B01 Attachment J04 Technical Specifications.docx
DOCX document 71 KB Posted
- Attached to
- Northern Cheyenne Service Unit Flooring Replacement Project Federal contract opportunity
- Solicitation number
- 75H70122R00058
About this file
This is a pre-solicitation notice for a firm fixed price construction contract to replace flooring at the Northern Cheyenne Service Unit in Lame Deer, Montana. The scope of work is to demolish existing carpet and vinyl composition tile flooring in main hallways, corridors, and other designated areas, and install new carpet tile and luxury vinyl tile flooring along with integral cove base and appurtenances. The project magnitude is estimated between $250,000 to $500,000. The solicitation will be set aside for small businesses with a preference for Indian Economic Enterprises and will be released on or around June 23, 2022, with proposals due approximately 30 days later. The period of performance is 90 calendar days from notice to proceed. Interested parties should monitor the Federal Business Opportunities website for solicitation updates and amendments. The contracting agency is the Indian Health Service within the Department of Health and Human Services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B05 Amendment A00001 Attachment 1 Flooring Photographs.pdf | ||
| B05 Amendment A00001 SF30 7 25 2022.pdf | ||
| B01 RFP 22R00058 NCSU Flooring Replacement.pdf | ||
| B01 Attachment J02 Wage Determination Rosebud County 2 25 2022.pdf | ||
| B01 Attachment J01 Self Performed Calculation Sheet (Construction).docx | DOCX document | |
| B01 Attachment J05 IHS IEE Representation Form.pdf | ||
| B01 Attachment J03 NCSU Clinic Final Drawings.pdf | ||
| B01 Attachment J06 PPQ.docx | DOCX document | |
| B01 Attachment J07 Company Specialized Experience Form Construction.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
PROJECT BI19NC200C6
FLOORING REPLACEMENT – CLINIC
LAME DEER HEALTH CLINIC
LAME DEER, MONTANA
JUNE 2022
BILLINGS AREA INDIAN HEALTH SERVICE
DEPARTMENT OF HEALTH AND HUMAN SERVICES
Contents
| SECTION 011000 - SUMMARY | 1 |
| SECTION 013300 - SUBMITTAL PROCEDURES | 3 |
| SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL | 7 |
| SECTION 096513 - RESILIENT BASE AND ACCESSORIES | 8 |
| SECTION 096516 - RESILIENT SHEET FLOORING | 11 |
| SECTION 096813 - TILE CARPETING | 18 |
Flooring Replacement SPECIFICATIONS Lame Deer, MT
Table of Contents
SECTION 011000 - SUMMARY
GENERAL
SUMMARY
Section Includes:
Project information.
Work covered by Contract Documents.
Contractor's use of site and premises.
Coordination with occupants.
Work restrictions.
PROJECT INFORMATION
Project Identification: Flooring Replacement: Clinic & corridors.
Project Location: Lame Deer Health Clinic, Lame Deer, Montana.
Owner: Billings Area Indian Health Service.
WORK COVERED BY CONTRACT DOCUMENTS
The Work of Project is defined by the Contract Documents and consists of removal of existing carpet tile, resilient base, and related items, and replacement with carpet tile and welded sheet vinyl (Luxury Vinyl Tile, or LVT).
CONTRACTOR'S USE OF SITE AND PREMISES
Restricted Use of Site: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
Limits on Use of Site: Limit use of Project site to Work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
Limits on Use of Site: Confine construction operations to area designated to have flooring replaced as shown on drawings.
Driveways, Walkways, and Entrances: Keep entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.
Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.
COORDINATION WITH OCCUPANTS
Full Owner Occupancy: Owner will occupy site and existing building during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.
Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work.
WORK RESTRICTIONS
On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise indicated.
Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.
Notify Owner not less than two (2) days in advance of proposed disruptive operations.
Obtain Owner’s written permission before proceeding with disruptive operations.
Smoking and Controlled Substance Restrictions: Use of tobacco products and other controlled substances within the existing building is not permitted.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION 011000
Section 011000 - Summary Page 2
SECTION 013300 - SUBMITTAL PROCEDURES
1. GENERAL
SUMMARY
Section Includes:
Submittal schedule requirements.
Administrative and procedural requirements for submittals.
DEFINITIONS
Action Submittals: Written and graphic information and physical samples that require Engineer's responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."
Informational Submittals: Written and graphic information and physical samples that do not require Engineer's responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."
SUBMITTAL SCHEDULE
Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by Engineer and additional time for handling and reviewing submittals required by those corrections.
SUBMITTAL FORMATS
Submittal Information: Include the following information in each submittal:
Project name.
Date.
Name of firm or entity that prepared submittal.
Names of subcontractor, manufacturer, and supplier.
Unique submittal number, including revision identifier.
Submittal purpose and description.
Number and title of Specification Section.
Drawing number and detail references, as appropriate.
Indication of full or partial submittal.
Other necessary identification.
Signature of transmitter.
Contractor has the option of providing paper or electronic submittals.
Paper Submittals:
Place a permanent label or title block on each submittal item for identification; include name of firm or entity that prepared submittal.
Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by Engineer.
Action Submittals: Submit two paper copies of each submittal unless otherwise indicated. Engineer will return one (1) copy.
Informational Submittals: Submit one (1) paper copy of each submittal unless otherwise indicated. Engineer will not return copies.
Electronic Submittals: Prepare submittals as PDF package, incorporating complete information into each PDF file. Name PDF file with submittal number.
SUBMITTAL PROCEDURES
Prepare and submit submittals required by individual Specification Sections.
Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Engineer’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals. Allow 10 days for initial review of each submittal and 5 days for review of each resubmittal. Allow additional time if coordination with subsequent submittals is required.
Resubmittals: Make resubmittals in same form and number of copies as initial submittal.
Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.
Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Engineer's action stamp.
SUBMITTAL REQUIREMENTS
Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.
Mark each copy of each submittal to show which products and options are applicable.
Include the following information, as applicable:
Manufacturer's catalog cuts.
Manufacturer's product specifications.
Standard color charts.
Statement of compliance with specified referenced standards.
Testing by recognized testing agency.
Application of testing agency labels and seals.
Notation of coordination requirements.
Availability and delivery time information.
For equipment, include the following in addition to the above, as applicable:
Wiring diagrams that show factory-installed wiring.
Printed performance curves.
Operational range diagrams.
Clearances required to other construction, if not indicated on accompanying Shop Drawings.
Submit Product Data before Shop Drawings, and before or concurrent with Samples.
Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:
Identification of products.
Schedules.
Compliance with specified standards.
Notation of coordination requirements.
Notation of dimensions established by field measurement.
Relationship and attachment to adjoining construction clearly indicated.
Seal and signature of professional engineer if specified.
Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other materials.
Identification: Permanently attach label on unexposed side of Samples that includes the following:
Project name and submittal number.
Generic description of Sample.
Product name and name of manufacturer.
Sample source.
Number and title of applicable Specification Section.
Specification paragraph number and generic name of each item.
Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.
Product Schedule: Prepare a written summary indicating types of products required for the Work and their intended location.
Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of Engineers and owners, and other information specified.
Design Data: Prepare and submit written and graphic information indicating compliance with indicated performance and design criteria in individual Specification Sections. Include list of assumptions and summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Number each page of submittal.
Certificates: Submit written statements on the manufacturer’s letterhead certifying that the installer, manufacturer, material, or product complies with requirements in the Contract Documents.
Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of qualification on AWS forms.
Test and Research Reports:
Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for substrate preparation and primers required.
Field Test Reports: Submit written reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.
Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.
Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.
Product Test Reports: Submit written reports indicating that current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.
Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project.
CONTRACTOR'S REVIEW
Action Submittals and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Engineer.
Contractor's Approval: Indicate Contractor's approval for each submittal with a uniform approval stamp. Include name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
ENGINEER'S REVIEW
Action Submittals: Engineer will review each submittal, indicate corrections or revisions required, and return it.
Informational Submittals: Engineer will review each submittal and will return it if it does not comply with requirements. Engineer will forward each submittal to appropriate party.
Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from Engineer.
Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.
Submittals not required by the Contract Documents will be returned by Engineer without action.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION 0133
Section 013300 – Submittal Procedures Page 6
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
1. GENERAL
SUMMARY
Section includes administrative and procedural requirements for disposing of nonhazardous demolition and construction waste.
1. PRODUCTS (NOT USED)
1. EXECUTION
DISPOSAL OF WASTE
General: Except for items or materials to be salvaged or recycled, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate on-site.
Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
General: Except for items or materials to be salvaged or recycled, remove waste materials and legally dispose of at designated spoil areas on Owner’s property.
Burning: Do not burn waste materials.
END OF SECTION 017419
Section 017419 - Construction Waste Management and Disposal Page 7
SECTION 096513 - RESILIENT BASE AND ACCESSORIES
1. GENERAL
SUMMARY
Section Includes:
Thermoset-rubber base.
Thermoplastic-rubber base.
Vinyl base.
ACTION SUBMITTALS
Product Data: For each type of product.
Samples: For each exposed product and for each color and texture specified.
PRODUCTS
GENERAL
Contractor has the option of providing Thermoset-rubber base, Thermoplastic-rubber base, or Vinyl base. The selected product shall be used exclusively on this project.
THERMOSET-RUBBER BASE
Insert drawing designation. Use these designations on Drawings to identify each product.
Product Standard: ASTM F1861, Type TS (rubber, vulcanized thermoset), Group I (solid, homogeneous).
Style and Location:
Style A, Straight: Provide in areas with carpet.
Style B, Cove: Provide in areas with resilient floor coverings.
Style C, Butt to: Provide in areas indicated.
Thickness: 0.125 inch.
Height: 4 inches.
Lengths: Coils in manufacturer's standard length.
Outside Corners: Job formed or preformed.
Inside Corners: Job formed or preformed.
Colors: Match sample.
THERMOPLASTIC-RUBBER BASE
Copy this article and re-edit for each product.
Insert drawing designation. Use these designations on Drawings to identify each product.
Product Standard: ASTM F1861, Type TP (rubber, thermoplastic).
Group: I (solid, homogeneous) or II (layered).
Style and Location:
Style A, Straight: Provide in areas with carpet.
Style B, Cove: Provide in areas with resilient floor coverings.
Style C, Butt: Provide in areas indicated.
Thickness: 0.125 inch.
Height: 4 inches.
Lengths: Coils in manufacturer's standard length.
Outside Corners: Job formed or preformed.
Inside Corners: Job formed or preformed.
Colors: Match submitted sample.
VINYL BASE
Copy this article and re-edit for each product.
Insert drawing designation. Use these designations on Drawings to identify each product.
Product Standard: ASTM F1861, Type TV (vinyl, thermoplastic).
Group: I (solid, homogeneous)] or II (layered).
Style and Location:
Style A, Straight: Provide in areas with carpet.
Style B, Cove: Provide in areas with resilient floor coverings.
Thickness: 0.125 inch.
Height: 4 inches.
Lengths: Coils in manufacturer's standard length.
Outside Corners: Job formed or preformed.
Inside Corners: Job formed or preformed.
Colors: Match submitted sample.
INSTALLATION MATERIALS
Trowelable Leveling and Patching Compounds: Latex-modified, portland-cement-based or blended hydraulic-cement-based formulation provided or approved by resilient-product manufacturer for applications indicated.
Adhesives: Water-resistant type recommended by resilient-product manufacturer for resilient products and substrate conditions indicated.
Stair-Tread Nose Filler: Two-part epoxy compound recommended by resilient stair-tread manufacturer to fill nosing substrates that do not conform to tread contours.
Floor Polish: Provide protective, liquid floor-polish products recommended by resilient stair-tread manufacturer.
EXECUTION
PREPARATION
Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products.
Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound; remove bumps and ridges to produce a uniform and smooth substrate.
Do not install resilient products until materials are the same temperature as space where they are to be installed.
Immediately before installation, sweep and vacuum clean substrates to be covered by resilient products.
RESILIENT BASE INSTALLATION
Comply with manufacturer's written instructions for installing resilient base.
Apply resilient base to walls, columns, pilasters, casework and cabinets in toe spaces, and other permanent fixtures in rooms and areas where base is required.
Install resilient base in lengths as long as practical without gaps at seams and with tops of adjacent pieces aligned.
Tightly adhere resilient base to substrate throughout length of each piece, with base in continuous contact with horizontal and vertical substrates.
Do not stretch resilient base during installation.
On masonry surfaces or other similar irregular substrates, fill voids along top edge of resilient base with manufacturer's recommended adhesive filler material.
Preformed Corners: Install preformed corners before installing straight pieces.
Job-Formed Corners:
Outside Corners: Use straight pieces of maximum lengths possible and form with returns not less than 3 inches in length.
Form without producing discoloration (whitening) at bends.
Inside Corners: Use straight pieces of maximum lengths possible and form with returns not less than 3 inches in length.
Miter or cope corners to minimize open joints.
CLEANING AND PROTECTION
Comply with manufacturer's written instructions for cleaning and protecting resilient products.
Floor Polish: Remove soil, adhesive, and blemishes from resilient stair treads before applying liquid floor polish.
Cover resilient products subject to wear and foot traffic until Substantial Completion.
END OF SECTION 096513
Section 096513 – Resilient Base and Accessories Page 10
SECTION 096516 - RESILIENT SHEET FLOORING
GENERAL
SUMMARY
Section Includes:
Unbacked vinyl sheet flooring.
Vinyl sheet flooring with backing.
Unbacked rubber sheet flooring.
Rubber sheet flooring with backing.
ACTION SUBMITTALS
Product Data: For each type of product.
Samples: For each exposed product and for each color, texture, and pattern specified.
CLOSEOUT SUBMITTALS
Maintenance data.
QUALITY ASSURANCE
Installer Qualifications: An entity that employs installers and supervisors who are competent in techniques required by manufacturer for resilient sheet flooring installation and seaming method indicated.
PRODUCTS
Manufacturers and products listed in SpecAgent and Masterworks Paragraph Builder are neither recommended nor endorsed by the AIA or AVITRU. Before inserting names, verify that manufacturers and products listed there comply with requirements retained or revised in descriptions and are both available and suitable for the intended applications. For definitions of terms and requirements for Contractor's product selection, see Section 016000 "Product Requirements."
PERFORMANCE REQUIREMENTS
Retain "Fire-Test-Response Characteristics" Paragraph below if fire-test-response testing is required by authorities having jurisdiction. In most building codes, resilient flooring is exempt from fire-test-response requirements. See "Fire-Test-Response Characteristics" Article in the Evaluations for additional information.
Fire-Test-Response Characteristics: For resilient sheet flooring, as determined by testing identical products according to ASTM E648 or NFPA 253 by a qualified testing agency.
Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm.
UNBACKED VINYL SHEET FLOORING
Product Standard: ASTM F1913.
Thickness: 0.080 inch.
Wearing Surface: Embossed.
Sheet Width: Manufacturer’s standard.
Seamless-Installation Method: Heat welded or Chemically bonded.
Colors and Patterns: Match submitted sample.
VINYL SHEET FLOORING WITH BACKING
Product Standard: ASTM F1303.
Type (Binder Content): Type I, minimum binder content of 90 percent or Type II, minimum binder content of 34 percent.
Wear-Layer Thickness: Grade 1.
Overall Thickness: Manufacturer’s standard.
Backing Class: Class A (fibrous).
Wearing Surface: Embossed.
Sheet Width: Manufacturer’s standard.
Seamless-Installation Method: Heat welded or Chemically bonded.
Colors and Patterns: Match submitted sample.
UNBACKED RUBBER SHEET FLOORING
Product Standard: ASTM F1859.
Type: Type I, homogeneous rubber sheet floor covering or Type II, heterogeneous (layered) rubber sheet floor covering.
Thickness: Manufacturer’s standard.
See "Rubber Sheet Flooring" Article in the Evaluations for a discussion of hardness values.
Hardness: Manufacturer’s standard.
Wearing Surface: Textured.
Sheet Width: Manufacturer’s standard.
Seamless-Installation Method: Heat welded or Chemically bonded.
Colors and Patterns: Match submitted sample.
RUBBER SHEET FLOORING WITH BACKING
Product Standard: ASTM F1860.
Type: Type I, homogeneous rubber sheet floor covering or Type II, heterogeneous (layered) rubber sheet floor covering.
Wear-Layer Thickness: Manufacturer’s standard.
For molded-pattern (raised-pattern) rubber sheet, overall thickness is generally measured at the thickest cross-sectional area of flooring product.
Overall Thickness: Manufacturer’s standard.
Interlayer Material: Manufacturer’s standard.
Backing: Fibrous.
See "Rubber Sheet Flooring" Article in the Evaluations for a discussion of hardness values.
Hardness: Manufacturer’s standard.
Wearing Surface: Smooth.
Sheet Width: Manufacturer’s standard.
Seamless-Installation Method: Heat welded or Chemically bonded.
Colors and Patterns: Match submitted sample.
INSTALLATION MATERIALS
Trowelable Leveling and Patching Compounds: Latex-modified, portland-cement-based or blended hydraulic-cement-based formulation provided or approved by resilient sheet flooring manufacturer for applications indicated.
Adhesives: Water-resistant type recommended by flooring and adhesive manufacturers to suit resilient sheet flooring and substrate conditions indicated.
Seamless-Installation Accessories:
Heat-Welding Bead: Manufacturer's solid-strand product for heat welding seams.
Chemical-Bonding Compound: Manufacturer's product for chemically bonding seams.
Integral-Flash-Cove-Base Accessories:
Cove Strip: 1-inch radius provided or approved by resilient sheet flooring manufacturer.
Cap Strip: Square metal, vinyl, or rubber cap provided or approved by resilient sheet flooring manufacturer.
Corners: Metal inside and outside corners and end stops provided or approved by resilient sheet flooring manufacturer.
Floor Polish: Provide protective, liquid floor-polish products recommended by resilient sheet flooring manufacturer.
EXECUTION
PREPARATION
Extensive surface preparation is required over substrates from which existing flooring has been removed. Requirements vary among manufacturers. Insert requirements to suit Project.
Prepare substrates according to resilient sheet flooring manufacturer's written instructions to ensure adhesion of resilient sheet flooring.
Concrete Substrates: Prepare according to ASTM F710.
Verify that substrates are dry and free of curing compounds, sealers, and hardeners.
Remove substrate coatings and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, using mechanical methods recommended by resilient sheet flooring manufacturer. Do not use solvents.
Alkalinity and Adhesion Testing: Perform tests recommended by resilient sheet flooring manufacturer. Proceed with installation only after substrate alkalinity falls within range on pH scale recommended by manufacturer in writing, but not less than 5 or more than 10 pH.
Moisture Testing: Perform tests so that each test area does not exceed 1000 sq. ft. , and perform no fewer than three tests in each installation area and with test areas evenly spaced in installation areas.
When tested according to ASTM F1869, a maximum moisture-emission level of 3 lb of water/1000 sq. ft. (1.36 kg of water/92.9 sq. m) of slab area in a 24-hour period is generally accepted in resilient flooring industry.
Anhydrous Calcium Chloride Test: ASTM F1869. Proceed with installation only after substrates have maximum moisture-vapor-emission rate of 3 lb of water/1000 sq. ft. in 24 hours.
Relative Humidity Test: Using in-situ probes, ASTM F2170. Proceed with installation only after substrates have a maximum 75 percent relative humidity level measurement.
Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound; remove bumps and ridges to produce a uniform and smooth substrate.
Do not install resilient sheet flooring until materials are the same temperature as space where they are to be installed.
At least 48 hours in advance of installation, move flooring and installation materials into spaces where they will be installed.
Immediately before installation, sweep and vacuum clean substrates to be covered by resilient sheet flooring.
RESILIENT SHEET FLOORING INSTALLATION
Comply with manufacturer's written instructions for installing resilient sheet flooring.
Unroll resilient sheet flooring and allow it to stabilize before cutting and fitting.
Lay out resilient sheet flooring as follows:
Maintain uniformity of flooring direction.
Minimize number of seams; place seams in inconspicuous and low-traffic areas, at least 6 inches away from parallel joints in flooring substrates.
Match edges of flooring for color shading at seams.
Avoid cross seams.
Scribe and cut resilient sheet flooring to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.
Extend resilient sheet flooring into toe spaces, door reveals, closets, and similar openings.
Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on resilient sheet flooring as marked on substrates. Use chalk or other nonpermanent marking device.
Install resilient sheet flooring on covers for telephone and electrical ducts and similar items in installation areas. Maintain overall continuity of color and pattern between pieces of flooring installed on covers and adjoining flooring. Tightly adhere flooring edges to substrates that abut covers and to cover perimeters.
Adhere resilient sheet flooring to substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.
Seamless Installation:
Heat-Welded Seams: Comply with ASTM F1516. Rout joints and heat weld with welding bead to fuse sections permanently into a seamless flooring installation. Prepare, weld, and finish seams to produce surfaces flush with adjoining flooring surfaces.
Chemically Bonded Seams: Bond seams with chemical-bonding compound to fuse sections permanently into a seamless flooring installation. Prepare seams and apply compound to produce tightly fitted seams without gaps, overlays, or excess bonding compound on flooring surfaces.
Integral-Flash-Cove Base: Cove resilient sheet flooring 6 inches up vertical surfaces. Support flooring at horizontal and vertical junction with cove strip. Butt at top against cap strip.
Install metal corners at inside and outside corners.
Floor Polish: Remove soil, adhesive, and blemishes from flooring surfaces before applying liquid floor polish.
END OF SECTION 096516
Flooring Replacement SPECIFICATIONS Lame Deer, Montana
Section 096519 – Resilient Tile Flooring Page 12
SECTION 096813 - TILE CARPETING
1. GENERAL
SUMMARY
Section Includes Modular Carpet Tile
ACTION SUBMITTALS
Product Data: For each type of product.
Shop Drawings: For carpet tile installation, plans showing the following:
Pattern of installation.
Type, color, and location of insets and borders.
Type, color, and location of edge, transition, and other accessory strips.
Transition details to other flooring materials.
Samples: For each exposed product and for each color and texture required.
INFORMATIONAL SUBMITTALS
Product test reports.
Sample warranty.
CLOSEOUT SUBMITTALS
Maintenance data.
QUALITY ASSURANCE
Installer Qualifications: Certified by the International Certified Floorcovering Installers Association at the Commercial II or Master II certification level.
WARRANTY
Special Warranty for Carpet Tiles: Manufacturer agrees to repair or replace components of carpet tile installation that fail in materials or workmanship within specified warranty period.
Verify available warranties and warranty periods for carpet tiles.
Warranty Period: 10 years from date of Substantial Completion.
PRODUCTS
CARPET TILE
Color and Pattern: Match submitted samples.
Fiber Content: 100 percent nylon 6, 6.
Fiber Type: Manufacturer’s standard proprietary type.
Pile Construction: Pattern loop.
Pile Thickness: .15 inches minimum.
Stitches: 9.25 per inch minimum.
Tufted yarn weight: 30 oz/sq. yd minimum.
Primary Backing/Backcoating: Manufacturer's standard synthetic.
Secondary Backing: Manufacturer’s standard.
Density: 8,000 oz/sy minimum.
Soil-resistance treatment: Manufacturer’s standard.
Performance Characteristics:
Appearance Retention Rating: Severe traffic, 3.5 minimum according to ASTM D7330.
Critical Radiant Flux Classification: Not less than 0.22 W/sq. cm according to NFPA 253.
Reference Product: Mannington Arroyo – Infinity Modular is an example of an acceptable product.
INSTALLATION ACCESSORIES
Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet tile manufacturer.
Adhesives: Water-resistant, mildew-resistant, nonstaining, pressure-sensitive type to suit products and subfloor conditions indicated, that comply with flammability requirements for installed carpet tile, and are recommended by carpet tile manufacturer for releasable installation.
EXECUTION
EXAMINATION
Concrete Slabs:
Moisture Testing: Perform tests so that each test area does not exceed 1000 sq. ft., and perform no fewer than three tests in each installation area and with test areas evenly spaced in installation areas. Use one of the following test methods, or as recommended by carpet and adhesive manufacturer.
Anhydrous Calcium Chloride Test: ASTM F1869. Proceed with installation only after substrates have maximum moisture-vapor-emission rate of [3 lb of water/1000 sq. ft. in 24 hours.
Relative Humidity Test: Using in situ probes, ASTM F2170. Proceed with installation only after substrates have a maximum 75 percent relative humidity level measurement.
Perform additional moisture tests recommended in writing by adhesive and carpet tile manufacturers. Proceed with installation only after substrates pass testing.
PREPARATION
General: Comply with the Carpet and Rug Institute's CRI 104 and with carpet tile manufacturer's written installation instructions for preparing substrates indicated to receive carpet tile.
Use trowelable leveling and patching compounds, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch wide or wider, and protrusions more than 1/32 inch unless more stringent requirements are required by manufacturer's written instructions.
Concrete Substrates: Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by adhesive and carpet tile manufacturers.
Broom and vacuum clean substrates to be covered immediately before installing carpet tile.
INSTALLATION
General: Comply with the Carpet and Rug Institute's CRI 104, Section 10, "Carpet Tile," and with carpet tile manufacturer's written installation instructions.
Installation Method: As recommended in writing by carpet tile manufacturer.
Maintain dye-lot integrity. Do not mix dye lots in same area.
Maintain pile-direction patterns As recommended in writing by carpet tile manufacturer].
Cut and fit carpet tile to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as recommended by carpet tile manufacturer.
Extend carpet tile into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.
Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on carpet tile as marked on subfloor. Use nonpermanent, nonstaining marking device.
Install pattern parallel to walls and borders.
Protect carpet tile against damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods indicated or recommended in writing by carpet tile manufacturer.
END OF SECTION 09681