTED HORIZONTAL UNIT VENTILATOR COMPLETE.
EXTEND AND CONNECT 1" HEATING HOT WATER SUPPLY AND RETURN TO
NEW UNIT. PROVIDE NEW ISOLATION AND CONTROL VALVES. REUSE
EXISTING OUTDOOR AIR LOUVER. ROUTE CONDENSATE PIPING THRU
EXISTING LOUVER. EXTEND NEW REFRIGERATION PIPING FROM
ASSOCIATED CONDENSING UNIT ON ROOF TO NEW UNIT. LINESETS TO
BE SIZED PER MANUFACTURER'S REQUIREMENTS. ROUTE NEW
REFRIGERANT AND HYDRONIC PIPING DOWN IN PRE-FABRICATED METAL
ENCLOSURE. COORDINATE WITH ARCHTIECTURAL TRADES TO MATCH
FINISHES TO EXISTING WALL. REPLACE THERMOSTAT IN PLACE OF
EXISTING AND REUSE THERMOSTAT BOX IF APPLICABLE.
INSTALL CABINET UNIT HEATER COMPLETE IN PLACE OF EXISTING.
REWORK HEATING HOT WATER PIPING AND EXTEND 1/2" HEATING HOT
WATER SUPPLY AND 1/2" HEATING HOT WATER RETURN PIPING TO
CABINET UNIT HEATER AND TERMINATE WITH ISOLATION VALVES. IF
CABINET UNIT HEATER IS RECESSED REWORK WALL PENETRATION TO
ALIGN WITH DIMENSIONS OF NEW UNIT. FIELD VERIFY ALL DIMENSIONS
BEFORE COMMENCEMENT OF WORK. REPLACE THERMOSTAT IN PLACE OF
EXISTING AND REUSE THERMOSTAT BOX IF APPLICABLE.
INSTALL CEILING MOUNTED HORIZONTAL FAN COIL UNIT (FCU) COMPLETE
IN PLACE OF EXISTING AIR HANDLING UNIT. REWORK SUPPLY DUCTWORK
AND OUTSIDE AIR DUCTWORK TO CONNECT TO HORIZONTAL UNIT
VENTILATOR. REWORK EXISTING HEATING HOT WATER PIPING AND EXTEND
1" HEATING HOT WATER SUPPLY AND 1" HEATING HOT WATER RETURN TO
FCU AND TERMINATE WITH ISOLATION VALVES. REPLACE THERMOSTAT IN
PLACE OF EXISTING AND REUSE THERMOSTAT BOX IF APPLICABLE.
7 24x16 RETURN AIR DUCT PENETRATION INTO MECHANICAL MEZZANINE
ROOM, SEE SHEET M4.20 FOR CONTINUATION.
8 CLEAN EXISTING DIFFUSER AND GRILLE. REBALANCE TO CFM INDICATED.
REFRIGERANT LIQUID AND SUCTION (RL/RS) PIPING UP THRU ROOF
THRU COMMON MECHANICAL PIPE CURB. SEE ROOF PLAN AND DETAILS
FOR ADDITIONAL INFORMATION.
X
SCALE:
MECHANICAL DEMOLITION FIRST FLOOR PLAN - UNIT B
1/8" = 1'-0"
UNIFIED BUILDING
SYSTEMS ENGINEERING
SHEET TITLE
SHEET NO.
PROJECT TITLE
UBS PROJECT : 047.26.03
69 S. GRATIOT AVE.
MT. CLEMENS, MI 48043
N
KEY PLAN
N.T.S.
A B
C
OWNER JOB NO.
TC JOB NO. 107445
TD\ORU SFKRROV
HRRYHU MLGGOH
SFKRRO - H9AC
USJUDGHV
27101 BHYHUO\ RG
TD\ORU� MI 48180
ISSUED FOR BIDDING08.11.2026
MECHANICAL NEW
WORK FIRST FLOOR
PLAN - UNIT B
M1.11
08.31.2026 ADDENDUM 001
A B C D
E F G H J K
UNIT A
UNIT C
UN
IT
C
UN
IT
B
UN
IT
A
UN
IT
B
RTU-1
(HC-1 REPLACE.)
42x42 SA DN 54x24 RA DN
THRU ROOF
IH-1 IH-1
IH-1 IH-1
(E)IH
(E)KITCHEN EF
(E)KITHCEN EF
(E)EF (E)EF
(E)EF
(E)EF
(E)GRH
(E)GRH
(E)BF
(E)BF
(E)BF
(E)EF
(E)BF
(E)ROOF
ACCESS HATCH
(E)IH(E)IH
EF-5
EF-6
ACCU-2
ACCU-3
EF-1
6…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .