Specifications.pdf
PDF 25 MB Posted
- Attached to
- Maintenance Dredging
- Solicitation number
- 70Z08819BPQQ10600
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_of_Offers.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004_10_May_2019.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002_29_April_2019.pdf | ||
| CG_YBI_Conditions_Survey_signed_June2018.pdf | ||
| YBI_2018_1x1.xyz | XYZ file | |
| Amendment_0001_12_April_2019.pdf | ||
| YBI_2018_R3.dwg | DWG drawing | |
| Wage_Determination.pdf | ||
| Responsibility_Questionnaire.pdf | ||
| Invitation_For_Bid.pdf | ||
| Request_for_Clarification.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
SECTION TITLE PAGE
DIVISION 01 - GENERAL REQUIREMENTS 3
01 10 00 - GENERAL PARAGRAPHS 3
01 33 00 – SUBMITTALS PROCEDURES 10
01 35 43 – ENVIRONMENTAL PROCEDURES 16
DIVISION 2 – WATERWAY AND MARINE CONSTRUCTION 20
02 41 00 TEMPORARY REMOVAL AND RE-INSTALLATION FLOATING DOCKS 20
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION 23
35 20 23 - DREDGING 23
*DIVISIONS 3-34- Not Applicable
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 - GENERAL PARAGRAPHS
PART 1 GENERAL
1.01 SCOPE OF WORK: Provide all labor, materials, and
equipment necessary to dredge and dispose of approximately 120,000 cubic yards (cy) of sediment from the U.S. Coast Guard (USCG) Cutter ASPEN Mooring and Approach (CGC ASPEN mooring) and the USCG Station San Francisco Small Boat Basin (SF small boat basin). Dredge both locations by mechanical clamshell dredge to the permitted design depths. The CGC ASPEN mooring shall be dredged to a design depth of -24feet (ft.) Mean Lower Low Water (MLLW) plus 2ft. overdepth allowance. The SF small boat basin shall be dredged to -10ft. MLLW plus 2ft. overdepth allowance in Area A, and -14ft. MLLW plus 2ft. overdepth allowance in Area B. Dredge material shall be transported and placed upland at the Montezuma Wetlands Restoration Site for beneficial reuse as cover and the at the Government furnished deep open ocean disposal site (SF-DODS). All in-water work must be completed during the in-water work window of June 1-November 30. All dredging, material transportation and material placement shall be in accordance with the project plans, specifications, environmental permits, regulatory guidance, and applicable contract clauses.
1.02 BASIS FOR BIDS
A. Base Bid
Mobilization and preparation of dredging site(s), and demobilization. Conduct pre- dredge and post- dredge hydrographic surveys for each location. Coordinate use of the sediment placement facility (Montezuma Wetlands Restoration Site) with the facility owner, dredge locations as specified. Include all direct costs.
1) Mobilization and demobilization: Measurement and payment for mobilization and demobilization will be considered complete and full compensation, and will be paid at the Contract lump sum price, for the effort and cost to transport to and from the job site(s) all necessary serviceable Contractor plant including related equipment, fuel, materials, supplies, personnel, and labor required for its operation for all work.
2) Dredging: Dredge and dispose of approximately 120,000 cubic yards (cy) of sediment from the CGC ASPEN mooring and the SF small boat basin. Dredge both locations by mechanical clamshell dredge to the permitted design depths.
The CGC ASPEN mooring shall be dredged to a design depth of -24ft. MLLW plus 2ft. overdepth allowance.
Dredged material excavated from the CGC ASPEN mooring Area C and a portion of the combined material excavated from the CGC ASPEN Area A and Area B shall be transported and placed at the Government furnished deep open ocean disposal site (SF-DODS). The remainder of the excavated material from the CGC ASPEN mooring Area A and Area B shall be transported and placed at the Montezuma Wetlands Restoration Site as cover material.
The sum total amount of material excavated from Areas A, B, and C that is placed at SF-DODS shall be equal to the total amount of excavated material from Area A and B that is disposed of at the Montezuma Wetlands Restoration Site, as to split the volume by 50/50 between the two disposal sites while ensuring all of the material from Area C is disposed of at SF-DODS.
The SF small boat basin shall be dredged to -10ft. MLLW plus 2ft. overdepth allowance in Area A and -14ft. MLLW plus 2ft. overdepth allowance in Area B. Note the transition area between Area A and Area B shall be graded between -10ft. MLLW to -14ft. MLLW. Dredge material from the SF small boat basin shall be transported and placed at the Government furnished deep open ocean disposal site (SF-DODS).
The removal, transport and disposal of dredged material shall be paid for at the established unit prices per cubic yard (cy) and based on the difference between available material shown in the pre- dredge hydrographic survey and the post- dredge hydrographic survey of the dredge prism for each location. Payment for dredging, including disposal fees, shall not be made for dredging deeper than the allowable overdepth, dredging outside the authorized areas, or dredging and/or disposing of material in an unauthorized manner.
The combined estimated unit price dredge quantity is approximately 120,000cy. This quantity is based upon the volume to dredge to the design depth plus the volume to dredge the allowable overdredge depth as indicated by the hydrographic surveys, conducted on 26 March 2018 and 16 October 2017.
The Contractor shall hire an independent contractor to conduct the required hydrographic surveys. A pre-dredge survey is required no earlier than 60 calendar days and not later than 20 calendar days before commencement of dredging. Drawings shall be provided in AutoCAD using the Civil Engineering Unit Oakland standard template (Figure 1), and in Adobe Pdf. The surveys shall be completed per the scope of work described in Division 35.
B. Option Items:
1) Eelgrass Surveys and Reports: Conduct pre- dredge and a post-dredge eelgrass surveys and provide reports. The surveys shall be completed by a qualified biologist and shall follow NOAA’s California Eelgrass Mitigation Policy and Implementing Guidelines (CEMP), October 2014. Payment will be made for costs associated with performing the surveys and producing the associated reports. Unit of measure is one job and paid as lump sum per each survey.
2) Temporary Removal and Reinstallation of Floating Jet Docks: Temporary removal and reinstallation of the existing four Jet Docks (measuring approximately 15ft wide x 30ft long each) and the concrete floating dock (measuring approximately 9ft wide x 70ft long). The scope of work includes disconnecting the existing floating docks, tugging them away temporarily, and reinstalling them in the same original configuration once dredging work is completed. The temporary removal and re-installation shall be completed per the scope of work described in Division 2.
1.03 LOCATION: The CGC ASPEN mooring and the SF small boat
basin are collocated within Coast Guard Sector San Francisco, in Yerba Buena Island, San Francisco, California.
1.04 SITE INVESTIGATION: Investigate the site per FAR 52.236-3 to ascertain the general and local conditions, which can affect the work or its cost. Since the site is secured, prior arrangements for site visits should be made by contacting the Contracting Officer. In addition, a pre-bid meeting will be made available.
1.05 KICK OFF MEETING: Within 10 days after award, the
Contractor shall be available for a project kick-off meeting.
1.06 NOTIFICATION OF START AND COMPLETION OF WORK: The
Contractor shall notify the Contracting Officer in writing five (5) business days in advance of the date he intends to commence work, and five (5) business days prior to the date that work will be ready for final inspection.
1.07 CONTRACTOR'S DAILY REPORT: Complete Form 17-148
"Contractor's Daily Report to Construction Manager" every day there is any type of contractor or subcontractor activity (including equipment or material delivery) at the construction site. The daily reports shall be compiled during the week and mailed to the USCG Contracting Officer, Contracting Officer's Representative (COR) at the close of business each Friday.
1.08 FINAL INSPECTION AND ACCEPTANCE: When work is complete and ready for final inspection, submit a written request for final inspection to the Contracting Officer at least 10 working days in advance of the date of final inspection.
Final inspection will not be scheduled until all submittals have been approved.
1.09 CONTRACTOR SECURITY REQUIREMENTS: The Contractor shall
provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer.
The contractor shall update this list when changes occur.
Contractor personnel not listed may be denied access to the USCG facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the USCG facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities.
Contractor and delivery personnel may be required to present personal photo identification to gain access to a USCG installation. If identification does not indicate United States citizenship, USCG Security may require proof of the legal right to work in the United States.
Contractor and delivery personnel also may be subjected to an immigration status and outstanding criminal warrants check.
The Real ID Act of 2005 established minimum security standards for license issuance and production and prohibits Federal agencies from accepting, for certain purposes, driver's licenses and identification cards from states not meeting the Act's minimum standards. Anyone requiring access to a military facility under this contract, to include subcontractors, who holds a driver's license from any state without approved licenses will be required to provide identification other than that driver's license to gain access. Government IDs annotated with “Federal Limits Apply” will not be accepted for Contractor to ensure that their personnel have federally acceptable personal photo identification and comply with any other requirements for base access.
Contractors shall provide the Contracting Officer's Technical Representative with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, parts, etc.) and provide the company name, delivery person, and phone number of the firm(s) making deliveries.
All vehicle access to government property require vehicle registration and proof of liability insurance, otherwise access to the USCG facility may be denied.
1.10 CONTINUITY OF FACILITIES OPERATION: Schedule work to
minimize interference with the facilities normal operations. Notify the Contracting Officer and site contact 3 business days in advance of any shutdowns.
Perform all on-site work, including deliveries, between the hours of 7:00 AM and 5:00 PM, Monday through Friday (Federal Holidays excluded), unless otherwise approved by the Contracting Officer and the Unit Commanding Officer.
1.11 CONTRACTOR USE OF PREMISES: The Contractor will be working on a military installation. Become familiar with and obey fire, traffic, and security regulations. Personnel shall not stray form the immediate area of work nor direct avenues of ingress and egress unless authorized in advance by the Contracting Officer. Contractor shall coordinate dredging operations with the USCG Sector San Francisco command to minimize disruption to the USCG operations and movement of USCG boats through the mooring, approach, and basin.
1.12 RECYCLING AND DISPOSAL OF REFUSE: Refuse, excess or waste materials resulting from construction operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All disposal shall be done in accordance with federal, state, and local laws and regulations.
1.13 HAZARDOUS MATERIAL IDENTIFICATION: Submit Material Safety Data Sheets (MSDS) for any materials defined as hazardous under the most current revision of Federal Standard 313.
One copy of each MSDS shall be submitted to the Contracting Officer’s Representative no later than the delivery date of the product. Two copies shall be submitted to the Contracting Officer.
1.14 SAFETY: During the execution of this contract, the
Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction and State of California Code of Regulations, Title 8, Div. 1, Ch 4, Subchapter 4 Construction Safety Orders. When the standards differ, the more restrictive standard shall apply. The contractor shall provide barriers, temporary fencing, trench covers, etc. wherever work could cause injury to workers, visitors, USCG personnel, or dependents. An Accident Prevention Plan shall be submitted in accordance with Section 01 35 29, paragraph 1.05.
1.15 CLEANUP: The Contractor shall keep the work area, including storage area, free from accumulations of waste materials on a daily basis and comply with all federal, state and local regulations pertaining to storage, transport and disposal of wastes. The Contractor shall not use the USCG waste disposal facilities including garbage cans, trash piles, or dumpsters. The Contractor shall remove all debris at the disposal site, which accumulated during the job.
1.16 TEMPORARY FACILITIES:
A. Storage: If needed, and with prior approval, the Contractor may be provided a storage area in a location determined by the Contracting Officer. The Contractor shall be responsible for restoring the area to its original condition at the completion of work. The Contractor shall be responsible for protecting materials stockpiled against weather, damage, theft, and other risks of loss. The USCG assumes no responsibility for material or equipment left in the storage area.
B. Sanitary Facilities: There are no toilet facilities available for Contractor use at the job site. The Contractor shall provide his own facilities, including hand washing facilities, in accordance with 29 CFR 1926, Subpart D, paragraph 1926.51 (c)(1) and (f)(1).]
C. Availability of Utility Services: No commercial utilities are available.
1.17 Existing Utilities: The existence of any other utility
locations and cable crossings is unknown. The authorized dredge footprint and disposal site are not anticipated to contain underground utilities. The Contractor shall verify all utility and cable crossing locations prior to dredging.
1.18 Drawings: Drawings to be used in conjunction with these
specifications are listed below. The drawings are the property of the Government and shall not be used for any purpose other than that contemplated by the specification.
The work shall conform to the drawings listed below which form a part of these specifications.
Number Title
C606723 Hydrographic Survey, USCG Yerba Buena Island, dated 5 June 2018.
Figure 1 Vicinity Map
Figure 2 ASPEN Mooring and Approach Dredge Site
Soundings March 2018
Figure 3 ASPEN Mooring and Approach Detail of Sample
Locations
Figure 4 Small Boat Basin Dredge Soundings, October
Figure 5 Small Boat Basin Maintenance Dredging Sample
Locations
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
END OF SECTION
01 33 00 – SUBMITTALS PROCEDURES
1.01 GENERAL
A. Forward all submittals, except as stated elsewhere, to the Contracting Officer on CD-ROM or by email within 10 business days from date of award, unless indicated otherwise in this specification. Submittals shall be accompanied with the USCG furnished material submittal form in Microsoft Word Format. Unless noted otherwise, all submittals shall be provided in an electronic image format. Provide these submittal images to the Contracting Officer, the COR, and the Construction Manager simultaneously. If the electronic image is insufficient to ascertain submittal acceptability, the Contracting Officer may request a hard copy submittal. The Contracting Officer will e-mail approval or disapproval of submittals, within 10 calendar days after receipt.
B. The COR and Construction Manager will review all submittals for compliance with these specifications. The Contracting Officer shall approve submittals before acceptance.
C. Approval of submittals, and corrections or comments made during the review, do not relieve the Contractor from compliance with the requirements of the plans and specifications or permit coordination.
D. The schedule of submittals listed in the Submittal Register and in the individual sections are the submittals required for this contract. Unsolicited submittals may be returned to the Contractor without review.
1.02 CERTIFICATES OF COMPLIANCE: Certificates of compliance
shall be signed by an authorized officer of the manufacturing company furnishing the material which states that the material being furnished meets all requirements of these specifications and referenced specifications.
1.03 DESIGN DRAWINGS: Design drawings shall be provided in
AutoCAD 2017 file format and in Adobe Pdf, .xyz files shall be included. The Civil Engineering Unit Oakland standard template shall be used, and will be provided upon request, with the CEU Oakland AutoCAD plot style.
Drawings shall comply with the National CAD Standards for symbols and layers and shall also comply with USCG standards for font (Romans), font size (0.1 inch minimum height) and title block attributes, as shown in Figure A.
The title block contains attributed information and shall not be exploded. This information shall be entered with specific information based on the titled attribute as shown by the figure at the end of this specification section in order for the information to accurately export to the USCG document management application. Each drawing shall be a separate file; i.e., not a tab of one file.
Drawings shall be submitted on CD-ROM electronic media, with all photos and external reference drawings bound to their respective drawing. Plot styles and fonts used, other than Romans, shall also be included on the CD-ROM.
PART 3 EXECUTION
FIGURE A. Civil Engineering Unit Oakland Standard Drawing Template
AUTOCAD TITLE BLOCK - TITLED ATTRIBUTES
01 35 29 – HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES
1.01 SECTION INCLUDES: This section applies to steps taken by the contractor to comply with the health and safety requirements listed herein. The Contractor shall comply with all applicable federal, state, and local laws and regulations. The ultimate responsibility for identifying applicable requirements and protecting contractor employees or sub-contractors rests with the primary contractor.
1.02 APPLICABLE PUBLICATIONS: The publications listed below
form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
A. American National Standards Institute (ANSI):
Z359 Series Fall Protection Code, Version 2 (Z359.0-2007, Z359.1-2007, Z359.2- 2007, Z359.3-2007, Z359.4-2007, Z359.6-2009, Z359.12-2009, Z359.13- 2009, Z359.14-2012, and historical Z359.1-1992 (R1999)
B. Environmental Protection Agency (EPA) Regulations:
40 CFR 204 Noise Abatement Program for Construction Equipment
40 CFR 302.4 Designation of Hazardous Substances
C. U.S. Army Corps of Engineers (USACE):
EM 385-1-1 Safety and Health Requirements Manual
D. U.S. Department of Labor Occupation Safety and Health Administration (OSHA) Regulations:
29 CFR 1910.1200 Hazard Communication
29 CFR 1926.106 Working Over or Near Water
29 CFR 1926.453 Aerial Lifts (Construction Specific)
29 CFR 1926 Subpart M Fall Protection
29 CFR 1926 Subpart P Excavations
E. U. S. Coast Guard Commandant Instructions (COMDTINSTs):
COMDTINST M5100.47B U.S. Coast Guard Safety and Environmental Health Manual Chapter 12 – Asbestos Awareness Program
1.03 REFERENCE STATUTES: The statutes listed below form a part of this specification to the extent referenced.
Noise Control Act (NCA) (42 U.S.C. §§ 4901 to 4918)
1.04 DEFINITIONS
A. Sediment: Soil and other debris that has been eroded and transported by runoff water.
B. Solid Waste: Rubbish, debris and other discarded solid materials resulting from industrial, commercial, and agricultural operations, and from community activities.
Solid waste may also include non-sewage liquids.
C. Rubbish: A variety of combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.
D. Debris: Includes combustible and noncombustible wastes, such as ashes, waste materials that result from construction or maintenance and repair work, leaves, and tree trimmings.
E. Chemical Wastes: Includes salts, acids, alkalines, herbicides, pesticides, and organic chemicals.
F. Sewage: Wastes characterized as domestic sanitary sewage.
G. Garbage: Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
H. Oily Waste: Includes petroleum products and bituminous materials.
I. Hazardous Material (HM): Chemicals defined by OSHA 29 CFR
1910.1200 and under the U.S. Department of Transportation (DOT) regulations (Title 49 CFR Parts 100 through 199) which are determined by the Secretary of Transportation to present risks to safety, health, and property during transportation. The DOT regulations include requirements for shipping papers, package marking, labeling, transport vehicle placarding, and training of personnel handling hazardous materials.
1.05 Accident Prevention: Submit a copy of your “Accident
Prevention” or “Injury and Illness Prevention” Plan as required under the submittal register.
1.06 Mobile Equipment Operator List: A list of qualified
operators for all mobile equipment that will be brought onto the job site with employee name(s), qualifications and specific equipment to be operated shall be provided to the Contracting Officer prior to equipment operation.
(This includes forklifts, cranes, motorized lifting device, etc.)
1.07 NOISE: Make the maximum use of "low-noise-emission
products" as certified by EPA and described at 40 CFR Part
204. No blasting or use of explosives is permitted.
Comply with applicable portions of the Noise Control Act (NCA). The Contractor is responsible for complying with all other federal, state, and local noise control laws and regulations.
1.08 WORKING OVER OR NEAR WATER: When working over or near
water, comply with 29 CFR 1926.106.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
01 35 43 – ENVIRONMENTAL PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES: This section applies to all necessary
steps taken by the contractor to comply with the environmental protection requirements listed herein.
1.02 APPLICABLE PUBLICATIONS: The publications listed below
form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
A. Environmental Protection Agency (EPA) Regulations:
40 CFR 122 National Pollution Discharge Elimination System
40 CFR 261 Identification and Listing of Hazardous Waste
1.03 REFERENCE STATUTES: The statutes listed below form a part of this specification to the extent referenced.
Clean Air Act (CAA) (42 U.S.C. §§ 7401 to 7642)
Clean Water Act (33 U.S.C. §§ 1251 to 1387)
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. §§ 9601 to 9675)
Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) (7 U.S.C. §§ 136 to 139y)
Federal Water Pollution Control Act (CWA) (33 U.S.C. §§ 1251)
Toxic Substance Control Act (TSCA) (15 U.S.C. §§ 2601 to 2654)
Resource Conservation and Recovery Act (RCRA) (42 U.S.C.
§§ 6901 to 6991i)
1.04 ENVIRONMENTAL PROTECTION REQUIREMENTS: Provide and
maintain environmental protection during the life of the Contract to control pollution or to correct conditions that develop during construction. Comply with all Federal, State, and local laws and regulations pertaining to water, air, soil, and noise pollution.
1.05 PROTECTION OF NATURAL RESOURCES
A. Permits:
1) CGC ASPEN Mooring: The Government is seeking permits and concurrences from the U.S. Environmental Protection Agency for compliance with the Marine Protection, Research and Sanctuaries Act (MPRSA) aka Ocean Dumping Act, the U.S. Army Corps of Engineers for compliance with Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act, the Regional Water Quality Control Board for compliance with Section 401 of the Clean Water Act, the California Coastal Commission for compliance with the Coastal Zone Management Act, and the U.S. Fish and Wildlife Service and National Marine Fisheries Service for compliance with Section 7 of the Endangered Species Act, Marine Mammal Protection Act, and Magnuson- Stevens Fisheries Conservation and Management Act. Additional compliance requirements to those already captured in this specification may result from finalizing the aforementioned permits and consultations. Permits are anticipated to be obtained by 01 September 2019.
2) SF Small Boat Basin: The USCG has valid permits to conduct maintenance dredging of the SF small boat basin. The Corps permit number is 2010-00371S. Copies of the permits for this location are enclosed. However, USCG is still waiting on episode approval from the regulatory agencies for the subject dredging. The episode approval is anticipated to be obtained by 01 September 2019.
B. Preserve the natural resources within the project boundaries and outside the limits of permanent work performed under this Contract in their existing condition or restore to an equivalent or improved condition upon completion of the work. Repair or restore to original condition landscape features scarred or damaged by equipment or operations. Obtain Contracting Officer's approval before repair or restoration. Confine construction activities to areas defined by the work schedule, drawings, and specifications. Federal Acquisition Regulation clause 52.236-9 applies.
C. Except in areas indicated to be cleared, do not remove, cut, deface, injure, or destroy vegetation without special written permission from the Contracting Officer.
D. Construction equipment is to be kept in good repair, without leaks of hydraulic or lubricating fluids. If such leaks or drips do occur, they shall be cleaned up immediately. Drip pans shall be utilized when vehicles are parked. Confine equipment maintenance and/or repair to one location. Control runoff in this area to prevent contamination of soils and water.
E. When working in or around water, hydraulic equipment shall be operated with vegetable oil based hydraulic fluids, not petroleum based.
F. At or before Contract completion, obliterate all signs of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess or waste materials, and all other vestiges of construction. Temporary roads, parking areas, staging areas, and similar temporary use areas where excavation has been accomplished shall be graded in conformance with surrounding areas. Restore all disturbed areas to their original condition.
G. For all work in or over water habitats, provide a debris boom approved by the Contracting Officer. Take precautions to preclude construction materials from entering the water and immediately remove any material that enters the water in the work area. Report spills of any liquids into the water habitat and take steps to preclude spread or dissipation of spilled liquids.
1.06 EELGRASS Protection:
A. Silt Curtain: A silt curtain shall be deployed around the existing eelgrass bed limits during dredging operations.
The silt curtain shall have a freeboard of 8 inches to 12 inches above the water surface and be positioned to enclose the eelgrass bed to minimize turbidity; extend below water to within 2 feet of mudline at mean lower low water (MLLW); and be suitably anchored to prevent movement. Silt curtains shall be deployed during dredging operations to ensure that adverse effects to eelgrass are minimized. A silt curtain deployment plan shall be included in the required Dredge Operation Plan prior to commencement of dredging episode.
B. Eelgrass Surveys (Option Item) - Pre-dredge and Post-dredge: The Contractor shall perform eelgrass surveys to determine the presence of eelgrass (Zostera marina and Zostera pacifica) within the dredge footprint. The pre-dredge survey shall be completed during the eelgrass growing season and no later than 10-days prior to the start of construction. The post-dredge survey shall be completed no more than 15 days after completion of work.
Submit the results in report form no later than 30 days after completion of work. The eelgrass surveys shall comply with the standards established by NOAA’s California Eelgrass Mitigation Policy and Implementing Guidelines (CEMP) (October 2014). Submit the name and qualifications of the eelgrass survey firm to conduct the eelgrass survey for approval 20 days prior to the start of construction.
Do not commence the survey until written approval of the selected firm has been received. The surveys shall use at least a 45 meter buffer area outside of the dredge footprint perimeter. The report shall include calculated square meters of eelgrass in the project and buffer areas;
a map that clearly show the location(s) of any eelgrass beds; and a brief discussion of the survey methods, survey results relative to the survey parameters (spatial distribution, aerial extent, percent vegetated cover, and turion density), observation of invasive species (caulerpa sp.), and recommendations. Data recording sheets shall also be included in the report.
1.07 EROSION AND SEDIMENT CONTROL MEASURES:
A. Burn-off of ground cover is not permitted.
B. Borrow pits are not permitted on Government property.
C. Provide necessary controls to prevent visible or measurable erosion from leaving the construction site.
1.08 CONTROL AND DISPOSAL OF WASTES: With the exception of
materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government, all wastes and demolished materials become the contractor's property and shall be removed from the job site daily.
PART 2 PRODUCTS
Not Used
DIVISION 2 – WATERWAY AND MARINE CONSTRUCTION
02 41 00 TEMPORARY REMOVAL AND RE-INSTALLATION FLOATING DOCKS
1.01 TEMPORARY REMOVAL AND RE-INSTALLATION OF FLOATING DOCKS:
This section applies to temporary removal and reinstallation of up to three Jet Docks (measuring approximately 15ft. wide x 30 ft. long each). The scope of work includes disconnecting the floating docks, tugging them away temporarily, and re-installing them in the same original configuration once dredging work is completed.
1.02 APPLICABLE PUBLICATIONS: The publications listed below
form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only:
A. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A10.6-2006 (R2016) Safety Requirements for Demolition Operations.
B. U.S. ARMY CORPS OF ENGINEERS (USACE)
EM385-1-1 (2014) U.S. Army Corps of Engineers Safety and Health Requirements Manual.
1.03 SUBMITTALS:
A. TEMPORARY REMOVAL PLAN: The Contractor shall submit a removal plan within 10-days after award. Do not begin work until authorization is received form the Contracting Officer.
1.04 REGULATORY AND SAFETY REQUIREMENTS: Comply with federal, state and local hauling and disposal regulations. IN addition to the requirements of the “Contract Clauses,” safety requirements shall conform to ANSI A10.6.
1.05 PROTECTION:
A. Existing Work: Before beginning any removal work, the Contractor shall survey the site and examine available drawings and specifications to determine the extent of the work and verify current conditions. The Contractor shall take all necessary precautions to avoid damage to existing items remaining in place, any damaged items shall be repaired or replaced as approved by the Contracting Officer. The Contractor shall coordinate the work of this section with all tor work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Provide new supports and reinforcement for existing construction weakened by demolition or removal work. Repairs, reinforcement, or structural replacement must have Contracting Officer approval.
B. Facilities: The Contractor shall isolate all electrical power or other stored energy systems and disconnect them from the dock to be removed. The Contractor is required to isolate and lock out any energized lines feeding to the dock. The Contractor shall work with assigned station personnel to identify isolation points to notify station personnel that the systems have been locked out. Where removal of existing utilities is required, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. The Contractor shall ensure that no elements determined to be unstable are left unsupported and shall be responsible for placing and securing bracing, shoring, or lateral supports may be required as a result of any cutting, removal, or demolition work performed under this contract.
1.06 RELOCATIONS: Perform the removal and reinstallation of
relocated items (floating docks) with craftsmen skilled in the trades involved. Any damages to the items during relocation process shall be repaired or replaced with new undamaged items as approved by the Contracting Officer at the Contractor’s expense.
1.07 REQUIRED DATA: Removal Plan shall include procedures for coordination with other work in progress, description of methods, and equipment to be used for each operation and of the sequence of operations. The plan shall address the schedule for removing the floating docks and the stowaway location and reinstallation plans.
1.08 USE OF EXPLOSIVES: Use of explosives is not permitted.
No used.
3.01 EXISTING FACILITIES TO BE REMOVED:
A. Floating Docks (Jet Docks): The Contractor is responsible for removing and reinstalling the floating docks. The floating docks are tied to a concrete floating docks via chains and include electrical utilities. Temporary storage and protection is the responsibility of the Contractor.
Information on Jet Docks can be obtained from Mr. Dominic Buccieri (800) 538-3625 or Dbuccieri@jetdock.com, and www.jetdock.com/index.asp. The Contractor shall inform the USCG of any deficiencies in the floating dock system prior to removal and is responsible for all repairs. The USCG will inspect the floating docks at the completion of the project for acceptance.
B. Disconnect all utilities and lock out all energy sources to the existing floating docks.
C. Cap utilities and ensure all feed lines are closed and temporarily isolated and non-operable.
D. Disconnect the floating docks.
E. Tug the floating docks to a pre-approved nearby temporary stationing location and maintain in this position until time for reinstallation.
Items A through E above shall be executed in sequence. All tugging activity shall be by pulling on the floating docks with the proper size chains/ cables/ ropes attachments and at connections properly fit for the action. Care shall be taken not to damage any components of the floats.
3.02 REINSTALLATION OF FACILITIES AFTER COMPLETION:
A. Tug the floating dock(s) back into original functioning position and secure to concrete dock. The floating docks shall be reinstalled in the same configuration as found.
mailto:Dbuccieri@jetdock.com http://www.jetdock.com/index.asp
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
35 20 23 - DREDGING
1.01 SECTION INCLUDES: This section applies to all work
required for dredging and placement of sediment. Perform all operations necessary for the removal of all materials to the required dimensions as shown on the drawings, the satisfactory disposal thereof, and all operations thereto.
If nighttime operations are to be conducted, the Contractor shall inform the Contracting Officer and comply with lighting requirements listed in Section 30 20 23:
3.02(b), below.
1.02 SUBMITTALS: Submit the following in accordance with
Section 01 30 00 “Submittals.”
A. Dredge Operations Plan: Submit a detailed dredge and disposal operations plan (DOP) of the entire dredging and dredge material disposal operation including a list of equipment, environmental controls, means of transport, and means and locations of intermediate storage or handling of dredge material. The DOP shall adhere to the permit requirements from the U.S. Army Corps of Engineers (Corps) and shall include, at a minimum, a narrative description of the proposed project specific activities and methodologies, the pre- dredge hydrographic survey, volume calculations, disposal locations, dredging plant and equipment schedule, a Notice to Mariners, a solid debris management plan, and the names and contact information for the crew.
Provide plans and procedures should gale force winds or higher be forecast. Precautions shall include, but not be limited to, closing all openings, removing all loose materials, tools and equipment from exposed locations, anchoring and tying down barge.
This submittal is required no later than 20 days prior to start of work and must be approved by the Corps prior to initiating the work.
B. Hydrographic Surveys: Submit results of hydrographic surveys taken before and after dredging. Hydrographic surveys shall be obtained for each location, the CGC ASPEN mooring and the SF small boat basin, separately. The hydrographic surveys and related drawings must include the dredged prism and side slope. The pre-dredge survey submittal is required no later than 20 days prior to dredging operations and the post-survey submittal is required prior to final acceptance of the completed work or 5 days after dredging is completed. The hydrographic surveys are to be provided in the USCG template format, as referenced in Section 01 33 00- 1.03 Design Drawings.
Include areas to be dredged with over depth allowances;
this includes existing depths, estimated quantities to be dredged for the project, estimated quantities for over depth, and material in the side slope. A post-dredge hydrographic survey is required within 30 calendar days of the last disposal activity. Include the Corps permit number, dates of dredging commencement and completion, and actual quantities dredged (identify project depth and overdepth quantities).
Hydrographic survey procedures (positioning modes, EPS calibration, accuracy requirements, depth measurements calibration, and data reduction, adjustment, processing and plotting, etc.) shall conform to industry standards similar to, or more stringent than, those found in Army Corps of Engineers Manual EM 1110-2-1003 for Hydrographic Surveying and published November 30, 2013 (http://www.publications.usace.army.mil/USACEPublications/ EngineerManuals.aspx). The contractor is responsible for installing any survey points required and shall include that information on the drawings. If necessary, a tide board shall be installed and will remain at the facility.
Include a typical cross section(s) of the dredge footprint on the drawing. The survey shall locate the shoreline including mean higher high water (MHHW) and MLLW and show it on the cross section of the survey drawing. Locate all in-water structures outfalls, cable crossings or other man made features within or adjacent to the dredge footprint and include these structures within the hydrographic survey drawing. Drawings shall be provided in AutoCAD version 2017 file format (.dwg and .xyz) using the Civil Engineering Unit Oakland standard template (Figure A), and in Adobe Pdf.
C. Dredge Volume Calculations: Submit results of actual gross and design volume of dredged material. Cover sheet shall be signed, dated, and sealed by licensed surveyor.
D. Post-Dredge Project Report: Within 30 days after the completion of the project, the Contractor shall submit a post-dredge report to document the project’s execution.
This report will be submitted to the regulatory agencies to satisfy permit requirements. At a minimum, the report shall include a narrative of the project activities, dates when work began and finished, calculated final dredging volume based on the pre and post dredge surveys, copies of the all hydrographic surveys, maps of the dredging footprint, any noncompliance issues, required monitoring logs (DSVL), environmental permitting compliance documentation, biological reports, and the disposal location of the dredged material.
E. Standard Conditions for Use of SF-DODS: Abide by the EPA and Army Corps Standard Conditions for use of SF-DODS, which will be provided upon receipt of all environmental permits. The conditions include providing a primary tracking system for recording the ocean disposal operations, posting the disposal vessel tracking data on the internet, utilizing a third party system to generate and distribute email alerts regarding any degree of apparent dumping outside Surface Disposal Zone of SF-DODS, submitting Disposal Site Verification Logs (DSVL) on a weekly basis, and including all pertinent information in the post-dredge project report.
1.03 ARTIFICIAL OBSTRUCTIONS: The USCG anticipates debris such as, but not limited to, metal bands, pallets, pieces of broken cable, rope, hose, and broken piles. The Government has no knowledge of existing wrecks or wreckages within the dredge footprint. Debris removed from the dredge area shall be removed from the water. Explosives shall not be used under any circumstance. Disposal of debris shall be the responsibility of the Contractor and disposal shall be outside the limits of the USCG property.
1.04 QUANTITY OF MATERIAL:
A. Allowable (Paid) Overdepth Prism: The depth of the allowable overdepth (paid) prism is defined by the material below project depth and above the 2ft. allowable (paid) overdepth. To cover unavoidable inaccuracies of dredging processes, removal of material to a depth of two feet below the elevation specified and within the dredging limits will be allowed. The elevation specified for the CGC ASPEN mooring is -24ft. MLLW. The elevation specified for the SF small boat basin is -10ft. MLLW for Area A and -14ft. MLLW for Area B. Note the transition area between Area A and Area B, which requires a depths between -10ft.
MLLW to -14ft. MLLW.
B. Side Slope Prism: Dredging on the side slope is authorized for this project. Excavation areas at the toe of the slope at the berth area boundary is allowed to capture sloughed material in the side slope prism. The side slopes at the side limits of the dredge area shall be 3H:1V (horizontal:
vertical) on the. Project the side slope from the dredged bottom elevation at the limits of the dredge area line outward until it intersects the existing bottom of the adjacent waterway. Excavation areas cannot extend beyond the boundary of the berth, or deeper than the unpaid overdepth elevation. Dredging on side slopes shall follow, as closely as practicable, the lines indicated on the reference drawings.
C. Slides: In the event sliding occurs in any excavation after its completion but prior to its acceptance, the Contractor shall remove such portions of the slide at no additional cost to the Government. Particular attention shall be provided to the slope nearest to the eastern edge of the float dock.
1.05 OBSTRUCTION OF WORK AREA: Sector San Francisco homeports four coastal patrol boats, seven small boats and a buoy tender (CGC ASPEN), all which may be present during dredging operations. For this reason, the Contractor is to coordinate with the COR on scheduling activities. Once on site, and if working in proximity to the vessels, keep close communication with the Captain of the buoy tender, and the small boats to ensure appropriate safety zones are observed.
The Contractor will be required to conduct the work in such manner as to avoid obstruction to USCG operations and navigation. In case the Contractor’s plan so obstructs the navigable water as to make difficult, or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work, the Contractor shall promptly remove his plant, including equipment, ranges, buoys, debris boom, and other marks placed under the contract in navigable waters or onshore. The USCG will need access to the facilities during the work period and in some instances it may be an emergency. If required, the Contractor’s plant must have the ability to be maneuvered from the boat basin immediately following direction from the USCG.
2.01 Not used.
PART 3 EXECUTION
3.01 INSPECTION: Inspect the work, keep records of work
performed, and ensure that gages, targets, ranges, and other markers are in place and usable for the intended purpose. Furnish, at the request of the Contracting Officer, boats boatmen, laborer, and materials necessary for inspecting, supervising, and surveying the work.
3.02 CONDUCT OF DREDGING WORK
A. Debris: Debris, including but not limited to man-made objects, timber, chains, anchors, miscellaneous metal objects, tires, cables, plastics, lumber, abandoned utilities, pilings, tree branches and other foreign material removed during dredging shall not be disposed of in the Government- furnished disposal and fill areas. All waste shall be disposed of properly in compliance of any federal, state and local laws
B. Removal and Disposal of Steel Reinforced Concrete Pile from the SF Small Boat Basin: The Contractor shall remove the fallen steel- reinforced concrete pile (pile) located at the last floating dock in the SF Small Boat Basin. Once removed, the pile shall be disposed of at an appropriate Contractor furnished offsite refuse location. The pile measures 18 inches square by 60 ft. long and weighs approximately 850 pounds.
C. Debris Plan: The solid debris management plan shall describe the methods for disposing of solid debris. The dredged material shall be passed through a grid with openings of not more than 10 inches in any dimension to prevent debris larger than 10 inches in diameter to enter the scow. The Contractor may propose another method, such as slurrying, that will similarly break up the dredge material. The Contractor shall submit a grid plan or an alternate plan for breaking up the material, including but not limited to procedures and equipment used to generate the slurry.
D. Equipment: The USCG and other authorized personnel shall be allowed access to all equipment and materials pertaining to this Contract for the purposes of monitoring and inspections.
E. Dredging Plant: Dredging shall be performed by mechanical (clamshell) dredge plant only. The use of a hydraulic dredge (hopper or pipeline) is prohibited for this project to avoid impacts to federally listed species.
F. Damage to Dredging Contractor’s Equipment: The Government is not liable for any damage to either the dredging Contractor’s equipment or the Offloading Contractor’s equipment that may have been sustained during the offloading process.
G. Interference with Navigation: Minimize interference with the use of channels and passages. The Contracting Officer will direct the shifting or moving of dredger or the interruption of dredging operations to accommodate the movement of vessels and floating equipment, if necessary.
H. Lights: Each night, between sunset and sunrise and during periods of restricted visibility, provide lights for floating plants, ranges, and markers. Also, provide lights for buoys that could endanger or obstruct navigation. If night work proposed, lights must be made available from sunset to sunrise for the observation of dredging operations. Lighting shall conform to the USCG requirements for visibility and color, and ensure lights point downward as not interfere with transient birds.
I. Ranges, Gages, and Lines: Furnish, set, and maintain ranges, buoys, and markers needed to design the work and to facilitate inspection. Establish and maintain gates in locations observable from each part of the work so that the depth may be determined. Suspend dredging when the gates or ranges cannot be seen or followed.
J. Plant: Maintain plant, scows, coamings, barges, and associated equipment to meet the requirements of the work.
K. Mobilization: Mobilization shall include all work required to prepare for contract work including preparing the Contractor’s dredging plant and equipment for shipment;
moving the plant, equipment, labor, materials, supplies and incidentals to the job site; making ready for dredging; and maintaining plant and equipment in working condition at the site during the dredging period.
L. Reaches: Dredging prior to Contractor Certification of the Government approved pre-dredge hydrographic survey is unauthorized. The project area is divided into two reaches, as presented in the figures and referred to as the CGC ASPEN mooring and the SF small boat basin. The Contractor shall not dredge in a reach without written approval from the COR. Written requests shall include a copy of the request for Reach Acceptance Survey for the previous reach if there is a previous reach.
M. Demobilization: Demobilization shall include all work required at the completion of the contract work to prepare the Contractor’s dredging plant and equipment shipment and to remove all plant, equipment, labor, unused supplies and incidentals from the job site, including cleaning up any land based staging site used in the prosecution of the work. Written permission from the COR shall be obtained prior to removing construction plant, equipment and materials from the project site. Structures and facilities prepared or erected for the prosecution of the contract work shall be maintained and shall not be dismantled or removed prior to the completion and acceptance of the entire work without the authorization of the COR.
N. Dispose of Excavated Material: Provide for safe transportation and disposal of dredged materials.
Transport and dispose of dredge material in the area designated for disposal of dredged material. The deposit of dredged materials in unauthorized places is forbidden.
O. Method of Disposal: The material excavated from the boat basin shall be transported by barge to the disposal location indicated. The Contractor shall ensure compliance with the provision of this Specification Section and the regulatory permits.
P. Salvaged Material: Anchors, chains, firearms, and other articles of value, which are brought to the surface during dredging operations, shall remain or…
This is the start of the file's text. The full file is on GovTribe.