B05 Amendment A00001 SF30 7 25 2022.pdf

PDF 553 KB Posted

Attached to
Northern Cheyenne Service Unit Flooring Replacement Project Federal contract opportunity
Solicitation number
75H70122R00058
Issued by
Department of Health and Human Services Indian Health Service

About this file

This document provides information on a forthcoming federal construction solicitation for flooring replacement work at the Northern Cheyenne Service Unit in Lame Deer, Montana. The Indian Health Service intends to award a firm-fixed-price contract to remove and replace carpeting and vinyl composition tile flooring across approximately 60,000 square feet of the facility. Work must be completed within 90 calendar days and is set aside for small businesses with a preference for Indian Economic Enterprises. Interested offerors should monitor SAM.gov for the full solicitation release anticipated in late June 2022, which will include plans, specifications and wage determinations for the project valued between $250,000 and $500,000.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00001

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project #BI19NC200C6, Northern Cheyenne Service Unit Flooring Replacement Project

The purpose of this amendment is to extend the proposal due date and incorporate changes to documents as a result of the Question and Answer phase of the solicitation.

See summary of changes.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Indian Health Services (IHS) Division of Engineering Services (DES) - Dallas 1301 Young Street, Suite 840 Dallas, TX 75202-5433

See block 6.

75H70122R00058

BI19NC200C6

1 3

7/25/2022

06/23/2022

SF30 CONTINUATION OF BLOCK NARRATIVE 75H70122R0058

Amendment #A00001

SUMMARY OF CHANGES

The purpose of this amendment is to change the proposal due date, provide responses to questions and provide photographs.

The period of performance shall read 90 days from the Notice to Proceed in Section H.12 Project Schedule, paragraph (c).

Questions and answers:

Northern Cheyenne Service Unit – Lame Deer Health Center Flooring Project Qs for RFP

1. Paragraph F. on page 7 of the RFP states the Contractor is responsible for moving furniture. Does this also include electronics and personal items? Typically, these items are moved by others.

Facility employees will move their own electronics and any personal items.

2. Per page 16 of the specifications for carpet tile, it specified a Type 6, 6 fiber. This carpet tile style is almost non-existent because it is considered a cationic fiber or hollow core filament fiber and also is non-recyclable. Would a Type 6 fiber carpet be accepted that IS cationic fiber or hollow core filament fiber and that is recyclable? Yes, that recyclable alternative is acceptable.

3. On page 13 of the specifications regarding the sheet vinyl it specified a thickness of .08”. Would a 2mm or .0787” gauge and grade 1 wear layer which is just under the .080 specified be accepted? 2mm is standard for commercial grade. Yes, the clinic will accept a 2mm thickness substitute.

4. Will weekend work or after-hours work be allowed on this project? Weekend and after-hours work may be permitted if approved by the COR prior to the work commencing.

5. Can you confirm the period of performance? The SF1442 states 90 days from the Notice to Proceed, however paragraph c on page 19 of the RFP states 120 days for the performance period. POP is only 90 days.

6. Will the work need to be phased out or can it be completed simultaneously in sequence? If not, what is the desired phasing schedule of the work areas? If the work is done after hours and on weekends, there should be no problem with simultaneous completion. The Lame Deer Health Center has an urgent care clinic that is open 24/7 and that will likely need to have advanced planning, possibly phasing. We will need to ensure critical medical functions can continue in this department throughout the construction process.

7. Are there any pictures of the work areas that can be provided? Photographs have been attached.

8. What is the linear footage of the cove base to be installed? The clinic staff provided an estimate of approximately 60-65,000 linear feet. Taking precise measurements before commencing work would be necessary to confirm.

9. What are the work hours and days? Please refer to Section 011000 of the Technical Specifications and the clarification provided in Question 6.

10. Is the government or contractor responsible for moving furniture? Please refer to Paragraph F on page 7 as the RFP as well as the clarification provided in Question 1.

11. Is there phasing required? Please refer to the clarification provided in Question 6.

12. Is there an area for material and equipment storage? Space can be allocated in the parking lot, but there are no storage facilities on-site.

13. Is there a location available for a roll-off dumpster? A roll-off dumpster could be accommodated on-site.

14. Do you have specs for the Carpet, Cove Base, and LVT? Please refer to the sections 096513, 096516, and 096813 of the Technical Specifications.

15. Do you have an anticipated period of performance? Please refer to the SF1442 and clarifications provided in Question 5.

16. What are the current COVID protocols in place? Current protocols are that all patients, staff, and contractors wear a mask while in the building except for to eat or drink.

17. Does the building owner have an expected progression of work through the building? There is no expected progression. The urgent care clinic is a 24-7 operation and will likely have to be done separately and in phases. It is not necessarily rate-limiting; however, it should be done as quickly as possible to minimize disruptions to patient care. Everything else, clinic staff can work around it.

The proposal due date is hereby changed to:

PROPOSAL DUE DATE: Monday, August 1, 2022 at 2:00pm Central

Time Attachments:

1. Flooring Photographs