70Z08520RP4501500 Page 1

USCG POLAR HUBS OVERHAUL

NOTICE FOR FILING AGENCY PROTESTS

United States Coast Guard Ombudsman Program

It is the policy of the United States Coast Guard to issue solicitations and make contract awards in a fair and timely manner. Parties who believe a specific procurement is unfair or otherwise defective are encouraged to use the Coast Guard Ombudsman Program for Agency Protests (OPAP), rather than filing a protest with the Government Accountability Office (GAO) or other external forum. The OPAP is designed to resolve contractor protests in a faster, less expensive manner. Concerns of interested parties can be resolved through independent, government binding adjudication taking place outside the procuring activity's chain of command.

How do I file an agency protest?

Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the contracting officer or Ombudsman.

Informal Forum Interested parties should first direct their concerns to the responsible contracting officer. If the contracting officer is unable to satisfy the concerns, the interested party is encouraged to contact the OPAP. Under this informal process, the agency is not required to suspend contract award performance. In order to ensure a timely response, interested parties should provide the following information: solicitation/contract number, contracting office, contracting officer, and solicitation closing date (if applicable).

Formal Agency Protest Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the contracting officer through open and frank discussions. If the protester’s concerns are unresolved, the protester may file a formal agency protest with the contracting officer or the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined to be in the best interest of the government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. If the protester fails to submit the required information, as outlined in Federal Acquisition Regulation (FAR) 33.103, resolution of the protest may be delayed or the protest may be dismissed. To be timely, protests must be filed within the period specified in FAR 33.103(e).

Protests filed under the OPAP program should be submitted to:

Department of Homeland Security United States Coast Guard (CG-91) Ombudsman Program for Agency Protests Email: OPAP@uscg.mil

For questions pertaining to the OPAP program, please contact the Ombudsman hotline at 202- 372-3695.

70Z08520RP4501500 Page 2

Commander

U.S. Coast Guard Surface Forces Logistics Center

SFLC-CPD-C&P2-LREPL

1301 Clay Street, Suite 800 N

Oakland CA 94612

REQUEST FOR PROPOSAL

70Z08520RP4501500

USCG POLAR HUBS OVERHAUL FY 2020 - 2025

TABLE OF CONTENTS

TITLE PAGES

SF 1449, Solicitation/Contract/Order for Commercial Items Continuation of SF 1449 3-6 FAR 52.212-4 Contract Terms and Conditions-Commercial Items Addendum 7-26

FAR 52.212-5 Contract Terms and Conditions Required to Implement 26-36 Statutes and Executive Orders – Commercial Items

FAR 52.212-1 Instructions to Offerors Addendum 36-42 FAR 52.212-2 Evaluation-Commercial Items Addendum 42-50

FAR 52.212-3 Representations and Certifications-Commercial Items Alt I Addendum 50-78

Contract Documents/Exhibits and/or Attachments Price Schedule Attachment 1

Specifications Attachment 2

Request for Clarification Form Attachment 3

Government Property Report Attachment 4

DHS 11000-6 Non-Disclosure Agreement Form Attachment 5

Past Performance Questionnaire Attachment 6

70Z08520RP4501500 Page 3

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

70Z08520RP4501500

6. SOLICITATION

ISSUE DATE

1 APR 2020

7. FOR

SOLICITATION

INFORMATION

CALL:

a. NAME

Lee Thomas

b. TELEPHONE NUMBER (no collect calls)

(206) 217-6870

8. OFFER DUE DATE/

LOCAL TIME

1 MAY 2020, 9:00

a.m. Pacific Time

9. ISSUED BY CODE 75174

USCG Surface Forces Logistics Center Attn: Lee Thomas 1301 Clay Street, Suite 800N Oakland CA 94612

E-mail: Lee.F.Thomas@uscg.mil

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 %FOR:

SMALL BUSINESS WOMEN-OWNED SMALL

BUSINESS (WOSB)

HUBZONE SMALL NAICS:

BUSINESS ECONOMICALLY DISADVANTAGED 336611

WOMEN-OWNED SMALL (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED SIZE STANDARD:

SMALL BUSINESS 8(A) 1250 employees

11. DELIVERY FOR FOB

DESTINATION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT

TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER DPAS (15

CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE

See Description of Supplies/Services

16. ADMINISTERED BY CODE

Same as block 9

17a. CONTRACTOR/ CAGE CODE FACILITY

OFFEROR CODE

DUNS No.

TELEPHONE NO:

FAX NO:

18a. PAYMENT WILL BE MADE BY CODE

Commanding Officer USCG Finance Center 1430A Kristina Way Chesapeake, VA 23326

(800) 565-5504

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH

ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

The Contractor shall perform ship repair services in support of USCGC POLAR STAR (WAGB 10) in accordance with this solicitation and the specification, USCGC POLAR CLASS ICEBREAKER Specification to Repair Polar Class Icebreaker Controllable Pitch Propeller Hub Assembly (Rev-0, 6 February 2018), Attachment 2. Scope of work shall include ship repair and associated support work, and may include work that is not currently listed as Definite Items. Price Schedule is provided as a separate document (Attachment 1 – Price Schedule).

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (FOR GOVT USE ONLY)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 & 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND

RETURN 1COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO

FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE

IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REFERENCE _____

OFFER DATED___. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY

ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO

ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

31a. UNITED STATES OF AMERICA (SINGATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER

31c. DATE SIGNED

70Z08520RP4501500 Page 4

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (Rev. 2/2012)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA – FAR (48 CFR) 53.212

19.

ITEM

NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER

34. VOUCHER NUMBER

35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT

COMPLETE PARTIAL FINAL

37. CHECK

NUMBER

PARTIAL FINAL

38. S/R ACCOUNT

NUMBER

39. S/R VOUCHER NUMBER

40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

42 a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD)

42d. TOTAL

CONTAINERS

70Z08520RP4501500 Page 5

CONTINUATION OF SF 1449 – BLOCKS 17a - 25

(1) Block 17a: Offeror shall include company’s name, address and DUNS number.

(2) Block 17b: REMITTANCE ADDRESS: Payment will be made to the Financial Institution listed in System for Award Management (SAM). To receive award Offeror must be registered in SAM (copy and paste www.sam.gov into search engine).

(3) Block 19 through 24: SEE ATTACHMENT 1, PRICE SCHEDULE

(4) Block 25: ACCOUNTING AND APPROPRIATION DATA: To be included on contract award document.

ALL OFFERORS ARE RESPONSIBLE FOR VERIFYING THE RECEIPT OF THEIR

PROPOSALS.

PROPOSAL SUBMITTAL PROCEDURES: E-mail proposal is the preferred form of submittal for the proposal. Please note that emails are restricted to 10MB in size. Faxed and mailed proposals will not be accepted. When submitting proposals by email, please submit the electronic copy to Lee.F.Thomas@uscg.mil and courtesy copy Ian.S.Weiss@uscg.mil. All submissions shall include the solicitation number in the subject line of the email at a minimum.

These submission instructions will also apply to any future correspondence, as applicable, in response to this solicitation.

PERFORMANCE PERIOD: 01 July 2020 through 30 June 2021.

PLACE OF PERFORMANCE: Contractor’s provided facility. The offeror shall specify its facility in which it will perform the work under the contract. Such facility shall be located on the west coast of the United States (WA, OR, CA).

QUESTIONS: All questions shall be submitted via email to Lee.F.Thomas@uscg.mil with a courtesy copy to Ian.S.Weiss@uscg.mil using the Request for Clarification Form, Attachment 3.

The last day to ask questions regarding this solicitation is 15 APR 2020 at 12:00 p.m. Pacific Time. After this date further requests may not be accepted due to time constraints.

REQUIRED DOCUMENTS: Each offeror shall furnish the information required by the solicitation which includes:

a) Completed and Signed SF Form 1449 with Offeror’s address, DUNS number, and other required information;

b) Any issued Amendments to the Solicitation, acknowledged and signed;

c) Price Proposal (ATTACHMENT 1, Price Schedule). Insert unit price in all CLINS listed in the schedule (see FAR 52.212-1 and 52.212-2 including Addendums);

d) Technical Capability Proposal (see FAR 52.212-1 and 52.212-2 including Addendums);

e) Past Performance Proposal (see FAR 52.212-1 and 52.212-2 including Addendums);

70Z08520RP4501500 Page 6

f) List the names of ALL Sub-Contractor’s that your company intends to subcontract for the CLIN Item(s) listed in the Schedule of Supplies/Services.

g) Welding Certifications and Procedures;

h) Proof of Insurance (Statement of coverage from current insurance carrier); and

i) All provisions/clauses in this solicitation that require contractor response, including a completed copy of the provision at FAR 52.212-3 Offerors Representation and Certifications – Commercial Items OR Offeror’s must include a completed copy of FAR 52.212-3 with their proposal OR provide notice of registration at www.sam.gov.

j) Completed DHS 700-23 DHS Subcontracting Plan Review Checklist (Applicable to Large Businesses only).

70Z08520RP4501500 Page 7

CONTRACT CLAUSES

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS

(OCT 2018) ADDENDUM

(1) FAR 52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of Deputy Chief of Contracting Office (SFLC) and shall not be binding until so approved.

(2) FAR 52.216-18 ORDERING (OCT 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from the date of award through contract completion.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract.

In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

(End of clause)

(3) FAR 52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $500, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor-

(1) Any order for a single item in excess of $4,000,000;

(2) Any order for a combination of items in excess of $8,000,000; or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to

70Z08520RP4501500 Page 8 order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs(b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 7 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(4) FAR 52.216-22 INDEFINITE QUANTITY (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after contract completion.

(5) FAR 52.217-7 OPTION FOR INCREASED QUANTITY – SEPARATELY PRICED

LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within twenty-four hours via e-mail.

70Z08520RP4501500 Page 9

Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(6) FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:

https://www.acquisition.gov/

FAR 52.203-12

Limitation on Payments to Influence Certain Federal Transaction (OCT 2010)

FAR 52.215-21

Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data – Modifications( OCT2010)

Alternate II (OCT1997) FAR 52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) Alternate I (JUL 1995)

FAR 52.223-12

Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016)

FAR 52.227-14 Rights in Data -- General (May2014) Alt IV (Dec2007) FAR 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) FAR 52.242-2 Production Progress Reports (APR 1991) FAR 52.245-1 Government Property (JAN 2017) Alt I (Apr 2012) FAR 52.245-9 Use and Charges (APR 2012) FAR 52.247-34 F.o.b. Destination (Nov 1991) HSAR 3052.205-70 Advertisement, Publicizing Awards, and Releases (SEP 2012) HSAR 3052.211-70 Index for Specifications(Dec2003)

HSAR 3052.217-91 Performance. (USCG) (DEC 2003) HSAR 3052.217-92 Inspection and Manner of Doing Work. (USCG)(DEC 2003) HSAR 3052.217-93 Subcontracts. (USCG)(DEC 2003) HSAR 3052.217-95 Liability and Insurance (DEC 2003) HSAR 3052.217-96 Title. (USCG)(DEC 2003) HSAR 3052.217-97 Discharge of Liens. (USCG) (DEC 2003) HSAR 3052.217-98 Delays. (USCG)(DEC 2003) HSAR 3052.217-99 Department of Labor Safety and Health Regulations for Ship Repair (DEC

2003) HSAR 3052.217-100 Guarantee. (USCG)(JUN 2006) HSAR 3052.219-71 DHS mentor-protégé program(JUN 2006) HSAR 3052.222-70 Strikes or Picketing Affecting Timely Completion of the Contract

Work(Dec2003) HSAR 3052.222-71 Strikes or Picketing Affecting Access to a DHS Facility (DEC2003) HSAR 3052.222-90 Local Hire (JUN 2006)

70Z08520RP4501500 Page 10

HSAR 3052.223-90 Accident and Fire Reporting(Dec2003) HSAR 3052.242-72 Contracting Officer’s Technical Representative.(DEC 2003) HSAR 3052.247-72 F.o.B. Destination Only.(DEC 2003)

(7) FAR 52.252-6 - AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any Homeland Security Acquisition Regulation (48 CFR Chapter 30) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

(8) VOLATILE ORGANIC COMPOUNDS (VOC) REGULATIONS

(a) Contractors are required to comply with federal, state and local VOC compliance laws and regulations.

(b) Contractors, therefore, must submit the following to the designated Port Engineer not later than two weeks after contract award:

1) Copies of any federal, state or local permits required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places;

2) Copies of any compliance plans required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places.

(c) If no federal, state or local permits or compliance plans are required and applicable to the use or application of VOCs at Contractor’s facility or offsite workplaces, then Contractor shall submit to the designated Port Engineer a letter, notarized under oath, that such documents are not required.

(d) Contractors will submit the following to the designated Port Engineer not later than two weeks after contract award: Data Sheets (MSDS) documents, certificates, specifications or any other manufacturing data verifying the VOC ratings of paints to be applied to the Cutter in accordance with MLCA Standard Spec 63000N, Section 5.3.1.

(9) ACCESS TO VESSEL

(a) A reasonable number of officers, employees, and associates of the Government shall, as authorized by the Contracting Officer, have, at all reasonable times, admission to the plant, and access to vessel(s) to perform and fulfill their respective obligations to the Government on a noninterference basis. Work hours for the vessel will be discussed at the Arrival Conference.

70Z08520RP4501500 Page 11

Any work performed outside of those hours will be allowed at the sole discretion of the Contracting Officer.

The Contractor shall make reasonable arrangements with the Government to be given admission to the Contractor's facilities and access to the vessel(s) and to office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of their respective responsibilities and reasonable to their performance. All such above personnel shall be required to comply with all Contractor rules and regulations governing personnel at its shipyard, including those relative to safety and security.

(b) The Contractor further agrees, as authorized by the Contracting Officer, to afford to a reasonable number of officers, employees, and associates of bidders on other contemplated work, the same privileges of admission to the Contractor's plant and access to the vessel(s) on a noninterference basis subject to all Contractor rules and regulations governing personnel in its shipyard, including those relative to safety and security.

(c) ASSOCIATE CONTRACTOR AGREEMENT. After award, the Contractor shall enter into an Associate Contractor Agreement, if applicable, with one or more other prime contractors with the Government who will be present and performing work on the vessel during the dry dock availability.

(10) ASSOCIATE CONTRACTOR CLAUSE

(1) This clause is intended to ensure that there will be appropriate integration of work by the USCGC POLAR STAR associate contractors to maximize coordination and prevent delay or additional costs.

(2) The Firm Fixed-Price (FFP) for each Work Item in Attachment 1, Price Schedule shall include all costs associated with the Prime Contractor executing each requirement stipulated in the Associate Contractor Agreement (“ACA”) as required by this clause, in support of this contract.

(3) For purposes of this clause, the Associate Contractor, known at this time, is defined as:

(a) Prime Contractor, under 70Z08520CP4501500.

(b) Additional contractors may be identified at a later date.

(4) The Associate Contractors shall work and maintain close liaison with each other. In order to assure accomplishment of this objective, the Associate Contractors shall enter into a written ACA with each other.

(5) The ACA shall provide for a complete and unbiased exchange of scheduling information to include work locations. The following shall be included in the ACA:

70Z08520RP4501500 Page 12

(a) Identification of the information to be furnished between the Associate Contractors. This shall, at a minimum, include the schedule and locations of work to be performed.

(b) Services to be provided by one Associate Contractor to another [if applicable]

(c) The materials to be provided between the Associate Contractors during performance. [if applicable]

(d) In accordance with Specification General Requirements (para. 3.5), the Prime Contractor shall hold a weekly progress meeting, and also daily production meetings.

(i) At the daily production meetings, Associate Contractors shall attend and participate to resolve any potential conflicts in the work schedule for that day, so as to minimize delay, disruption or overlapping work.

(ii) At the weekly progress meetings, the Associate Contractors shall provide an integrated and de-conflicted master planning document for review by the USCG COR. Associate Contractors shall meet together prior to the weekly progress meeting to develop this master planning document.

(iii) The Associate Contractors are responsible to resolve all planning conflicts. However, the USCG COR reserves the right to serve as final decision authority when needed to ensure timely schedule completion and/or that Operational Commander’s priorities are met.

(e) The ACA may also address treatment of any proprietary or confidential information. [if applicable]

(6) Following execution by both Associate Contractors, the ACA may be made an attachment to this contract. The ACA is for information purposes only and shall not be subject to or governed by this contract. In the event of a conflict between the terms of this contract and terms of the ACA, the terms of this contract shall control.

(7) Where the Associate Contractors fail to agree upon action to be taken in connection with their respective responsibilities, each of them shall promptly notify the COR responsible for their respective contract and furnish their recommendations for a solution. The Associate Contractors shall not be relieved of its obligations to make timely deliveries or be entitled to any other adjustment because of their failure to: (a) resolve ACAs disputes; (b) promptly refer matters to the COR assigned to their respective contract; or (c) to implement any direction given by the COR assigned to their respective contract.

(11) INDEMNIFICATION FOR ACCESS TO VESSELS

Notwithstanding any provision in the "Access to Vessels" clause, or any other clause of the contract, the Contractor agrees to allow officers, employees, and associates of the Government, or other prime Contractors with the Government and their subcontractors, and officers, employees, and associates of Offeror on other contemplated work, admission to the Contractor's facilities and access to the vessel equipment without any further request for indemnification from any party at no additional cost to the Coast Guard.

70Z08520RP4501500 Page 13

(12) INSPECTIONS

Except as specified elsewhere, the U.S. Coast Guard shall rely on the Contractor to accomplish all inspection and testing needed to ensure that the work conforms to contract quality requirements.

Records of all inspection work by the Contractor shall be kept complete and available to the Government during the term of this contract and for such longer period as may be specified elsewhere in this contract.

The name and telephone number of the U.S. Coast Guard Inspector will be provided after the award of a contract resulting from this solicitation.

(13) COMPOSITE LABOR RATE

The composite labor rate offered shall be the sole labor hour rate used to price the Prime Contractor's direct labor hours for contract changes, i.e. growth work. The Contractor shall not receive any compensation in addition to this rate for the Prime Contractor's direct labor associated with such changes under this contract.

(a) The composite labor hour rate shall represent total compensation for the following:

(1) direct labor wages and salaries;

(2) all employee benefits including, but not limited to, paid leave, supplemental pay, insurance, retirement, savings, and legally required benefits;

(3) other direct costs associated with transit time, delay, disruption, expendable supplies, and equipment;

(4) all indirect costs such as overhead and general and administrative expense;

(5) any port or association fees, rents, or other levies;

(6) profit (fee); and

(7) all direct and indirect costs and profit associated with the following support functions:

Supervision and Management Quality Assurance Planning Engineering Surveyors Worker Transit Time Material Handling Testing Housekeeping Security Guard Estimating Contract Administration Transportation Drivers

(b) The composite labor hour rate will be applied to production labor hours only. Production labor hours include only those hours necessary and reasonable to perform direct production

70Z08520RP4501500 Page 14 functions and do not include the hours expended on the support functions listed above. This exclusion of support function hours applies whether such support functions are normally charged directly or indirectly by the Contractor's accounting system. These support functions are to be priced into the composite labor rate quoted and shall not be separately compensated.

(c) The Quantity of Composite Labor hours indicated in the Schedule of Supplies/Services, is only an estimate and is an Optional Item pursuant to this solicitation. The Estimated Quantity represents the Government’s best estimate of the total number of additional hours that may be required throughout the contract. The Government may elect to exceed this value at the prices stated in the schedule and its discretion during performance of the contract. The inclusion of this item does not obligate the Government to exercise the item nor entitle the Contractor to compensation if not exercised.

(d) For materials and subcontractor costs the mark-up/loading rate percentage may include the Prime Contractor’s general & administrative, overhead and profit rates. This inclusive mark-up/loading rate shall be used for all change requests.

(14) DISCOVERIES AND CHANGES TO CONTRACT

Condition Found Report, and Change Requests will be transmitted electronically by using email.

The bullets below display the process of how these documents are to be followed for the duration of the contract performance period:

(a) Condition Found Report (CFR) - All readings and inspections are to be taken within 24 hours after the machinery or system is opened. All reports of reading and inspections required by the specifications shall be submitted to the COR in writing using a "Condition Found Report (CFR)" form, within 24 hours after the readings and/or inspections are made.

Promptness in taking and reporting readings is particularly important for underbody work items such as shaft bearing or rudder bearing clearances. Often during the progress of a work item, conditions are discovered by the Contractor which are considered abnormal for reasons of safety, expected reliability, health, or habitability. These conditions must be brought to the attention of the Coast Guard using a CFR. Details provided by the Contractor in a CFR are important because the CFR may result in a contract change. To speed the contract change progress, the Contractor should include in his/her CFR the following details as a minimum:

(i) A sequential number.

(ii) The contract item which the "CFR" relates to.

(iii) A clear statement, definition, and description of the condition found, including but not limited to frame numbers, part numbers, materials and dimensions as appropriate.

(iv) A proposed or recommended repair to correct the defective condition.

(v) Indicate whether the report requires Cost Guard action, or if it is provided "for info"

70Z08520RP4501500 Page 15 only. If action is required, indicate the response time required by the Coast Guard and whether or not a contract extension would be needed if the additional work is authorized.

(vi) A space on the form for the Coast Guard to make comments.

(vii) All CFR's shall be dated, submitted, and signed by a representative of the Contractor. Contracting Officer’s Representative (COR) will respond to the Contractor’s within 24 hours of receiving a Condition Found Report. A copy of ALL condition found reports shall be retained in the Cutter’s file.

(b) Change Request Process:

1. Condition Found Report-Generated by the Contractor and provided to COR .

2. Condition Report Reply-Generated by the COR and provided to Contractor

3. Change Request- CR and IGE are generated by the COR and entered in the Contract Workbook. COR will assign the Change request number.

4. COR provides copy of Change Request to the Contractor

5. Contractor’s Proposal- Provided to the KO for the identified tasking on CR

6. Negotiations- If needed, take place to establish pricing

7. Approved Change Request- Forwarded to Contractor and COR by the KO

The Change Request must be submitted by the COR to the Contractor within 24 hours after responding to the CFR. Contractor must submit proposal to the Contracting Officer within 72 hours receipt of the Change Request.

A modification will be issued to incorporate and implement all changes made by Change Requests.

(15) CONTRACT DEFICIENCY REPORT

The Contracting Officer or Contracting Officer’s Representative (COR) may issue a Contract Deficiency Report (CDR), SFLC Form 005. The Contractor shall respond in writing within 24 hours of receipt, unless otherwise approved by the Contracting Officer, to the COR. The COR will comment on the Contractor's response and will forward the Deficiency Report and comments to the Contracting Officer, with a copy to the Contractor and Availability Program Manager. The Contracting Officer will render a final determination and provide it to the Contractor and COR in writing.

(16) MAINTAINING, REPORTING, AND DISPOSING OF GOVERNMENT

PROPERTY IN THE PERFORMANCE OF A SHIP REPAIR CONTRACT

1. The Government Property Clause incorporated by reference delineates the Contractor's overall responsibility when taking possession of government property in performance of a contract. In performance of this contract the Contractor is required to properly identify, track and control property within its possession. This includes, a) property furnished by the government (GFP) to the Contractor in conjunction with specific work items under the CLINs. These items and their values are listed in the specification, b) property that is pre-existing in a location that during the

70Z08520RP4501500 Page 16 course of performance shall be replaced or renewed.

2. The items listed in the specification, as government furnished property shall be provided in the quantities designated. Government furnished property may be provided in person by an official Coast Guard employee, shipment via commercial carrier, etc. The Contractor shall sign for all government furnished property using either a DD Form 1149, entitled, “Requisition and Invoice/Shipping Document” or a DD Form 1348, entitled, “Issue Release/Receipt Document”. A copy of the DD 1149 or DD 1348 must be sent within 48 hours of receipt of property, to the designated Government Property Administrator. The name of the individual assigned as Property Administrator will be furnished to the Contractor at time of award. The Contractor shall not take receipt of property that is not listed in the specification, has not been previously identified as becoming part of the contract (via contract modification) or which otherwise cannot be identified. Such irregularities shall be immediately reported to the Property Administrator.

3. The Contractor shall complete the report provided herein, entitled, “Government Property Report”. This report is intended as a living document whereby relevant fields shall be filled in, maintained and kept current at all times. All property described in paragraph 1 (a and b) above shall be reported on the report. At contract completion the Contractor and the Property Administrator shall ensure that all fields are appropriately completed. A signature block is provided at the end of the report for both parties to attest to the report's accuracy and completeness. The Government Property Report shall clearly delineate the complete track that all Government property took over the course of the contract. This completed report must accompany the Contractor's final invoice. Final payment may be delayed, without penalty of interest, until such time as the report is received. A separate copy of the completed report and any final DD 1149s or DD 1348s executed, as a result of carrying out disposition instructions shall be provided to the Property Administrator.

4. Pursuant to the Government Property Clause the authority to render disposition instructions of Government property associated with this contract is delegated to the Property Administrator.

The Contractor shall comply with all instructions in the contract for the return of government property to the Coast Guard. This includes government property taken off the vessel (shafts, propellers, etc.), government property returned to the vessel (special tools, etc.) or surplus government property not used during performance of the contract.

(17) INSURANCE

a. The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract, at least the kinds and minimum amounts of insurance required by this Clause as follows:

TYPE AMOUNT

70Z08520RP4501500 Page 17

1) Workman's Compensation and Employer's Liability

As legally required by the State wherein the work is being performed.

2) Comprehensive General Liability Insurance (including vessel liability reference HSAR 3052.217-95)

Personal Injury Liability:

$1 million per person $1 million per occurrence

Property Damage (may be included in general aggregate limits or combined single unit coverage) $1 million per occurrence

3) Automobile Liability Personal Injury Liability:

$1 million per person $1 million per occurrence

Property Damage (may be included in general aggregate limits or combined single unit coverage):

$1 million per occurrence

4) If single general aggregate limits or combined single unit coverage is obtained for General Liability and/or Automobile Liability coverage, minimum amounts shall be the sum of the personal injury and property damage coverage required above. Umbrella Form Excess Liability insurance coverage shall be added to general liability and automobile liability coverage to determine if minimum insurance limits are met.

b. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

c. As evidence that it has obtained the insurance specified in paragraph (a) of this clause, the contractor shall furnish the Contracting Officer with a certificate or certificates executed by an agent of the insurer authorized to execute such certificates. Such certificates shall be furnished prior to commencement of the work. Each certificate shall state that (name of insurer) has insured (name of contractor) awarded contract number (to be determined at time of award) for repair/alteration of applicable USCG ship in accordance with the Liability and Insurance clause and the Insurance Requirements clause contained herein.

70Z08520RP4501500 Page 18

d. The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

e. "Government Installation" for this clause includes government vessels.

(18) CONTRACTING OFFICER’S AUTHORITY

No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.

(19) CONTRACTOR PERFORMANCE EVALUATION

(a) GENERAL: The U.S. Coast Guard Surface Forces Logistic Center (SFLC) will monitor and evaluate the successful Offerors past performance of this contract and prepare a Contractor Performance Assessment Reporting System (CPARS) in accordance with FAR Part 42.1502. All information contained in this assessment may be used, within the limitations of FAR 42.1502, by the government for future source selections and in accordance with FAR 15.304, when past performance is an evaluation factor for award.

(b) NOTIFICATION: Upon completion of the contract, the Contractor will be notified of the assessment. The Contractor will be allowed 60 days to respond to the SFLC’s assessment of its performance entered into CPARS. The Contractor’s response, if any, will be made part of the CPARS record.

(c) INFORMATION: Information included in the CPARS may include, but is not limited to, the Contractor’s record of conforming to contract requirements and to standards of good workmanship; the Contractor’s record of forecasting and controlling costs; the Contractor’s adherence to contract schedules, including the administrative aspects of performance; the Contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction; the Contractor’s record of integrity and business ethics, and generally, the Contractor’s business-like concern for the interest of the customer.

(d) RELEASE OF DATA: CPARS information is considered business sensitive and will not be released except: (1) to other Federal procurement activities which request it; (2) when SFLC must release pursuant to a Freedom of Information Act (FOIA) request; or (3) when prior written consent is requested and obtained from the Contractor.

70Z08520RP4501500 Page 19

(20) METHOD OF PAYMENT AND INVOICING INSTRUCTIONS

INVOICE SUBMISSION PROCESS:

1. The Contractor shall prepare a proper invoice IAW FAR clause 52.212-4, and in addition to the information required by FAR 52.212-4(g) as cited in the contract. All invoices shall be itemized to correlate to the Price Schedule including funding code designations.

(A) The Government will make payment under this contract based on a percentage or stage of completion. The Contractor may invoice for each work item under the two contract line items (CLIN) as work progresses. The amount invoiced shall be calculated based on those prices stipulated in the contract Schedule of Supplies/Services as follows:

(B) A work item may not be invoiced until the percentage complete reaches ten percent.

Future invoices for that work item have no limitation as to the percentage of completion required before invoicing. (The minimum percentage of completion (10%) to be reached prior to billing each work item may be waived by the Contracting Officer on a case by case basis for large dollar work items.) Invoices shall be accompanied with the COR signed weekly progress report.

(C) The Contractor shall invoice no more than twice per calendar month and no sooner than 14 calendar days from the date of the first or previous invoice when entered for payment at U.S. Coast Guard Finance Center website.

(D) 10% of the total contract price will be withheld as retainage. The Contractor shall withhold 10% of each submitted invoice’s total invoice amount until the Guarantee period has expired and all deliverables, required by the contract, are received and accepted by the USCG.

(E) The Contractor shall request for release of retainage via a separate invoice from billable work (i.e., billing against work items). Release of retainage may be requested after all deliverables, required by the contract, are received and accepted by the USCG and the Guarantee period has ended.

(F) Only work that has been awarded at time of contract award and/or added via modification to the contract may be invoiced for.

(G) In addition to the information required by FAR 52.212-4 (g) Invoices shall include:

1) Contract Number, Delivery Order/Task Order Number, DOC Number

2) Name and Address of the Contractor

3) Invoice Number and Invoice Date

4) DUNS Number

5) Name of the Contract Specialist and Contracting Officer’s

6) Invoice Routing Code (IRC): SFLC-2

70Z08520RP4501500 Page 20

7) Indicate Small Business Status

8) Indicate if Final Invoice for contract- The Contractor’s final invoice submitted under the contract shall be marked as follows: THIS INVOICE CONSTITUTES

THE FINAL INVOICE – UPON PAYMENT OF THIS INVOICE NO OTHER

MONIES ARE DUE UNDER CONTRACT NUMBER (list number here that will be assigned upon contract award).

9) The percentage of completion for each work item identified;

10) Vessel name

11) The overall percentage and dollar amount previously billed, currently billed and unbilled,

12) Shipping and Payment Terms

13) Name, title, phone number, and mailing address of person to be notified in the event of a defective invoice.

All information must be included in an invoice for it to constitute a proper invoice. All improper invoices will be rejected which could delay payment.

2. The Contractor shall provide the invoice to Lee.F.Thomas@uscg.mil, Contract Specialist/Officer, for review and approval before submission to COR.

3. After Contract Specialist/Officer’s review, the Contractor shall forward invoice to the Contracting Officer’s Representative (COR), for review and signature for progressed billable work accomplished to date.

4. The COR will review and verify invoices, sign the invoice, and return the invoice to the Contractor.

5. The Contractor shall complete the Contractor Invoice Submission Form (sample below).

6. The Contractor shall submit the Contractor Invoice Submission Form, a PDF file of the invoice, and any necessary documents for supplies or services via the U.S. Coast Guard Finance Center website at:

http://www.fincen.uscg.mil/electron.htm

70Z08520RP4501500 Page 21

Contractor Invoice Submission Form Directions: Please complete as much information as possible. All blocks in red text are required entries.

Note: Web-Invoices are accepted only for Coast Guard Contracts over the Simplified Acquisition Threshold (Document Type 24).

THIS WEB FORM IS NOT AN OFFICIAL INVOICE. THE OFFICIAL INVOICE MUST BE ATTACHED

Invoice Information Invoice Routing Code:

SFLC-2

(help) Invoice Number: (help)

Contract Number: (help) Invoice Date:

MM/ DD/ YY

(help)

BPA Number: (help) Invoice Amount:

0.00

(help)

Delivery/Task Order Number: (help) Discount Terms:

00.00

Discount Days:

Net Days:

(help)

Company Information Attachment of Official Invoice

Company Name: (help)

DUNS: Plus 4: (help)

Point of Contact Name: (help)

Point of Contact Email: (help)

Phone: (help) Fax: (help)

Please verify your entry on the next page. Attach invoice and any supporting documentation after verification.

Attachment must be a single PDF file no larger than 3 MB. Grey-scale PDFs are not compatible. This will be our official invoice. Supporting documentation must be combined in the single PDF file or submitted to your contracting office separately via email.

Need help creating a PDF file? Click here for instructions.

Verify

Reset

7. The Contractor must select the correct Invoice Routing Code for timely invoice processing. The Invoice Routing Code for this contract is SFLC-2.

8. Visit the U.S. Coast Guard Finance Center Website for instructions regarding invoice attachments. http://www.fincen.uscg.mil/electron_cg.htm

9. The Contractor shall send notification that the invoice was submitted for payment.

Additional work verbally agreed to by the parties that has not yet been incorporated into the contract by modification shall not be included in an invoice. Payments will not be made for any work to which a modification has not been properly executed. Invoices submitted for payment that includes such a request will be reduced by the unmodified amount.

70Z08520RP4501500 Page 22

FURTHER CONSIDERATIONS WITH INVOICING:

In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:

(1) On the later of:

(i) For invoices that are mailed the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt.

(ii) For invoices electronically transmitted by the Contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or

(ii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless—

a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or

b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date;

(2) On the date placed on the invoice by the Contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be a proper invoice); or

(3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.

(4) Web based submission by the Contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.

(5) For inquiries and payment status please visit http://www.fincen.uscg.mil/electron.htm .

The Data Universal Numbering System (DUNS) number is the primary identifier in System for Award Management (SAM), (see FAR 52.232-33, Payment by Electronic Funds Transfer – System for Award Management (Jul.2013)). Contractors are located and identified in SAM by their DUNS number. Therefore, to facilitate payment, the DUNS number shall be recorded on every invoice submitted to the U.S. Coast Guard.

70Z08520RP4501500 Page 23

All payments for partial performance rendered by the Government under this contract are based on the assumption that the Contractor shall, in good faith, execute and honor all payment terms entered into between it, the Prime Contractor, and any subcontractor thereof in the performance of this contract. The Contractor hereby acknowledges the Government’s right to reduce or suspend progress payments based on non-payment in accordance with any payment terms of the subcontract agreement.

Any amount deemed not payable will be deducted from the Contractor’s invoice. Deducted amounts may be resubmitted on the next invoice for reconsideration.

(21) PROGRESS PAYMENTS

A. The Contractor may invoice requesting progress payments without…