COMPILED LIST OF PROSPECTIVE VENDOR QUESTIONS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7TF-09-0005 QUESTIONS AND ANSWERS 6-22-09.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. 7TF-09-0005
PROJECT NO. FASCOE200901
U.S. ARMY CORPS OF ENGINEERS ENHANCED CELLULAR SERVICE
THE FOLLOWING IS A COMPILED LIST OF PROSPECTIVE VENDOR QUESTIONS SUBMITTED UP TO THIS POSTING. NO ADDITIONAL QUESTIONS WILL BE ENTERTAINED UNLESS YOU PARTICIPATE IN THE SITE SURVEY NOTED IN THIS DOCUMENT.
Q: Does our engineering/cabling firm need to be an approved GSA vendor in order to bid this?
A: No, GSA pre-approved vendors are not a requirement, however, design and installation must be in accordance with industry specifications for projects of similar scope and size.
Q: Where can I download a copy of the full RFP? Are there blueprints of the floors I can download?
A: The entire requirement has been posted on FED BIZ OPS in a combined synopsis/solicitation executed in FAR Part 12 format..
Q: Inquiring about getting the RFP documents concerning the RFP Bid Number:7TF-09-0005.
A: Please see previous response.
Q: Is it possible to provide building floor plans for our review?
A: A GSA SBU form was E-Mailed to all inquirers earlier today. If that document is completed and FAXed back to the number shown in the E-Mail by COB (1700hrs CST) today 17 June 2009, a CD containing the floor plans for floors 1 through 5 of the worksite will be sent to you in overnight mail. The drawings are in dwg format (Autocad drawing) to allow you better determine distances from scale. Those whom have not responded with the SBU form may obtain copies of the same disk by completing the GSA SBU at the site survey.
Q: Could you forward to me the floor plans?
A: Please see previous response Q: Floor plans - Are there floor plans available to provide a design? If so, what are the requirements and/or procedure for acquiring?
A: Please see previous response Q: Are you available for some of my design engineers to do a site survey tomorrow at 11:00?
A: Site survey will be conducted as a group. The address is 819 Taylor St., Fort Worth, TX., 76102. Survey will commence at 12:00PM on Friday 19 June 2009. Please contact Gil Jones on 817-501-9814 upon arrival. You may opt to proceed directly to room 14A02 upon arrival where you will be met by Mr. Jones. Please try to arrive by 11:30 AM so that escort determination can be made.
Q: Is there still time to schedule a site survey for this site?
A: Please see previous response Q: In section 5.0 period of performance I have some questions, equipment delivery may make the July 1 install date difficult? What are the options?
A: The July 1 date is our current target date. All attempts will be made to ensure that this date is met. At this time there are no options being considered for alternate dates nor are any anticipated.
Q: Project completion date - I see it being listed as July 1, 2009. Is this a firm completion date, or will an extension date be available?
A: Please see previous response Q: Prevailing Wage - Does this project qualify for prevailing wage? If so, do you have the documentation for wages available?
A: This contract is not subject to the Davis Bacon Act or Service Contract Act.
Q: Change Orders - Is there an allowance for change orders if no plans are available to design and provide a bid from?
A: This is to be a Firm Fixed Price contract. Change orders will not be allowed.