7202 - Durham WRRF Odor Control Phase 3 Headworks Project Advertisement for Bids.pdf
PDF 12 KB Posted
- Solicitation number
- S-X34350-00016399
- Issued by
- Washington County, Oregon
About this file
This is an Advertisement for Bids issued by Clean Water Services, a public water resource recovery facility located in Tigard, Oregon, for the Durham WRRF Odor Control Phase 3 Headworks Project No. 7202. The project involves comprehensive odor control improvements at the Durham Water Resource Recovery Facility, including construction and commissioning of a new engineered media biofilter with reinforced concrete basin construction, installation of two new odor control fans, modification and rerouting of foul air ducting, demolition of the existing odor mist scrubber and related equipment, installation of variable speed drives and instrumentation systems, grouting of abandoned force mains, site grading with new concrete stairway and cart path construction, installation of site lighting and drainage infrastructure, and final site preparation. Sealed bids will be accepted electronically via Equity Hub's Bid Locker until 2:00 p.m. local time on April 9, 2026, with public opening and reading at the same time via telephone conference. First-Tier Subcontractor Disclosure Forms must be submitted by 4:00 p.m. on April 9, 2026. A voluntary prebid conference and site visit will be held on March 17, 2026, at 10:00 a.m. at the Durham WRRF Operations and Maintenance Mallard Conference Center. Bid security must be delivered to specified locations within five business days after the bid deadline. The work is subject to Oregon Revised Statutes 279C.800 to 279C.870 regarding public works projects.
The estimated construction cost is $4,240,000. Bidders must be registered with the Oregon Construction Contractors Board prior to bid submission and must be qualified in accordance with applicable Oregon Revised Statutes to submit bids for public work. The successful bidder will be required to furnish additional bonds and insurance as prescribed in the bidding documents. All bidding documents, amendments, addenda, and bid results are available through the Bid Locker website at https://bidlocker.us/details/4476, with bidders responsible for monitoring the site daily for updates. The project does not involve asbestos, so asbestos-related regulations do not apply. Clean Water Services reserves the right to reject all bids or any bid not conforming to the intent and purpose of the bidding documents. Technical and administrative questions should be directed to Steve Waldron, Procurement Specialist, at 503.547.8134 or WaldronS@CleanWaterServices.org.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7202 SECTION 00030: ADVERTISEMENT FOR BIDS
SECTION 00030
ADVERTISEMENT FOR BIDS
Sealed Bids for construction of the Durham WRRF Odor Control Phase 3 Headworks Project No. 7202 (Project) will be accepted by Steve Waldron, Procurement Specialist, electronically via Equity Hub’s Bid Locker at https://bidlocker.us/details/4476 (Bid Locker) until 2:00:00 p.m., local time, on April 9, 2026. Any Bids received after the specified time will not be considered. It is each Bidder’s responsibility, when submitting its Bid electronically via Bid Locker, to ensure timely delivery by submitting its Bid sufficiently in advance of the deadline. Before Bidders can submit their Bids, they will need to register with Bid Locker at https://bidlocker.us/Home/bidlockerus. There is no cost to register. First-Tier Subcontractor Disclosure Forms must be electronically submitted to Bid Locker at or before 4:00:00 p.m. local time on the same day (Deadline). If Bidder fails to submit a disclosure form with the information required by the stated Deadline, the Bid will be deemed nonresponsive and will not be considered. Clean Water Services (Owner) will not accept Bids by facsimile or email.
Bids will be publicly opened and read aloud by telephone conference at 2:00 p.m. local time on April 9, 2026. Bidders can attend the opening by calling the telephone conference number 503.681.4499.
Contractor shall complete the work as specified or indicated in Owner’s Contract Documents for the Project. The Project generally consists of the following:
Furnish all labor, materials, and equipment necessary to:
1. Construct and commission a new engineered media biofilter (biofilter). The biofilter will be a single-cell, reinforced concrete basin with integral air distribution, internal high-density polyethylene liner, engineered media, media floor support system, water panel, and humidification and irrigation system.
2. Install and commission two new odor control fans located adjacent to the new engineered media biofilter.
3. Modify, re-route, and provide new foul air ducting and supports within the Headworks facility to the new odor control fans and biofilter.
4. Demolish the existing odor mist scrubber, including the existing odor exhaust fan, unused foul air duct, low-pressure air piping, and chemical piping.
5. Install and commission two Owner-furnished variable speed drives in the upper electrical room.
6. Install instrumentation and control stations, associated conduits, conductors, and other appurtenances necessary to complete the Work.
7. Fill abandoned force mains below the footprint of the new biofilter with grout as shown on the Drawings.
8. Finish grading to incorporate the biofilter into the earthen bank south of Headworks, including a new concrete stairway alongside the north edge of the biofilter and a cart path extending south from the fan pad to the digester gas treatment skid.
9. Install site lighting to illuminate access around the biofilter, odor control fans, and cart path.
10. Install irrigation sleeves at hardscape crossings. Final landscaping and site irrigation will be by Owner.
11. Install new drainage piping and manhole for the biofilter drain, connecting to the existing sanitary sewer line.
The Work Site is located at Durham Water Resource Recovery Facility, 16580 SW 85th Avenue, Tigard, Oregon 97224 (Site).
The Work is a public works project subject to ORS 279C.800 to 279C.870.
The estimated construction cost of the Work is $4,240,000.
The Bidding Documents are entitled “Durham WRRF Odor Control Phase 3 Headworks Project No. 7202.”
All Bidding Documents and Bid Results can be downloaded from Bid Locker at https://bidlocker.us/details/4476. It is the Bidder’s responsibility to refer daily to Bid Locker’s website to check for any available amendments or addenda, response to inquiries or questions, cancellations, or notices of intent to award, and any and all information regarding this opportunity. It is not Owner’s responsibility to notify participating Bidders by email or by any other means of any of the above. Copies of this advertisement can be obtained on the Bid Locker website or Owner’s website at https://dynamic.cleanwaterservices.org/Bids. If problems are experienced downloading the documents, please contact Steve Waldron at WaldronS@CleanWaterServices.org.
Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security as prescribed in the Instructions to Bidders. Bidders must deliver the original of the Bid security to Steve Waldron either by first class mail to Administration Building Complex, 2550 SW Hillsboro Hwy, Hillsboro, Oregon 97123 (Owner’s Office), or by hand delivery to the Durham Treatment Plant Services Building, 16060 SW 85th Avenue, Tigard, OR 97224, within five business days after the Deadline.
The Successful Bidder will be required to furnish the additional bond(s) and insurance prescribed in the Bidding Documents.
Prior to submission of its Bid, Bidder shall be registered with the Oregon Construction Contractors Board.
The Work does not involve asbestos, so the requirements of ORS 468A.700 through 468A.760 shall not apply.
Bidders must be qualified in accordance with the applicable parts of ORS 279C in order to submit a Bid for public work in Oregon.
For questions regarding technical and administrative issues, contact Owner: Steve Waldron, at
503.547.8134 or by email to WaldronS@CleanWaterServices.org.
Prospective Bidders are encouraged to voluntarily attend a prebid conference and Site visit that will begin at 10:00 a.m. local time on March 17, 2026 in the Durham WRRF Operations and Maintenance Mallard Conference Center and last approximately one hour. Representatives of Owner and Engineer will be present to discuss the Project.
Owner reserves its right to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents.
Dated this 9th day of March, 2026.
File details come from the government source that posted it. Updated .