Scope of work for WPB- shore tie repairs Station Venice Oct 2018 Work Statement:

In the performance of this contract, the contractor shall complete the work listed for the WPB Shore Tie and associated equipment below at US Coast Guard Station Venice located at 436 Coast Guard Rd. Venice, LA 70091. The current WPB shore tie is not working properly. There is no power at the shore tie or in the transformer box located next to the shore tie receptacle box.

The contact person for this contract is MK1 Anthoney Horine at 504-534-2332 Scope of Work:

The contractor shall furnish trained, qualified personnel and any required special tools or equipment necessary to complete any and all of the work tasks listed below:

1. Replace main panel breaker in building for WPB shore tie (PN GE General Electric SGDA32AT0400). See attachment 1

2. Trench and install new conduit from foot of the building to the transformer. Install pull boxes as per NEC 2017. Contractor shall ensure conduit is sealed to prevent water intrusion.

3. Demolish/remove old wire and conduit that is buried underground.

4. Replace three existing 500 MCM wires from inside main power panel to shore tie transformer. This is an approximate 250 to 300 foot run (contractor shall verify). This run goes from the inside breaker panel into the station attic and then back down to the ground level where it runs underground until it get to the transformer at the river sea wall. There is only one pull box location that was located in the attic of the station. See attachment 6.

5. Replace the shore tie electrical box located out by the river seawall with same or similar equivalent equipment. See attachment 2

6. Replace Shore tie knife switch and fuses with the same or similar equivalent equipment. See attachment 3 and 5.

7. Trouble shoot and make needed repairs to shore tie transformer located near seawall. See attachment 4.

8. Replace shore tie female receptacle inside shore tie box with same or similar equivalent equipment.

All work shall be performed during normal business hours 0800-1700 Monday thru Friday excluding holidays and be coordinated through station POC.

Attachment 1:

Attachment 2:

Attachment 3:

Attachment 4:

Attachment 5:

Attachment 6: