This performance work statement outlines repair services required for four JLG lifts to support the 402nd Maintenance Squadron at Robins Air Force Base, Georgia. The contractor shall attend a pre-award site visit on November 14, 2023 to evaluate the lifts, then schedule pickup within one week of award and complete all repairs at an OEM-certified facility within 60 days. Repairs must be performed by factory-trained technicians according to OEM specifications. Upon delivery, the government will inspect the lifts to ensure proper operation before acceptance. The related federal contract opportunity is solicitation number FA857124Q0016 for these JLG lift repair services through the Department of the Air Force Materiel Command Air Force Sustainment Center. The primary point of contact is Janel Welck-Vest of the 402nd Maintenance Squadron.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
JLG Lift Repair Services
30 Aug 23
1.0 DESCRIPTION OF SERVICES. The contractor shall provide all equipment, tools, materials, and transportation to provide repair services for the below four (4) JLG lifts to support 402nd MXSG at Robins AFB, GA:
| Description |
| Model # of Lift |
| Serial # of Lift |
| 135FT JLG DIESEL BOOM LIFT |
| 1350SJP |
| 0300149625 |
| 45FT JLG EE ARTICULATING BOOOM LIFT |
| E450AJ-EE |
| 0300104876 |
| 45FT JLG EE ARTICULATING BOOM LIFT |
| E450AJ-EE |
| 0300104923 |
| 80 FT JLG TELESCOPIC BOOM LIFT |
| 800S |
| 0300090182 |
1.1 Pre-Award Site Visit. The contractor shall attend a required pre-award site visit for evaluation of the four (4) JLG lifts in need of repair, located in Bldg 20042 at Robins Air Force Base, GA. The contractor shall contact the Government Point of Contact (POC) listed in paragraph 4.1 at least one (1) week prior to the scheduled visit. The date and time of the site visit is: Tuesday, November 14, 2023 at 9:00 AM EST.
1.2 Repair service. No later than one (1) week after contract award, the contractor shall contact the GPOC to schedule the pickup of the lifts from Bldg 20042 at Robins Air Force Base. All repair services will be performed by Original Equipment Manufacturer (OEM) certified factory-trained personnel. Service repair technicians shall perform repair services using the most up-to-date maintenance techniques, instrument operation and modifications, and latest state-of-the-art applications for repair being performed on this equipment according to OEM specifications. The contractor shall complete repairs and deliver the repaired lifts back to Robins Air Force Base no later than 60 days after evaluation. The contractor shall provide the GPOC a written informational summary of the repair services performed upon delivery of the repaired lifts. The contractor shall contact the GPOC to schedule the delivery of the repaired lifts.
1.3 Acceptance. Upon delivery of the repaired lifts, the Government shall perform a functional test to ensure proper operation of the lifts. The Government POC must witness and approve the functional test.
2.0 SERVICES SUMMARY (SS). None
3.0 GOVERNMENT FURNISHED PROPERTY (GFP). Contractor will track, secure and account for all GFP/GFM IAW FAR 45 and DFARs 245: The property shall be listed as an attachment. This attachment is generated from the GFP module in the Procurement Integrated Enterprise Environment (PIEE) system.
See GFP Attachment that lists the applicable GFP. This attachment is generated through the GFP module of the PIEE system.
3.1. Government Inventory. None
3.1.1 Government Furnished Property (Material/Equipment). The contractor shall maintain records evidencing receipt, accountability, preventative maintenance and disposal as defined within the government property clauses. All furnished government property shall be included in the attached spreadsheet.
4.0 GENERAL INFORMATION.
4.1 Government Representatives. The following individuals will serve as Government Representatives for 402nd MXSG.
| Primary Government Representative |
| Alternate Government Representative |
| Name: Janel Welck-Vest |
| Name: Jason Wood |
| Unit: 402 MXSS/MXDXB |
| Unit: 561 AMXS/402 MXSG |
| Phone: 478-926-2241 |
| Phone: 478-222-5354 |
| Email: janel.welck-vest@us.af.mil |
| Email: jason.wood.2@us.af.mil |
4.2 Period of Performance. Scheduling of on-site evaluation of lifts shall occur within three (3) business days of contract award. Evaluation of lifts shall occur no later than two (2) weeks after contract award. Contractor shall provide a written quote to the Government Contracting Officer no later than three (3) business days after completion of evaluation. Repairs shall be completed, and lifts delivered back to Robins Air Force Base no later than 60 days after evaluation.
FOB Destination
4.3 Delivery Address.
Attention: Janel Welck-Vest Unit: 402 MXSS/MXDXB
DODAAC: FD2060
Address: 150 Marauder Street, Robins AFB, GA 331098, Bldg 20042
4.4 Contractor Program Manager. The Contractor shall provide a Program Manager who shall be the single point of contact between the Contractor and the Government. The name and phone number of the Contractor’s Program Manager shall be provided in writing to the Contracting Officer, Government Representatives, and COR no later than five (5) calendar days after contract award date.
4.5 Place of Performance and Hours of Work. On-site contract services (pick-up of lifts) shall be performed at the Warner Robins Air Logistic Complex. The pick-up will take place in building 20042 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 6:30 am to 3:15 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel, and will provide a 48-hour notice prior to changing any work hours.
4.6 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
4.7 Security Requirements.
4.7.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), Air Force Instruction (AFI) 31-101, Integrated Defense.
4.7.2 Communications Security (COMSEC). The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with 2 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM).
4.7.2.1 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA. Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base. The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only. For visitors, a short term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).
4.7.2.2 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security”, DoD Manual 5205.02-M and AFI 10-701 “Operations Security” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.
4.7.2.3 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.
4.7.2.4 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations. Contractor risk management procedures shall comply with:
· Air Force Pamphlet (AFPAM) 63-113, Program Protection Planning for Life Cycle Management,
· SAE Aerospace Standard AS5553C, Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition,
· National Institute of Standards and Technology (NIST) Special Publication 800-53 Rev 5, Security and Privacy Controls for Information Systems and Organizations.
4.8 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.
4.9 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry. Information may be obtained by calling the following phone number: Commercial 478-222-1972.
4.10 Agency Affirmative Procurement Program. In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
4.10.1 In accordance with FAR 23.404(a)(3)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.
4.11 Environmental Management System (EMS). Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) to be maintained in the contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.
4.11.1 EMS training is provided by Environmental Management. Request for Robins EMS Awareness training through email at 78ceg.cev.FrontOfc@us.af.mil. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. (Front Desk: 478-926-8178.)
4.11.2 Option 1: Contractors can register for an account through The Environmental Awareness Course Hub (TEACH), the Air Force training database: https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f Search for Course ID: EMS110UHHZ00293 Directions:
1. Hover your mouse over the Courses and Transcripts tab.
1. Click on Transcripts
1. Click into the TEACH Course Completion Log by clicking the orange Continue or Begin button.
1. When you are on the transcript, click on the blue “Search for Course” button.
1. When the pop up appears enter the course name or course number and press search.
1. Once you find the course you want to add, click on the +Select button to add the course to your transcript.
(Note: TEACH may not supported by Internet Explorer; recommend using Chrome.)
4.11.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training PowerPoint Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, 78ceg.cev.FrontOfc@us.af.mil. Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training.
4.12 ISO 50001 – Energy Management System. Due to the WR-ALC being ISO 500001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.
4.12.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.
4.12.1.1. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.
4.12.2. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract.
4.13 Contractor Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.
4.13.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil. The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A001, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).
4.13.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.
4.14 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478)-222-0043 during duty hours and (478)-926-3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
| a. Contract, Contract Number, Name and Title of Person(s) Reporting |
| b. Date, Time and exact location of accident/incident |
| c. Brief Narrative of accident/incident (Events leading to accident/incident) |
| d. Cause of accident/incident, if known |
| e. Estimated cost of accident/incident (material and labor to repair/replace) |
| f. Impound Authority Name and Phone Number (as applicable) |
| g. Nomenclature of equipment and personnel involved in accident/incident |
| h. Corrective actions (taken or proposed) |
| i. Other pertinent information |
(CDRL A002, DI-SAFT-81563 NOT 2, Accident/Incident Report)
4.15 Essential Services During Crisis. The Functional Service Manager (FSM) has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DFARS 237.76, Continuation of Essential Contractor Services.
4.16 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
4.17 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site: https://piee.eb.mil/
5.0 APPENDICES. None